Loading...
HomeMy WebLinkAboutRESO 10038180321 cc 0260111 Resolution No. 10038 Resolution of the Council of the City of Palo Alto to Adopt a List of Projects for Fiscal Year 2022-2023 Funded by SB 1: The Road Repair and Accountability Act of 2017 R E C I T A L S A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi-modal transportation funding shortfalls statewide; and B. SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Palo Alto (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and C. The City must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and D. The City, will receive an estimated $1,542,218 in RMRA funding in Fiscal Year 2023 from SB 1; and E. This is the fifth year in which the City is receiving SB 1 funding which enables the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and F. The City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and G. The funding from SB 1 will help the City maintain and rehabilitate various streets throughout the City this year and many similar projects into the future; and H. The 2018 California Statewide Local Streets and Roads Needs Assessment found that the City’s streets and roads are in “excellent” condition and this revenue will help us maintain the overall quality of our road system and implement complete streets projects over the next decade; and I. The SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows: SECTION 1. The foregoing recitals are true and correct. DocuSign Envelope ID: B1120F52-528D-41B5-9486-44A7B9CB4412 180321 cc 0260111 SECTION 2. The City of Palo Alto hereby adopts the following list of streets planned to be funded in-part or solely with fiscal year 2022-2023 with Road Maintenance and Rehabilitation Account revenues: FY 2023 Street Resurfacing Project includes pavement repair, sidewalk, curb and gutter replacement, upgraded curb ramps, and street paving. The following streets are included in the FY2023 Street Resurfacing Project: Acacia Avenue (El Camino Real to Angle), Addison Avenue (Cowper Street to Webster Street), Ash Street (California Av enue to Sherman Avenue), Bryson Avenue (Middlefield Road to End), Cambridge Avenue (Birch Street to Park Blvd), Community Lane (Harriet Street to Wilson Street), Community Lane (Newell Road to Cedar Street), Dartmouth Street (Werry Park to College Avenue), Embarcadero Way (Embarcadero Road to End), Florence Street (Lytton Avenue to University Avenue), Fulton Street (Embarcad ero Road to Tennyson Avenue), James Road (El Camino Way to Narrow), Kent Place (Center Drive to End), Lane 6 East (High Street to Emerson Street), Loma Verde Avenue (Emerson Street to Ramona Street), Loma Verde Avenue (Waverley Street to Cowper Street), Los Trancos Road (City Limits to City Limits), Morris Drive (Maddux Drive to Greer Road), Park Blvd (Park Avenue to Castilleja Avenue), Seale Avenue (Middlefield Road to Fulton Street), and Wilson Street (Hopkins Avenue to Parkinson Avenue). The estimated useful life is 30 years. Construction of FY2023 Street Resurfacing Project will start in Fall 2022 and be completed in Summer 2023. // // // // // // // // // // // // // DocuSign Envelope ID: B1120F52-528D-41B5-9486-44A7B9CB4412 180321 cc 0260111 // SECTION 3. The Council finds that the adoption of this resolution does not meet the definition of a project under Public Resources Code Section 21065, thus no environmental assessment under the California Environmental Quality Act is required. INTRODUCED AND PASSED: May 16, 2022 AYES: BURT, CORMACK, DUBOIS, KOU, STONE, TANAKA NOES: ABSENT: FILSETH ABSTENTIONS: ATTEST: __________________________ _____________________________ City Clerk Mayor APPROVED AS TO FORM: APPROVED: __________________________ _____________________________ Assistant City Attorney City Manager _____________________________ Director of Public Works _____________________________ Director of Administrative Services DocuSign Envelope ID: B1120F52-528D-41B5-9486-44A7B9CB4412 Certificate Of Completion Envelope Id: B1120F52528D41B5948644A7B9CB4412 Status: Completed Subject: Please DocuSign: RESO 10038 SB1 FY2023 Resolution.doc Source Envelope: Document Pages: 3 Signatures: 6 Envelope Originator: Certificate Pages: 2 Initials: 0 Mahealani Ah Yun AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 250 Hamilton Ave Palo Alto , CA 94301 Mahealani.AhYun@CityofPaloAlto.org IP Address: 199.33.32.254 Record Tracking Status: Original 5/20/2022 9:06:01 AM Holder: Mahealani Ah Yun Mahealani.AhYun@CityofPaloAlto.org Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign Signer Events Signature Timestamp Cassie Coleman cassie.coleman@cityofpaloalto.org Assistant City Attorney Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Signed by link sent to cassie.coleman@cityofpaloalto.org Using IP Address: 199.33.32.254 Sent: 5/20/2022 9:08:55 AM Viewed: 5/20/2022 9:58:35 AM Signed: 5/20/2022 9:59:56 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Kiely Nose kiely.nose@cityofpaloalto.org Director, Administrative Services/CFO City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Signed by link sent to kiely.nose@cityofpaloalto.org Using IP Address: 174.194.203.22 Signed using mobile Sent: 5/20/2022 9:59:57 AM Viewed: 6/1/2022 8:55:15 AM Signed: 6/1/2022 8:55:22 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Brad Eggleston brad.eggleston@cityofpaloalto.org Director of Public Works City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Signed by link sent to brad.eggleston@cityofpaloalto.org Using IP Address: 199.33.32.254 Sent: 6/1/2022 8:55:23 AM Viewed: 6/1/2022 9:34:53 AM Signed: 6/1/2022 9:38:13 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Signer Events Signature Timestamp Ed Shikada ed.shikada@cityofpaloalto.org Ed Shikada, City Manager City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Signed by link sent to ed.shikada@cityofpaloalto.org Using IP Address: 199.33.32.254 Sent: 6/1/2022 9:38:14 AM Viewed: 6/1/2022 12:21:48 PM Signed: 6/1/2022 12:21:57 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Patrick Burt pat@patburt.org Mr Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Signed by link sent to pat@patburt.org Using IP Address: 98.37.159.0 Sent: 6/1/2022 12:21:59 PM Viewed: 6/1/2022 12:36:26 PM Signed: 6/1/2022 12:36:46 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Lesley Milton Lesley.Milton@CityofPaloAlto.org City Clerk Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Signed by link sent to Lesley.Milton@CityofPaloAlto.org Using IP Address: 199.33.32.254 Sent: 6/1/2022 12:36:47 PM Viewed: 6/1/2022 12:38:44 PM Signed: 6/1/2022 12:38:49 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 5/20/2022 9:08:55 AM Certified Delivered Security Checked 6/1/2022 12:38:44 PM Signing Complete Security Checked 6/1/2022 12:38:49 PM Completed Security Checked 6/1/2022 12:38:49 PM Payment Events Status Timestamps