Loading...
HomeMy WebLinkAboutRESO 4355lows: RESOLUTION NO. 4355 • ORIGINAL RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING SCHEDULES W-1 AND W -1-O OF THE CITY OF PALO ALTO UTILITIES RATES AND CHARGES The Council of the City of Palo Alto does RESOLVE as fol- SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Schedules W-1 and W-1-0 of the Palo Alto Utilities Rates and Charges are hereby amended to read as set forth in Sheets 108d and 109d attached hereto and by reference made a part hereof. SECTION 2. The foregoing changes shall become effective on all billings subsequent to June 13, 1970. INTRODUCED AND PASSED: June 8, 1970 AYES: Beahrs, Clark, Comstock, Dias, Gallagher, Norton, Pearson, Wheatley NOES: None ABSENT: Arnold,-Berwald, Spaeth ATTEST: f City Clerk/ ' C om. - ft APPROVED AS TO FORM: ty Attorney APPROVED AS TO CONTENT: CC ' Water -Gas -Sewer Department City of Palo Alto California Sheet No. 109d Canceling Sheet No. 109c UTILITY RATE SCHEDULE SCHEDULE W-1-0 GENERAL WATER SERVICE APPLICABILITY. This schedule applies to all water service. TERRITORY: RATES: Outside the incorporated limits of the City of Palo Alto within Pressure Zones 1, 2 Valley Area. Service Charge: Per Meter Per Month For 5/8 -inch meter $ 2.00 For 3/4 -inch meter 2.25 For 1 -inch meter 3.00 For 1 -inch meter 4.50 For 2 -inch meter 6.00 For 3 -inch meter .. 10.00 For 4 -inch meter 15.00 For 6 -inch meter 30.00 For 8 -inch meter 50.00 For 10 -inch meter 70.00 Quantity Rate: Per Meter Per Month First Next Next Next Next Ove r 10 hundred 90 hundred 400 hundred 500 hundred 1,000 hundred 2,000 hundred (To be added to Service Charge) Per 100 Cubic Feet cubic feet $ 0.44 cubic feet 0.38 cubic feet 0.35 cubic feet 0.31 cubic feet . . 0.28 cubic feet 0.24 Temporary unmetered service to residential subdivision developers, per connection $ 2.00 per month Effective Date: June 13, 1970 Issued by The City Council • • City of Palo Alto Sheet No. 108d California Canceling Sheet No. 108c UTILITY RATE SCHEDULE SCHEDULE W-1 GENERAL WATER SERVICE APPLICABILITY. This schedule applies to all water service. TERRITORY: Inside the incorporated limits of the City of Palo Alto and land owned or leased by the City. RATES: Per Meter Service Charge: Per Month For 5/8 -inch meter $ 2.00 For 3/4 -inch meter 2.25 For 1 -inch meter 3.00 For 1A -inch meter 4.50 For 2 -inch meter 6.00 For 3 -inch meter 10.00 For 4 -inch meter 15.00 For 6 -inch meter 30.00 For 8 -inch meter 50.00 For 10 -inch meter 70.00 Quantity Rate: (To be added to Service Charge) Per Hundred Cubic Feet Pressure Zone Per Meter Per Month 1& 2 3 4 5 6 7 First 10 Ccf $ 0.34 $ 0.37 $ 0.40 $ 0.46 $ 0.51 $ 0.57 Next 90 Ccf 0.30 0.33 0.36 0.42 0.47 0.52 Next 400 Ccf 0.27 0.31 0.34 0.39 0.45 0.50 Next 500 Ccf 0.25 0.28 0.32 0.37 0.43 0.48 Next 1,000 Ccf 0.23 0.26 0.30 0.35 0.40 0.46 Over 2,000 Ccf 0.20 0.23 0.26 0.32 0.37 0.43 Temporary unmetered service to residential subdivision developers, per connection $2.00 per month Effective Date: June 13, 1970 Issued by The City Council