HomeMy WebLinkAboutRESO 10162
180321 cc 0260111
Resolution No. 10162
Resolution of the Council of the City of Palo Alto to Adopt a List of
Projects for Fiscal Year 2024-2025 Funded by SB 1: The Road Repair
and Accountability Act of 2017
R E C I T A L S
A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 in order to address the significant multi-modal transportation funding shortfalls
statewide; and
B. SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of Palo Alto (City) are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
C. The City must adopt a list of all projects proposed to receive funding from the
Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which
must include a description and the location of each proposed project, a proposed schedule for
the project’s completion, and the estimated useful life of the improvement; and
D. The City, will receive an estimated $1,753,076 in RMRA funding in Fiscal Year
2024-2025 from SB 1; and
E. This is the seventh year in which the City is receiving SB 1 funding which enables
the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1; and
F. The City used a Pavement Management System to develop the SB 1 project list
to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the community’s priorities for transportation investment; and
G. The funding from SB 1 will help the City maintain and rehabilitate various streets
throughout the City this year and many similar projects into the future; and
H. The 2018 California Statewide Local Streets and Roads Needs Assessment found
that the City’s streets and roads are in “excellent” condition and this revenue will help us
maintain the overall quality of our road system and implement complete streets projects over
the next decade; and
I. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows:
SECTION 1. The foregoing recitals are true and correct.
DocuSign Envelope ID: 08911D70-53C7-4D35-80DF-2E26F42EF300
180321 cc 0260111
SECTION 2. The City of Palo Alto hereby adopts the following list of streets planned to
be funded in-part or solely with fiscal year 2024-2025 with Road Maintenance and
Rehabilitation Account revenues:
FY 2025 Street Resurfacing Project includes pavement repair, sidewalk, valley gutter, curb and
gutter replacement, upgraded curb ramps, and street paving. The following streets are included
in the FY2025 Street Resurfacing Project: Addison Avenue (Alma Street to Middlefield Road),
Chaucer Street (Palo Alto Avenue to City Limits), Downing Lane (Forest Avenue to Homer
Avenue), Edgewood Drive (Channing Avenue to Edgewood Cul-de-sac1), Embarcadero Road
(High Street to Under Pass), Embarcadero Road (Emerson Street to High Street), Embarcadero
Road (Greer Road to Saint Francis Drive), Genevieve Court (Maddux Drive to End), Higgins Place
(Colorado Avenue to End), Kendal Avenue (Josina Avenue to La Donna Avenue), New Mayfield
Lane (Sedro Lane to Mimosa Lane), Ortega Court (East Meadow Drive to End), San Antonio
Road (Narrow to Metering Station), University Avenue (Webster Street to Middlefield Road),
University Avenue (Stanford University to The Circle).
The estimated useful life is 30 years. Construction of FY2025 Street Resurfacing Project will start
in Fall 2024 and be completed in Summer 2025.
//
//
//
//
//
//
//
//
//
//
//
//
//
//
DocuSign Envelope ID: 08911D70-53C7-4D35-80DF-2E26F42EF300
180321 cc 0260111
SECTION 3. The Council finds that the adoption of this resolution does not meet the
definition of a project under Public Resources Code Section 21065, thus no environmental
assessment under the California Environmental Quality Act is required.
INTRODUCED AND PASSED: May 20, 2024
AYES: BURT, KOU, LAUING, LYTHCOTT-HAIMS, STONE, VEENKER
NOES: TANAKA
ABSENT:
ABSTENTIONS:
ATTEST:
__________________________ _____________________________
City Clerk Mayor
APPROVED AS TO FORM: APPROVED:
__________________________ _____________________________
Assistant City Attorney City Manager
_____________________________
Director of Public Works
_____________________________
Director of Administrative Services
DocuSign Envelope ID: 08911D70-53C7-4D35-80DF-2E26F42EF300
Certificate Of Completion
Envelope Id: 08911D7053C74D3580DF2E26F42EF300 Status: Completed
Subject: Docusign: Resolution 10162 - SB1
Source Envelope:
Document Pages: 3 Signatures: 6 Envelope Originator:
Certificate Pages: 2 Initials: 0 Vinhloc Nguyen
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Vinhloc.Nguyen@CityofPaloAlto.org
IP Address: 199.33.32.254
Record Tracking
Status: Original
6/3/2024 9:04:48 AM
Holder: Vinhloc Nguyen
Vinhloc.Nguyen@CityofPaloAlto.org
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign
Signer Events Signature Timestamp
Mark Vanni
Mark.Vanni@CityofPaloAlto.org
Assistant City Attorney
COPA
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 146.75.154.155
Sent: 6/3/2024 9:12:29 AM
Viewed: 6/3/2024 12:58:19 PM
Signed: 6/3/2024 12:58:25 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Lauren Lai
lauren.lai@cityofpaloalto.org
Director Administrative Services/CFO
COPA
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 199.33.32.254
Sent: 6/3/2024 12:58:26 PM
Viewed: 6/3/2024 4:10:29 PM
Signed: 6/3/2024 4:11:17 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Brad Eggleston
Brad.Eggleston@CityofPaloAlto.org
Director of Public Works
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/3/2024 4:11:19 PM
Viewed: 6/3/2024 4:17:57 PM
Signed: 6/3/2024 4:18:05 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Ed Shikada
Ed.Shikada@CityofPaloAlto.org
Ed Shikada
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/3/2024 4:18:06 PM
Viewed: 6/3/2024 4:52:55 PM
Signed: 6/3/2024 4:53:05 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Signer Events Signature Timestamp
Greer Stone
greer.stone@cityofpaloalto.org
Vice Mayor
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 199.33.33.245
Sent: 6/3/2024 4:53:06 PM
Viewed: 6/3/2024 6:33:25 PM
Signed: 6/3/2024 6:33:38 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Mahealani Ah Yun
Mahealani.AhYun@CityofPaloAlto.org
City Clerk
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/3/2024 6:33:40 PM
Viewed: 6/4/2024 7:33:48 AM
Signed: 6/4/2024 7:33:55 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 6/3/2024 9:12:29 AM
Certified Delivered Security Checked 6/4/2024 7:33:48 AM
Signing Complete Security Checked 6/4/2024 7:33:55 AM
Completed Security Checked 6/4/2024 7:33:55 AM
Payment Events Status Timestamps