Loading...
HomeMy WebLinkAboutRESO 9993 13460 CAB91021 Resolution No. 9993 Resolution of the Council of the City of Palo Alto Authorizing the Commitment of Electric Special Project (ESP) Reserve funds for Advanced Meter Infrastructure Implementation-Related Expenditures via a Transfer of up to $8.4 million from the Electric Special Project (ESP) Reserve to the Smart Grid Technology Installation Project (EL-11014), and the Loan of up to $10.5 Million from the ESP Reserve to the Smart Grid Technology Installation Project (EL-11014) A. In 2011 (Resolution 9206) Council established the Electric Special Projects (ESP) Reserve to fund projects that benefit electric ratepayers. The fund reserve was established in 1983 to defray costs associated with the Calaveras Hydroelectric Project, with contributions from a ratepayer surcharge assessed between 1997 and 1999 to cover the potential for electric assets exceeding their value under deregulation. B. In 2015 (Resolution 9510), Council modified the guidelines for managing the ESP Reserve as follows: 1. The purpose of the ESP Reserve is to fund projects that benefit electric ratepayers; 2. ESP Reserve funds are to be used for projects of significant impact; 3. Projects proposed for funding must demonstrate a need and/or value to electric ratepayers. The projects must have verifiable value and not be speculative, or risky in nature; 4. Projects proposed for funding must be substantial in size, requiring funding of at least $1 million; 5. Set a goal to commit funds by end of FY 2017; and 6. Any uncommitted funds remaining at the end of FY 2022 will be transferred to the Electric Supply Operation Reserve and the ESP Reserve will be closed. C. Staff anticipates seeking Council approval to modify and update the ESP Reserve guidelines in 2022 and approval to extend the life of the ESP Reserve through 2030. D. As of June 30, 2021, the ESP Reserve balance is approximately $46.7 million, not including the interfund transfer and loan requested via this Resolution. E. There are sufficient ESP Reserve funds available to fund the Advanced Metering Infrastructure (AMI) project (the Project)’s electric-related expenditures for the benefit of electric ratepayers, and to loan funds to the Project to cover the water- and gas-related expenditures which also will benefit water and natural gas ratepayers. F. At the July 7, 2021 Utility Advisory Commission (UAC) meeting, UAC voted 5-1 (with Commissioner Metz voting against and Vice Chair Segal absent) to recommend using funds DocuSign Envelope ID: 1C499892-1DE1-4412-A82B-E3115A1FFF3F 13460 CAB91021 from the ESP Reserve fund the AMI Project, through a commitment of ESP Reserve funds to cover the electric-related AMI expenses, and a loan of ESP Reserve funds to cover the water- and gas-related AMI expenditures. The Council of the City of Palo Alto does hereby RESOLVE as follows: SECTION 1. Transfer up to $18.9 million from the Electric Special Projects Reserve to the Smart Grid Technology Installation Project (EL-11014) for Advanced Meter Infrastructure implementation-related expenditures, as follows: 1. Transfer up to $8.4 million from the Electric Special Project (ESP) Reserve to the Smart Grid Technology Installation Project (EL-11014) for Electric AMI and smart grid-related expenditures; 2. Transfer up to $6.5 million from the ESP Reserve to the Smart Grid Technology Installation Project (EL-11014) for Water AMI and smart grid-related expenditures, structured as an inter-fund loan with a repayment term of 5 years with appropriate interest, with repayment to begin upon completion of the Project; and 3. Transfer up to $4.0 million from the ESP Reserve to the Smart Grid Technology Installation Project (EL-11014) for Gas AMI and smart grid-related expenditures as an inter-fund loan with a repayment term of 5 years with appropriate interest, with repayment to begin upon completion of the Project. 4. Individual fiscal year transfer amounts up to the totals listed in subsections 1-3 above will be determined based on annual CIP budgets, and are currently estimated to be $7 million in FY 2022, $7 million in FY 2023, and $4.9 million in FY 2024. SECTION 2. The Council finds that the fund transfers described in Section 1 above meet Council’s guidelines for managing the Electric Special Project Reserve, described in Recital B above. Council approves the commitment of ESP funds to support the electric AMI Project expenses, and the loan of ESP funds to support the water and gas AMI Project expenses. // // // // // // // DocuSign Envelope ID: 1C499892-1DE1-4412-A82B-E3115A1FFF3F 13460 CAB91021 // SECTION 3. The Council finds that the adoption of this resolution to transfer and loan funds from the ESP to fund the Smart Grid Technology Installation Project (EL-11014) for Advanced Metering Infrastructure (AMI) and smart grid-related expenditures is categorically exempt under California Environmental Quality Act (CEQA) Guidelines section 15301(b) as a Project involving minor alteration of existing public utilities facilities and equipment, with negligible or no expansion of existing or former use; therefore, CEQA review is not required. INTRODUCED AND PASSED: October 18, 2021 AYES: BURT, CORMACK, DUBOIS, FILSETH, KOU, STONE NOES: TANAKA ABSENT: ABSTENTIONS: ATTEST: APPROVED: ________________________________ ________________________________ City Clerk Mayor ________________________________ ________________________________ Deputy City Attorney City Manager _______________________________ Director of Utilities DocuSign Envelope ID: 1C499892-1DE1-4412-A82B-E3115A1FFF3F Certificate Of Completion Envelope Id: 1C4998921DE14412A82BE3115A1FFF3F Status: Completed Subject: Please DocuSign: RESO 9993 ESP Reserve Transfer to Fund AMI Projects.docx Source Envelope: Document Pages: 3 Signatures: 5 Envelope Originator: Certificate Pages: 2 Initials: 0 Danielle Kang AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 250 Hamilton Ave Palo Alto , CA 94301 Danielle.Kang@cityofpaloalto.org IP Address: 199.33.32.254 Record Tracking Status: Original 10/19/2021 5:08:25 PM Holder: Danielle Kang Danielle.Kang@cityofpaloalto.org Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign Signer Events Signature Timestamp Aylin Bilir Aylin.Bilir@CityofPaloAlto.org Deputy City Attorney Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 71.202.3.196 Sent: 10/19/2021 5:10:43 PM Viewed: 10/19/2021 5:54:03 PM Signed: 10/19/2021 5:54:54 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Dean Batchelor Dean.Batchelor@CityofPaloAlto.org Director of Utilities Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 10/19/2021 5:54:56 PM Viewed: 10/20/2021 9:29:00 AM Signed: 10/20/2021 9:29:11 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ed Shikada Ed.Shikada@CityofPaloAlto.org Ed Shikada, City Manager City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 10/20/2021 9:29:13 AM Viewed: 10/20/2021 12:00:07 PM Signed: 10/20/2021 12:00:13 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Tom DuBois tomforcouncil@gmail.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 24.5.55.204 Sent: 10/20/2021 12:00:14 PM Viewed: 10/20/2021 3:04:24 PM Signed: 10/20/2021 3:04:34 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Signer Events Signature Timestamp Lesley Milton Lesley.Milton@CityofPaloAlto.org City Clerk Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 10/20/2021 3:04:36 PM Viewed: 10/20/2021 3:17:32 PM Signed: 10/20/2021 3:17:40 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 10/19/2021 5:10:43 PM Certified Delivered Security Checked 10/20/2021 3:17:32 PM Signing Complete Security Checked 10/20/2021 3:17:40 PM Completed Security Checked 10/20/2021 3:17:40 PM Payment Events Status Timestamps