HomeMy WebLinkAboutRESO 4678------~------------------------------------• • ORIGINAL RESOLUTION NO. 4678 RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING SCHEDULES G-5, S-5, AND W-5 OF THE CITY OF PALO ALTO UTILITIES RATES ANO CHARGES PERTAINING TO UTILITY CONNECTION CHARG~S The Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, the following schedules are herepy amended to read as shown on the sheets designated and attach~~ hereto: Schedule G-5 Utility Connection Charges Gas Service Schedule S-5 Utility Connection Charges - Sewer Service Schedule W-5 Utility Connection Charges - Water Service Sheets 118d, 119d, 120c, and 120.1 Sheets 12Se, 125.lb, ·.1.25.2b, and 125.3 Sheets lllg, 112g, 113e, 113.lc, and 113.2 SECTION 2. The foregoing changes shall become effective December 1, 1972. INTRODUCED AND PASSED: AYES; NOES: ABSENT: ATTEST: UNANIMOUS NONE COMSTOCK Noyember ZO, 197Z a-s~ J' vl~v& City Clerk(/ · APPROVED AS TO FORM; APPROVED AS TO CONTENT: /q,..a_,,, "' • .(. --~wer Department APPROVED: City Treasurer APPRO~ ~ Cit~ ~ L • ~-.-.::...-,.._ .. , . ,.11..-.-!. '· ~. - e-----..._ . ..1x.:;,_,l.h-r-. -~~·k :,1 ~' ~ ' '· ' • • • City of Palo Alto California Sheet No. lllg Canceling Sheet No. 111£ TERRITORY: UTILITY CONNECTION CHARGES SCHEDULE W-5 WATER SERVICE Inside the incorporated limits of the City of Palo Alto and on land owned or leased by the City of Palo Alto. CHARGES: ·A. Supply System: Deferred Area Assessment Per Acre Water Service Area 1 . . . Water Service Area 2, 59-11 Water Service Area 3, 59-01 Water Service Area 4, 62-08 B. Distribution Syf: •. ~m: WateL Service Areas 1 & 2 Water Service Areas 3 & 4 C. Service Connection Charges: Sizes 1-inch thro1Jgh 2-inch l-inch connection . . . . . 1\-inch connection . . • . 1\-inch connection • . 2-inch connection . . . . . . . . . • . . . . . . . • .$ .oo Assessment Dist. . . . • . . . . 95.00 Reassessment Dist. See "Other Conditions" Reassessment Dist. Sec "Other Conditions" . • . . . . . • . . • . . . . . Street Frontage Charges Per Foot ZONES R.-1, R-2, R-3 $3.00 3.50 ~ $4.85 5.35 Amount • . • . . . $210.00 . • • 250.00 • • • . • • 300.00 • . . . . . 360.00 $50.00 reduction in above service connection charges for connec- tions installed at time main is constructed. Issued by The City Council (Continued} Effective Date: • ) • • • City of Palo Alto California Sheet No. 112g canceling Sheet No. 112£ UTiLITY CONNECTION CHARGES SCHEDULE W-5 WATER SERVICE C. Service Connection Charges (Continued): Sizes 4-inch through lO·inch 0 4-inch connection • • • • • 6-inch connection .8-inch connection . . . . . . 10-inch connection • • • • • Water Service $ 575 150 900 1,100 Fire Service $525 675 800 950 Water & Fire Comb. Serl7icc $ 975 1,300 1,565 1,900 For service connections of 4-inch through 10-inch sizes, the owner must provide a vault to hou~e 111eters or other required control equipment in ac~ordance with the Water Utility'§ specifications. Approved detector·check valves with by-pass assemblies must be provided by owner on all fire servi.ces. An exception may be made where only an automatic fire-sprinkler system is served, provided the sprinkler control equipment is within ten feet of the end of the street portion of the fire service. $1SO reduction in above service connection charges for connec- tioas installed at time main is constructed. D. Additional Meters on Connection: With new connection • • • • • • • On existing connection • • • • . . . . .. . . . . ·Per Meter • • • • • • $30.00 • • " • 65.00 Maximum size additional meter: l-inch. The Water !Jtility may limit add:i.tional mete:t.s on a connection. E. RelOc.ation of Facilities: Approved relocation of services, hydrants, or other facilities will be done at cost. Deposit of estimated cost is required before work begins. Issued by The eity Coun~il (Continued) Effective Date: ) I I ~ I I I • • • City of Palo Alto California OTHER CONDITIONS: UTD..ITY CONNECTION CHARGES SCHEDULE W-5 WATER SERVICE 1. Supply System Charges: (Total of a. and b.) a. Basic Charge: 59-01 -Deferred Reassessment shown on Reassessment Role 62-08 -No Charge Sheet No. llJe Canceling Sheet No. ll3d b. Property to be developed at an indicated level of demand exceeding the dema~d of the permissible number of residential units (or equivalent) shown on the Reassessment Roles must pay an additional charge for each equivalent excess unit: 59-01 -$172.30 per unit 62-08 -141.33 per unit \ c. An equivalent residential unit shall be 46 fixture units as defined in the Uniform Plumbing Code. I 2. Distribution System Charges: a. Connection charges are based on lot or parcel size as des- cribed in City's official records and apply to all vacant land except land developments where connection charges are recorded as paid by the developer. This exception applies, generally, to land developments after February, 1953. b. Street front:1ge charges for corner lots shall be based on the total frontage on all streets. c. Where a street service has been installed·and assessed in accordance with the "Improvement Procedure Code," dis tri- bution system charges must be paid ~efore service can begin. d. 'Where service is from a main that is in an easement or right· of-way, the frontage charge shall be based upon that portion of the parcel that borders the right-of-~ay or easement. Issued by The City Council (Continued) Effective Date: I t ! . ,. • . . • • City of Palo Alto California Sheet No. 113.lc Canceling Sheet No. 113.lb UTll.ITY CONNEClION CHARGES SCHEDULE W-5 WATER SERVICE 2. Distribution System Charges (Continued): e. If a street, right-of-way, or easeoent is designed to serve oniy on one side, the frontage charge shall be doubled. £. If a street, right-of-way, or easement is designed to serve both sides, but only one side is being developed, special arrangell'tents must be made to provide for the frontage charge of the other side. g. Where extensions are required to service areas that are not contiguous to existing systems, special arrangements must be made to provide for the cost of the intervening distri- bution system. 3. Service Char&es: 4. a. Additional service connections are available with payment of additional service connection charge as shown in Section c. b. Replacement of service connections m•de necessary because of ordinary wear and deterioration will be made without charge. Replacement due to inadequacy will be charged as an additional service connection. Installation under Unusual Conditions: Any condition which, in the opinion of the Chief Engineer of the Water Utility will result in a cost higher by-more than fifteen (15) per cent of the charges set forth in (B). (C), or (D) above will be classified as unusual. The charge for an unusual installation will be based on the Chief Engineer's ·estimate of the total costs of ~11 materials, labor, and other costs incidental to the instailation. (Continued) Effective Date: Issued by The City Council • . • • • City of Palo Alto California Sheet No. 113.2 5. Exceptions: trI'ILlTY CONNECTION CHARGES SCHEDULE W·S WATER SERVICE a. Water Service Areas 3 & 4, connections served directly from supply main: The distribution system charges (Section B) will be based on a maximum frontage of 660 feet. This exception applies to single applications for service and does not apply to subdivisions or tracts. b. The developer may, at his option, furnish and install the on-site water system at his expense and in accordance with City's specifications in lieu of street frontage and con- nection charges. Effective Date: Issued by The City Council • c ~·· . ... ._ .. •. • • City of Palo All:o California Sheet No. -118d Canceling Sheet No. 118c UTILITY CONNECTION CHARGES SCHEDULE G-5 GAS SERVICE TERRITORY: Inside t:lae i.Dcorporated limits of the City of Falo Alto and on land owned or leased by the City. CHARGES: A. Supply SJSte-.: Foothills Gas System 68-82, Reassessment District. See •Other Conditions". B. Discribudon. System: Street Frontage Charges Per Foot Z 0 NE S Gas Senice Area t Gas Service Area 2 . . . . . . . . • • • • • • • • . . . . . . . ~ c. Seryice Coanec:tion Charge: l-iach c.anection H;-:1.Dch connection 2-iDch CODDection 3-iDcb CGGUection CONDIT! A B $ 75.00 $150.00 130.00 200.00 165.00 255.00 190.00 315.00 $1.20 1.70 ON c $ 75.00 110.00 135.00 165.00 Others $2.25 2.75 Excess.Length Per Foot $2.00 2.60 3.25 4.15 Conclltica A: Service installed at time main is constructed. Condi.tic:a B: Service installed on existing main, CondLtioa C: Service extended fran an existing street service stub. Excess Length: Additional charge for extension greater than forty (40) feet fraa the street property line to the gas meter location, measared along a line perpendicular to the street property line. (Continued) ,Effective Date: Issued by 'lbe -City Council I J City of Palo Alto California • UTILITY CONNECTION CHARGES SCHEDULE G-5 GAS SERVICE D. Additional Meters on Connection: • Sheet No. 119d Canceling Sheet No. 119c Per Meter With new connection • • • • • • On existing metered connection . . . . . . . . . . $ 7 .so 25.00 . . . . . . . . . . . E. Service Relocation: S_ervice riser relocation . . . . . . . . . . . . . . . . $30.00 New piping required will be charged at excess length rate. OTHER CONDITIONS: 1. Supply System Charges: (Total of a. and b.) a. Reassessment shown on Reassessment Role. b. Property to be developed at an i~dicated level of demand exceeding ·the demand of the permissible·number of residential units (or equivalent) listed on the Reassessment Role must pay an additional charge for applicable facilities for each equivalent excess unit: Primary Supply $57.35 per unit Secondary Supply -Lines E and F 2.05 II ii Secondary Supply -Lines G and H 26.37 II II c. An equivalent residential un~t shall be defined 38 an aggregate input rating of 600,000 BTU/hr. 2. Distribution Syscem Charges: a. Connection charges·apply to all vacant land except land developments where connection charges are recorded as paid for by the developer. This exception applies, generally, to land developments.after February, 1954. (Continued) Effective Date: Issued by The City Council • • • City of Palo Alto California Sheet No. ll9d Canceling Sheet No. li9c UTILITY CONNECTION CHARGES SCHEDULE G-5 GAS SERVICE D. Additional Mete!"s on Conrlection: 'With new connection • • • • • • On existing metered connection E. Service Relocation: . . . . . . . . . . . . . .. . . . . . . . s.ervice riser relocation . . . . . . . . . . . . . . . . ' New piping required will be charged at excess length rate. OTHER CONDITIONS: 1. Supply System Charges: (Total of a. and b.) a. Reassessment shown on Reassessment Role. Per Meter $ 7.50 25.00 $30.00 b. Property to be developed at an indicated level of demand exceeding the demand of the permissible·number of residential units (or eouivalent) listed on the Reassessment Role must pay an additional charge for appltcable facilities for each equivalent excess unit: Primary Supply Secondary Supply -Lines E and F Secondary Supply -Lines G and H $57.35 per unit 2.05 II II 26.37 " " c. An equivalent residential unit shall be defined as an aggregate input rating of 600,000 BTU/hr. 2. Distribution System Cha~ges: a. Connection charges·apply to all vacant land except land developments where connection charges are recorded as paid for by the developer. This exception applies, generally, to land developments.after February, 1954. (Cont iL1ued) Effective Date: Issued by The City Council I\ • City of Palo Alto California • t..1TILITY CONNECTION CHARGES SCHEDULE G-5 GAS SERVICE D. Additional Meters on Connection: • Sheet No. ll9d Canceling Sheet No. ll9c Per Meter With new connection • • • • • • On existing metered connection • • • • • • • • • • c • • $ 7.50 25.00 • • • • • • • • • • E. Service Relocation: s.erviee riser relocation . . . . . . . . . . . . . . . :. . $30.00 New piping required will be charged at excess length rate. OTHER CONDITIONS: 1. Supply System Charges: (Total of a. and b.) a. Reassessment shown on Reassessment Role. b. Property to be developed at an indicated level of demand exceeding the demand of the permissible·number of residential units (or equivalent) listed on the Reassessment Role must pay an additional charge for applicable facilities for each equivalent excess unit: Primary Supply Secondary Supply -Lines E snd F Secondary Supply -Lines G and H $57 .35 per unit 2.05 II H 26.37 " " c. An equivalent residential unit shall be defined as an aggregate input rating of 600,000 BTU/hr. 2. Distribution System Cha~ges: a. Connection cherges apply to all vacant land except land developments where connection charges are recorded as paid for by the deyeloper. This exception applies, gen~rally, to l•nd developments.after February, 1954. (Continued) I Effective Date: Issued by The City Council • • ' City of Palo Alto California • UTILITY CONN£CTION CHARGES SCHEDULE G-5 GAS SERVICE (continued) 2. Distribution System Charges (Continued): • Sheet No. 120c Canceling Sheet No. 120b b. Street frontage charges for corner lots shall be based on the total frontage on all streets. c. Condition C is applied where a street service has been inst&lled and assessed in accordance with the "Improvement Procedure Code.n Distribution system charges also must be paid before service can begin. d. -Where service is from a main in an easement or right-of• way, the frontage charge shall be based upon that portion of the parcel that borders the right-of-way or easement. e. If a street, right-of-way, or easement is designed to serve only on one side, the frontage charge shall be doubled. f. If a street, risht-of-way, or easement is designed to serve both sides, but only one side is being developed, special arrangements must be made to provide for the frontage charge of the other side. g. Where dist~ibution system extensions are required to service l'- areas that -are not contiguous to existing systems, special arrangements must be made to provide for the cost of the intervening distribution system. 3. Service Charges: a. Additional service connections are available with payment of additional service connection charges as shown in -Section c. b~ Replacement of service connections made necessary because of ordinary wear and deterioration will be made without charge. c. In coamercial or industrial areas where a surface meter installation is impractical, meters may be placed in underground vaults. Vaults must be provided by the Issued By The City Council Effective Date: t ' -------------------------------------------• • • City of Palo Alto California Sheet No. 120. l UTILITY CONNECTION CHARGES SCHEDULE G·S GAS SERVICE (continued) 3. Service Charges (Continued): c. (Continued) owner in accordance with the Gas Utility's specifications. Subsurface meter instal~ations will not be allowed in residential areas. 4. Installation under Unusual Conditions: Any condition which, in the opinion of the Chief Engineer of the Gas Utility, will result in a cost higher by more than fifteen (15) percent of the charges set forth in (B), (C), or (D) above will be classifit>d as unusual. Ihe charge for an u4usual installation will be based on the Chief Engineer's estimate of the total costs of all materials, labor, and other costs incidental to the installation. 5. Exceptions: Gas Service Area 2, connections served directly from supply main: The distribution system charges (Section B) will be based on a maximum frontage of 660 feet. This exception applies to single applications for service and does not apply to subdivisions or tracts. Issued by • The City Council Effective Date: ~ I I • \ 1 • • 0 • • • City of Palo Alto California Sheet No. 125e canceling Sheet No. 125d UTILITY CONNECTION CHARGES SCHEDULE S-5 SEWER SERVICE TalllTORY: Inside the incorporated limits of the City of Palo Alto and on land owned or leased by the City of Palo Alto. CBOGES: A. trunk System: Per Per Deferred Area Assessment Connection Acre Sewer Service Area 1 $ .00 $ .oo Sewer Service Area 2, 59-10 Assessment Dist. 175.00 .OO Sewer Service Area 3, 59-01 Reassessment Dist. See "Other-Conditions" ) Sewer Service Area 4, 62-08 Reassessaent Dist. See "Otb~r Conditions" -=----------~...;.__----.;;.._;,,,"'--"'- B. Collection System: Sewer Service Areas 1 & 2 Sewer Service Areas 3 & 4 c. Service Connection Charges: Street Frontage Charges Per Foot $ .oo 3.00 4-ineh connection ••••••••• •-• ••••• 6-incl: connection • • • • • • • • • • • • • • • • $280.00 350.00 Special arrangements must be made to provide for the cost of a connection larger than six-inch. D. Relocation of Facilities: Approved relocation of services or other facilities will be done at cost. Deposit of estimated cost is required before work begins. Issued by The City Council (Continued) Effective Date: • • ' . • City of Palo Alto Callfornia • UTD.ITY CONNECTION CHARGES. SCHEDULE S-5 SEWER SERVICE · • Sheet No. 125.lb · CancelinR Sheet No. 125.la omER CONDITIOllS ~ ' - 1. Trunk System Charges: (Total of a. and b.) a. Basic Charge: (1) If property did ,!21 receive a refund under Reassessment - 59-01 -Deferred Reassessment shown on Reassessment Role 62-08 -No Charge (2) If property did receive a refund under J&eassessment - 59-01 -$ 86 per acre 62-08 -124 per acre b. Propert:y to be developed at an indicated level of demand exceeding the demand of the permissible number of residential units (or equivalent) shown on the Reassessment Boles must pay an additional charge for eaeb equivalent excess unit: . 59-01 -$ 43.33 per unit 62-08 -74.44 per unit c. AD equivalent resid•ntf.al un.Lt shall be 31 fixture unita as defined in tbe UnifoEm Plurabins Code. 2.. Collection System Charges: a. Connection charges _are basP.d on lot or parcel •be •• described in City's official records mid applJ to all v.cant land except land development where connection charges are recorded as paid by the developer. - b. Street frontage for corner lots shall be total frontage OD all streets. 1.-~~~~~~--~~~--~~~~--~~~-----~~~--~----~---<~c_o~u~1_n_u_e_d~>~---· If fee tive Date:< !Hued by The City Council • • ~ I I ~ i ,\-. c City of Palo Alto California • unUTY CONNECTION CHARGES SCHEDULE S-5 SEWER SERVICE OTHER CONDITIONS (Continued): . 2. Collection System Charges (Continued): • Sheet No·. 125. 2b Canceling Sheet No. 125.2a c. 'Wher~ a street service has been installed in accordance with the "Improvement Procedure Code, 11 collection system charges must be paid before service can begin. d. Ybere service is from a main that is in an easement or right-of-way, the frontage charge shall be that portion of the parcel that borders the right-of-way or easemenc. e. If a street, r!ght-of•way, or easement is designed to serve only on one side, the frontage charge shall be double for that portion. f. If a street, right-of-way, or easement is designed to serve both sides, but only one side is being developed, special arrangements must be made to provide for the frontage charge of the other side. g. Where extensions are required to ser-Vice areas that are not contiguous to existing systems, special arrangements must be made to provide for the cost of the intervening collection system. 3. Service Charges: a. Additional service connections are available with payinent of additional service connection charge as sbowo in Section c. b. Replacement of service connections made necessary because • of ordinary wear. and deterioration will be 11ade without charge. Replacement due to inadequacy will be charged as an additional service conn.ection. Effective Date: Issued by The City Council • • • ~ • • City of Palo Alto Cal~fornia Sheet No. 125.3 ~----~~~~~~~~~~~~~~~--~~~~~~~--;.....;.--~;;..._.;,;;;,...;..;;.... utnITY CONNECTION CBARGBS SCHEDULE S-S SEWER SER.VICE <mmR CONDITIONS (Continued): 4. Installation under Unusual Conditions: Any condition which, in the opinion of the Chi~f Engineer of the Sewer Utility, will result in a cost higher by more than fifteen (lS) percent of the charges set forth in (S) or (C) above will be classified as unusual. The charge for an un- usual installation will be based on the Chief Engineer's eathtate of the total costs of all materials, labor. and other costs incidental to the installation. 5. Pullpillg Plants: Where pumpillg facilities are needed to drain an area into the trunk or collection system, the cost of such facilittes will be at the expense of the developer. 6. Exceptions: a. Sewer Service Areas 3 & 4, connections served directly from trunk sewer: The cOliection system charges (Section B) will be baaed on a maximum frontage of 660 feet. 'Ibis exception applies ta single applications for service a'Dll does not apply to subdivisions or tracts. · b. 'l'be developer may, at his option, furnish and install the oo-aite sewer ayi.tea at his expense and in accordance with City'• epecificatious in lieu of street frontage and connec- tion charges. Issued by The City Coun~il Effective Date: • • ! I .J I I i