HomeMy WebLinkAboutRESO 10170027060524 1
Resolution No. 10170
Resolution of the Council of the City of Palo Alto Adopting the Fiber to the Premises Project
Mitigated Negative Declaration for which an Initial Study was Prepared, in accordance with the
California Environmental Quality Act and Adopting a Related Mitigation, Monitoring and
Reporting Program
R E C I T A L S
A. Prior to the adoption of this Resolution, the City of Palo Alto prepared an Initial
Study and approved for circulation a Mitigated Negative Declaration for the Fiber to the
Premises Project, (the “Initial Study/Mitigated Negative Declaration”) all in accordance with
the requirements of the California Environmental Quality Act of 1970, together with state and
local guidelines implementing said Act, all as amended to date (collectively “CEQA”).
B. The Fiber to the Premises Project analyzed under the Initial Study/Mitigated
Negative Declaration would involve the installation of approximately 194 miles of fiber optic
cables, both below ground and aerial, installation of approximately 4200 underground utility
vaults and 147 aboveground utility cabinets, and installation of approximately two local
aggregation sites either inside modular communication shelters (“fiber huts”) or enclosed
within existing commercial buildings. A more detailed description of the Project is set forth in
the Initial Study/Mitigated Negative Declaration.
C. The draft Initial Study/Mitigated Negative Declaration was made available for
public comment from May 1, 2024 through May 31, 2024.
D.The City of Palo Alto considered the comments received during the public review
period and prepared a final Initial Study/Mitigated Negative Declaration, published June 6, 2024.
E.The Initial Study/Mitigated Negative Declaration concluded that implementation
of the Project could result in a number of significant effects on the environment and identified
mitigation measures that would reduce each of those significant effects to a less-than-significant
level.
F.In connection with the approval of a project involving the preparation of an initial
study/mitigated negative declaration that identifies one or more significant environmental
effects, CEQA requires the decision-making body of the lead agency to incorporate feasible
mitigation measures that would reduce those significant environmental effects to a less-than-
significant level.
G.Whenever a lead agency approves a project requiring the implementation of
measures to mitigate or avoid significant effects on the environment, CEQA also requires the
lead agency to adopt a mitigation monitoring and reporting program to ensure compliance with
the mitigation measures during project implementation, and such a mitigation monitoring and
DocuSign Envelope ID: 694ACB9E-5D0B-48D5-92B8-3D95B8C69E07
027060524 2
reporting program has been prepared for the Project for consideration by the decision-making
body of the City of Palo Alto as lead agency for the Project (the “Mitigation Monitoring and
Reporting Program” or “MMRP”).
H.The City of Palo Alto is the lead agency on the Project, and the City Council is the
decision-making body for the proposed approval of the Project.
I.The City Council has reviewed and considered the Initial Study/Mitigated Negative
Declaration and related Mitigation Monitoring and Reporting Program for the Project, together
with comments received on the Initial Study/Mitigated Negative Declaration, and intends to take
actions on the Project in compliance with CEQA and state and local guidelines implementing
CEQA.
J.The Initial Study/Mitigated Negative Declaration and related Mitigation
Monitoring and Reporting Program for the Project are on file at the City of Palo Alto
Development Center, 285 Hamilton Avenue -- Ground Floor Palo Alto, CA 94301, and are
available for inspection by any interested person at that location, and are, by this reference,
incorporated into this Resolution as if fully set forth herein.
The Council of the City of Palo Alto does hereby RESOLVE as follows:
SECTION 1. THE CITY COUNCIL does hereby make the following findings: (1) it has
independently reviewed and analyzed the Initial Study/Mitigated Negative Declaration and other
information in the record and has considered the information contained therein, prior to acting
upon or approving the Project, (2) the Initial Study/Mitigated Negative Declaration prepared for
the Project has been completed in compliance with CEQA and is consistent with state and local
guidelines implementing CEQA, and (3) the Initial Study/Mitigated Negative Declaration
represents the independent judgment and analysis of the City of Palo Alto, as lead agency for the
Project. The City Council designates the Director of Planning and Development Services, at 250
Hamilton Avenue, 5th Floor, Palo Alto, CA 94301, as the custodian of documents and records of
proceedings on which this decision is based.
//
//
//
//
//
//
DocuSign Envelope ID: 694ACB9E-5D0B-48D5-92B8-3D95B8C69E07
027060524 3
SECTION 2. THE CITY COUNCIL does hereby find that based upon the entire record of
proceedings before it and all information received that there is no substantial evidence that the
Project will have a significant effect on the environment and does hereby adopt the Mitigated
Negative Declaration and related Mitigation Monitoring and Reporting Program prepared for the
Project. The Initial Study/Mitigated Negative Declaration is available for viewing at City of Palo
Alto Development Center, 285 Hamilton Avenue -- Ground Floor, Palo Alto, CA 94301.
INTRODUCED AND PASSED: June 17, 2024
AYES: BURT, KOU, LAUING, LYTHCOTT-HAIMS, STONE, VEENKER
NOES: TANAKA
ABSENT:
ABSTENTIONS:
ATTEST:
City Clerk Mayor
APPROVED AS TO FORM: APPROVED:
Assistant City Attorney City Manager
_____________________________
Director of Planning and Development
Services
Director of Utilities
DocuSign Envelope ID: 694ACB9E-5D0B-48D5-92B8-3D95B8C69E07
Certificate Of Completion
Envelope Id: 694ACB9E5D0B48D592B83D95B8C69E07 Status: Completed
Subject: Docusign: Resolution 10170 - Fiber to the Premises Project
Source Envelope:
Document Pages: 3 Signatures: 6 Envelope Originator:
Certificate Pages: 2 Initials: 0 Vinhloc Nguyen
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Vinhloc.Nguyen@CityofPaloAlto.org
IP Address: 199.33.32.254
Record Tracking
Status: Original
6/20/2024 5:20:03 PM
Holder: Vinhloc Nguyen
Vinhloc.Nguyen@CityofPaloAlto.org
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign
Signer Events Signature Timestamp
Aylin Bilir
Aylin.Bilir@CityofPaloAlto.org
Assistant City Attorney
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 108.211.178.63
Sent: 6/20/2024 5:27:24 PM
Viewed: 6/20/2024 5:29:08 PM
Signed: 6/24/2024 10:02:03 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Dean Batchelor
Dean.Batchelor@CityofPaloAlto.org
Director of Utilities
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 174.195.82.113
Signed using mobile
Sent: 6/24/2024 10:02:04 AM
Viewed: 6/24/2024 12:50:11 PM
Signed: 6/24/2024 12:50:20 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Jonathan Lait
Jonathan.Lait@CityofPaloAlto.org
Director, Planning and Development Services
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Uploaded Signature Image
Using IP Address: 99.88.42.180
Sent: 6/24/2024 12:50:21 PM
Viewed: 6/25/2024 11:40:48 AM
Signed: 6/25/2024 11:43:32 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Ed Shikada
Ed.Shikada@CityofPaloAlto.org
Ed Shikada
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/25/2024 11:43:34 AM
Viewed: 6/26/2024 10:35:42 AM
Signed: 6/26/2024 10:35:46 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Signer Events Signature Timestamp
Greer Stone
greer.stone@cityofpaloalto.org
Vice Mayor
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 46.193.128.104
Sent: 6/26/2024 10:35:48 AM
Viewed: 6/27/2024 9:17:39 AM
Signed: 6/27/2024 9:17:46 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Mahealani Ah Yun
Mahealani.AhYun@CityofPaloAlto.org
City Clerk
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/27/2024 9:17:47 AM
Viewed: 7/1/2024 10:37:02 AM
Signed: 7/1/2024 10:37:11 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 6/20/2024 5:27:25 PM
Envelope Updated Security Checked 6/20/2024 5:35:31 PM
Envelope Updated Security Checked 6/20/2024 5:35:31 PM
Envelope Updated Security Checked 6/20/2024 5:35:31 PM
Envelope Updated Security Checked 6/20/2024 5:35:31 PM
Envelope Updated Security Checked 6/20/2024 5:35:31 PM
Envelope Updated Security Checked 6/20/2024 5:35:31 PM
Envelope Updated Security Checked 6/20/2024 5:35:31 PM
Certified Delivered Security Checked 7/1/2024 10:37:02 AM
Signing Complete Security Checked 7/1/2024 10:37:11 AM
Completed Security Checked 7/1/2024 10:37:11 AM
Payment Events Status Timestamps