HomeMy WebLinkAboutRESO 4678------~------------------------------------• • ORIGINAL
RESOLUTION NO. 4678
RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING SCHEDULES G-5, S-5, AND W-5 OF THE CITY OF
PALO ALTO UTILITIES RATES ANO CHARGES PERTAINING TO
UTILITY CONNECTION CHARG~S
The Council of the City of Palo Alto does RESOLVE as follows:
SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto
Municipal Code, the following schedules are herepy amended to read
as shown on the sheets designated and attach~~ hereto:
Schedule G-5 Utility Connection Charges
Gas Service
Schedule S-5 Utility Connection Charges -
Sewer Service
Schedule W-5 Utility Connection Charges -
Water Service
Sheets 118d, 119d,
120c, and 120.1
Sheets 12Se, 125.lb,
·.1.25.2b, and 125.3
Sheets lllg, 112g,
113e, 113.lc, and
113.2
SECTION 2. The foregoing changes shall become effective
December 1, 1972.
INTRODUCED AND PASSED:
AYES;
NOES:
ABSENT:
ATTEST:
UNANIMOUS
NONE
COMSTOCK
Noyember ZO, 197Z
a-s~ J' vl~v&
City Clerk(/ ·
APPROVED AS TO FORM;
APPROVED AS TO CONTENT:
/q,..a_,,, "' • .(. --~wer Department
APPROVED:
City Treasurer
APPRO~ ~ Cit~
~ L • ~-.-.::...-,.._ .. , . ,.11..-.-!. '· ~. -
e-----..._ . ..1x.:;,_,l.h-r-.
-~~·k
:,1
~' ~
' '·
' • • •
City of Palo Alto
California
Sheet No. lllg
Canceling Sheet No. 111£
TERRITORY:
UTILITY CONNECTION CHARGES
SCHEDULE W-5
WATER SERVICE
Inside the incorporated limits of the City of Palo Alto and on land
owned or leased by the City of Palo Alto.
CHARGES:
·A. Supply System:
Deferred Area Assessment Per Acre
Water Service Area 1 . . .
Water Service Area 2, 59-11
Water Service Area 3, 59-01
Water Service Area 4, 62-08
B. Distribution Syf: •. ~m:
WateL Service Areas 1 & 2
Water Service Areas 3 & 4
C. Service Connection Charges:
Sizes 1-inch thro1Jgh 2-inch
l-inch connection . . . . .
1\-inch connection . . • .
1\-inch connection • .
2-inch connection . .
. . . . . . . • . . . . . . . • .$ .oo
Assessment Dist. . . . • . . . . 95.00
Reassessment Dist. See "Other Conditions"
Reassessment Dist. Sec "Other Conditions"
. • . . . . . • . . • . . . . .
Street Frontage Charges
Per Foot
ZONES
R.-1, R-2, R-3
$3.00
3.50
~
$4.85
5.35
Amount
• . • . . . $210.00 . • • 250.00
• • • . • • 300.00
• . . . . . 360.00
$50.00 reduction in above service connection charges for connec-
tions installed at time main is constructed.
Issued by
The City Council
(Continued}
Effective Date:
•
)
•
• •
City of Palo Alto
California
Sheet No. 112g
canceling Sheet No. 112£
UTiLITY CONNECTION CHARGES
SCHEDULE W-5
WATER SERVICE
C. Service Connection Charges (Continued):
Sizes 4-inch through lO·inch
0
4-inch connection • • • • •
6-inch connection
.8-inch connection
. . . . . .
10-inch connection • • • • •
Water
Service
$ 575
150
900
1,100
Fire
Service
$525
675
800
950
Water & Fire
Comb. Serl7icc
$ 975
1,300
1,565
1,900
For service connections of 4-inch through 10-inch sizes, the
owner must provide a vault to hou~e 111eters or other required
control equipment in ac~ordance with the Water Utility'§
specifications.
Approved detector·check valves with by-pass assemblies must be
provided by owner on all fire servi.ces. An exception may be
made where only an automatic fire-sprinkler system is served,
provided the sprinkler control equipment is within ten feet of
the end of the street portion of the fire service.
$1SO reduction in above service connection charges for connec-
tioas installed at time main is constructed.
D. Additional Meters on Connection:
With new connection • • • • • • •
On existing connection • • • •
. . . . .. . . . .
·Per Meter
• • • • • • $30.00
• • " • 65.00
Maximum size additional meter: l-inch. The Water !Jtility may
limit add:i.tional mete:t.s on a connection.
E. RelOc.ation of Facilities:
Approved relocation of services, hydrants, or other facilities
will be done at cost. Deposit of estimated cost is required
before work begins.
Issued by
The eity Coun~il
(Continued)
Effective Date:
)
I
I
~
I
I
I
• • •
City of Palo Alto
California
OTHER CONDITIONS:
UTD..ITY CONNECTION CHARGES
SCHEDULE W-5
WATER SERVICE
1. Supply System Charges: (Total of a. and b.)
a. Basic Charge:
59-01 -Deferred Reassessment shown on
Reassessment Role
62-08 -No Charge
Sheet No. llJe
Canceling Sheet No. ll3d
b. Property to be developed at an indicated level of demand
exceeding the dema~d of the permissible number of residential
units (or equivalent) shown on the Reassessment Roles must
pay an additional charge for each equivalent excess unit:
59-01 -$172.30 per unit
62-08 -141.33 per unit
\
c. An equivalent residential unit shall be 46 fixture units
as defined in the Uniform Plumbing Code. I
2. Distribution System Charges:
a. Connection charges are based on lot or parcel size as des-
cribed in City's official records and apply to all vacant
land except land developments where connection charges are
recorded as paid by the developer. This exception applies,
generally, to land developments after February, 1953.
b. Street front:1ge charges for corner lots shall be based on
the total frontage on all streets.
c. Where a street service has been installed·and assessed in
accordance with the "Improvement Procedure Code," dis tri-
bution system charges must be paid ~efore service can begin.
d. 'Where service is from a main that is in an easement or right·
of-way, the frontage charge shall be based upon that portion
of the parcel that borders the right-of-~ay or easement.
Issued by
The City Council
(Continued)
Effective Date:
I
t
! . ,.
•
. . • •
City of Palo Alto
California
Sheet No. 113.lc
Canceling Sheet No. 113.lb
UTll.ITY CONNEClION CHARGES
SCHEDULE W-5
WATER SERVICE
2. Distribution System Charges (Continued):
e. If a street, right-of-way, or easeoent is designed to serve
oniy on one side, the frontage charge shall be doubled.
£. If a street, right-of-way, or easement is designed to serve
both sides, but only one side is being developed, special
arrangell'tents must be made to provide for the frontage charge
of the other side.
g. Where extensions are required to service areas that are not
contiguous to existing systems, special arrangements must
be made to provide for the cost of the intervening distri-
bution system.
3. Service Char&es:
4.
a. Additional service connections are available with payment
of additional service connection charge as shown in
Section c.
b. Replacement of service connections m•de necessary because
of ordinary wear and deterioration will be made without
charge. Replacement due to inadequacy will be charged as
an additional service connection.
Installation under Unusual Conditions:
Any condition which, in the opinion of the Chief Engineer of
the Water Utility will result in a cost higher by-more than
fifteen (15) per cent of the charges set forth in (B). (C), or
(D) above will be classified as unusual. The charge for an
unusual installation will be based on the Chief Engineer's
·estimate of the total costs of ~11 materials, labor, and other
costs incidental to the instailation.
(Continued)
Effective Date:
Issued by
The City Council
•
. • • •
City of Palo Alto
California
Sheet No. 113.2
5. Exceptions:
trI'ILlTY CONNECTION CHARGES
SCHEDULE W·S
WATER SERVICE
a. Water Service Areas 3 & 4, connections served directly
from supply main: The distribution system charges (Section B)
will be based on a maximum frontage of 660 feet. This
exception applies to single applications for service and
does not apply to subdivisions or tracts.
b. The developer may, at his option, furnish and install the
on-site water system at his expense and in accordance with
City's specifications in lieu of street frontage and con-
nection charges.
Effective Date:
Issued by
The City Council
•
c
~·· .
... ._ ..
•. • •
City of Palo All:o
California
Sheet No. -118d
Canceling Sheet No. 118c
UTILITY CONNECTION CHARGES
SCHEDULE G-5
GAS SERVICE
TERRITORY:
Inside t:lae i.Dcorporated limits of the City of Falo Alto and on land
owned or leased by the City.
CHARGES:
A. Supply SJSte-.:
Foothills Gas System 68-82, Reassessment District. See
•Other Conditions".
B. Discribudon. System:
Street Frontage Charges
Per Foot
Z 0 NE S
Gas Senice Area t
Gas Service Area 2
. . . . . . . .
• • • • • • • •
. . . . . . . ~
c. Seryice Coanec:tion Charge:
l-iach c.anection
H;-:1.Dch connection
2-iDch CODDection
3-iDcb CGGUection
CONDIT!
A B
$ 75.00 $150.00
130.00 200.00
165.00 255.00
190.00 315.00
$1.20
1.70
ON
c
$ 75.00
110.00
135.00
165.00
Others
$2.25
2.75
Excess.Length
Per Foot
$2.00
2.60
3.25
4.15
Conclltica A: Service installed at time main is constructed.
Condi.tic:a B: Service installed on existing main,
CondLtioa C: Service extended fran an existing street service stub.
Excess Length: Additional charge for extension greater than forty
(40) feet fraa the street property line to the gas meter location,
measared along a line perpendicular to the street property line.
(Continued)
,Effective Date:
Issued by
'lbe -City Council
I
J
City of Palo Alto
California
•
UTILITY CONNECTION CHARGES
SCHEDULE G-5
GAS SERVICE
D. Additional Meters on Connection:
•
Sheet No. 119d
Canceling Sheet No. 119c
Per Meter
With new connection • • • • • •
On existing metered connection
. . . . . . . . . . $ 7 .so
25.00 . . . . . . . . . . .
E. Service Relocation:
S_ervice riser relocation . . . . . . . . . . . . . . . . $30.00
New piping required will be charged at excess length rate.
OTHER CONDITIONS:
1. Supply System Charges: (Total of a. and b.)
a. Reassessment shown on Reassessment Role.
b. Property to be developed at an i~dicated level of demand
exceeding ·the demand of the permissible·number of residential
units (or equivalent) listed on the Reassessment Role must
pay an additional charge for applicable facilities for each
equivalent excess unit:
Primary Supply $57.35 per unit
Secondary Supply -Lines E and F 2.05 II ii
Secondary Supply -Lines G and H 26.37 II II
c. An equivalent residential un~t shall be defined 38 an
aggregate input rating of 600,000 BTU/hr.
2. Distribution Syscem Charges:
a. Connection charges·apply to all vacant land except land
developments where connection charges are recorded as paid
for by the developer. This exception applies, generally,
to land developments.after February, 1954.
(Continued)
Effective Date:
Issued by
The City Council
•
• •
City of Palo Alto
California
Sheet No. ll9d
Canceling Sheet No. li9c
UTILITY CONNECTION CHARGES
SCHEDULE G-5
GAS SERVICE
D. Additional Mete!"s on Conrlection:
'With new connection • • • • • •
On existing metered connection
E. Service Relocation:
. . . . . . . . . . . . . .. . . . . . . .
s.ervice riser relocation . . . . . . . . . . . . . . . .
'
New piping required will be charged at excess length rate.
OTHER CONDITIONS:
1. Supply System Charges: (Total of a. and b.)
a. Reassessment shown on Reassessment Role.
Per Meter
$ 7.50
25.00
$30.00
b. Property to be developed at an indicated level of demand
exceeding the demand of the permissible·number of residential
units (or eouivalent) listed on the Reassessment Role must
pay an additional charge for appltcable facilities for each
equivalent excess unit:
Primary Supply
Secondary Supply -Lines E and F
Secondary Supply -Lines G and H
$57.35 per unit
2.05 II II
26.37 " "
c. An equivalent residential unit shall be defined as an
aggregate input rating of 600,000 BTU/hr.
2. Distribution System Cha~ges:
a. Connection charges·apply to all vacant land except land
developments where connection charges are recorded as paid
for by the developer. This exception applies, generally,
to land developments.after February, 1954.
(Cont iL1ued)
Effective Date:
Issued by
The City Council
I\
•
City of Palo Alto
California
•
t..1TILITY CONNECTION CHARGES
SCHEDULE G-5
GAS SERVICE
D. Additional Meters on Connection:
•
Sheet No. ll9d
Canceling Sheet No. ll9c
Per Meter
With new connection • • • • • •
On existing metered connection
• • • • • • • • • • c • • $ 7.50
25.00 • • • • • • • • • •
E. Service Relocation:
s.erviee riser relocation . . . . . . . . . . . . . . . :. . $30.00
New piping required will be charged at excess length rate.
OTHER CONDITIONS:
1. Supply System Charges: (Total of a. and b.)
a. Reassessment shown on Reassessment Role.
b. Property to be developed at an indicated level of demand
exceeding the demand of the permissible·number of residential
units (or equivalent) listed on the Reassessment Role must
pay an additional charge for applicable facilities for each
equivalent excess unit:
Primary Supply
Secondary Supply -Lines E snd F
Secondary Supply -Lines G and H
$57 .35 per unit
2.05 II H
26.37 " "
c. An equivalent residential unit shall be defined as an
aggregate input rating of 600,000 BTU/hr.
2. Distribution System Cha~ges:
a. Connection cherges apply to all vacant land except land
developments where connection charges are recorded as paid
for by the deyeloper. This exception applies, gen~rally,
to l•nd developments.after February, 1954.
(Continued) I
Effective Date:
Issued by
The City Council
•
•
'
City of Palo Alto
California
•
UTILITY CONN£CTION CHARGES
SCHEDULE G-5
GAS SERVICE
(continued)
2. Distribution System Charges (Continued):
• Sheet No. 120c
Canceling Sheet No. 120b
b. Street frontage charges for corner lots shall be based on
the total frontage on all streets.
c. Condition C is applied where a street service has been
inst&lled and assessed in accordance with the "Improvement
Procedure Code.n Distribution system charges also must be
paid before service can begin.
d. -Where service is from a main in an easement or right-of•
way, the frontage charge shall be based upon that portion
of the parcel that borders the right-of-way or easement.
e. If a street, right-of-way, or easement is designed to
serve only on one side, the frontage charge shall be
doubled.
f. If a street, risht-of-way, or easement is designed to
serve both sides, but only one side is being developed,
special arrangements must be made to provide for the
frontage charge of the other side.
g. Where dist~ibution system extensions are required to service l'-
areas that -are not contiguous to existing systems, special
arrangements must be made to provide for the cost of the
intervening distribution system.
3. Service Charges:
a. Additional service connections are available with payment
of additional service connection charges as shown in
-Section c.
b~ Replacement of service connections made necessary because
of ordinary wear and deterioration will be made without
charge.
c. In coamercial or industrial areas where a surface meter
installation is impractical, meters may be placed in
underground vaults. Vaults must be provided by the
Issued By
The City Council
Effective Date:
t
'
-------------------------------------------• • • City of Palo Alto
California Sheet No. 120. l
UTILITY CONNECTION CHARGES
SCHEDULE G·S
GAS SERVICE
(continued)
3. Service Charges (Continued):
c. (Continued)
owner in accordance with the Gas Utility's specifications.
Subsurface meter instal~ations will not be allowed in
residential areas.
4. Installation under Unusual Conditions:
Any condition which, in the opinion of the Chief Engineer of
the Gas Utility, will result in a cost higher by more than
fifteen (15) percent of the charges set forth in (B), (C),
or (D) above will be classifit>d as unusual. Ihe charge for
an u4usual installation will be based on the Chief Engineer's
estimate of the total costs of all materials, labor, and other
costs incidental to the installation.
5. Exceptions:
Gas Service Area 2, connections served directly from supply
main: The distribution system charges (Section B) will be
based on a maximum frontage of 660 feet. This exception
applies to single applications for service and does not apply
to subdivisions or tracts.
Issued by •
The City Council
Effective Date:
~
I
I
•
\
1 • •
0
• • •
City of Palo Alto
California
Sheet No. 125e
canceling Sheet No. 125d
UTILITY CONNECTION CHARGES
SCHEDULE S-5
SEWER SERVICE
TalllTORY:
Inside the incorporated limits of the City of Palo Alto and on land
owned or leased by the City of Palo Alto.
CBOGES:
A. trunk System:
Per Per
Deferred Area Assessment Connection Acre
Sewer Service Area 1 $ .00 $ .oo
Sewer Service Area 2, 59-10 Assessment Dist. 175.00 .OO
Sewer Service Area 3, 59-01 Reassessment Dist. See "Other-Conditions" )
Sewer Service Area 4, 62-08 Reassessaent Dist. See "Otb~r Conditions"
-=----------~...;.__----.;;.._;,,,"'--"'-
B. Collection System:
Sewer Service Areas 1 & 2
Sewer Service Areas 3 & 4
c. Service Connection Charges:
Street Frontage Charges
Per Foot
$ .oo
3.00
4-ineh connection ••••••••• •-• •••••
6-incl: connection • • • • • • • • • • • • • • • •
$280.00
350.00
Special arrangements must be made to provide for the cost of a
connection larger than six-inch.
D. Relocation of Facilities:
Approved relocation of services or other facilities will be done
at cost. Deposit of estimated cost is required before work begins.
Issued by
The City Council
(Continued)
Effective Date:
•
•
' . •
City of Palo Alto
Callfornia
•
UTD.ITY CONNECTION CHARGES.
SCHEDULE S-5
SEWER SERVICE ·
•
Sheet No. 125.lb
· CancelinR Sheet No. 125.la
omER CONDITIOllS ~ ' -
1. Trunk System Charges: (Total of a. and b.)
a. Basic Charge:
(1) If property did ,!21 receive a refund under
Reassessment -
59-01 -Deferred Reassessment shown on
Reassessment Role
62-08 -No Charge
(2) If property did receive a refund under
J&eassessment -
59-01 -$ 86 per acre
62-08 -124 per acre
b. Propert:y to be developed at an indicated level of demand
exceeding the demand of the permissible number of residential
units (or equivalent) shown on the Reassessment Boles must
pay an additional charge for eaeb equivalent excess unit: .
59-01 -$ 43.33 per unit
62-08 -74.44 per unit
c. AD equivalent resid•ntf.al un.Lt shall be 31 fixture unita
as defined in tbe UnifoEm Plurabins Code.
2.. Collection System Charges:
a. Connection charges _are basP.d on lot or parcel •be ••
described in City's official records mid applJ to all
v.cant land except land development where connection
charges are recorded as paid by the developer.
-
b. Street frontage for corner lots shall be total frontage
OD all streets.
1.-~~~~~~--~~~--~~~~--~~~-----~~~--~----~---<~c_o~u~1_n_u_e_d~>~---·
If fee tive Date:<
!Hued by
The City Council
•
•
~
I I ~
i
,\-.
c
City of Palo Alto
California
•
unUTY CONNECTION CHARGES
SCHEDULE S-5
SEWER SERVICE
OTHER CONDITIONS (Continued):
. 2. Collection System Charges (Continued):
•
Sheet No·. 125. 2b
Canceling Sheet No. 125.2a
c. 'Wher~ a street service has been installed in accordance
with the "Improvement Procedure Code, 11 collection system
charges must be paid before service can begin.
d. Ybere service is from a main that is in an easement or
right-of-way, the frontage charge shall be that portion
of the parcel that borders the right-of-way or easemenc.
e. If a street, r!ght-of•way, or easement is designed to
serve only on one side, the frontage charge shall be
double for that portion.
f. If a street, right-of-way, or easement is designed to
serve both sides, but only one side is being developed,
special arrangements must be made to provide for the
frontage charge of the other side.
g. Where extensions are required to ser-Vice areas that are
not contiguous to existing systems, special arrangements
must be made to provide for the cost of the intervening
collection system.
3. Service Charges:
a. Additional service connections are available with payinent
of additional service connection charge as sbowo in
Section c.
b. Replacement of service connections made necessary because
• of ordinary wear. and deterioration will be 11ade without
charge. Replacement due to inadequacy will be charged
as an additional service conn.ection.
Effective Date:
Issued by
The City Council
•
•
• ~ • •
City of Palo Alto
Cal~fornia Sheet No. 125.3 ~----~~~~~~~~~~~~~~~--~~~~~~~--;.....;.--~;;..._.;,;;;,...;..;;....
utnITY CONNECTION CBARGBS
SCHEDULE S-S
SEWER SER.VICE
<mmR CONDITIONS (Continued):
4. Installation under Unusual Conditions:
Any condition which, in the opinion of the Chi~f Engineer of
the Sewer Utility, will result in a cost higher by more than
fifteen (lS) percent of the charges set forth in (S) or (C)
above will be classified as unusual. The charge for an un-
usual installation will be based on the Chief Engineer's
eathtate of the total costs of all materials, labor. and
other costs incidental to the installation.
5. Pullpillg Plants:
Where pumpillg facilities are needed to drain an area into the
trunk or collection system, the cost of such facilittes will
be at the expense of the developer.
6. Exceptions:
a. Sewer Service Areas 3 & 4, connections served directly from
trunk sewer: The cOliection system charges (Section B) will
be baaed on a maximum frontage of 660 feet. 'Ibis exception
applies ta single applications for service a'Dll does not
apply to subdivisions or tracts. ·
b. 'l'be developer may, at his option, furnish and install the
oo-aite sewer ayi.tea at his expense and in accordance with
City'• epecificatious in lieu of street frontage and connec-
tion charges.
Issued by
The City Coun~il
Effective Date:
•
•
!
I
.J