HomeMy WebLinkAboutRESO 9977180321 cc 0260111
Resolution No. 9977
Resolution of the Council of the City of Palo Alto to Adopt a List of
Projects for Fiscal Year 2021-2022 Funded by SB 1: The Road Repair
and Accountability Act of 2017
R E C I T A L S
A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 in order to address the significant multi-modal transportation funding shortfalls
statewide; and
B. SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of Palo Alto (City) are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
C. The City must adopt a list of all projects proposed to receive funding from the
Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which
must include a description and the location of each proposed project, a proposed schedule for
the project’s completion, and the estimated useful life of the improvement; and
D. The City, will receive an estimated $1,356,343 in RMRA funding in Fiscal Year
2021-2022 from SB 1; and
E. This is the fifth year in which the City is receiving SB 1 funding which enables the
City to continue essential road maintenance and rehabilitation projects, safety improvements,
repairing and replacing aging bridges, and increasing access and mobility options for the
traveling public that would not have otherwise been possible without SB 1; and
F. The City used a Pavement Management System to develop the SB 1 project list
to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the community’s priorities for transportation investment; and
G. The funding from SB 1 will help the City maintain and rehabilitate various streets
throughout the City this year and many similar projects into the future; and
H. The 2018 California Statewide Local Streets and Roads Needs Assessment found
that the City’s streets and roads are in “excellent” condition and this revenue will help us
maintain the overall quality of our road system and implement complete streets projects over
the next decade; and
I. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows:
SECTION 1. The foregoing recitals are true and correct.
DocuSign Envelope ID: E696CD7F-81D4-4E82-BF41-7E41FB7CD6B3
180321 cc 0260111
SECTION 2. The City of Palo Alto hereby adopts the following list of projects planned to
be funded in-part or solely with fiscal year 2021-2022 with Road Maintenance and
Rehabilitation Account revenues:
Charleston-Arastradero Corridor Project – Phase 3 includes pavement repair, sidewalk, curb and
gutter replacement, upgraded curb ramps, median islands, street paving, traffic signal
improvements, and landscaping. The following streets are included in the Charleston-
Arastradero Corridor Project – Phase 3: Arastradero Road (Los Palos Avenue to El Camino Real),
West Charleston Road (El Camino Real to Alma Street), and East Charleston Road (Middlefield
Road to San Antonio Road).
The estimated useful life is 30 years. Construction of Phase 3 will start in Summer/Fall 2021 and
be completed in Summer 2022.
SECTION 3. The Council finds that the adoption of this resolution does not meet the
definition of a project under Public Resources Code Section 21065, thus no environmental
assessment under the California Environmental Quality Act is required.
INTRODUCED AND PASSED: June 22, 2021
AYES: BURT, CORMACK, DUBOIS, FILSETH, KOU, STONE, TANAKA
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
__________________________ _____________________________
City Clerk Mayor
APPROVED AS TO FORM: APPROVED:
__________________________ _____________________________
Assistant City Attorney City Manager
_____________________________
Director of Public Works
_____________________________
Director of Administrative Services
DocuSign Envelope ID: E696CD7F-81D4-4E82-BF41-7E41FB7CD6B3
Certificate Of Completion
Envelope Id: E696CD7F81D44E82BF417E41FB7CD6B3 Status: Completed
Subject: Please DocuSign: RESO 9977 - SB 1 FY 2022 Resolution.doc
Source Envelope:
Document Pages: 2 Signatures: 6 Envelope Originator:
Certificate Pages: 2 Initials: 0 Danielle Kang
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Danielle.Kang@cityofpaloalto.org
IP Address: 199.33.32.254
Record Tracking
Status: Original
6/23/2021 1:03:08 PM
Holder: Danielle Kang
Danielle.Kang@cityofpaloalto.org
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign
Signer Events Signature Timestamp
Cassie Coleman
Cassie.Coleman@cityofpaloalto.org
Assistant City Attorney
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/23/2021 1:08:31 PM
Viewed: 6/23/2021 3:57:01 PM
Signed: 6/23/2021 3:57:43 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Kiely Nose
Kiely.Nose@CityofPaloAlto.org
Director, Administrative Services/CFO
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Uploaded Signature Image
Using IP Address: 73.71.66.28
Sent: 6/23/2021 3:57:44 PM
Viewed: 6/23/2021 4:02:55 PM
Signed: 6/23/2021 4:03:06 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Brad Eggleston
Brad.Eggleston@CityofPaloAlto.org
Director of Public Works
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/23/2021 4:03:07 PM
Viewed: 6/23/2021 6:23:36 PM
Signed: 6/23/2021 6:23:45 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Ed Shikada
Ed.Shikada@CityofPaloAlto.org
Ed Shikada, City Manager
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/23/2021 6:23:46 PM
Viewed: 6/24/2021 7:38:37 AM
Signed: 6/24/2021 7:38:47 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Signer Events Signature Timestamp
Tom DuBois
tomforcouncil@gmail.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 24.5.55.204
Sent: 6/24/2021 7:38:49 AM
Resent: 6/25/2021 3:37:39 PM
Viewed: 6/25/2021 4:35:08 PM
Signed: 6/25/2021 4:35:14 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Beth Minor
beth.minor@cityofpaloalto.org
City Clerk
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 174.85.69.168
Signed using mobile
Sent: 6/25/2021 4:35:16 PM
Viewed: 6/25/2021 4:41:30 PM
Signed: 6/25/2021 4:41:44 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 6/23/2021 1:08:31 PM
Certified Delivered Security Checked 6/25/2021 4:41:30 PM
Signing Complete Security Checked 6/25/2021 4:41:44 PM
Completed Security Checked 6/25/2021 4:41:44 PM
Payment Events Status Timestamps