··RESOLUTION NO. 4465 ORIGINAL
RESOLUTION OP THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING SCHEDULES G-5, S-5 AND W-5 OF THE CITY OF
PALO ALTO UTILITIES RATES AND CHARGES PERTAINING TO
UTILITY CONNECTION CHARGES
The Council of the City of Palo Alto does RESOLVE as follows:
SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto
Municipal Code, the following schedules are hereby amended to read as
shown on the sheets designated and attached hereto:
Schedule G-5
Schedule s-s
Schedule W-5
Utility Connection Charges/Gas Service
Utility Connection Charges/Sewer Service
Utility Connection Charges/Water Service
Sheets 118q, 119c
215, 216 and 217
Sheet 12Sd
Sheet lllf 112f ,
SECTION 2. The foregoing changes will become effective at the
commencement of the July billing cycle.
INTRODUCED AND PASSED: June 21, 1971
AYES: Arnold, Bea hrs, Berwald, Comstock, Dias, Gallagher, Norton, Pearson,
Wheatley
NOES: None
ABSENT: Clark, Spaeth
(C;,,'~.~
City ClJC Mayor
AP,PROVED AS TO FORM:
' '1 • (--c· L t 7 l AS .?/l .. -• .. /,( ~-= • ' .. . . ./ Sehior Assistant City
Attorney
APPROVED:
2t&~~ City Tr asurer
City of Palo Alto
California
•
STANFORD
UNIVERSITY
•
Original Sheet No. 215
SAN FRANCISCO BAY
'''(l
' ...
' GAS '
SERVICE
AREA
I
LOS ALTOS HILLS
AS SERVICE AREA 2
ALTOS
LOCATION MAP OF GAS
SERVICE AREAS
Issued by
The City_ Counc i 1
Effective Date: July, 1971
Billing Cycle
City of Palo Alto
California •
-IAYSH01t1E
GAS
• Original Sheet No. 216
SAN
... ,.
aay \.AtlOI
Issued by
The City C .. rnncjl
CAlllllNO
Effec~ive Date: July. 1971
Billing Cycle
..
City 0f Palo Alto
California
1 ;, i {. ___ .,.
GAS
SllVICI AllA 2
•
Issued by
The City Council
•
Original Sheet No. 217
(
1 ~-----~
Effective Date: July, 1971
Bil ling Cycle
••
City of Palo Alto
Califc•rnia
TERRITORY:
•
UTILITY CONNECTION CHARGES
SCHEDULE W-5
WATER SERVICE
•
Sheet No. lllf
C.:;11-=eling Sheet No. llle
Inside the incorporated limits of the City of Palo Alto and on land
owned or leased by the City of Palo Alto.
CHARGES:
A. Supply System:
Deferred Area Assessment Per Acre
Water Service Area l . . . . . .$ .00
Water Service Area 2. 59-11 Assessment District 95.00
Water Service Area 3, 59-1 Assessment District 100.00
Water Service Area 4, 62-8 Assessment District .oo
B. Distribution System:
Area and Street
Frontage Charges:
Water Service Areas l & 2
Water Service Areas 3 & 4
C. Service Connection Charges:
Sizes 1-inch through 2-inch
1-inch connection .
l~-inch connection
1\-inch connection
2-inch connection .
Area
Per Acre
ZONES
$ .oo
ll0.00
Street Frontage
Per Foot
Z 0 N E S
R-1, R-2, R-3 .... Other
$3.00 $4.85
3.50 5.35
Amount
$2l0.00
250.00
J00.00
360.00
$50.00 reduction in above service connection charges for connec-
tions installed at time main is consttucted.
Issued by
The Ciiy Council
(Continued)
Effective Date: July, 1971
Billing Cycle
I
City of Palo Alto
California
•
UTILITY CONNECTION CH/.RGES
SCHEDULE W-5
WATER SERVICE
C. Service Connection Charges (Continued):
Sizes 4-inch through 10-inch
4-inch connection
6-inch connection .
8-inch connection
10-inch connection
Water
Service
$ 575
750
900
1,100
•
Sheet No. 112f
Canceling Sheet No. 112e
Fire
Service
$525
615
800
950
Water & Fire
Comb. Service
$ 975
1,300
1,565
1,900
For service connections of 4-inch through 10-inch sizes, the
owner must pro··ide a vault to house <;neters or other required
control equipment in accordance with the Water Department's
specifications.
Approved detector check valves with by-pass assemblies must be
provided by owner on all fire services. An exception may be
made where only an automatic fire sprinkler system is served,
provided the sprinkler control equipment is within ten feet of
the end of the street portion of the fire service.
$150 reduction in above service connection charges for connec-
tions installed at time main is constructed.
D. Additional Meters on Counection;
With new connection ..
On existing connection
Per Meter
$30.00
65.00
Maximum size additional meter: !-inch. Water Department may
limit additional meters 0.1 a connection.
E. Relocation of Facilities:
Approved relocation of services, hydrants, or other facilities
will be done at cost. Deposit of estimated cost is required
before work begins.
Issued by
The City Council
(Continued)
Effective Date: July, 1971
Billing Cycle
• • •
City of Palo Alto
California
Sheet No. ll8c
Canceling Sheet No. 118b
UTILITY CONNECTION CHARGES
SCHEDULE G-5
GAS SERVICE
TERRITORY:
Inside the incorporated limits of the City of Palo Alto &nd on land
owned or leased by the City.
CHARGES:
A. Snpply System:
Foothills Gas System 68-82 In accordance with Assessment Roll
B. Distribution System:
Frontage Charge:
Street Frontage
Per Foot
Zones
R·l, R-2, R-3 Others
Gas Service Area 1 .
Gas Service Area 2
C. Service Connection Charge:
A
\-inch connection $ 75.00
1\-inch connection 130.00
2-inch connection 165.00
3-inch connection 190.00
CONDIT
B
$1~0.00
200.00
255.00
315.00
$1. 20
l. 70
I 0 N
c
$ 75.00
110.00
135.00
165.00
$2.25
2. 75
Excess Length
Per Foot
$2.00
2.60
3.25
4.15
Condition A: Service installed at time main is constructed.
Condition B: Service installed on existing main.
Condition C: Service ~xtended from an existing street service stub.
Excess Length: Additional charge for extension greater than forty
(40) f~et from the street property line to the gas meter location,
measured along a line perpendicular to the street property line.
Issued by
The City Council
(Continued)
Effective Date: July, 1971
Bil ling Cycle
. •
. '
• • •
City of Palo Alt.o
California
Sheet No. 119c
Canceling Sheet No. ll9b
UTILITY CONNECTION CHl.RGES
SCHEDULE G-5
GAS SERVICE
(continued)
D. Addltional Meters on Connection: Per Meter
With new connection ....•••
On existing metered connection
E. Service Relocation:
Service riser relocation . . . . . . . .. . . . . ....... , ..
New piping required will be charged at excess length rate.
OTHER co~~ITIONS:
1. Distribution System Charges:
$ 7.50
25.00
$30.00
a. Connection charges apply to all vacant land except land
developments where connection charges are recorded as paid
for by the developer. This exception applies, generally,
to land developments after February, 1954.
b. Street frontage charges for corner lots shall be based on
the total frontage on all streets.
c. Condition C is applied where a street service has been
installed and assessed in accordance with the "Improvemer.t
Procedure Code." Distribution system charges also must be
paid before service can begin.
d. Where service is from a main in an easement or right-of-
way, the fronta~e charge shall be based upoa that portion
of the parcel that borders the right·of-way or easement.
e. If a street, right-of-way, or easement is designed to
serva only on one side, the frontage charge shall be
doubled.
f. If a street, right-of-way, or easement is designed to
serve both sides, but only one side is being developed,
special arrangements must be made to provide for the
frontage charge of the other side.
Issued by
The City Council
(Continued)
Effective Date: July, 1971
Billing Cycle
• • -·
. , • • •
City of Palo Alto
California
Sheet No. 125d
Canceling Sheet No. l25c
UTILITY CONNECTION CHARGES
SCHEDULE S-5
SEWER SERVICE
TERRITORY:
Inside the incorporated limits of the City of Palo Alto and on land
owned or leased by the Cit] of Palo Alto.
CHARGES:
A. Trunk System:
Per Per
Deferred Area Assessment Connection Acre
Sewer Service Area l . . . . . . $ .oo $ .00
Sewer Service Area 2, 59-10 Assessment Dist. 175.00 .oo
Sewer Service Area 3, 59-1 Assessment Dist. .00 50.00
Sewer Service Area 4, 62-8 Assessment Dist. . .00 .00
B. Collection System:
Area and Street Frontage Charges
Sewer Service Areas 1 & 2 •
Sewer Service Areas 3 & 4
C. Service Connection Charges:
4-inch connection
6-inch connection ••
Area
Per Acre
• $ .oo
50.00
Street Frontage
Per Foot
$ .00
3.00
• $280.00
. $350.00
Special arrangements must be made to provide fur the cost of a
connection larger than six-inch.
D. Relocation of Facilities:
Approved relocation of services or other facilities will be done
at cost. Deposit of estimated cost is required before work begins.
Issued by
The City Counci 1
(Continued)
Effective Date: July, 1971
Billing Cycle