Loading...
HomeMy WebLinkAboutRESO 4842• . . :,..' • RESOLUTION NO. 4842 RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO DETERMINING THE GENERAL PREVAILING RATES OF PER DIEM WAGES IN CONTRACTS FOR PUBLIC WORKS FOR THE CITY OF PALO ALTO AND PROVIDING FOR PUBLICATION OF SUCH RATES AND RESCINDING {ADOPTED NOVEMBER 20, 1972) RESOLUTION NO. 4677 .fl ;1~~ ,.., , 1,,, c ..;.::----p~~ ~ ·o,,/O -~'5 . WHEREAS, under the provisions of section 1773 of the Labor Code a public body awarding a contract or undertaking public works must determine the guneral prevailing rate of per diem wages in accordance with standards set forth in said Code for eac~ craft, classification or type of workman needed to execute the contract; and WHEREAS, the City Council has ascertdined dlld considered· applicable wage rates established by collective bargaining agree- ments within· the locality and in the nearest labor market area, particularly the Santa Clara-San Benito counties Building and ~onstruction Trades Council wage scales; NOW, THEREFORE, the COWlCil of the.City of Palo Alto does RESOLVE as follows: SECTION 1. The Council hereby determines the general pre- vailing rate of per diem wages as of November 19, 1973, in· the· Palo Alto .locality for ~11 public works under contract to be that set forth in EXHIBIT A attached hereto and made a part hereof by reference. SECTION 2. The City Clerk is hereby directed to send-a certified copy o; this resolution to the Clerk of the Board of S~pervisors of the County of Santa Clara and said county is authorized to publish said wage rates as required by law. SECTION 3. The City Clerk is hereby directed to send a certified copy of this resolution to the Director of Industrial -l -1/22/75 Note to file: Resoluti~n I 5040 repeals this resolution -December 16, 1974 ' .·~. • • Relation• of the State of·C&lifornia, San Franoiac:o, C&lifornia. SECTION 4. , Reaolution No. 4677, adopted November 20, 1972, ia hereby repealed. INTRODCCED AND PASSED: November 19, 1973 AYES: Beahrs, Berwald, Clay, Comstock, Henderson, Norton, Pearson, Rosenbaum) Sher NOES: -None ABSENT: None APPROVED: :~J'~ APPROVED AS TO FORM: ~~ Mayor ~ APPROVED1 ~-.....J,J.(]~ Department of Plibiic Works and Engineering APPROVEDs APPROVED: /0-J -2 - I i_/ ,. I: ,. I Proof of Publication {2013.5 c..:.P.) SAN JOSE POST·f~ECOl?D "l6 West St . .lohn Street San Jose, California Phone: 28 7-4866 ~-~o. ···--···· ... ·-·····-·-···-·-.. --........ -... . Stale o~ C"lifoml.i Cwnly or $;.,;!;;, Ciara, SS I, the tindersi~;,d, state that I am, and al all 1;mes hero:ii:\ menlior:c:d, was a citizcri of 1ia U;,i:ed Slates of Ameriei!l, over I~ age ol ei51hreen yec:n and not i:I par1y !o or inleresled ir. the i'bc'le enlit!ed maller; that l .-rn the pri.ncip..,.f clerk or the printer and pub- lisher or 1hc S~~ JOSE POST-RECORD, a newsp.aper of 9em~ral circula:ion, printed and published daily ex· cept Saturdays, s~·ndays <ind leg:il holida)'$", if' l~e City of San Jose, County of Santa Clara, which news-- paper has been adi11d9ed a newspaper of general drc:ulafion by Svperior Court oi the County of Santa Clara, Stafe of California, under date of February 3, 1922, Case Number 2784~; a:u:i that the nolice of which tho lSnMxed is a printed copy, has been pub- lished in each regular and enli~e issue of :;aid naws· paper and not in any supplement thereof, on the foJ. lowing dates to-wit: December 28, 1973 I declare under penally of perj;,iry thal the fore- going is true ond correct. Executed on ..... December .. 28, .... 19.7.3 ....... _ a! San Jo!ie, Cafifo'mia. ~-mlflt~11ct?!~,./ ···-·-·······~-········-·•·"---···-............. ·"'-'~--· ............... --c. McClelland " ' _,• ~ I ' '"•;r ... . t' ... ~-.. <1" J ,". -(... ,' f; ' .. ·-~"" J, I ,.1 .;. ~1·:~ Sriace: f>elow for Uic d C.ounly Clerk Or.!y J,~ .• t b /. 0 :,[! • bl t•e·, -. . ::/~·,,,, ( 01 7 <: J ~ , 1 < 'I .... ,.. ... f, : /.· ._....,A \ ... ·--.. -, . {SEE AT"TACHED) rcJ.e ·tfl / .t. BASIC WAGE RATES. FRI'.IJGE BENEFITS. HOLJDAYS AND CONTRACT Tl:aMlNATJON J'>ATES ARE '!'HOSE ur TilADE UXIONS OPERATING IN THE JURISDICTIONAL AREA OF THF :s.ANTA CLARA -SA!\ BENITO COUNTIES BUILDING AND CONSTRUC'.i.'ION TRADES COUNCIL, AND ARE SHOWl' ON SHEETS 1 · 48 INCLUSIVE HEREOF. THE INFORMATION IS CURRENT AS OF ~OVEMBER 27, 1971 AND HAS BEEN PREPARED PURSUANT TO THE STATE LABOR CODE FOR PUBLIC CONTRACTS. Bt.:T IS SUBJECT TO RULES AND REGULATIONS ADOPTED PURSUANT TO THE U~11'Ef> STATES PRESIDENTIAL EXECUTIVE ORDER NO. 11588, 36 F. R. 6331. ASBESTOS WORKERS Dourly Basic Wage Rate Vacation I: Holiday Vacation Adm. Fund Pension Fund Occupational Health Health &: Welfare Apprentice Training Indu~try Promot:on Fund a) General Foreman -$.75 per hour over Mechanic's rata- Foreman -$.40 per hour over mechanic·s rate. b) Overtime --all double. c> Apprentice Rate -4th Year Apprentice .......... $7.79 3rd 0 year appn-ntice .. -···--· 6.92 2nci vear apprentice---··· 6.06 1st year apprentice.·-·-··· 5.19 Effeedve 1/1/71. $8.75 1.07 .01 .65 .07 .90 .06 .01. Effeethre 8.'1/'13"' $9.30 1.07 .01 .75 .07 .90 .06 .IJI d) Mileage allowance -any tra~·el over a 20-mile round trip is pa.Id $.15 a mile. Room and Board -$15.00 per day e) Premium pay for work rrom a bosun's chair, suspended scaffolding, etc .• 20 feet or more above rtoor or ground. to be $0.35 per hour. • NOTE: Wages with effecti\•e date of 8/1/73 waiting for approval of Comtzuction lnduatey Stablliza· tion Committee. Contractors should verify currP.nl wage rates prior to payment. BOILERMAKERS: Iron Shipbuilders Blacksmitb'i Forgers I: Helpers Boarly Basic Wage Rate General Foreman Foreman Asst. Foreman Boilermaker · Blacksmith Health I: Welfare Pension Trairing Fund Vacation Effective H·1·7Z $8.70 8.45 8.20 7.95 .60 1.00 .02 .50 Effective* H-MJ $9.20 8.95 8.70 8.45 .65 1.00 .02 .so ---. Eftedtvc* Z.t.74 $9.50 9.ZS D.00 B.75 .65 1.00 .02 .so al Apprentice Rate -four · year program, 70% of journt'yman's rate for first six months; 2"l% in· crease thereafter !or each six month period. b} Overtime -all double in excei:s of eight hours, first shift; 7~ hours. seconcJ shift: seven boun, third shift. Double Saturday, Sunday and holidays. •NOTE: Wages wi~h effecth•e date tlf 8/1/73 waiting lot approval ol CoD!tructloa hclustry Stablll.za· tion Committee. Contractors should verify current wage rates prior to payment. BRICKLAYERS: Journeymen Bricklayers. Stone Masons, Block Layers, Cork Layers, Terrazzo Workers, Pointing, Caulking & Cleaning Hourly •Bask Wage Ralf' Health & Welfare Pension •vacati'ln · .Apprentice Fund ·· fndustry Promotion Dental Fund Ellectke 7-1-73 $9.55 .65 .65 .75 .15 .26 .20 a) Foreman -One hour pay per day above the rate. b) Overtime -All double. Bff.ethe l·Mf SUS .65 .6."i .75 .15 .20 .JO Eftedhe 7-1-74 $10.15 .65 .61 .71) .15 .20 .20 c) Apprentice rate -4 year program: 45% of joumeyman•s rate for ftnt am IDCll"tb period; in- crease 5% each six month period up to and including eiahtb period; 1095 lnerea. for nfDtb period. d) Undergrou.'ld work -sewer, manholes, catch basins, sewer pipes and telepbane canctutia, ts.GO per day above the regular w~. _ ~) Milel'ge allowance -any travel over a ten mile round trip la pe1cl $.10 a mile. · : ) Seven ltour day. •NOTE: Vacation is included in basic wage rate. CARPENTERS: Millwrights, Shinglers, Floor Layers (Hant- woocl). Power saw Operators, Patent Scafffl~ Erectors Hourly Basic Wage Rate Carpenters Millwrights Sblnglers Efrtttrve 6-16-7! $8.10 8.50 8.25 EtfeeUve S-H-73 $8.75 9.15 8.10 ,... 2 Vacatioa & Holiday Appnntlce Tralnlng Fund Health and Welfare Pemlon Penaion .02 .02 Promotion Fund .01 .Ill .7S .60 .55 .80 8·1-71 1-1-72 6-1-73 Floor laJen (hardwood), power saw operators, and patent scaffold erectors are paid tile same as ~. a) Fcreman -$.75 _per hour over the current journeyman's wage rate. b) Overtime -Building construct.ion: time and one . hall for four hours after regular eiJht hour11; double time for Saturday, Sunday and Holidays. Heavy highway and engineering construct.Ion: dou- ble t.ime for Sunday and Holidays; time and one-half for all other overtime. c) ApprenUce rate -four • year program; 60% or journeyman's rate for first six months: 5% in· crease each sh: month period thereafter. d) $.25 per hour above journeyman or apprentice wage rate is paid for scaffold hos'n chair or any work suspended rrorr. or held in posi~on by rope, cable or safety belt. - CARPET LINOLEUM AND son TILE Be• Eflecllve Joanaey- Date mea 8-1-73 $7.80 2-1-74 8.00 Basic Wage Rate Sliopmen $6.05 Straipt CaUer Macblne Operator $5.92S Carpet Sewers $5.89 Health• Welfare 8-1-'13 .60 Z.l-74 .60 Pensloo 8-1-73 .35 2-1-74 .SS Vacation• Holiday 8-1-73 1.00 2-1-74 1.00 Training Fund 8-1-73 .05 2-1-74 .10 Industry Fund 8-1-73 .06 2-1-74 .06 Dues Cbectoft .... 8-1-13 .07 Z.l-74 .07 •APPRE.NTICE WAGE RATE 6.25 .60 .60 .55 .55 .75 .75 .05 .10 .06 .06 .07 .07 s-1-n 1st 12 Mo. 50% 3.90 12 to 11 Mo. 60% 1.63 11 to 24 Mo. W% S.46 24 to 30 Mo. tlO% 6.24 30 to 36 Mo. 90% 7.02 ••"Deduct from wage rate a) Foreman -$ .50 per hour above any basic wage b) Overtime -all dOuble CEllBNT MASONS 6.125 .60 .60 .55 .55 .81 .81 .05 .10 .06 .06 .07 .07 Z-1-74 4.00 4.80 MO liAO 7.20 6.09 .60 .fiO .55 .55 .81 .81 .05 .10 .06 .06 .07 .07 . .....,. Effective Effective J.1·73 &·16-73 Basic Wage Rate $7.39 Health • Welfare .56 Pension $LOO 1.00 Vaeatian .75 Floor Coverla1 Halldler $2.35 2.45 .60 .60 .55 .55 .40 .4-0 .05 .10 .06 .06 .07 .07 Appreadces • • .60 .60 .55 .55 .... .05 .10 .06 .06 .07 .07 ••vac. • Hol. 8-1·73 I: 2-1-74 .58 .53 .59 .66 .75 Effective 1-1-74 $1.00 a) Foreman -$.50 per hour above respective journeyman's rate. b) Overtime -time and one-half ror first two hours; double tim~ thereafter: double Saturday. ~. and Holidays. c) Apprentice rate -three -year program -First six months, 65~: :M!COlld six months. 75%: third siz months, ~: fourth six months, 85%: fifth six months, 90%: sixth six months, !)5% of ~··rate. d) Swing or slip form scaffolds -$.25 per hour ab\we journeyman's rate. e) llastlc. ~. ~ e~y. polyester, resin and all composition masons -$.25 per hour abaft journeymjD s rate. D Sblft work -ftrSt shift m hours work for eight hours PIJ'. Second shit&. 7 hours wol'k for eight hours pay. Tblrd lbitt 7 hours wort ror £ight hours pay. ELECTRICIANS JlMrb' Rl•ic 'Nate Rate Geaen1 Foreman ,._ Journeyman .Joame;rmu ==- HealUi°'r;3:;:" Eftecilve 1-M3 12.15 10.94 S.7' i0.94 9.72 EUecUu 12-1-D lz..16 1!.22 9.97 ll.Z2 9.97 Pension (National Electrical Benefit Fund) Vacation .45" 1% Basic Wage .. 8% Basic Wage• 4% Basic Wage• (Pd. by Contractor to Ins. Co.) Holiday Induat!Y Fund Local l"ension • To Be Deducted .os•• .35 ... .. Paid Above Scale •••Above all Hourly Rates a> O.ertbaw -all double. bl Appnetlce rate -four year program -first period of six months, 50% of Journeyman's rate: MCGnd, 1511&: third,'°": fourth, 85%: fifth, 70%; sixth. 75%: seventh, 80%; eighth. 85%. P-ve 3 c) Swine shift -15% of basic waie per hour. Graveyard shift -20% of basic wage per hour. . . . dJ Time and OO"! • ball -work under compressed all, or lb muks. or m a pos1Uon of 60 LO 9V ft>et abc>n.' ground (line work excepted). Double time -work in excess of 90 r~t atxive &•ound (line work excepted). e) 36 hour week. ELE~'ATOR CONSTRUCTORS Hourly -Basic Wage Rate Mechanic Jn Charge Mechanic EfrecUve Effective Helper (70%) Helper (50'.'t -6 Months) Health & Welfare Pension Vacation Supplemental Yi.lcation Fund Educational Fund ••Deducted from wage package 9·15·7% 9.11-73• $10.665 $11.1517 948 9.S126 664 6.9388 4.74 4.9563 345 paid by Employer .395 .035 paid by Employer .035 .n .u .055 paid by Employee .055 2% basic wage for men with les.s than five yea.n in the industry. 4% basic wage ror men with more than five ,:;ears plu.s ~% for each additional year in the in- dustry. . 015•• .02 .. *NOTE: Wages with effective date o! 9-16-73 waiting for approval or Comtruction Industry Stabiliza· tion Committee. Ccntractors should verify current wage rates prior to payment. ENGINEERS (OPERATING) Hourly Basic Wage Rate Group 1 Group 2 Group 3 Group 4 Group 5 Group 6 Group 7 Group 8 Group 9 Group 10 Group lOA Group 11 Group llA Group 118 Group UC Foreman• • With the exception ol general foreman. shifters. chanics (heavy duty) . Efledlve Effective* 6/16/7Z 1/11/73 $ 6.63 $ li.93 6.91 7.21 7.08 7.38 7.53 7.83 7.70 11.00 7.111 8.11 7.94 8.24 8.U S.56 8.44 8.74 8.60 3.90 8.69 8.99 8.83 9.13 9.70 10.00 9.92 10.22 10.15 10.45 9.69 9.99 heavy duty repairman foreman, and master me· •NOTE: Wages with effective date of 9-16-73 waiting for approval ol Cons~cUon Inc:!ustry Stabiliza- tion Committt>e. Contractors should verify current wage rates prior to payment. ENGINEERS (OPERATING) CONT. STEEL ERECTORS Hourly Basic Wage Rate Group 1 Group 2 Group 3 Group 4 Group 4A Group :i Group 6 Group 7 Hourly HealUi &: Welfare Training Fund Pension Vacation &: Holiday Pensioned Health a Welfare 1111':? Affirmative Action .24 .57 .24 .90 60 .05 ElfecUve 1/11/7! $ 7.05 7.36 a.11 8.29 8.52 8.91 9.24 10.49 EffttUve 111/73 $ .7Z .:24 1.00 .69 .oa EHecttve 6/11/73 .. $ 7.35 (.66 e.47 8.59 8.82 9.Zl 9.54 hl.79 $ .84 .2-1 1.15 .SS .08 a) For work on cranes with booms of: 80 ft. up to 129 ft. $.20 per hr. above basic wage rate 130 ft. up to 179 ft. $.35 per hr. above basic wage rate 180 ft. and over S.50 per hr. above basic wage rate bl O\•ertime -Double the straight time rate up to and including 12 hours ror all work performed be- fore a st.ift begins and after it ends.and on Saturdays, Sundays and Holidays. Triple U. straight time rate shall be paid for all work after 12 hours on any day. d Apprentices --1st Period Apprentice 70% Less S.40 of Group 8 Basic rate 2nd Period Apprentice 78% Less $.40 or Group 8 Basic rate 3rd Period Apprentice 86% Less $.40 of Group 8 Basic rate ·Hh r>eriod Apprentice 95% Less $.40 of Group 8 Basic rate ••NOTE: Wages with effective date of 6/16/73 waiting for approval of Construction Industry StabUU. tfon Committee. Contractors sl':ould verify current wage rates prior to payment. , ..... GBOVP NO. l Boom Truck or Dual Purpose A· Capacity or less) Brakeman frame Truck Self-propelled Elevatfni Grade Fireman Concrete Batch Plznts (wet or Plane Heavy Duty Repairman dry) Slusher Operator Helper Concrete Saws (self-propelled Small Tractor (with boom> Oller unit) on streets, highwa)·s, Soil Tester Signalman airparts and canals Truck Ty).'!e loader . . Swltchmim !>rilling ar.d Borlllg Machinery, Gantry Rider (or Similar Equip. Tar Pot Fireman ~ertical & horizontal fnot to ment) Partsman (Heavy Duty Repair apply to water liners, wagon Hydra-Hammer or Similar Shop Parts Room) drills or j~ckhamm'!rs) (:isst. GROUP NO. 8 Deckhand to eng. reqwred} . . (All of the above ue assistant Grndesetter. -Gradn Checker Armor-coater (or similar} (two to qineer) (mechanical or oth(!rwise) operators and one asst. to enc. GROUP NO Z HighLne Cablew:.1.y Signalman A:pe~i[pcifuit En"'neer · Roller ... Compres so r 0 p e rat or, &reedman lBnriwr-Greene & Cast-in-place Pipe La y i n I Concrete Mixer (up to I: incl. similar) (asphaltic concrete ,.._Ma<:hin~ SI h nd M one yard) pavingJ ......,mbmation us er a otor Conveyor Belt 0 p e r a t o r S~lf-propel.!td CompectDr (single Operator .<tunnel) t-nginel C-Onc;rete Batch Plant (multiple Fireman Hot Plant Self-propelled Pipeline Wrapping umts) Hydraulic Monitor Machine (Pt:rilult, CRC, or Dozei:-. Mec~az:iical Conveyor (handling similar types) Heading Shield O~rator building materials) Self . prop.,tled Power Sweeper Heavy-duty Repairman, and/or Mixer Box 0pPrator (concrete Operator Welders . .• plant) Locomotives (steam or over 30 Ken Seal Machine (or similar) Pump Operator ton) (asst. to eng. req.) Kolman Loauer Casst. to eng. Spreader Boxman CW/screeds> Maginnis Internal Full Slab required on two(%) or more) Tar Pot Fireman ( pow e r Vibrator Con alrports highways Loader (up to 2 yds.) agitated} canals and warehouses) ' Mechanical Tre!lch Shield . GROVP NO 3 Mechanical l'inishers (concrete) Portable Crushing and Screemng ' (Clary, Johnson, Bidwell Bridge Plants (asst. to eng. reqwred) Box Operator (Bunker> Deck or similar types) Push Cat Helicopter Radioman (Signalman) Mechanical Burm, Curb and/or Ti~~r Skidder (Rubber Tired or Locomotive rust. to eng. Curb and Gutter Machire Similar) . requiredl -concrete or asphalt Rubbe_r Tired Earth ~oving Motorman Portable Crushers Eqwpment (~,P to a.~ mcJ. 45 Rodman or CMinma!i . Power Jumbo Operator (setting cu. . yds. struck. M.R.C. ~~)a r r a e r Cconstruct1cn ~P forms, etc., in tunnels) . :~~;f pulls, DW-10, 20, 21, ROtotnist Operator Sli,.rorm . Pu~p~ (power driven Rubber Tire<! Dozer Sc d ( ph I . l:iydraulic lifting device for ree man . except as a tic con-concrete forms) Tractor Drawn Scraper S crete paving) Small Rubber-tirea Tractors Self-propelled Compactor with e 1 f ·propelled. Automatically s f H Dozer applied concrete curing ur ace eater Sheepfoot machine (OD streets, bilhW81S. GROUP NO. 7 Tractor airports I: canals) Concrete Conveyor or Concrete Trenching Machine (asst. to eng. Tre~ch.ing Mac~ne • maximum Pump, truck or equipment z:equired} digging .:city 3 ft. deptl mounted (asst. to eng. when Tn·batch Paver (asst. to eng. (any . tance fn t b e required) (boom length to required) operation. if needed shall be apply) Tunnel MolP Boring machine performed by a.a ant. to Concrete Conveyor, buildiJlg site Opet .. (any a~sistance Jn the ,.!~·> 0 _._ ---(any assistance shall be an operation. 1f needed, shall be ... .._er -t. single ....-um employee covered by this pe~onned by an a~t. to Truck Crane Oiler CA.s.>t. to Eng.) agreement) engineer) GROVP No • Deck Engineers Welder Ball _ _. J ...... T • • Dual Drum Mixer (asst. lo eng. Woods·n:Uxer .<and other similar -· a.... amper .-equired) Pugm1ll equipment) BallBallasastt TRegulato;.ulti Fuller Kenyon Pump and similar GROUP NO 9 amper .. ·purpose types • Boxman (asphalt plant) Instrument man Canal Finger D,rnln Digger (asst. Fork Wt _or Lumbe.a:· Stacker Journeyman Trainee to eng. r~wred) (In addition (construction jobsite) Material Hoist (2 or more to the abo\ e there snall be one I.Joe~~ . drums) (1) Group 7 Operator) Lubn~tion • Servtce Er.g. Mechanical 1''inishers or Spreader Chicago ~m (mobile I:. grease rack) Ma~hine (asphalt. Barber. Comb .. M2xer and compressor Material Ho1.1t Cl drum) Greene & similar) (screedman (gu~te)_ ~uttlecar required} Combination Slurry Mixer and/or Tie Spacer Mine or Shaft Hoist ~le~ner Tcrwermoblle Mixermobile Highlme Cableway (5 tons and Elnator Operator (Inside) Pavement Breaker with or unde~). GROUP NO. 5 ... I t b 0 u t c 0 m p r e s I 0 r Lull Hi-lift or afmJlar (20 ft. or Co "'--•-(2 combination over) _ C ~ ~(---1 d to 7} Pavement Breaker, t r u c It Mucking M~chir.e (asst. to eni. oncre ers over y I mounted with com;iressor when required} Co~ Pampa or Pwnp-c-.rete combinaUon (asst. to eng. Tractor CW/boom) (~or lar1er. Generators. Gasoline Diesel or driver required) and similar) Electrlc Drive (100 KW) ' Pipe Bending Machine (pipe lines GROUP NO. 18 Press-weld (air operated) _only) -. Boom· type Backfilling Mec:hine Pumps (2 to 7) Pipe Cleaning Machine (tractor (asst to eng. req.) Weldin& llachlnea (gaaoUne or .Propelled and supported) Bridgt: Crane diesel) (2 to 7l Pipe Wrapoina: M!tchine (tractor Cary-lift (or similar) GROUP NO 1 PrC?pellecfand supported) Chemical Grouting Machine (asst. • Refr1gerallon Plant to eng required) BLH Lima Road ?actor or Selr-propelled Boom Type Lifting Chief of Party similar Device (Center Mount) (10 Ton Combination Backhoe It Loader {up to and including 1/2 yd. 1 Highli":e Cableway (over 5 tou) GROUP NO. UC M.R.C.) i Loade. (over 4 yds. up to I: incl. Operator of Helicopter (when Derricks C! Operators required twet ~ (12) cu. yards) used In erection work) when swing engine rPmote ;rom I! Power 3hovels, C I a m s h e 11 s , Remote Contr'>lled Earth-moving hoi.st) a Dr aglines, Backhi>es, Gradalla. ! Equipment (no one operator Drrrick .. a.u.,es ( P. x c e P t1 (over 1 yd. I: up to I: Incl. shall operate more than two excava.1on work) (_~ck Engr. I 7 cu. yds. M.R.C.) (asst. to (2) pieces of earth-moving & asst. to engr. n'<1u1redJ I eng. required) (2 assts. to engr. equipment at one time.) Do-i.tore Loader Ii Adams required on 120 B similar or Elegrader • Jarg.:!r) STEEL ERECTORS' Elev!'-ting Grader Ope_ra~or .. I Rubber Tired Earth-moving CLASSIFICATIONS Eucltd Loader & s1m1lar t_.pes Machines (multiple propulsion GROUP NO. I {asst.~ engr. req.) . power units &: two or more Assistant to Engineer (oiler} Rubber·ttred Scraper. seU loadmg scrapers) (up to & incl. 75 cu. (paddle wheels, etc.) ·d •• t k" M R C ) GROUP NO. 2 Heavy Duty Rotary Orill R!gs )' · s rue ' · · · · Assistant to Engineer (Truck (including caiss1Jn !oundatlon Self-pr~pelled Compactor (with Crane Oiler) work & kob!>ins . type drills) m~tiple propulsion Po we r Compressor Operator (ass~-lo en~r. requ1redl . . u~ts) . . Rodman. Chainman Koehring Skooper (or simtlar} Continuous Fhg~t Tie_ Back Auger Generator, gasoline or Diesel (asst. to engr. req.) over 1 cu. :,:d. (mcl. crane) drh·en (100 KW or over) Wt Slab Machine ( Va;;tborg &: . two (2) operators) similar types) Drott Travelift 651-A·l or similar GROUP NO. 3 Lo:ider (4. yds. up to & incl. 4 (45 ton or O\'erJ (Asst. to Eng. Compressors, Generators and/or yds.) req.; Welding M a c bi n e s or Locomoti~e (o\·e.r 100 tons) (single Sell-propelled Compactor (with ccmbinat.i'!n (2 to 6) ~over six or ~ultiple umts) (asst. to engr. I m u l t i p 1 e propulsion power (6) additional e n g 1 n e e rs rf(iu1red) . units) required) Multiple Engine ~anhmovmgtCanal Finger Drain Bacttiller Deck Engineer Machine (Eudids, dozers, etc.) (asst. to engr. required) (in ~strument Man. (no tandem s_crape_r) . addition to the above there IJba.11 S1gn~an (usmg mechanical Pi:_e·slr~ss Wttl' W r a PP 1 n g be two (2) Group 7 Operators) eqwp_ment) i\f.achine . · Canal Trimmer with ditching at-Fork Lift Shuttle Car Creclrum stat.Ion) tachments (two (2) operators GROUP NO 4 Soil Stabilizer (P&H or equal) ) d t t (2)' · • Sub Grader (Gurrie!: or other one U gra, eset er, wo Heavy Duty Repairman autvmatic type) (e.sst. to engr. ~sst. to Eng., Tractor Operator required) Slip Form Paver (concrete or GROUP NO . .fA Track Laying Type.e:irth Mo\ing asphalt) (I operator I: 2 Combinati H Dut)' Machine (single t:ngine with screedmen) Re • on we1d! av Y tandem scrapers) Tandem Cats pairman-r Tractor, Compressor 1Jr11l Comb. Trencher (pulling attached shield) GROUP NO. 5 (asst. to P.ngr. req.) (asst. to engr. req.) Boom Truck or Dual Purpose A Train Loading Station Tower Cranes Mobile (assL to frame Truck Vacuum Cooling Plant engr. required) Chicago Boom Single Engine Scraper over 45 Single Engine Rubber·tired Eartll· SeU·propelled Boom type IJfting yarda . . maving Machine (with tandem Device (asst. to engr. re.:,.:dred, Whirley Crane (up to & including scrapers) De\'ice (center mount) (10 ton 25 tons) Cranes (over 25 tons up to I: incl. or less M.R.C.l Reservoir-Deb~is Tug (Self Pro· 125 tons) (asst. to engr. req.) Chief of Party pelled Floating) Universal Liebher & Tower Boom Cat GROUP NO. 19A Cranes (I: similar typas) (in the Crawler Cranes and Truck Cranes Backhoe (Hydraulic) (up to & incl . erection, dismantlillt( I: moving (15 tons M.R.C. or less) (aSst. 1 cu. yd. M.R.C.) (Asst. to Eng. of equipment there shall be an to eng. required) req.) additional '.>pernting engr. at Single Drum hoist Backhoe (Cable) (up· lo &: incl Group 8 rates> Tugger Hoist t cu. yd) (Asst. tc Eng. req.) \'.'heel Excavator (up to & incl. GROUP NO & Cranes toot over 2S tons, 750 cu. yds. per hr.) (asst. to ' Hammerh~ad & Gantry) (asst. engt. required) Crawler Cranes I: Truck Cranes to engr. required) Whirley Crane (over 25 tons) (over 15 to_ns M.R.C.) (asst. Comh B,;.ckhoe I: Loader Over to engr. reqwred) l/2 cu. yd. M.R.C. (Asst. to Eng. GROUP NO. UA Derricks 52 ope:ators required Req. when used as Backhoe} Loader (o\'er 12 cu. yds., up to when swing engine remote from Continuous Flight Tie Back Auger & incl. 18 cu. yd) .hol~t) (up to & incl. I cu. yd.) (Crane Rubber Tired Multi-purpose H1ghl11~e Cableway (!'lignalman attached) (Two (2) operators) earthmoving Machines (two (2) req~) . . . Grade-Alls Cup to and incl. 1 cu. units over 75 cu. yds. "struck" GSe8J1try R{d1eder (oboor similat r ,~.) yd.) (Asst. to Eng. Req.) M.R.C.) -prope m-ype ng Power Shovels, Clamshells. Drag. I Power Shovels &: Draglines (over device (ce~r mount) Cov!i;r 10 lines (up to &: incl. one CD cu. I 7 cu yds MR C ) (asst. to ton capac1t7 M.R.C. O!. ce11- d M R C l (A • to E g Req l · · · d: · · dditfonal ter mounts not certified i~ Se1r-Pro.peiled e~~-typen Lifting r ~~fsta~i'I:~~e~~ isa required classificat.ion #6881) <~st.. to Device (center mouF't) {over 10 if the shovel or dragline is Eng. req. when boom 15 ex· ton) (Asst. to Eng. req. when electrically powered) tended over 35 feet). boom is extended over 35 ft.) Cranes (over 125 tons) (Asst. to Tower Cranes Mobile (asst. to Self-propelled Boom-Type Lifting. Eng. req.) engr. required) Device (center mount) (over 15 Band Wagons {in conjunction with Universal Liebher and Tower tons) (Asst. lo Eng. Req.) wheel excavator) Cranes (a_nd si~ types) (in GROUP NO. 11 Wheel E>"cavator (over 750 cu. the erection, dismanWng and Automatic Concrete Slip Form yds. per hr) (two (2) operators moving of eq.~pment, ~ Paver (grade-setter, screedman one (1) asst. to engr. required; shaµ be an additional operating & asst. to engineer required) any additional assistance abal1 engineer) Auton:atic Railroad Car be by asst. to engr.) Two or more Drum Hoists Dumper I · O Canal Trimmer (two (2) a.ssts. GROUP NO. 118 GR l1P NO. 7 to engr. required) Loader Cover 18 cu. yds.) Operator of Hellc:opUtr ,.,. 6 FENCE WORDRS (WOOD FENCE) BnrlJ" Ba.sic Wage Rate Jourt1eyinan Fence Worker Feace Worker EflecUve 9/1/7% $6.75 li.50 EUeetlve 7/1/73 tHO 7.15 Probationary Worker Start Aner 3 Montt.s After 5 Monlhs 3.80 5.15 6.50 4.45 5.80 7.1!\ P.:!nsion Health 6: Welfare Health&: Welfare (Retirees) Dental Plan a) Foreman -$.ZS per hour above journeyman·s b) Overtimt -up to four hours -lime and ooe · days -double time. - c) Paid vacation and Holidays -$.60/hr./workcd • Per calendar month for each eligible employee, month under the agreement. rau-. .IS 43.65/Mol'!th• 2.35/Month* .06 ,1)7 half; over four hours. Saturday, Sunday, and holi· for each man. who does 64 or more hours ol. work per calendar GLAZIERS BIMU'IJ Effective Effective Effeellve* 7·1-11 7-MZ 1-1-73 Basic Wap Rate $7.835 $8.455 $8.875 Health • Welfare .35 .35 .46 Pension .55 .55 .61 Vacatlon "' • • Holidays (7 Paid) .23 .24 .24 Tralnfq .01 .01 .01 Industry Fund .02 .02 .02 •Beneficial Fund is deducted from Basic Wage Rate .65 .65 .65 a) High pay -effective 7-1-70 -any man working rrom a suspended cootrivance on the outside of a building or structure for four hou!'S or more shall be paid 25¢ per hour over the scale. b) Apprentice basic hourly rate shall be the rollowing percentage cl joumeJman's wases: 1st 6 months or 1.000 hours 5'l% 2nd 6 months or 1,000 hours 55% 3rd 6 months or 1,000 hours SK 4th 6 months or 1,000 hours 65% 5Ul S months or 1,000 hours '1K 6th 6 months or 1.000 hours 75% 7th 6 months or 1,000 hours 85% 8tb 6 months or 1.000 hours 95% c) Foreman 10% over basic wage rate. o) First two hours after the regular 8 hour day is time and one-half. All other time will be double time. NOTE: Wages with effective date of 7-1-73 waiting for approval or Construction lndu5try Stabilization Committee. Contractors should verify current wage rates prior to payment. BOD CARRIERS: BRICK BOIU"IJ Effective 8-1-7% Basic w~ Rate $7.17 lfealth 6 Welfare .45 Pension .55 Vacation .90• L11dustry Fund .05 Dentld Fund .15 Dues Check orr .os• Effective 1-1-73 $7.30 .50 .65 _90• .05 .15 .05"' Errecun 7-1-73 $7.54 .50 .6.5 .90• .05 .15 .o5• .05 (Not Deductedl .05 (Not Deducted) Promotion Fund .05 (Not Deducted1 ~o Be Deducted From Ba-;ic Wage al Seven hour day plus starting time of 15 minutes. bl Overtime -all double. Includes starting time. c) Swine shift -10% over hourly basic wage rate. d) Graveyard shift -15% over hourly basic wage rate. e) Underground pay -$2.00 per day above daily wage. f) Transportation costs -$ .10 per mile over and above 5 miles BOD CARRIERS -PLASTER B.....,. Basic Wage Rate HeaJtb A Welfare Pension Vacation Dental Fund Dues Check Off Industrial or Promotion .-ro be Deducted from Basic Wage EffecUve 7·M2 $7.7~ AS .55 .90• .15 .o5• .10 EHeoetin 7-MS $8.00 .45 .55 -~ .15 .05• .10 EfteeUve• t-1-74 $8.15 .50 .65 .w .15 .10• .10 a) 8 hour day plus sta..'1ing time of 15 minutes prior to work day. Four hours on Friday plus starting time b) Overtime -All Double c) Transportation Costs -No Tra\'el ~ay -Beyond 3.':i Miles. $8.00 Subsistance NOTE: Wages with effective date of 1·1·74 waiting for approval of Construction Inliustry Stabiliza· tion Committee. Contractors should verify current wage rates prior to payment. IRON WORKERS -FIELD ERECTION Hourl1 Basic Wage Rate Reinforcing Structural &: Ornam~ntal Fence Erector Effl'Cdve 8-11-7Z 8.55 8.58 8.44 EfteeUve Z·ll-73 8.75 8.78 8.64 Health & Welrare .6.1 .68 Pension .875 .875 Vacation . 75• .85• Training Fund -.02 .'l2 Administrati~·e Fund .01 .01 P~e 7 al Jroreman -$. 7j ~r hour O'w'er the regular hourly rate or the highest building trades r.lassiiication over which they ha\·e 5Uper\·ision. - b) Apprentice rates -for three year program for reinfo:-cing, structural and ornamental, and fence ere-tor apprentices: c) O\·ertime -All double. Fir~t Six Months: Second Six M\>nths: Third Six Months: 1''ounh Six Months: Fifth Six Months: ~ixth Six Months: 70% 83% 87% 91% 95% 98% N'OTE: Wages with Effective Date of 8-16-72 approved by the Wage Stabilization Board. •Added to Basic Wage for Tax Purposes LABORERS Hourly Basic Wage Rate Group ! Group l (a) Group l (bl• Grou9 1 (c) Group l (dl .. Group l (e) Group 2 Group 3 Effective 7-1·72 $5.685 5.91 5.735 6.235 5.535 5.435 Effective 1-MJ $5.785 1.11 5.835 6.335 5.635 5.53$ • Sewer cleaners shall receive $4.00 per d3y above Group I wage rates. "Sewer Cleaner" muns any workman who comes in contact with raw sewage or wbo works inside recently active, large diameter sewers. - •• Maintenan..:e and repair lrackmen and road beds and all employees performing work covaed by this agreement shall receive 12~¢. per hour above ~eir re.gular rate ror all work performed on underground 3tructures not spec1r1cally covered herein. This paragr-.:.Jh shall not be construed LABORERS (CONT.) to apply to work below ground level in open cut. The twelve and one-half cent (lnif) premium shall apply for work bid after August 1, 1971 to cut and cover work ol. subway CODStruction after the temporary cover has been Dlaced. a) Men wortung off or with or from bos'n chairs. swinging scaffolds. belts shall receive $.ZS per hour above the applicable wage rate. 'Fhis premium rate shall be reckoned b1 the day-and half day. This shall not apply to men entitled to recei•e the wage rate set lortb in Group 1 (a}. bl Labor Foreman -Shall receive $.50 per hou1· above any classification of thi<11 agreement working under his direction. GUNITE INDUSTRY Boari1 Basic Wage Rate Gunite Foreman Nozzleman. Gunman. Patman Rodman Groundman Gunile Trainee Reboundman General Laborer WRECKING WORK Skilled Wrecker (Removing & Salvaging C'i Sash, Windows. Doon. Plumbing I: Electric Fixtures) Semi-Skilled Wrecker (Salvaging ot Other Building Materials) General Laborer (lnclmles all cle11nup work, Loading, burning ar debris) BOUSEMOVERS Foreman SkiUed Housemover (Six Mos. or Less) Semi-!"killed Housemover (Less than 30 days) t:nskillEd These payments apply for all classifications of housemovers. -----Effedlve Hourly 7/1/7% Health• Welfare $ .55 Pension 1.05 Er.ective 7/1/7% $6.57 6.145 6.145 6.145 5.625 5.555 5.435 5.685 5.535 5.435 Ul 5.685 5.435 Efteetlve 6-1-73 $6.92 6.495 6.495 6.495 5.975 5.905 l.785 6.035 5.885 5.785 6.46 6.035 5.785 5.435 5 785 laborers, the gunite industry, wrecking work, and Effective 1/1/73 $ .55 1.15 Effmin 111/13 s .65 1~ , .... VacaUon a BoUdaJ' . 70 .80 .IO TraJn(DJ & Retralnina .06 .08 .10 a) Overtime -time and one • ball on Saturday and after eight hours WOf'k on weekdays. DoubJe time on Sunday and holic.iays. LABORERS CONT. GAap I Asphalt Ironers and Rakers Bnko, Wacker and similar type tampers Buggymobile Chainsaw, Faller, Losioader and Bueter Pavement Breakers and Spaders, including Tool Grinder Pipelayers, caulkers, Sanders, Pipewrappers, Conduit Layers, Plastic Pipe Layers Post Hole Diggers -air, gas, and electric Compactors of all types COllcr.M and Mqnesite Mixer Concrete Pan Work and ;oJ yard Power Broom swe£pers Power Tampers of all WJ>e1>, except as shown in Group II Concrete Saw, Concrete Sander Cribbers and/or Slloring Cut Granite Curb Setter Dri Pak·tt Machine Form Raisers, Slip Forms Green Cutters Headboard ment...Hubsetters, Aligners Hilb Pressure tslow Pipe uw· or over, 100 lbs. pressure or over) Hydro Seeder le Similar Type JacJrhammer Operators Jacking al Pipe over twelve !nches Kettlemen, Potmen and men appl.ymg asphalt. Lay-kold, creosote. lime, caustic and similar type materials, (applyinc means applying, dipping or ban~ of such materials) Laaing, Sheeting, Whaling. B r a c i n g , Trenchjacking, Hand-guickd Lagging Hammer Jaclrson &: Similar Type Compactors Masneslte, E~fn. Fitierglus and Mastic Workers {wet or drJ) Ram Set Gun and Stud Gun Riprap -Stonepaver and Rock·slingu, includi.1g placing of sacked _concrete and/or sand (wet or dry) Rotary Scarifier or Multiple Head Concrete Chipping Scarifier Davis Trencher -300 or similar type (and au small trenchers) Roto and Ditch Witch Rototiller Sand Blasters, Potmen. Gunmen and Nozzlemen Signalling and Rigging Tank Cleaners Tree Climbers Vibra-screed -Bull Float in connection with I.aborers' work Vibrators Group la J?Y Drill Model TWM-ZA Tr~t Drillers Jack LEJE Drillers Diamona Drillers Wagon Drillers MeChanical Drillers -all types regardless of type or method ~ power All work CJf lo9dlne, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and pl.acing. Gardener-Denver Model OH-14.3 and aimilar type drills (in accordance with m.!rnorandwn or unda"standing between laborers and operating engineers dated at Miami, Florida. February 3. 1954) Multiple Unit Drills Blasters and Powdermen Jtilb Scalers (including drilling of same} Tree Topper Bit Grinder Groap le Burning and Welding in connection with laborers premium rate shall be reckoned by the day work and half day. This shall not apply to men entitled Meo wortfu otr or from bos'n chairs, swing-to receive the wage rate set forth in Group tng scaffolcfs. belts shall receive 2S cents Ia. per hour above the applicable wage rate. This Group le Work on and/or in bell bole footings and shafts Shaft is an excavation over fifteen (15) feet thereof, and work oo and in deep footings {deep deep of any type, generally vertical in nature, rooting is a bole 15 feet or more in depth.) but may declinf: from the vertical and whose All work in the construction of tunnels and sharts dt::pth is greater than its largest horizontal shall be performed in accordance with tbe dimension. It is specifically understood that bell provisions of the Laborers' Master Tunnel hole footings and deep footing are subject to Asreement for Northern California and the the provisions ot this ~ent. and all shafts, individual emplo)•er agrees to comply with al! slopes. raises. and tunnels are subject to the al the proviaiona ot said Tunnel Master Agree-provisions of the Tunnel Master Aareement rnent aJ)ecified herein. s1>eeified herein. Groapll Asphalt Shovelers High Pressure Noulemen, Adductor Cement Dumpers, and handling dry cement or Grout Crew 1YPSUJD Hydraulic Monitor (over 100 lbs. pressure) Cbote-aetter and Rigel' (clearing wot'k) LOading and unloading, carrying and handling Concrete Bucket Dumper' and Cbuteman of all rods and materials for use in reinforcing Concrete Chipping and Grinding concrete construction Concrete Laborers (wet or dry) Pittsburgh Chipper, and similar type brosb Dri1!en Helper, Cbuc:t Tender, Nipper (one Cbuc!r-shredders tender on siQle machine operation with minimum Sloper - ol. one Chacitender for each two macblnes on Single root, hand held, pneumatic tamper multiple machfne operations (Jackhammers in no All pneumatic, _air, fas and electric tools not way Involved in Uilil item).) listed Groups I througb. le Guinea Chaser (Stakeman) Jacking of pipe -under lZ inches Groapm All cleanup work of debris, ll"OWlds and buildings Limbers. Brush Loaders and Pilers including, but not limited to Street Cleaners Maintenance Landscape Laborers on new Cleaning and wasbing windows (subject to construction (subject to the provisions al Sec. provisions ot Sec. ZO) 20) Page 9 Construction Laborers, lncludins Brldge Laborers and General Letxirers Dumpman, Load Spotter Maintenance, ~r Tractmea and Road Seda Streetcar and Railroad Construction Track Laborers Flagman Stre.-t Cleaners Fire Watchtr Gardeners, Horticultural. and Landscape Laborers (see Supplement No. 4) Temporary Air and Water Lines. Victualic or similar Toolroom Attendant <Job site only) Jetting Watchmen (subject to the provisions ol SecUon 20) LATHERS Boarl1 Basic Wage Ratt Supplemental Wage DUes Ch~k Off Dental Pension Health & Welfare Promotion ElfecUve 7/1/7! $7.86 .78 .01 •8.71 .20 .1:; .35 .10 Effective 7/1/73 $8.15 .78 .09 •9.02 .2() .55 .50 .10 • 'fotal taxable wage a) Foreman -10% of journeyman"$ rate up to 7 men: 15% ror 8 men or over. b) Apprentice Program -Three Years: First Three Months, 40% of Basic Taxable Wage Second Three Montlts, 50% of Basic Taxable Wage Second Six Months, 60% or Basic Taxable Wage Third Six Months. 68% of Basic Taxable Wage Fourth Six Months, 76% of Basic Taxable Wage Fifth Six Months, 84% of Basic Taxable Wage . Sixth Six Months, 92% of Basic Taxable Wage During first 90 days (trial period) the employer does not pay any contributions of the worked to any of the funds with the exception or the health A: welfare fund. <') Overtime -all double time. Training Fund: Single payment due at start ol fiscal year-$200.00 MARBLE SETTERS HELPERS hours Rouly EDective 7/l/7J*• Basic Wage Rate $7.22 EUecdve 7/1/74 .. EtfeeUve 111ns•• Health & Welfare .325 Vacation&: Holiday .45 Security Fund .30 $7.5T .325 .45 .30 $7.92 .325 .45 .38 a) Foreman -$3.00 per day over Marble Setters Helpers rate. b) Appren~ices -Six month program -$3.00 per hour starting rate. Increase at the end of each two month perioci by 33-1/3% of the difference between starting rate and Marble Setters Helpers rate until full rate is reached. c) Shift work -second shift -eight hours pay for seven hours w<>rk. dJ MileagE alk>wance -Subsistani.:e, travel time Mileage and parking allowances same as is provided in the Marble Setters . .\greement. e) Overtime -all double time. · ••NOTE: Wages with e!ft>Ctive date of 7-1-73 waiting for approval ol Construction Industry Stabiliza- tion Committee. Contractors should verify current wage rates prior to payment. PAINTERS Bvurly Basic Wage Rate Painter, Decorator, Paper Hanger, Building Washer, Sand Blaster EHective 7/1/7% $7.77 Taper l!.27 Welfare .64 Pension .6S • Beneficial .40 Holiday .40 t.) General foreman -25% OVl:r bask wage or journeyman. b) Foreman -In charge or three journeymen -'h hour pay per day extra. Effective 7/1/73 $8.52 9.02 .&I .o5 .10 .-1() In charge or five to nine joumeyme n -one hour pay per day extra. In charge of ten or more journey nen -one :>nd one • hair hours pay per day extra c) Apprentice rate -three year program -first six months. 50% of journeyman's rate; second six months. 55%; third six months, 60%: 10% increases each six month period thereafter. d) Taper Apprentice rate -18 month program -First three months. 50% of journeyman's rate: Second three months, 60% of Journeyman's rate: Second six months, 75% of joum~yman's rate: third six months, 90% of journeyman's rate. '?) Overtime -time and one half. weekdays. Double time, Saturday, Sunday, and holidays. • Formerly Vacation Fund PLASTERERS Boul'ly Bas.ic Wage Rate Health ti Welfare Pension Vacatioo Dues Check Orr · Promotional Dental Apprentice Effective 7/1/72 $7.58 .46 .50 .80 .10• .10 .18 .025 Effective 7/1/7JOI. $7.88 .. .51 .50 .80 .12 .10 .21 .025 P1199 10 •Wage rate does not include $.12 per hour worked which is added t.o wages and then withheld lrom union dues checkoff. a) $2.00 per day over scale for work on swinging scaffold. . $2.00 per day over scale ror all members working behind plaster gun. b) Forem"n -supervising ten or more plasterers -$5.00 a day over scale. Supervising Jess than ten but five or more -$4.00 per day over scale. Supervising under four plasterers -$2.00 per day over scale. c) Apprentice rate -fou.r yur program -starting scale 50% of journeyman"s rate with the follow· ing percentage increases for each six months interval: 50%; 62%: 68%; 74%; 80%; 88%; and 94% of joume)'man's rate. Apprentice must complete 60 days employment before employer is required to contribute lo health & welfare pension, vacation, dues check off and apprentice funds which will then be paid 30 days retroactively. d) Overtime -all double. ••NOTE: Wages with ef!ective date of 7-1·73 waiting for approval of Conslruclion Industry Stabiliza- tion Committee. Contractors should verify current wage rates prior to payment. PLUMBER AND STEAMFITTERS Houri,. Effective Effective Effective 5/1.17! S/1/73 12/1/73 Basic Wage Rate $9.53 $10.03 $9.93 Health & Welfare .61 .61 .&1 Pension .95 .95 UIS Vacation .72• .72• .72• Training Fund .12 .14 .14 • Included in Basic Wage Rate. The Employer to deduct from the basic hourly wage rate $.72 per hour for each hour worked and double time -$1-44 -i! overtime worked, to be paid into the Vacation Fund. a) General Foreman -20% of basic wage rate including vacation. Foreman -10% of basic wage rate inclutfng vacation. b) Apprentice rate -five year program; starting scale 45% or jourm::yman's rate, 5% increases at six month intervals. c> Overtime -all double. d) Jobbing and repair -time and one-half; $1.08 to be deducted by employer from basic wage rate tor vacation pay. e) 36 hour week. RADIO A TV ENGINEERS (NEW CONSTRUCTION) Journeyman Sound Technic1an Effective Effective Boarly 5/31/7% 1/1/73 Basic Wage Rate $8.57 $ 9.04 Health and Welfare .'i2.00/Month 52.00/Month a) Overtime -Time and one-half for all work in excess or (8) hours in an)· one shift or in excess of !'::lrty (40) hours in any one work wee!; or all time worked on the sixth (6th) consecu- tive day or on holidays. Double Time for work performed on Sundays or the seventh (7th) consecutive day. REFRIGERATION MEN* - Bovty Effec:Uve Effective Effective 5/1/7% 5/1/'73 lZ/1/73 Basic Wage Rate $9.53 $10.03 $9.93 Health a: Welfare .61 .61 .61 Pension .95 .95 1.05 Vacation and Holiday .7:!• .72• .72* Training Fund .12 .14 .14 •Include" in Basic Wage Rate. The t>mployer to deduct from the basic houri)· t"ate for e:\ch hour worked and double time -$1.44 to be paid into tr.e ucation fund. a) General Foreman -20% or basic wage rate including vacation and holiday. Foreman -18% of basic wage rate including vacation and holiday. b) Apprentice rate -five year program; starting scale 45% of journeyman•s rate, 5% increases at six month intervals. c) Overtime -all double. d) Jobbing and repair -time and one-half. $1.08 to be deducted by Employer. eJ 36 hour week. • Basic wage rate, fringe benefits, and other contract terms same as for jf)Utneyman plum~r. except new contract dates ROOFERS BHl'f1' Baste Wace Rate Foreman Su hi ore man Journeyman Kettleman KeWeman (2 Kettles) BitumasUc, Enamelers, Coal Tar, Pitch and Mastic Workers Extra Men Health 6 Wtlf11re Vacation Pension Dues Check orr Promotional Fund Efrectlve 8/1/71 $7.21 6.96 6.71 6.71 7.21 7.21 ERecUve 8/1/1% $7.51 7.26 7.01 7.01 7.51 Effective 8/1/73 $7.91 7.6C 7.41 7.41 Ul 7.51 7.91 90% of Journeyman's Wage .36 .46 .51 l~ 1~ 1.H .S3 .63 .73 .w .10 .u .05 .OS .10 a) AU pay starts from time leaving shop to go to job shop. site and ends wh«;n employee is returned to b) Extra man -any other employee who is not qualified as journeyman or 90% or Journeyman rate. c) Mechanized job -$0.25 per hour prunium pay to each member of the crew. apprentice; paid at Page 11 dl Apprentice rate -three year proeram: first six month period, 70% Of journeyman's rate: 5% Increase for each six month period tt.ereafter. e) Overtime: ror the fir.!Ct two hours, time and one. half: double time thenafter and for Saturday, Sunday, and Holidays. SHEET METAL Ho11rly Effective Effective EHecUve* 7-1·7Z 7-1.73 1·1 ·74 Basic Wqe Rat.e $3.10 $8.45 $8.45 Health & Wtlfare .38 .38 .38 Pension .81 .825 l.135 •V11c11tion .81 845 .845 ai No Health & Wt'lrarl', pen.>ion and industry fundare to be paid by employer durinJ employee's vaca· lion limr. This i~ paid anly fot hour worked. bl l''orem1m ·-$.i5 ~r hour abo\·e ba~ic wage ra·~e. Efrective 7-1-73. Gcl•t'ral Fol"t"m11n ·-$1.00 per hour above basic wage rate. Errective 7-1-73. c> Apprenti~·e ratt' -four Yl·ar program -first six month period, 45% or journeyman's rate; 5% in· crease lor earh per!od thereafter up ~o and Including sixth period; 10% increases ror seventh ani: eighth periods. These raise.~ for apprentices are earned raises and not automatic. d I Shirt Work: The Job must bf' O\."t'r fivt' (5 > consecuti\·e days duration. or double time to be paid for the rirst rivr (.5) d11y~. Ir job is or G days duration o• more. the following shall prevail: Sw!ng Shifl: 4 day~ or n2 hours, Friday 3~ hours. for 30 hours pay plus 10%. Graveyard: 4 days of 1 hours, 1''riday 3Y.a hours. for 30 hours pay plus 15%. e) Overtime -all double time. O 38 hour week. • Vacation pay is figured at 10% the gro11.s pay which means lli% of basic wage of Journeyman, or apprentice, or foreman. NOTE: Wagtis \\ith effc>ctive date or 1-1·73 waiting for approval or Construction Industry Stabilization CommiLtee. Contractors should verify current wage ra~s prior to payment. SIGN ARTISTS Ho11rly Ehective Etrectlve Effectlve Baste Wage Rate 7·1·71 7-l-7Z 7·1-73 Journeyman $6.875 $7.375 $7.875 Show Card Writer 5.935 6.435 6.935 Display Man 5.935 6.435 · 6.935 Screen Process 5.125 5.675 6.125 Helpers 6.125 6.675 7.175 Display Helpers 5.105 5.605 6.105 Screen Process Helper~ 4.325 4.825 5.325 Health & Welfare .275 .275 .375 Vitcation • 5.5% 5.5% 5.5% Pt:nsion .15 .15 .25 a) Health Ir welfare. vacation, and pension are not paid in excess of a forty hour week. b) Apprentice rate -fi\·e year program -first six month period, 50% or journeyman's rate: 5% increase for each six month period thereafter. c) Trainee Program: No Experience -70% or rate for display helpers or screen process helpers. First Six Months -81)% of rate for display helpers or screen process helpers. Second Six Months -90% of rate for display helpers or screen process helpers. Third Six Months -100% or rate for display helpers or screen process helpers. dl O\·ertime -· time and one· half. - el Paid holidays. • 5% shall be effective until the by-laws changes rc-quit"ed by agreement have been approved by union membership. TEAMSTERS WAGE RATES CLASSIFIC ATIOJ'j All dump trucks ( s111gle or multiple dump units including semis and double and tt"ansfer units) Under 4 yds. (water level) 4 yds. and under 6 yds. (water level) 6 yd$. and under 8 yds. (water level) 8 yds. and inciuding 12 yd$. (water le\"el) O•Jer 12 yds. and including !8 yds. (water level) Over 18 yds. and including 24 ydc;. (water level). Over 24 yds. and including 35 yds. (waler level) Over 35 yds. and including 50 yds. (water level) Over 50 yds. and under 65 yds. (watEr level) SS yds. and including 81> yds. (water level) Over 80 yds. and including 95 yds. (water level) Bulk cement spreader (w/ or w/o auger) JJurnpcrE'te truck Skid truck (debris box) Trucks (dry pre-batch concrete mix) Triple headers Dry distributor truck (a bootman when employed on such equipment. shall receive the rate specified tor the classification of road oil trucks or bootman) Ammonia nitrate distributor driver and mixer Combination dump truck and dump trailer (when any boards or other apparatus are added to a dump truck for the purpose of incnasing c:irrying capa· EHecUve &·IS-7? ..... $5.475 6.57 6.7'1 7.01 7.05 7.155 7.21 7.36 7.51 7.66 7-81 ... Use dump truck ratE Use dump truck rate .... Use dump truck ratE Use dump truck rate .... Use Dump truck rate plus $1.00 per :o;hift 7.05 7.155 city, the rate applicable to the in..:--.:ased carrying capacity shall be paid.) EHe::th~e AU transit mi% or agitator trucks 6-1&-1% Under I yds. . . .. . . . . . . . . . . . . . . . . . . 6.625 6 yds. and under 8 yds. . . . . 6.725 8 yds. through 10 yds. . 6.81.S over 10 yds. through 12 yds. . . . ..... 6.9~ Over 12 yds. through 14 yds. . .................... 7.025 Over 14 yds. through 16 yds. . 7.155 Transit mis with boom shall receive 12~~9! per hour above the appropriate yardage classifi· cation rate ol pay when such boom is used. Water trucks Etteetive Gallonqe capacity shall be clearly indicated on all tanks 6-16-72 Under 2,500 gals. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6.585 2,500 and under 4,000 sats. . . . . . . . . . . . . . . . . . . . . . .. 6.685 4,000 and under 5,000 gals. . . . . . . . ............ 6.78.> 5,000 and under 7 ,000 gals. . . . . . . . 6.885 Jetting truck (use appropriate water truck rate) DW lO's, 20's, 21 's and other similar cat type, 7.46 Terra Cobra, Letourneau Pulls. Tournorocker, Euclid and ~imilar type equipment when pulling aqua/pak, water tank trailers and fuel and/or grease tank trailers, or other miscellaneous trailers . . . . . . . . . . . . . . . . . . . . 7.21 Vacuum trucks Under 3,500 gals. . ............................................. 6.6;;5 3,500 gals. and u."lder 5,500 gals. 6. 735 5,500 1als. and under 7,500 gals. . . . ...... 6.835 Nipper truck (when flat rack truck is used, appropriate flat rack rate shall apply) .. ..... 6.475 Concrete pump truck (when fiat rack truck is used appropriate fiat raek rate shall apply) ................... 6.475 Concrete pump machine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.475 Scisaor' truck . . . . . . . . ....................................... 6.67 Helicopter pilot (when transporlinJ. men or materials) 7.51 Industrial lift truck (mechanical tailgate) . . . . . . . . . . . . . . . . . . . ... Use appropriate flat rack rate Dumpster or similar type . . . . . . Use appropriate yardage rate of pa) Rubber Ured muck car (not self-loaded) .......... 6. 745 Rubber tired truck jumbo . . . . 6. 785 (Men regularly: employed underJI'OW!d on tunnel work shall be paid $1.00 per day premium. for such work. pro- vided that such employment under ground oo tunnel work continues for at least two (2) hours.) Lift jitneys and fork lift . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . 6.60-5 Winch truck and "A" frame drivers . 6.785 Fuel and/or grease truck drivers or fuelman ........... 6.64 Teamster oiler and/or greaser and/or service man 6.55 Tire repairman (shall apply ooly when a full time employee d the contractor is assigned to the work) . . . . . . . . . Truck repairman . . . . . . . . . . . . . . . . . ....................... . Truck repairman helper . . . . . . . .............. . SiDgJe unit flat rack (2 axle unit) .. . . . . . . . . . . . . . . . . . . . ... . Single unit flat rack (3 axle unit) . . . . . 7.01 .. 7.H5 .... 6.645 .... 6.57 6.67 Heavy duty transport (high bed) . . . . . . . . . . . . . . ...... .. Heavy duty transport (gooseneck low bed) Double gooseneclr. (7 or more axlEs) . . . . . Heavy duty transport tiller man Combination bootman and road oiler . 6.79 7.02 ........ 7.07 7.07 Road oil trucks or bootman . . . 6.915 . 6.565 Heater planer > .......... · · · · · · · · · · · · · · · · · · · · · · · · · · · Use appropriate rate for Aspbalt burner ) . · . · power unit Scaritier burner ) . . . . . . Snow buggies (Shall apply only where a full time employee or the contractor is assigned to the work at the sole discretion d tbe contractor) . . . . . . . . . 6.475 Snow go and/or plow . . . . . . . . . . . . . . . . . . . . . .............. 7.01 Slurry truck . . . . . . . . . . . . . . . . .Use appropriate dump truck rate Fuel island attendant, or combination pit and/or grease rack and fuel island attmdant (:;:ball apply only where a full time employee of the contractor is assigned to the work at the sole discretion. or the contractor) Fire award (Where a full time employee or '11<' contractor is assi~r:.ed to the work> . . . . . . . . . . . . . . . . . . . . . ...... . TiJt bed trailer or flat bed pull trailers Steam cleaning 6.64 Appropriate rate for the {'Quipment utilized 12Y.z¢ per hour above rate for Towing unit (When an employee is assigned to this work on a full time basis) . . . 6.475 Small rubber tired tractor (When used within teamsters jurisdiction) . 6.67 Combination winch truck with hoist . . . ............. 6.725 Hydro-lift or Swedish crane type (including when Swedish crane is used for jetting) . . . . . . . . . . . . . . .............. 7.14 Buggymobile . . . . . . . . . . . . . . . . . . . . . . . . . . 6.785 Hydro-lift extension or retracting crane (boom type} ............ 7.14 Ross Hyster and similar straddle carrier . . . . . . . . . . . . . . . . . . 6.815 Self-propelled street swei:.per with self-<:C;ntained refuse bin 7.01 P. B. or similar type sell-loading truck ...... 7.11 Bus or manhaul drh'er . 6.475 Ei;cort or pilot car driver .................. 6.475 Pickup trucks . . . 6.475 Helpers . . . . . . . . . . . . . . . . . . . . ........... 6.475 Hook tenders (when doing work in teamster jurisdiction, including loadlng and unloading} ............. 6.475 Team ddvers 6.475 Warehousem<!n . . . . . . . . . . . . . . . . ........... 6.475 Warehouse clerk' ;parts mJn (jot-site construction: per- mant.nt yards where an employee covered by thl:; agree- ment is presently assigned to the work) . . 6.60 Truck dispatcher (shall apply only where a Cull time em- ployee ol the contractor is assigned to the work at the sole discretion ol tbe contractor) . . . . ......................... 6.86 Tool Room Attendant (Refineries) 6.475 Utility and C?ean-Up Truck Use Appropriate flat . rack or dump truck rate TEAMSTERS Hourly Health & WeUare Hospital, Medical&: Surgical (-t) c•• J Dental Care Visual Care Prescription Drugs Retired Employees Health & Welfare Pension( .. '"> Vacation & Holiday Enecuve 1-1-72 $ .765 .ul .75 Effeetivr 6-16-'n $ .6-0 .11.5 Effective 1-1-73 s.~ .01 .70 .85 Page 13 • Trustees to work out application or $.01 per b our for employee claim administration. •• May be used for any ot the other health &r: welfare benefits. Otherwise to be applied to wagu. ••• If not needed for increased pension benefits, may be applied to wages. a) Foremen -Foreman (10 or more teamsters) -$.40 per hour above highest classification super- vised. Working Foreman (7 or more teamsters) -$.25 per hour above highest classification super· vised. . bJ Shirt wortt -if ther.,. are two or three shifts each shift rec£ives 8 hours pay ror 7 hours work. c) OverU.me -time and one half; double time for Sunday and holidays. Teamsters submitted a $.!i2 package increase to the Construction Industry Stabilizat\on Committee •. CISC approved S.40. As of 11/12/73. the Teamsters ha\'e not decided as to how the $.41> is to be allo- cated. Contractors ~hould verify current wage rates prior to payme~t. TERRAZZO HELPERS Hourly Basic Viqe Rate Effective 7-1-72 Helpers $6.745 Base Machine Operators 7.145 Health & Welfare .355 Pension 30 Vacation .65 Industey Fund .15 Effecilve l·M3 $6.895 7.2P5 .455 .30 .65 .l5 EflectJve 7·1-73• $7.395 7.795 .505 .30 .70 .15 a) Apprentice rate -one year training program -first three months. 80% of helpers rate: 5% increa le for each three months period there after. b) Shilt work -second, third shifts get seven hours pay ror 6lh hours work . c) Travel time -$3.75 per day for jobs 25 miles or less. hut more than 15 miles, from the city hall in tbe city where the shop is located. $6.75 per day for jobs 50 miles or less, but more than 25 miles, from the city hall in the city whert: ihe shop is located. $12.00 per day for jobs 50 miles or more, from the city hall where the shop is located. d) O~·ertime -time and one ha!: after 3:30 p.m. and on Saturday. Outside men -first two hours overtime at time and one hail; thereafter at double time (week days only). Double time on Sun- day, holidays; after midnight on regular work day and after 3:30 p.m. on Saturday. e> .15 hour week (seven hour day) NOTE: Wages with ~rfective date of 7-1-73 waiting for approval of Coostruction Industry Stabilization Committee. Contractors should verify current wage rates prior to payment. TILE RELPER3 Boari7 Basic Wage Rate Health It Welfare Pension Vacation & Holiday Industry Fund• Effective 3-MZ $6.65 .38 .36 8% Basic Wage .10 Ellectlve 4--%3-'13 $7.11 .38 .36 8% Basic Wage .10 a> Trainee helpers -80% Qf helpers basic wage. b) $.35 fer hour above scale for working with resinous or epoxy cement. or steam cleaning. c) $.75 ~ hour above scale. for unde~nd work. . . d) Mileace allowance; from city hall or city where empl.:iyer has bis principal. place of business to cit-• <'r tO'.m center in which job is located. · $4.00 -More than 20 miles up to and including 30 miles 5.00 -More than 30 miles uo to and including 40 miles 8.00 -More than 4-0 ~miles bUt less than 60 miles. Pap U More than 60 miles, but less than 100 miles--$18.00 per day fot" sub!ii.stence plus travel pay after 100 miles~t8.00 per day (7 days a week) plus travel pay and mUcage. e) Bridge, ferry and other tolls, arid necessary parking in public parking lot paid by employer. f) Overtime -all double time. TILE LAYERS Houl7 Effective Effeetlve ~~ ~~ Basic Wqe Rate $7.25 $765 Health & Welfare .56 .62 Pension .60 .10 Vacation a: Holiday .80 .80 1'rain1nl Fund .015 .615 Industry Fund .10 .10 a) Foremen -Supervising 1 to 3 journeymen -$2.00 per day ovt-r joumeyman·s wage. Supervising 4 to 11 journeymen -$4.00 per day over journeyman's wage. Supervising 11 or more journeymen -$8.00 per day over journeyman's wag~. b) Apprentice rate -three year program -first six month period, 80% or journeyman's rate: sttood six mllllths, 84%; third and fourth six month periods, 89%; fifth and sixth six month periods, 94%. c) $.35 per hour in addition to regular wage while worldng with epoxy or resinous cement. d) Mileage allowance -from city ball or city w h~l'e employer has his principal place of businPss to city or town cent.er in which job is located: $4.00 -More than 20 miles up to and Including 30 miles. $5.00 -More than 30 miles up to and including 40 miles. $8.00 -More than 40 miles but less than 50 miles. Over SO miles -$18.00 per day 1 days a week. e) Bridge tolls and requittd parking in public Parkins lot paid by employer. f) Overtime -all double time. TBAFFIC DELINEATORS BoulJ' I Journeyman Traffic Delineating Device Applicator Trainee for Traffic Delineating Device Applicator After 3 Months After 6 Months, Journeyman Rate II Traffic Surface Protective Coating Applicator :O.lelper III J0t;..~:;'ma:: \!heel Stop Installer Helper IV Journeyman Traffic Surface Sandblaster Helper V Journeyman Striper He!per Beginning Helper Striper After 3 Months After 6 Months -Helper Rate VI Servieeman $6.27 $6.52 5.77 6.02 6.02 U7 6.27 6.51 5.TI 0.02 6.27 6.52 5.77 6.02 6.27 6.52 5.17 6.02 7.37 7.62 6.27 6.52 s:n 6.02 6.12 6.37 5.75 5.iS Boarly Effective ... 1.73 Health and Wellare $ .40 Pension .20 Industry Fund .20 Holidays .17 Vacation -First Year or Employment .10 Second Year or Employment .20 Fifth Year of Employment .30 Tenth Year ot Employment .40 $6.82 6.32 . 6.57 6.82 6.32 6.82 6.32 6.82 6.32 1.92 6.82 6.32 6.67 5.75 NOTE: Wages wit.h effective dates or lD-1-7 to 4·1· 74 waiting for approval of Construction Industry Sta· bilizatiOb ~ommittee. Contractors should verify current wage rates prior to payment. a) Recognized bo .. days shall be New Years Day, Memorial Day. Fourth of July, Labor Day, Thanks- giving Day and Christmas Day regardless of the day of the week on which they fall. When holidays fall on Sunday, the following Monday shall be observed as a holiday. Employees required to work on any of the paid holidays shall :receive two times their straight time hourly rate. b) Vacations -Employees shall be entited to one (1) week vacation after one year of service: two (2) weeks vacation after two years of service: three (3) weeks vacatioo. after five (5) years or service; four (4) weeks vacation after ten tlO) years of service. c) Overtime -Eight hours in any one day shall constitute a day's work. Forty hours in a117 one week shall constitute a we e k • s work. Overtime shall be paid at the rate of one and one-half times the regular rate as follows: over eight hours in any OM day, over forty hours in any one week. Time off shall not be taken to compensate for overtbne worked. d) Dues Check Off -Employer agrees to check ofr from the wages or employee special administra· t.ive dues in the sum of $ .10 per hour for all hours worked and will remit to tbe union at each pa)' period, pro\•ided the employees in question have signed a valid authorization card. • • UPHOLSTERERS Hout1 Basic Wage Rate Pension Health • Wellare Dental $32.65 per month $ 8.10 per month Enedhe 7·1·'n $ 5.16 4% 3265 8.10 al Paid Vacation -One week aft~r completing 1 year ser\'ice; two weeks after 2 years service; 3 . . weeks art~r h\ie or m~re yea rs of ~enice with any ont' Employer b) Paid Hobday~ --~PW Years Day, ~a~hmgton's BirU!day, Memorial Day, Independence Day, La- . bor Day, Thanksg1v1J1g Day, Christmas Day, Employee's Individual Birthday. c) Foremen -$1.25 per hour above journeyman·s wage rate. d) Apprentice ra~ -three year program - First slx month period, 60% or Journeyman's wage. Second six month period, 66~% ol journeyman's wage. Third six month period, 73"2% of journeyman's wage. Fourth six month period 801A% of journeyman's wage_ Firth six month period. 87% of journeyman's wage. Sixth six month period, 93% o! journeym11n's wage. e) Overtime -all double time. UNION Asbestos Workers Boilennakers Bricklayers Carpet, Lino Carpenters Cement Masons Electricians Elevator Constructors Engineers Fence Workers Glaziers Hod Carriers-Plaster Brick Lathers Iron workers Laborers EXPIRATION DATE 01'' CONTRACT Jul> 31, 1976 June 30, 1974 June 30, 1975 July 31, 1915 July 1, 1974 June 16, 1974 May 31, 1974 September 1, 1977 June 15, 1914 June 30, 1974 J.une 30, 1976 June 30, 1971 June 30. 197~ June 30, 1974 June 15, 1974 June 30, 1974 Btdldfag Trades BoBdays Day before New Years••• New Year's Day Washington's Birthday Memorial Day (Decoration Day) Fourth of July (Independence Day) Labor Day Admissicn Day * Columbus Day •• Thanksgiving Day Day before Christmas ••• Christmas Day • Obser\'ed by Elevator Constructors but not a paid holiday nobserved by Carpet-1.ino & Sort Tiles **'"Observed by Plumbers, Boilermakers 1/2 day before Christmas-Iron Workers UNION :\tarble Setters Helpers P~inters Plasterers Plumbers Refrigeration Radio& TV Roofers Sheet Metal Sign Artists Teamsters Terrazo Tile Helpers Tile Layers t:pholsterers Traffic Delineators ExcepCleu EXPIRATION DATE OF CONTRACI' June 30, 1976 .June 30, J9';4 July 1, 1914 January 1, 1975 January 1, 1975 October 31, 1974 July 31, 1974 June 30, 1974 June 30, 1974 June 15, 1974 July 1, 1974 February 28, 1974 March 31. 1975 June 30, 1974 October 1. 1974 Do not observe Admission Day: Asbestos Worlters Operating Engineers Boilermakers Painters Bricklayers Plumbers Building Trades Council Radio ai TV Engineers Carpenters Carpet-Lino• Sort Tiles Cement Masons Glaziers Iron Workers-- Field Erect.ion Refrigeration Roort>rs Sheet MetaJ Workeriic Sign Artists Teamsters Tile Layers Do not observe Washington's Birthday: Painters Sign Artisls Traffic Delineators Observe Veteran's Day: Roofers Observe Day after Thanksetving Day: Asbesto!I Workers Iron Worlters- Boilermakers Field Erection Bricklayers Laborers Building Trades Council Lathers Carpet, Lino & Sofl Tile Operating En&ineers Carpenters Plumbers Cement Masons Radio • TV En&ineers Electricians l«?frigeraUoo Engineers Sheet Metal Workers Fence Workers Teamsters Glaziers , ... 1' COUNTY PASSED AND ADOPTED b)' the Board of Supervisors, C'ounty of Sant.a Clara, on Nov~mber 27, 1973. ATTEST: DONALD M. RAINS, Clerk CITIES PASSED AND ADOPTED by tbe City of Campbell OD November 26, 1973. ATTEST: DOROTHY TR~VETHAN. Clerk PASSED AND ADOPTED by the City of Cupertino on November lit, 1973. ATTEST: WlLLlAM E. RYDER, Clerk PASSED AND ADOPTED by tbe City of Los Altos OD November 27, 1973. . ATTEST: S. GEORGE SANREGRET. Chief Administrativt Officer PASSED A.VD ADOPTED by the City of Los Altos Hills on December 5, 1973. ATTEST: BRUCE G. LAWSON, Cit.y Clerk PASSED AND ADOPTED by the 1.1>wn of Los Gatos on November 19, 1973. ATTEST: JO LEIBFRITZ, Town Clerk PASSED AND ADOPTED by the City of Milpitas on November 20, 1973. ATTEST: W. E. SMITH. City Clerk PASSED AND ADOPTED by the City of Monte Sereno an NllvL'mber 20, 1973. ATTEST: THOMAS B. INGLIS, JR. PASSED AND ADOPTED by the City of Morgan Hill on November 19, 1973. ATTEST: MADGE W. SOARES. City Clerk PASSED AND ADOPTED by the City al. Mountain View on November 19, 1973. . ATTEST: JEAN HIXSON. City Clerk PASSED AND ADOPTED b:t the City of Palo Alto on November 19. 1973. ATTEST: A."lN J. TANNER, City Clerk PASSED AND ADOPTED by tbe City of Santa Clara on November 27, 1973. ATTEST: A. S. BF.LICK, Clerk PASSED AND ADOPTED by tbe City<#. San Jose on November 27, 1973. ATTEST: FRANCIS GREINER P•\SSED AND ADOPTED by the City of Saratoga on December 19, 1973. ATrEST: ROBERT F. BEYER, Clerk PASSED AND ADOPTED by the City al SunnyvalL' on November 20, 1973. ATTEST: CAROL BUTLER, Deputy Clerk SCHOOL DmTRICTS . PASSED AND ADOPTED by the Berryessa Sc:IK.ol District November 29L.1973. ATTEST: CECIL BABCOCK, ISUSiness Manager PASSED AND ADOPTED by the Campbell Un.ion School District December 4, 1973 ATTEST: A. 0. BACHELOR, Business Manager PASSED A.VD ADOPTED by the East Side l'nion High School District on December 12, 1973. ATTEST: FRANK FISCALINI, Superint.endezrt PASSED AND ADOPTED by the Evergreen School District on November ZO, 1973 ATTEST: RICHARD KEY, Superintendent PASSED AND ADOPTED by t.'lc Foothill Community College District on NovL'mber 19, 1973 ATI'EST: WILUAM CUTLER, Director PASSED A.llffi ADOPTED by the Fremont Un.ion High School District on December 4, 1973 ATTEST: ALBERT R. ST. CYR, Business Manager PASSED AND ADOPTED by the Gilroy Unified School District on NOvt'mber 26, 1973 ATI'EST: VANCE D. BALDWIN, Director, Administrative Servi~:. PASSED AND ADOPTED by the ~ Altos School District on November 19, 1973 ATTEST: HAROLD L. EVANS, JR .. Secretary PASSED AND ADOPTED by the Luther Burbank School District on December 5, 1973 ATI'EST: GEORGE DUNLAP, President of the Board PASSED AND ADOPTED by the Morgan Hill Unified School District on Noveml>er 19, 1973. ATI'EST: LYLE E. SIVERSON. Di~rict Superintendent PASSED AND AOOPTED by the San Jose Community College District on December 12. 1973. ATI'EST: OTTO ROEMMICH, Superintendent ,_ PASSED AND ADOPTED by the San Jose Unified School District on December 6, 1973. ATI'F..ST· CHARLES KNIGHT. SUpt"rintendent of Schools PASSED AND ADOPTED by the Santa Clara 'lnified School District on November 29, 1973. · . ATTEST: D. CALLEJON, Acting Superintendent PASSED AND ADOPTED by llH' Saratoga Union School District on November 27, 1973 ATTEST: SALLY DRAKE, Chairman or the Board . PASSED AND ADOPTED by the West Valley Joint Community College District on December 6, 1973. ATTEST: JAMES P. H.,RDY. Secretary SPECIAL DISTRICl'S PASSED A.~D ADOPTED by the Santa Clara County Sanitation District 2 on December 11, Um. ATTEST: DONALD M. RAINS. Secretary PASSED AND ADOPTED by the Santa Clara County Sanitation District 3 on December 11. 1973 ATI'EST: DONALD M. RAINS, Secretary PASSED AND ADOPTED by the Santa Clara Count)· Sanitation District 4 «in November 26, 1973 ATI'EST: OeLORA SPENCE. Secretary or the Board PASSED AND ADOPTED by the Milpitas Sanitary District on November 13, 1973 A'M'F..sT: JOHN WYRO. Secretary PASSED AND ADOPTED by the 8.lnta Clara County Flood Control • Water District on November 27, 1973 A'M'EST: VIOLET ENANDER. Clerk PASSED AND ADOPTED by the El camino Hospital District on November 29, 1973 ATTEST: H. L. PONTZIOUS, Superintendent of Building . I: Grounds PASSED A."lD ADOPTED by the Cupertino Sanitary District on December 5, 1973 ATTEST: WILLIAM E. McBEE, District Manager (December 28 · Ll0,000) . t .. /~· • • ASBESTOS WORKERS HOURLY BASIC WAGE RATE VACATION & HOLIDAY VACATION ADM. FUND PENSION FUND OCCUPATIONAL HEALTil HEAL1H & WELFARE APPRENiICE TRAINING INDUSTRY PROMOTION FUh1> a) GENERAL FOREMAN -$. 75 PE-R HOUR OVER MECHANICS FOREMAN -·$.40 PER HOUR OVER MECHANICS RATE. b) OVERTIME -A LL DOUBLE c) APPRENTICE RATE - 4TH YEAR APPRENTICE 3RD YEAR APPRENTICE 2ND YF.AR APPRENTICE lST YEAR APPRENTICE EFFECTIVE 8/l/i2 $8.75 1.07 .01 .65 .07 .90 .06 .01 RATE. EFFECTIVE 8/1/73* $9.10 1.07 .01 . 75 . 07 .90 .06 .01 · d) MILEAGE ALLOWANCE -ANY TRAVEL OVER A 20-MILE ROUND TRIP IS PAID $. 15 A MILE. ROOM AND BOARD -$15.00 PER DAY . e) PREMIUM PAY FOR WORK FROM A BOSUN'S CHAIR, SUSPENDED SCAFFOLDING, ETC., 20.FEET OR MORE ABOVE FLOOR OR GROUND, TO BE $.35 PER HOUR. l. *NOTE: WAGES Wint EFFECTIVE DATE OF 8/1/73 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION COMMITIEE. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT. • • BOILERMAKERS IRON SHIPBUILDERS BLACKSMITHS FORGERS & HELPERS 2. EFFECTIVE EFFECTIVE* EFFECTIVE* HOURLY BASIC WAGE RATE HEALTH & WELFARE PENSION TRAINING FUND VACATION GENERAL FOREMAN FOREMAN ASST. FOREMAN BOILERMAKER·BLACIWMITH 10-1-72 $8.70 8.45 8.20 7.95 .60 1.00 .02 .so 10-1-73 2-1-74 $9.20 $9.50 8.95 9.25 s.10 9.00 8.45 8.75 .65 .65 1.00 1.00 .02 .02 .so .50 a) APPRENTICE RATE -FOUR YEAR PROGRAM, 70% OF JOURNlftMAN'S RATE FOR FIRST SIX K>NTHS; 2 1/2% INCREASE TIIEREA!TER FOR EACH SIX M>NTH PERIOD. b) OVERTIME -ALL DOUBLE IN EXCESS OF EIGHT HOURS, FIRST SHIFT; 7 1/2 HOURS, SECOND SHIFr; SEVEN HOURS, THIRD SHIFT. DOUBLE SATURDAY, SUNDAY.AND HOLIDAYS. NOTE: ·WAGES WITH EFFECTIVE DATES OF 10·1-73 to 2-1-74 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION CO}l(lrrEE. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT • ... • • BRICKLAYERS JOURNEYMEN BRICKLAYERS, STONE MASONS, BLOCK LAYERS, CORK LAYERS, TERRAZZO WORKERS, POINTING, CAULKING & CLEANING HOURLY *BASIC WAGE RATE HEALTH & WELFARE PENSION *VACATION APPRENTICE FUND INDUSTRY PROK>TION DENT.\L FUND EFFECTIVE 7-1-73 $9.55 .65 .65 .75 .15 .20 .20 a) FOREMAN -ONE HOUR PAY PER DAY ABOVE THE RATE · b) OVERTIME -ALL DOUBLE EFFECTIVE EFFECTIVE .J.-1-7/. 7-1-74 $9.85 $10.15 .65 .65 .65 .65 .75 .75 .15 .15 .20 .20 .20 ;20 c) APPRENTICE RATE -4 YEAR PROGRAM; 45% OF JOURNEYMAN'S RATE FOR FIRST SIX K>NTH PERIOD: INCRF.ASE 5% EACH SIX MONTH PERIOD UP TO AND INCLL"DING EIGHT PERIOD; 10% INCREASE FOR NINTH PERIOD • d) e) UNDERGROUND WORK -SEWER, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUITS, $2. 00 PER DAY ABOVE THE REGULAR WAGE. MILEAGE ALLOWANCE -ANY TRAVEL OVER A TEN MILE ROUND TRIP IS PAID $ .10 A MILE f) SEVEN HOUR DAY *TOTAL HOURLY WAGE FOR PURPOSE OF TAX COMPUTATION ($9.10). •). ... • • CARPENTERS MILLWRIGHTS, SHINGLERS, FLOOR LAYERS (HARDWOOD), POWER SAW OPERATORS, PATENT SCAFFOLD ERECTORS HOURLY BASIC WAGE RATE CARPENTERS MILLWRIGHTS SHINGLE RS EFFECTIVE 6-16-72 $8.10 8.50 8.25 EFFECTIVE 6·16-73 $8.75 9.15 8.90 I ~. EFFECTIVE VACATION & HOLIDAY APPRENTICE TRAINING FUND HEALTH AND WELFARE PENSION PENSION PROKlTION FUND .02 .02 .01 .01 DATE .75 8-1-72 .60 8-1-71 .55 1-1-72 .80 6-1-73 FLOOR LAYERS (HARDWOOD), PCMER SAW OPERATORS AND PATENT SCAFFOLD ERECTORS ARE PAID THE SAME AS SHINGLERS. a) FOREMAN -$ .75 PER HOUR OVER nm CURRENT JOURNEYMN'S WAGE RATE • b) OVERTIME -BUILDING CONSTRUCTION: TIME AND ONE•HALF FOR FOUR HOURS AFTER REGULAR EIGHT HOURS; DOUBLE TIME FOR SA?VRDAY, SUNDAY AND HOLIDAYS. HEAVY HIGHWAY AND . ENGINEERING CONSTRUCTION: DOUBLE TIME FOR SUNDAY AND HOLIDAYS; TIME AND OHE•HALF FOR ALL OTHER OVERTIME. c) d} APPRENTICE RATE -FOUR-YEAR PROGRAM: 60l OF JOURNEYMM'S RATE FOR FIRST SIX MONTHS: 5% INCREASE EACH SIX !l>NTH PERIOD THEREAF'EER. $ • 25 PER HOUR ABOVE JOURNEYMAN OR APPRENTICE WAGE RATE IS PAID FOR SCAFFOLD, BOS'N CHAIR. OR ANY WORK SUSPENDED FROM OR HELD IN POSITION BY ROPE, CABLE OR SAFETY BELT. ..... 5 . ~ARPET, LINOLEUM AND SOFT TILE STRAIGHT CUTl'ER FLOOR EFFECTIVE MACHINE CARPET COVERING HOURLY DATE JOURNEYMEN SHOP MEN OPERATOR SEWERS HANDLER APPRE~1TICES BASIC WAGE RATE 8-1-73 $ 7.80 $ 6.05 $ 5.925 $ 5.89 $ 2.35 * 2-1-74 8.00 6.25 6.125 6.09 2.45 * HEALTH & WELFARE 8-1-73 .60 .60 .60 .60 .60 .60 2-1-74 .60 .60 .60 .60 .60 .60 PENSION 8-1-73 • SS .ss .SS .55 .55 . .55 2-1-74 .55 .ss .55 .55 .55 .55 VACATION & HOLIDAY 8-1-73 1.00 .75 .81 .81 .40 ** 2-1-74 1.00 .75 .81 .81 .40 TRAINING FUND 8-1-73 .05 .05 .05 .05 .05 .os 2-1-74 .10 .10 .10 .10 .10 .10 INDUSTRY FUND 8-1-73 .06 .06 .06 .06 .06 .06 2-1-74 .06 .06 .06 .06 .06 .06 DUES CHECK-OFF**** 8-1-73 .07 .07 .07 .07 .07 .07 2-1 .. 74 .01 .07 .07 .07 .07 .07 *APPRENTICE WAGE RATE 8-1-73 2-1-74 **Vac. & Hol. 8-1-73 & 2-1-74 1st 12 Mo. 501 3.90 4.00 .so 12 to 18 Ho. 601 4.68 4.80 .53 18 to 24 Mo. 1oi 5.46 5.60 .59 24 to JO Mo. sot 6.24 6.40 .66 • 30 to 36 Mo. 90i 1.02 7.20 .75 ****DEDUCT FROM WAGE RATE a) FOREMAN -$ • 50 PER HOUR ABOVE ANY BASIC WAGE b) OVERTIME -ALL DOUBLE \,, 6. CEMENT MASONS A .. EFFECTIVE EFFECTIVE EFFECTIVE HOURLY 1-1-73 6-16-73 1-1-74 BASIC WAGE RATE $7~39 HEALTH & WELFARE .56 PENSION $1.00 1.00 VACATION • 75 $1.00 a) FOREMAN -$. 50 PER HOUR ABOVE RESPECTIVE JOURNEYMAN'S RATE. • b) OVERTIME -TIME AND ONE-HALF FOR FIRST '1WO HOURS; DOUBLE TIME THEREAFTER; DOUBLE TIME SATURDAY, SUNDAY AND HOLIDAYS • c) APPRENTICE RATE -THREE-YF.AR PROGRAM -FIRST SIX KlNT"dS, 65%; SECOND SIX KlNTHS, 75%; THIRD SIX KlNTHS, 80%.; FOURTH SIX KlNTRS, 85'7.; FIFTH SIX MJNTHS, 90%; SIXTH SIX K>NTHS, 95% OF JOURNEYMAN'S RATE. d) SWING OR SLIP FORM SCAFFOLDS -$.25 PER HOUR ABOVE JOURNEYMAN'S RATE e) MASTIC, :~GNESITE, GYPSUM, EPOXY, POLYESTER, RESIN AND AT..L COMPOSITION MASONS -$.25 PER HOUR AOOVE JOURNEYMAN'S RATE. £) SHIFI' WORK -FIRST SHIFT 712 HOURS WORK FOR EIGHT HOURS PAY SECOND SHIFT 7 HOURS WORK FOR EIGHT HOURS PAY THI.RD SHIFT 7 HOURS WORK FOR EIGHT HOURS PAY ' . ... ELECTRICIANS • • HOURLY B.ASIC W,\GE RATE HEALTH & WELFARE GENER.AT. FOREMAN . · FOREMAN' JOURNEYMAN JOURNEYMAN C~BLE SPLICER JOURNEYMt\N TEC~NICI~N PENSION (NATIONAL ELECTRICAL BENEFIT FUND} VACATION HOLIDAY INDUSTRY FUND LOCAL PENSION EFFECTIVE 6·1-73 12.15 10.94 9.72 10.94 9.72 .45** 1'7. BASIC WAGE** 8'%. BASIC WAGE* 47. BASIC WAGE* .05** .35*** * TO BE DEDUCTED ** PAID ABOVE SCALE *** ABOVE ALL HOURLY RATES a) OVERTIME -AJ.1L DOUBLE 12-1-73 12.46 11.22 9.97 ll.22 9.97 (PD BY CONTRACTOR TO INS. co.) b} APPRENTICE RATE -FOUR YEAR PROGRAM • FIRST PERIOD OF SIX K:>NTHS 50% OF JOURNEYMAN'S RATE: SECOND, 55'7.; THIRD.i 60%; FoURTH, 65%; FIFTH, 70i; SIXTH, 75%; . SEVENTH, 80%; EIGHTH, 857. • c) SWING SHIFT -15% OF BASIC WAGE PER HOUR. GRAVEYARD SHIFr -20% OF BASIC WAGE PER HOUR. d) TIME AND ONE-HALF .. WORK UNDER COMPRESSED AIR, OR GAS MASKS, OR IN A POSITION OF 60 TO 90 FEET ABOVE GROUND (LINE WORK EXCEPTED} DOUBLE TIME -WORK IN EXCESS OF 90 FEET ABOVE GROUND (LINE WORK EXCEPTED). e) 36 HOUR WEEK ... ELEVATOR CONSTRUCTORS HOURLY BASIC WAGE RATE HEALTII & WELFARE MECHANIC IN CHARGE MECHANIC HELPER (70%) HELPER (50% -6 K>N111S) EFFECTIVE 9-15-72 $10.665 9.48 6.64 4. 74 EFFEC'l'IVE 9-·: .. -7'J* $11.1517 9.9ll6 6.9388 4.9563 .345 PAID BY EMPLOYER .395 8 . • PENSION VACATION .035 PAID BY EMPLOYEE .035 .£3 .26 . 055 PAID BY EMPLOYEE . 055 2% BASIC WAGE FOR MEN WI111 LESS THAN FIVE YEARS IN 111E INDUSTRY 4% BASIC WAGE FOR MEN WITH MORE THAN FIVE YEARS PLUS ~% FOR EACH ADDITIONAL YEAR IN nIE INDUSTRY SUPPLEMENTAL VACATION FUND EDUCATIONAL FUND .015** .02** *"kDEDUCTED FROM WAGE PACKAGE * NOTE: WAGES WI'lli EFFECTIVE DATE OF 9-16-73 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION COMMITTEE. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT. . . ... ENGINEERS (OPERATI~) HOURLY BASIC WAGE RATE EFFECTIVE 6/16/72 EFFECTIVE* . 6/16/73 • GROUP l GROUP· 2 GROUP 3 GROUP 4 GROUP 5 GROUP 6 $ 6.63 6.91 7.08 7.53 7.70 7.81 7.94 8 .26 8.44 8.60 8.69 8.83 9.70 9.92 $ 6.93 7.21 7.38 7.83 8.00 s .. 11 8.24 8.56 s.14 8.90 B.99 9.13 GROUP 7 GROUP 8 GROUP 9 GROUP 10 GROUP lOA GROUP 11 GROUP llA GROUP llB GROUP llC FOREMEN* 10.15 9.69 10.00 10.22 10.45 9.99 *WITH THE EXCEPTION OF GENERAL FOREMAN; SHIFI'ERS, HEAVY DUTY REPAIRMAN FOREMAN, AND MASTER ! :. MECHANICS {HEAVY Dtrl'Y). **NOTE: WAGES WITH EFFECTIVE DATE OF 6/16/73 WAini«; FOR APPR.O'VAL OF CONSTRUCnON INDUSTRY STABILIZATION CCHfi'lTEE* CONTRACTORS SHOuLD VERIFY CURRENT WAGE RATES PRIOR TO ~~m , 9 . ' ENGINEERS (OPERATING) CONT. STEEL ERECTORS BASIC WAGE RATE GROUP 1 GROUP 2 GROUP 3 GROUP 4 GROUP 4A GROUP 5 GROUP 6 GROUP 7 EFFECTIVE 6/16/72 $ 1. os· 7.36 8.17 8 •. 29 8.52 8.91 9.24 10.49 10. EFFECTIVE 6/16/73 ** $ 7.35 7.66 8.47 8.59 8.82 9.21 9.54 10. 79 • HOURLY EFFECTIVE 1/1/73 •• HEALTH & WELFARE TRAINING FUND PENSION VACATION & HOLIDAY PENSIONED HEALTH & WELFARE AFFIRMATIVE ACTION .57 .24 .90 .60 .os $ .72 .24 1.00 .60 .08 .84 .24 1.15 .63 .08 a) FOR WORK ON CRANES-WITH BOCJilS OF: 80 FT. UP TO 129 FT. 130 FI. UP TO 179 FT; 180 FT. ARD OVER $ .20 PER HR. ABOVE BASIC WAGE RATE .35 PER HR. ABOVE BASIC WAGE RATE .50 PER HR. ABOVE BASIC WAGE RATE b) OVERTIME • DOUBLE THE STRAIGHT TIME RATE UP TO AND INCLUDI:t«; 12 HOURS FOR ALL WORK PERFORMED BEFORE A SHIFT BEGINS AND AF'l'Ell l't EROS, ARD OR SATURDAYS, SUNDAYS AND HOLIDAYS • TRIPLE THE STRAIGHT TIME RATE SHALL BE PAID FOR ALL WORK AFTER 12 HOURS ON ANY DAY. c) APPRENTICES -1st PERIOD APPRENTICE 2nd PERIOD APPRENTlCE 3rd PERIOD APPRENTICE 4th PERlOD APPRENTICE 70'k LESS $.40 OF GROUP 8 BASIC RATE 7n LESS $.40 OF GROUP 8 BASIC RATE 861. LESS $.40 OF GROUP 8 BASIC RATE 9Si LESS.$.40 OF GROUP 8 BASIC RATE *~NOTE: WAGES WITH EFFECTIVE DATE OF 6/16/73 WAITIM; FOR APPROVAL OF CONSTRUCTION INDUSTRY STASILIZAnON CCHUTI'EE* CONTRACTORS SHOULD VERin CURRE1'-r WAGE RATES PRIOR TO PAYMENT. . . ;_." ' .. .... F.!\GU~EERS (OPERATING) CONT. GROUP NO. 1 B -.AKEMAN FIRE:HAN HEAVY DUTY REPAIRMAN HELPER OILER fIGNAU!AN SWITCHMAN TAR POT FIREMAN PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM) DECKHAND • (ALL OF 'nlE ABOVE ARE ASSISTANT TO ENGINEER) GROUP NO. 2 COMPRESSOR OPERATOR CONCRETE MIXER (UP TO & INCL. ONE YARD) CONVEYOR BELT OPERATOR (TUNNEL) FIREMAN HOT PLANT HYDRAULIC MONITOR MECHANICAL CONVEYOR (HANDLING BUILDING MATERIALS) MIXER BOX OPERATOR (CONCRETE PLANT) PUMP OPERATOR SPREADER BOXMAN (W/ SCREEDS) TAR POT FIREMAN (POWER AGITATED) GROUP NO. 3 .mlllox OPERATOR (BUNKER) ~ELICOPTER RADIOMAN (SIGNALMAN) LOCOMOTIVE (ASST. TO ENG. REQUIRED) }10TORMAN RODMAN OR CHAINMAN ROSS CARRIER (CONSTRUC- TION JOBSITE) ROTOMIST OPERATOR SCREEDMAN (EXCEPT AS-. PHALTIC CONCRETE PAVING) SELF-PROPELLED, AUTO- MATICALLY APPLIED CONCRETE CURING MACHINE (ON STREETS, HIGHWAYS, AIRPORTS & CANALS) TRENCHING MACHINE-MAXI- MUM DIGGING CAPACITY 3 FT. DEPTH (ANY ASSISTANCE IN THE OPER- ATION, IF NEEDED SHALL BE PERFORMED BY-AN ASST. TO ENG.) ~· TUGGER HOIST, SINGLE DRUM TRUCK CRANE OILER (ASST. TO ENG.) 11. GROUP NO. 4 BALLAST JACK TAMPER BALLAST REGULATOR BALLAST TAMPER MULTI- PURPOSE BOXMAN (ASPHALT PLANT) FORK LIFT OR LUMBER STACKER·(CONSTRUCTION JOBSITE) LINE MASTER LUBRICATION & SER- VICE ENG. (MOBILE & GREASE RACK) MATERIAL HOIST ( 1 DRUM) SHUTTLECAR TIE SPACER TOWERK>BILE ELEVATOR OPERATOR (INSIDE) . GROUP NO. 5 COMPRESSOR OPERATOR (2 TO 7) CONCRETE MIXERS (OVER 1 YD) CONCRETE PUMPS OR PUMPCRETE GUNS GENERATORS, GASO- LINE, DIESEL, OR ELECTRIC DRIVE (100 KW) PRESS-WELD (AIR OPERATED) PUMPS (2 TO 7) WEI.DING MACHINES (GASOLINE OR DIESEL) (2 TO 7) E~GINEERS ' (OPER~TtNG) co~r, G~O:JP NO.~ BUI LIMA RO.~D PACTOR OR SIMII.AR BOOM TRUCK OR DUAL PURPOSE A-FRAME TRUCK CONCRETE BATCH PI.ANTS (WET OR DRY) CONCRETE SAWS (SELF- PROPELLED UNIT) ON STREETS, HIGtlWAYS, • AIRPORTS AND CANALS RILLING AND BORING MACHINERY, VERTICAL & HORIZONTAL (NOT TO APPLY TO WATER LINERS, WAGON DRILLS OR JACK- HAMMERS) (ASST. TO ENG. REQUIRED) GRADESETTER, GRADE CHECKER (MECHANICAL OR OTHERWISE) HIGHLINE CABLEWAY SIGNAL- MAN ROLLER SCREEDMAN (BARBER-GREENE & SIMILAR) (ASPHALTIC • CONCRETE PAVING) ELF-PROPELLED COMPAC- TOR (SINGLE ENGINE) SELF-PROPELLED PIPELINE WRAPPING MACHINE . LOCOMOTIVES (STEAM OR OVER 30 TON) ~ (ASST. TO ENG. REQ.) MAGINNIS INTERNAL FULL SLAB VIBRATOR (ON AIR- PORTS, HIGHWAYS,CANALS AND WAREHOUSES) MECHANICAL FINISHERS (CONCRETE) (C~RY, JOHN- SON1 BIDWELL BRIDGE DECK OR :sIMII..AR TYPES) MECHANICAL BURM, CURB AND/ OR CURB AND GUTrER MACHINE CONCRETE OR ASPHALT PORTABLE CRUSHERS POWER.JUMBO OPERATOR (SETTING SLIP 'FORMS , ETC. , IN TUNNELS) SLIP-FORM PUMPS (LIFT- ING DEVICE FOR CONCllEtE FORMS) SMALL RUBBER-TIRED TRAC- TORS SURFACE HEATER (PERAULT, CRC, OR SIMILAR TYPES) SELF-PROPELLED POWER SWEEPER OPERATOR 12. GROUP NO. 7 · CONCRETE CONVEYOR OR CONCRETE PUMP, TRUCK OR EQUIPMENT tt:>UNTED (ASST. TO ENG. WHEN REQUIRED) (BOOM LENG'lll ·TO APPLY CONCRETE CONVEYOR, BUILD- ING SITE (ANY ASSISTANCE SHALL BE AN EMPLOYEE COVERED BY .nus AGREE- MENT) DECK ENGINEERS DUAL DRUM MIXER (ASST, TO ENG,, REQUIRED) FULLER KENYON PUMP AND S IMI!AR TYPES INSTRUMENT MAN JOURNEYMAN TRAINEE MATERIAL HOIST (2 OR KlRE DRl!MS) MECHANICAL FINISHERS OR SPREADER MACHINE (AS-· PHALT, BARBER-GREENE & SIMILAR) (SCREEDMAN RE- QUIRED) MINE OR SHAFT HOIST MIXEIU«>BILE PAVEMENT BREAKER wrm OR WITHOUT COMPRESSOR COM- B !NATION PAVEMENT BREAKER, TRUCK MOUNTED, WITII COMPRESSOR COMBINA- TION (ASST. TO ENG DRIVER REQUIRED) PIPE BENDING MACHINE PIPE LINES ONLY PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED) PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED) REFRIGERATION PLANT SELF-PROPELLED BOOM TYPE LIFTI~G DEVICE (CENTER MOUNT) (10 TON CAPACI'I'Y OR LESS) SELF-PROPELLED ELEVA· TING GRADE PLANE SLUSHER OPERATOR SMALL TRACTOR (WITII BOOM) SOIL TESTER TRUCK TYPE LOADER GANTRY RIDER (OR SIMII.l\R EQUIPMENT) HYDRA-HAMMER OR SIMILAR '"ENGINEERS (OPERATING) CONT. GROUP NO. 8 ARMOR-COATER (OR SIMILAR) (TWO OPERATORS AND ONE ASST. TO ENG. REQUIRED) ASPHALT PLANT ENGINEER CAST-IN-PLACE PIPE LAYING MACHINE «OMBINATION SWSHER AND M>TOR OPERATOR NCRETE BATCH PU\NT (MULTIPLE UNITS) DOZER HEADING SHIELD OPERATOR HEAVY-DUTY REPAIRMAN, AND/OR WEIDER KEN SEAL MACHINE (OR SIMILAR) KOU1AN LOADER (ASST. TO ENG. REQUIRED ON TWO (2) OR MORE) LOADER (UP TO 2 YDS.) MECHANICAL TRENCH SHIELD PORTABLE CRUSHING AND SCREENING PU\NTS • (ASST. TO ENG. REQUIRED SH CAT TIMBER SKIDDER (RUBBER TIRED OR SIMILAR) RUBBER TIRED EARnl MOVING -EQUIPMENT (UP TO AND INCL. 45 cu. YDS. II nsTRUCK" H.R.C. EUCLIDS, T PULLS, DW-10,20,21, & SIMILAR) RUBBER TIRED DOZER TRACTOR 'ORAWN SCRAPER SELF-PR~iELLED COMPACTOR Winl DOZER SHEEPFOOT TRACTOR TRENCHING MACHINE (ASST. TO ENG. REQUIRED) TRI-BATCH PAVER (ASST. TO ENG. REQUIRED) TUNNEL MOLE BORING . MACHINE OPER. (ANY ASSISTANCE IN THE OPERATION, IF NEEDED, SHALL BE PERFORMED BY AN ASST. TO ENGINEER) WELDER WOODS-MIXER (AND OTHER SIM II.AR PUGMILL EQUIP- MENT) GROUP NO. 9 CANAL FINGER DRAIN DIGGER (ASST. TO ENG. REQUIRED) (IN ADDITION TO TIIE ABOVE TilERE SHA LL BE ONE ( 1) GROUP 7 OPERATOR) CHICAGO BOOM COMB. MDCE~, AND COMPRESSOR (GUNITE) COMBINATION SLURRY MIXER AND/OR CLEANER HIGHLINE CABLEWAY (5 TONS AND UNDER) LULL HI-LIFT OR SIMILAR {20 FT. OR OVER) MUCKING MACHINE (ASST. TO ENG. WHEN REQUIRED) TRACTOR (W/BOOM) (D-6 OR I..ARGER, AND S !MILAR) 13. • .. E~·:r.I:-.iEERS (OPERA'!'U~G) CONT. GROUP NO. l 0 BOOM-TYPE BACKFILLING MACHINE (ASST. TO ENG. REQUIRED) BRIDGE CRANE CARY-LIFT (OR SIMILAR) CHEMICAL GROUTING MACHINE (ASST. TO ENG. REQUIRED) • IEF OF PARTY MBINATION BACKHOE & LOADER (UP TO & IN- CLUDING ~ CU. YD. M.R.C.) DERRICKS (2 OPERATORS REQUIRED WHEN SWING ENGINE REMOTE FROM HOIST) DERRICK BARGES (EXCEPT EXCAVATION WORK) (DECK ENG. & ASST. TO ENG. REQUIRED) DO-MORE LOADER & ADAMS ELEGRADER ELEVATING GRADER OPERATOR EUCLID LOADER & SIMILAR TYPES (ASST. TO ENG. • REQUIRED) BBER-TIRED SCRAPER, SELF LOADING (PADDLE WHEELS,ETC.) • HEAVY DUTY ROTARY DRILL RIG (INCLUDING CAISSON FOUND- ATION WORK & ROBBI~S TYPE DRILLS) (ASST. TO ENG. REQ.) KOEHRING SKOOPER (OR SJ~ILAR) (ASST. TO ENG. REQ.) LIFT SLAB MACHINE (VAGT- BORG & SIMILAR TYPES) L0~DER (2 YDS UP TO & INCL. 4 YDS.) l.OCOK>TIVE (OVER 100 TONS) (SINGLE OR MULTIPLE UNITS) _ (ASST. TO ENG. RE- QUIRED) MULTIPLE ENGINE EARTH· MOVING MACHINE (EUCLIDS, DOZERS,ETC) (NO TANDEM SCRAPER) PRE-STRESS WIRE WRAPPING MACHINE SHUTTLE CAR (RECLA IM STATION) SOIL STABILIZER (P&H OR EQUAL) SUB GRADER (CURRIES OR OTIIER AUTOMATIC TYPE) (ASST TO ENG. REQ.) TRACK LAYING TYPE EARTH MOVING MACHINE (SINGLE ENGINE WITH TANDEM SCRAPERS) TRACTOR, COMPRESSOR DRILL COMB. (ASST. TO ENG • REQ.) TRAIN LOADING STATION VACUUM COOLING PLANT SINGLE ENGINE SCRAPER OVER 45 YARDS -WHIRLEY CRANE (UP TO & INCL. 25 TONS) RESERVOIR-DEBRIS TUG (SELF PROPELLED FLOATING) \ l .... GROUP NO. 1 OA BACKHOE (HYDRAULIC) (UP TO & INCL 1 CU. YDo M.R.C,) (ASST TO ENG REQ) BACKHOE (CABLE) (UP TO & INCL 1 CU. YD.) (ASST. TO ENG. REQ.) CRANES (NOT OVER 25 TONS, HAMMER- HEAD & GANTRY) (ASST. TO ENG.REQ.) COMB. BACKHOE & LOADER OVER ~ CU. YD. M.R.C. (ASST TO ENG. REQ. WHEN USED AS BACKHOE) CONTINUOUS FLIGHT TIE BACK AUGER (UP TO & INCL. 1 CU. YD.) (CRANE ATTACHED) (IWO (2) OPERATORS) GRADE-ALLS (UP TO AND INCL. 1 CU. YD.) (ASST. TO ENG. REQ.} POWER SHOVELS, CLAMSHELLS t DRAGLINES (UP TO & INCL. ONE (1) CU. YD, M.R.C.) (ASST. TO ENG. REQ.) SELF-PROPELLED BOOM-TYPE LIFTING DEVICE (CENTER MOUNT) (OVER 10 TON) (ASST. TO ENG. REQ. Wi~Ei·~ ~~OOM IS EXTENDED OVER 35 FT.) SELF-PROPELLED BOOM-TYPE LIFTING DEVICE (CENTER M'.>Utrr) (OVER 15 TONS) (ASST. TO ENG. REQ.) E;.<.; I~:EERS (OPERATING) CO~T. · GROUP NO. 11 AUTO~~TIC CONCRETE SLIP FORM PAVER (GRADESETTER, SC~ED­ MAN & ASST. TO ENG. REQ. AUTOMATIC RAILROAD CAR DUMPER CANAL TRIMMER (TWO (2) ASST'S TO ENG. REQ.) HIGHLINE CA~~AY (OVER 5 TON) LOADER (OVER 4 YDS. UP TO & INCL. TWELVE (12)_CU. YDS.) ,WER SHOVELS, CLAMSHELLI:\, DRAGLINES, BACKHOES, GRADAJ..LS, (OVER 1 YD. & UP TO & INCL. 7 CU. YDS. M.R.C.) (ASST~ TO ENG. REQ.) · (2 ASST'S TO ENG. REQ. ON 120-B SIMILAR OR LARCIBR) RUBBER TIRED EARTHMOVING MACHINES (MULTIPLE PROPUL- SION POWE .. ~ UN ITS & TWO OR NORE SCRAPERS) (UP TO & ~NCL. 75 CU. YD. "STRUCK", M.R.C.) SELF-PROPELLED COMPACTOR (WI'Di MULTIPLE PROPULSION POWER UNITS) CONTINUOUS FLIGHT TIE BACK • AUGER OVER 1 CU. YD. (INCL. CRANE) (TWO (2) OPERATORS) DROTT TRAVELIFT 650-A-l or S !MILAR ( 45 TON OR OVER) (ASST. TO ENG. REQ.) SELF-PROPELLED COMPACTOR (WITH MULTIPLE PROPULSION POWER UNITS) CANAL FINGER DRAIN BACKFILLER (ASST. TO ENG. REQ.) (IN ADDITION TO THE ABOVE TiiERE SHALL BE TWO (2) GROUP 7 OPERATORS) CANAL TRIMMER WI'Ill DITCH- ING ATTACHMENTS {1'WO (2) OPERATORS, ONE (1) GRADESETTF.ll, TWO ( 2) ASST. TO ENG.) SLIP FORM PAVER (CONCRETE OR ASPHALT) (1 OPERA- TOR & 2 SCREEDMEN) TANDEM CATS · · TRENCHER (PULLING ATTACHED SHIEID) (ASST. TO ENG. REQ.) TOWER CRANES MOBILE (ASST. TO ENG. REQ.) SINGLE ENGINE RUBBER- TIRED EARTil-K>VlNG MACHINE (WITII TA.NDEM SCRAPERS) CRANES (OVER 25 TONS UP TO & INCL. 125 TONS) (ASST. TO ENG. REQ.) UNIVERSAL LIEBHER & TOWER CRANES & SIMILAR TYPES IN TilE ERECTION, DIS- MANTLING & K>VING OF EQUIPMENT TIIERE SHALL BE AN ADDITIONAL OPERATING ENG. AT GROUP 8 RATES) WHEEL EXCAVATOR (UP TO & INCL. 750 CU. YDS. PER HR.) {ASST. TO ENG. REQ) WHIRLEY CRANE (OVER 25 TON) GROUP NO. llA LOADER (OVER 12 CU. YDS., UP TO & INC. 18 CU. YD.) 15. RUSBER TIRED MULTI-PURPOSE EARTH- MOVING MACHINES (TWO (2) UNITS OVER 75 CU. YDS. "STRUCK" M~R.C .·) POWER SHOVELS & DRAGLINES (OVER 7 CU. YDS 0 M.R.C.) (ASST. TO ENG. REQ.; AN ADDITIONAL ASST. TO ENG. IS REQ. IF THE SHOVEL OR DRAGLINE rs ELEC- TRICALLY POWERED) . CRANES (OVER 125 TONS) (ASST. TO ENG. REQ.) BAND WAGONS (IN CONJUNCTION WITH WHEEL EXCAVATOR) WHEEL EXCAVATOR (OVER 750 CU. YDS. PER HR.) (TWO (2) OPERATORS & ONE (1) ASST. TO ENG. REQ.; ANY ADDITIONAL ASSISTANCE SHALL BE BY ASST. TO ENG.) GROUP NO. llB LOADER (OVER 18 CU. YDS.) GROUP NO. llC OPERATOR OF HELICOPTER (WHEN USED IN ERECTION WORK) REMOTE·CONTROLLED EARTHMOVING EQUIPMENT (NO ONE OPERATOR SHALL OPERATE MORE THAN TWO (2) PIECES OF EARTHMOVING EQUIPMENT AT ONE TIME.) E~:GI~EERS (OPERATING) CONT. GROUP NO. 1 ASSISTANT TO ENGINEER (OILER) GROUP NO. 2 ASSISTANT TO ENGINEER (TRUCK CRANE OILER) COMPRESSOR OPERATOR RODMAN, CHA INMAN· • GROUP NO. 3 COMPRESSORS, GENERATORS AND /OR WELDING MACH INES OR COMBINATION (2 TO 6) (OVER SIX (6) ADDITIONAL ENGINEERS REQ.) GROUP NO. 4 HEAVY DUTY REPAIRMAN GROUP NO. 4A STEEL ERECTORS' CLASSIFICATIONS GENERATOR, GASOLiNE OR DIESEL DRIVEN (100 KW OR OVER) DECK ENGINEER INSTRUMENT MAN SIGNAI.MAN (USING MECHANICAL EQUIP- MENT) FORK LIFT. TRACTOR OPERATOR GROUP NO. 6 CRAWLER CRANES & TRUCK CRANES (OVER 15 TONS M.R~C~) (ASST. TO ENG. REQUIRED) DERRICKS (2 OPERATORS REQUIRED WHEN SWING ENGINE REMOTE FROM HOIST) HIGHLINE CABLEWAY (SIGNAllfAN REQ.) GANTRY RIDER (OR SIMILAR EQUIP.) SELF-PROPELLED BOOM-TYPE LIFTING DEVICE (CENTER MOUNT) (OVER 10 TON CAPACITY M.R.C. OR "CENTER MOUNTS" NOT CERTIFIED IN CLASSI- FICATION #6881) (ASST. TO ENG. REQ. WHEN BOOM IS EXTENDED OVER 35 FEET) TOWER CRANES K>BILE (ASST. TO ENG. REQ.) UNIVERSAL LIEBHER AND TOWER CRANES (AND SIMILAR TYPES) (IN THE ERECTION, DISMANTLING AND MOVING OF EQUIPMENT, TiiERE SHALL BE AN ADDITIONAL OPERATING ENGINEER) TWO OR MORE DRUM HOIST . COMBINATION HEAVY DUTY REPAIRMAt-1 WELDER • G~OVP NO. 5 BOOM TRUCK OR DUAL PUR- POSE A-FRAME TRUCK CHICAGO BOOM SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER MOUNT) (lOTON CAPACITY OR LESS M.R.C.) CHIEF OF PARTY BOOM C1\T CRAWLER CRANES & TRUCK CRANES (15 TONS M.R.C. OR LESS) (ASST. TO ENG. REQUIRED) . SINGLE DRUM HOIST TUGGER HOIST GROUP NO. 7 OPERATOR OF HELICOPTER 16. .. • • FENCE WORKERS (WOOD FENCE) EFFECTIVE EFFECTIVE HOURLY 9/1/72 7/1/73 BASIC WAGE RATE JOURNEYMAN FENCE WORKER $6.75 $7.40 FENCE WORKER 6.50 7.15 PROBATIONARY WORKER START 3.80 4.45 AFTER 3 K>NTHS 5.15 5.80 AFTER 6 K>NTRS 6.50 7.15 EFFECTIVE 12ll/72 PENSION .15 HEAL'm & WELFARE 43.65/t«>NTH* HEAL'm & WELFARE (RETIREES) 2.35/MONTH* DENTAL PIAN .06 .07 a) FOREMAN -$.25 PER HOUR ABOVE JOURNEYMAN'S RATE. b) OVERTIME • UP TO FOUR HOURS -TIME AND ONE-HALF; OVER FOUR HOURS, SATURDAY, SUNDAY AND HOLIDAYS -DOUBLE TIME. c) PAID VACATION AND HOLIDAYS -$.60/HR./WORKED FOR EACH MAN *PER CALENDAR MONTH FOR EACH ELIGIBLE EMPLOYEE WHO DOES 64 OR KJRE HOURS OF WORK PER CALENDAR MONTH UNDER THE AGREEMENT. --------------------------------~-~------- 17 . • GLAZIERS HOURLY BASIC WAGE RATE HEALTH & WELFARE PENSION VACATION HOLIDAYS (7PAID) TRAINING INDUSTRY FUND *BENEFICIAL FUND IS DEDUCTED FROM BASIC WAGE RATE EFFECTIVE 7 .. 1-11 $7.835 .35 .55 t .23 .01 .02 .65 18. EFFECTIVE EFFECTIVE* 7-1-72 7-1-73 $8.455 $8.875 • 35 .46 .55 .61 * * .24 .24 •. 01 .01 .02 • 02 .65 .65 a) HIGH PAY -EFFECTIVE 7-1-70 -ANY MAN WORKING FROM A SUSPENDED CONTRIVANCE ON THE OUTSIDE OF A BUILDING OR STRUCTURE FOR FOUR HOURS OR K>RE SHALL BE PAID .25¢ PER HOUR OVER THE SCALE. b) APPRENTICE BASIC HOURLY RATE SHALL BE THE FOLLailNG PERCENTAGE OF JOURNEYMAN'S RATE: 1st 6 MONTHS OR 1,000 HOURS • • • • •• 503 2nd 6 l«>NTHS OR 1,000 HOURS •.••••• 553 3rd 6 !t'.>NTHS OR 1,000 HOURS • • • • • • 603 4th 5 !l>NTHS OR 1,000 HOURS • • • • • • 653 5th 6 !l)NTHS OR 1,000 HOURS •••••• 70i 6th 6 K>NTHS OR 1,000 HOURS •••••• 7Si 7th 6 !«>NTHS OR 1,000 HOURS •••••• 853 8th 6 K>NTHS OR 1,000 HOURS •••••• 953 • c) FOREMAN 103 OVER BASIC WAGE RATE d) FIRST 'l'WO HOURS AFTER THE REGULAR 8 HOUR DAY IS TIME AND ONE-HALF. ALL OTHER TIME WILL BE DOUBLE TIME. NOTE: WAGES WITH EFFECTIVE DATE OF 7-1-7 3 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION COMMITTEE. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT. • • HOD CARRIER -BRICK HOURLY BASIC WAGE RATE .HEALTH & WELFARE PENSION VACATION INDUSTRY FUND DENTAL FUND EFFECTIVE 8-1-72 EFFECTIVE 1-1-73 EFFECTIVE 7-1-73 $7. 17 $ 7 . 30 $ t. 54 .45 .so .50 .SS ·• 65 • 65 .90* ~98* .90* .OS .OS .OS .. 15 .15 .15 .~· .~* .~* 19. DUES CHECK OFF PROK>TION FUND .OS (NOT DEDUGTED).05 (NOT DEDUCTED).05(NOT DEDUCTED) *TO BE DEDUCTED FROM BASIC WAGE a) SF.VEN HOUR DAY PLUS STARTING TIME OF 15 MINUTES b) OVERTIME -· ALL DOUBLE. INCLUDES STARTING TIME c) SWING SHIFT • 10'1 OVER HOURLY BASIC WAGE RATE d) GRAVEYARD SHIFT -151 OVER HOUBLY BASIC WAGE RATE e) UNDERGROUND: PAY -$2 .00 PR DAY ABOVE DAILY WAGE f) TRANSPORTATION COSTS -$ .10 PEil MILE OVER AND ABOVE 5 HILES • ·• HOD CARRIERS -PLASTER HOURLY BASIC WAGE BATE HEALTH & WELFARE PENSION VACATION DDTAL FUND DUES CHECK OFF INDUSTRIAL OR PROH>TION *TO BE DEDUCTED FROM BASIC WAGE EFFECTIVE 7-1-72 $7.75 .45 .ss .90* • l_S .OS* .10 EFFECTIVE EFFECTIVE* 7-1-73 1-1-74 $8.00 $8.15 .45 .so -.55 • 65 .90* .90* .15 .lS .05* .10* .10 .10 a) 8 HOUR DAY PLUS STARnNG TIME OF lS MINU'l'ES PRIOR TO WORK DAY. FOUR HOURS ON FRIDAY PLUS STARTING TIME b) OVERTIME • ALL DOUBLE c) TRANSPORTATION COSTS -NO TRAVEL PAY --• -BEYOND 35 MILES, $8.00 SUBSISTANCE 20. NOTE: WAGES Wll'R EFFECTIVE DATE OF 1-1-74 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION-CO!lll'l'TEI. CONTRACTORS SHOULD YDin CURRENT WAGE RATES PRIOR TO PAYMENT. • • IRON WORKERS -FIEW ERECTION EFFECTIVE EFFECTIVE HOURLY 8-16-72 2-16-73 BASIC WAGE RATE REINFORCING $8.55 $8.75 STRUCTURAL & ORNAMENTAL 8.58 B.78 · FENCE ERECTOR 8.44 8.64 HEALTH & WELFARE .63 .68 -PENSION .87; .81~· VACATION .7 .8Sk TRAINING FUND .02 .02 ADMINISTRATIVE FUND •. 01 .01 a) FOREMAN -$. 75 PER HOUR OVER THE REGULAR HOURLY RATE OF niE HIGHEST BUILDING TRADES CLASSIFICATION OVER WHICH THEY HAVE SUPERVISION b) APPRENTICE RATES -FOR THREE YEAR PROGRAM FOR REINFORCING, STRUCTURAL AND ORNAMENTAL, AND FENCE ERECTOR APPRENTICES: FIRST SIX MON'niS: 70% SECOND SIX MON'l11S: 83% mIRD SIX MONnlS: an FOURnl Six MONTHS: 91% FIFTH SIX l«>NTHS: 95% SIX'l'H SIX MON'lllS: 98% c) OVERTIME -ALL DOUBLE NOTE: WAGES WITii EFFECTIVE DATE OF 8-16-72 APPROVED BY TIIE WAGE STABILiZATION BOARD. *ADDED TO BASIC WAGE FOR TAX PURPOSES 21, • ·• LABORERS EFFECTIVE EFFECTIVE HOURLY 7-1-72 6-1-73 BASIC WAGE RATE GROUP l $5.i\85 $5.785 ·GROUP 1 (a) 5.}l 6.01 GROUP 1 m: GROUP 1 5.735 5.835 GROUP l GROUP 1 6.235 6.335 GROUP 2 5.535 S.635 Gd.OUP 3 5.435 S.535 * SEWER CLF.ANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP l WAGE BATES. "SEWER CLEANERS" MEANS ANY WO~ WHO HANDLES OR COMES IN CONTACT WITH RAW SmJAGE ~R WHO_ WORKS INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS. ** MAINTENANCE Am> REPAIR TRACKHEN AND ROAD BEDS AND ALL EMPLOYEES PERFORMING WORK COVERED .BY THIS AGREEME1''T SHALL RECEIVE 12 1/2¢ PER HOUR ABOVE 'DfEIR REGULAR BATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIVICALLY COVERED HEREIN. THIS PARAGRAPH ~;JtALL NOT BE CONSTRUED TO APPLY TO WORK BELCXJ GBOUND LEVEL IN OPEN CUT. THE lWELVE AND ONE•HALF CENT (12 1/2c) PREMIUM SHALL APPLY FOR WORK BID AFTEI. AUGUST 1, 1971 ro CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFl'Ell '1'llE TEMPORARY COVER HAS BEEN PLACED. a) HEN ·WORKING OFF OR WITH oa FROM BOS'N CHAIRS., SWINGING SCAFFOLDS, BELTS SHALL RECIEVE 25~ PER HOUR ABOVE THE APPLICABLE WAGE RATE~ 'l'HIS PREMIUM RATE SHALL BE RECKONED BY THE DAY AND HALF DAY.. THIS SHALL NOT APPLY ro· MEN ENTITLED TO RECIEVE THE WAGE BAT! SET PORTH IN GROUP 1 (a). b) LABOR. FOREMEN -SHALL RECEIVE $.SO PEil HOUR ABOVE ANY CLASSIFICATION OF THIS AGREEMENT WORKING UNDER ltlS DIRECTION. ) ', ·~ - 22. 23. LABORERS 'CONT.l EFFECTIVE EFFECTIVE HOURLY 7·1-72 6-1-73 BASIC WAGE RATE GUNITE INDUSTRY GUNlzYREMA~ $6.57 $6.92 NOZ , G N, POTMAN 6.145 6.495 RODMAN 6.145 6.495 GROUNDMAN 6.145 6.495 h~QlnfBINEE S.625 5.975 5.555 5.905 • GENERAL LABORER 5.435 5.785 'WRECKING WORK SKILLED WRECKER 5.685 6.035 (REK.lVING & SALVAGING OF SA-, w~s, DOORS, PLUMBING & ELECTRIC FIXTURES) SEMI-SKILLED WRECKER 5.535 5.885 (SALVAGING OF OTHER BUILDING MATERIALS) GENERAL LABORER 5.435· 5.785 (INCLUDES ALL CLEANUP WORK, LOADING, BURNING OF DEBRIS) • HOUSEH>VERS FOREMAN 6.11 6.46 SKILLEDHOUSEK>VER (SIX 5.685 6.035 K>Nl'HS Oil LESS) < · SEKI •SKILLED HOUSEK>VER. 5.435 5.785 (LESS tlWt 30 DAYS) UNSKILLED 5.435 5.785 • • LABORERS (CONT) THESE PAYMENTS APPLY FOR ALL CLASSIFICATIONS Of LABORERS, THE GUNITE INDUSTRY, WRECKING WORK AND HOUSEK'.>VERS. EFFECTIVE EFFECTIVE EFFECTIVE HOURLY 7-1-72 6-1-73 6-1-73 HEALTH & WELFARE $ .55 $ .SS $ .65 PENSION 1.05 1.15 1.35 VACATION & HOLIDAY .70 .so .80 TRAINING & RETRAINING .06 .08 .10 a) OVERTIME -TIME AND ONE-HALF ON SATURDAY AND AFTER EIGHT HOURS WORK ON --WEEKDAYS. DOUBLE TIME ON SUNDAY AND HOLIDAYS. - 24. LA BORERS (CONT. ) ASPHALT IRONERS AND RAKERS BARKO, WACKER AND S !MILAR TYPE TAMPERS BUGGYMOBILE CHAINSAW, FALLER, LOGLOADER AND BUCKER COMPACTORS OF ALL TYPES - CONCRETE J\ND MAGNESITE MIXER AND 1/2 YARD CONCRETE PAN WORK CONCRETE SAW~ CONCRETE SANDER CRIBBERS AND10R SHORING CUT GRANITE CURB SETTER DRI PAK-IT MACHINE • ORM RAISERS, SLIP FORMS REEN CUTTERS HEADBOARD MEN, HUBSETTERS l ALIGNERS HIGH PRESSURE BLOW PIPE ( \" OR OVER, 100 LBS PRESSURE OR OVER) HYDRO SEEDER & SIMILAR TYPE JACKHAMMER OPERATORS JACKING OF PIPE OVER 12" KETTLEMEN, POTMEN AND MEN APPLY~NG ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS {APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS) GROUP 1 LAGGING, SilEETING, WHALING, BRACING, TRENCH-· JACKING, HAND-GUIDED LAGGING HAMMER JACKSON & SIMILAR TYPE COMPACTORS • GROUP la JOY DRILL MODEL 'IWM-2A TRACK DRILLERS JACK LEG DRILLERS DIAMOND DRILLERS WAGO~ DRILLERS MECHANICAL DRILLERS -ALL TYPES REGARDLESS OF TYPE OR METIIOD OF POWER ALL W01.K OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, -REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING. . MAGNESITE, EPOXYRESIN, FIBERGLASS AND MASTIC WORKERS (WET OR DRY) PAVEMENT BREAKERS AND SPADERS, INCLUD- ING TOOL GRINDER PIPELAYERS, C.AULKERS, SANDERS, PIPF:WaAP_PERS, CONDUIT LAYERS, PLASTIC PIPE LAYERS POST HOLE DIGGERS -AIR, GAS & ELECTRIC POWER BROOM SWEEPERS POWER TAMPERS OF ALL TYPES, EXCEPT AS SHOWN IN GROUP 2 RAM SET GUN AND STUD GUN _ RIPRAP ... STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER DAVIS TRENCHER -300 or SIMILAR TYPE (AND ALL SMALL TRENCHERS) ROTO AND DITCH WITCH ROTOTILLER SAND BLASTERS, POTMEN, GUNMEN & NOZZLEMEN SIGNALLING AND RIC..CING TANK CLEANERS TREE CLIMBERS VIDRA-SCREED-BULL FLOAT IN CONNECTION . Wini LABORERS I WORK VIBRATORS GARDENER-DENVER MODEL DH-143 AND SIMILAR TYPE DRILL.5 (IN ACCORDANCE, wrm MEmRANDUM OF UNDERSTANDING BETWEEN IABORERS AND OP- ERATIHG ENGINEERS DATED AT MIAMI, FLORIDA, FEBRUARY 3, 1954) MULTIPLE UNIT DRILLS BLASTERS AND POWDERMEN HIGH SCALERS (INCWDING DRILLING OF SAME) TREE TOPPER. BIT GRINDER. • 1..:\BORERS (CONT.) GROUP le BURNING AND WELDING IN CONNECTION WITH LABORERS ' WORK MEN WORKING OFF OR FROM BOS'N CHAIRS, SWINGING SCAFFOI...::>St BELTS SHALL RECEIVE 25¢ PER HOUR ABOVE THE APPLICABLE WAGE RATE. mrs PREMIUM RATE SHALL BE RECKONED BY THE DAY AND HALF DAY. nns SHALL NOT APPLY TO.MEN ENTITLED TO RE- CEIVE THE WAGE RATE SET FORnI IN GROUP la . GROUP le WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS (DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH). ALL WORK IN TIIE CONSTRUCTION OF TUNNELS AND SHAFTS SHALL BE PERFORMED IN ACCORDANCE WITil THE PROVISIONS OF 'IHE LABORERS' MASTER TUNNEL AGREEMENT FOR NORTHERN CALIFORNIA AND-ntE INDIVIDUAL EMPLOYER AGREES TO COMPLY wrrn ALL OF mE PROVI- S IONS OF TIIE TUNNEL MASTER AGREEMENT SPECIFIED HEREIN. SHAFT IS AN EXCAVATION OVER FIFTEEN (15) • , FEET DEEP OF ANY TYPE, GENERALLY VERTICAL IN NATURE, BUT MAY DECLINE FROM llfE VER- TICA~-, AND WHOSE DEP'IH IS GREATER THAN ITS LARGEST HORIZONTAL DIMENSION. IT IS SPE- CIFICALLY UNDERSTOOD nl.AT BELL HOLE FOOTINGS AND DEEP FOOTING ARE SUBJECT TO ntE PRO- VIS IONS OF THIS AGREEMENT, AND ALL SHAFTS, STOPES, RAISES, AND TUNNELS ARE SUBJECT TO TilE PROVISIONS OF ntE TUNNEL MASTER AGREE· ~iE~T SPECIVIED HEREIN. GROUP 2 ASPHALT SHOVELERS 26. CEMENT DUMPERS, AND HANDLING DRY CEMENT.OR GY":>SUM CHOKE-SETTER AND RIGGER (CLEARING WORK) CONCRETE BUCKET DUMPER AND CHUTEMAN CONCRETE CHIPPING AND GRINDING CONCRETE IABORERS (WET OR DRY) DRILLERS HELPER, CHUCK TENDER, NIPPER (ONE CHUCKTENDER ON SINGLE MACHINE OPERATION : · Willf MINIMUM OF ONE CHUCKTENDER FOR EACH TWO MACHINES ON MULTIPLE MACHINE OPERATIONS (JACKHAMMERS IN NO WAY INVOLVED IN THIS ITEM).) GUINEA CHASER {STAKE.MAN) GROUT.CREW HIGH PRESSURE NOZZLEMEN, ADDUCTORS HYDRAULIC MONITOR .(OVER 100 LBS. PRESSURE) LOADING AND UNLOADING, CARRYING.AND HANDLING OF ALL RODS AND MATERIALS FOR USE IN RE- INFORCING CONCRETE CONSTRUCTION PITTSBURGH CHIPPER, AND SIMILAR TYPE BRUSH SHREDDERS SLOPER SINGLE FOOT, HAND HELD, PNEUMATIC TAMPER ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED GROUPS 1 'raROUGH le JACKING OF PIPE -UNDER 12 INCHES • • Lt\BORERS (CONT,) GROUP 3 ALL CLEANUP WORK OF DEBRIS, GROUNDS AND BUILDINGS INCLUDING, BUT NOT LIMITED TO STREET CLEANERS CLEAN!NG AND WASHING WINDOWS (SUBJECT TO PROVISIONS OF SECTION 20) CONSTRUCTION LABORERS, INCLUDING BRIDGE LABORERS AND GENERAL LABORERS DUMPMAN, LOAD SPOTl'ER FLAm'.AN FIRE WATCHER GARDENERS, HORTICULTURAL AND LANDSCAPE IABORERS (SEE SUPPLEMENT NO. 4) JETTING LIMBERS, BRUSH WADERS AND PILERS MAINTENANCE LANDSCAPE LABORERS ON NEW CONSTRUCTION (SUBJECT TO niE PROVI- S IONS OF SEC. 20) MAINTENANCE, REPAIR TRACKMEN AND ROAD BEDS STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORERS STREET CLEANERS TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR . TOOL ROOM ATI'ENDANT (JOB SITE ONLY) WATCHMEN (SUBJECT TO THE PROVISIONS OF SECTION 20) 27. • • LATHERS EFFECTIVE EFFECTIVE HOURLY 7/1/72 7/1/73 BASIC WAGE RATE $7.86 $8.15 SUPPLEMENTAL WAGE .78 • 78 DUES CHECK OFF .07 .09 *8.71 *9.02 DENTAL .20 .20 PENSION .45 .55 HEALTil & WELFARE .35 .50 PROMOTION .10 .10 *TOTAL TAXABLE WAGE a) FOREMEN -10% OF JOURNEYMAN'S RATE UP TO 7 MEN; 15% FOR 8 MEN OR OVER. o) APPRENTICE PROGRAM -THREt: YEARS: FIRST TIIREE MONTHS, 40% OF BASIC TAXABLE WAGE SECOND THREE MONTHS 1 50% OF BASIC TAXABLE WAGE SECOND SIX mNntS, t>O% OF BASIC TAXABLE WAGE 'flfIRD SIX MONTHS, 68% OF BASIC TAXABLE WAGE FOURlR SIX MON'rnS, 76% OF BASIC TAXABLE WAGE FIFTH SIX K>NTHS, 84% OF BASIC TAXABLE WAGE Slxnt SIX M>NTHS, 92% OF BAS! TAXABLE WAGE DURING FIRST 90 DAYS (TRIAL PERIOD) THE EMPLOYER DOES NOT PAY ANY CONTRIBUTIONS OF TiiE HOURS WORKED TO ANY OF IBE FUNDS wrm mE EXCEPTION OF ntE HEALTil & WELFARE FUND. c) OVERTIME -ALL DOUBLE TIME TRAIN ING FUND: SINGLE PAYMENT DUE AT START OF FISCAL YEAR .. $ 200. 00 28. • • 29. MARBLE SETTERS HELPERS EFFECTIVE EFFECTIVE EFFECTIVE 7/1/73 ** 7 /1/74 ** 7 /1/75 ** HOURLY ' BASIC WAGE RATE $7.22 $7.57 $7.92 HEALTH & WELFARE .325 • 325 • 325 VACATION .45 .45 .45 SECURITY FUND .. 30 .30 • 30 a) FOREMAN -$3.00 PER DAY OVER MARBLE SETTERS HELPERS RATE. b) APPRENTICES -SIX K>NTH PROGRAM -$3.00 PER HOUR STARTING RATE. INCREASE AT THE END OF EACH 'l'WO MONTH PERIOD BY 33 1/3% OF THE DIFFERENCE BElWEEN STARTLt«; RATE AND MARBLE SETTERS HELPERS RATE UNTIL FULL RATE IS REACHED. c) SHIFT WORK -SECOND SHIFT -EIGHT HOURS PAY FOR SEVEN HOURS WORK. d) MILEAGE ALLOWANCE -SUBSISTANCE, TRAVEL TIME MILEAGE AND PARKING ALLOWANCES SAME AS IS PROVIDED IN THE MARBLE SE'lTERS AGREEMENT. e) OVERTIME -ALL DOUBLE TIME. **NOTE: WAGES WITH EFFECTIVE DATE OF 7·1-73 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION COMMl'ITEE. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT. . " PAINTE.RS HOURLY BASIC WAGE RATE PAINTER, DECORATOR, PAPER HAliGAR, BUILDING WASHER, SAND BLASTER TAPER 3J. EFFECTIVE EFFECTIVE 7/1/72 7/1/73 $7.77 $8.52 • WELFARE PENSION 8. ~ ~ .6, ... • 65 . .40 .40 9.02 .64 .65 .40 .40 • * BENEFICIAL HOLIDAY a) GENERAL FOREMAN -25% OVER BASIC WAGE OF JOURNEYMAN b) FOREMAN -IN CHARGE OF THREE JOURNEYMEN -lz HOUR PAY PER DAY EXTRA IN CHARGE OF FIVE TO NINE JOURNEYMEN • ONE HOUR PAY PER. DAY EXTRA IN CHARGE OF TEN OR MORE JOURNEYMEN -ONE AND ONE-HALF HOURS PAY PER DAY EXTRA c) APPRENTICE RATE -THREE YEAR PROGRAM -FIRST SIX !il>NTHS, 50% OF JOURNEYMAN'S RATE; SECOND SIX MONTHS.t. 55%; THIRD SIX MONTHS, 60%; 10'7o INCREASE EACH SIX MONTH PERIOD THERt:aFTER. d) TAPER APPRENTICE RATE -18 MONTH PROGRAM -FIRST THREE MONTHS 1 50% OF JOURNEYMAN'S RATE; SEOND THREE MONTHS, 60% OF JOURNEYMAN S RATE;SECOND SIX MONTHS, 75% OF JOURNEYMAN'S RATE; THIRD SIX K>NTHS, 90% OF JOURNEYMAN'S RATE. e) OVERTIME -TIM£ AND ONE HALF, WEEKDAYS. DOUBLE TIME, SATURDAY, SUNDAY AND HOLIDAYS. '1;fORMERLY VACATION FUND • • 31. PLASTERERS EFFECTIVE EFFECTIVE . 7 /1/72 7/1/73 ** . HOURLY BASIC WAGE RATE $7.58 $?.88 HEALTH & WELFARE .46 .51 PENSION .50 .50 VACATION .80 .80 DUES Clt2CK OFF .10* .12 PROMOTIONAL .10 .10 DENTAL .18 .21 APPRENTICE .025 . 025 *WAGE RATE DOES NOT INCLUDE $.12 PER HOUR WORKED WRICH IS ADDED TO WAGES AND THIN WITHHELD FROM UNION DOES CHECKOFF. a) $2.00 PER DAY OVER SCALE FOR WORK ON SWINGING SCAFFOLD $2.00 PER DAY OVER SCALE FOR ALL MEMBERS WORKING BEHIND PLASTER GUN b) FOREMEN -SUPERVISING TEN OR K>RE PLASTERERS -$5.00 A DAY 0'lER SCALE. SUPERVISING LESS THAN TEN BUT FIVE OR K>RE -$4.00 PER DAY OVER SCALE. SUPERVISING UNDER FOUR PLASTERERS -$2.00 PER DAY OVER SCALE. c) APPRENTICE RATE -FOUR YEAll PROO'RAM -STARTING SCALE 50% OF JOURNEYMAN'S RATE WITH THE :rouav·ING PERCENTAGE INCREASES FOR EACH SIX K>NTHS INTERVAL: 563; 623; 681;:741; 801;-883; and 943 OF JOURNEY- MAN'S BATE. APPRENTICE MUST COMPLETE 60 DAYS EMPLOYMENT BEFORE EMPLOYER IS REQUIRED TO CONTRIBU"l'E TO HEALTH & WELFARE, PENSION, VACAnON, DUES CHECK OFF AND APPRENTICE FUNDS WHICH WILL THEN BE PAID 30 DAYS RETROACTIVELY. d) OVERTIME -ALL DOUBLE nHE **NOTE: WAGES WITH EFFECTIVE DATE OF 7-1·73 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION CO!til'n'EE. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT. • PLUMBER AND STEAMFITTERS HOURLY BASIC WAGE RATE HEALTH & WELFARE PENSION VACAnON TRAINING FUND EFFECTIVE Sil/72 $9.53 .61 .95 .72* .12 EFFECTIVE 5/1/73 $10.03 .61 .95 .72* .14 --*INCLUDED IN BASIC WAGE RATE. THE EMPLOYER TO DEDUCT FRCM THE BASIC HOURLY WAGE RATE $0.72 PER HOUR FOR EACH HOUR WORKED AND DOuBLE TIME ... $1.44, IF OVERTIME WORKED, TO BE PAID INTO THE VACATION FUND. a) GENERAL FOREMAN -20% OF BASIC WAGE RATE INCLUDING VACATION. FOREMAN -10% OF BASIC WAGE RATE INq,.JJ!>ING VACATION. b) APPRENTICE RATE -FIVE YEAR PROGRAM; STARTI!E SCALE 45% OF JOURNEYMAN'S RATE, 5% INCREASES AT SIX MONTH INTERVALS. c) OVERTIME -ALL DOUBLE d) JOBBING AND REPAIR -TIME AND ONE-HALF; $1.08 TO BE DEDUCTED BY EMPLOYER FRetol BASIC WAGE RATE FOR VACAnON PAY. • e) 36 HOUR WEEK EFFECTIVE 12/1/73 $9.93 • 61 1.05 .72* .14 • • RADIO & TV ENGINEER~ (NEW CONSTRUCTION) JOURN£YMAN SOUND TECHNICIAN HOURLY BASIC WAGE RATE HEAI .. TH AND WELFARE EFFECTIVE 5/31/72 $8.57 52.00/tl>NTH 33, EFFECTIVE 6/1/73 $9.04 52.00/K>N'm a) OVERTIME -TIME AND ONE-HALF FOR ALL WORK IN EXCESS OF (8) HOURS IN ANY ONE SHIFT OR IN EXCESS OF FORTY (40} HOURS IN ANY ONE WORK WEEK OR ALL TIME WORKED ON THE SIXTH (6TH) CONSECUTIVE DAY Oil ON HOLIDAYS. DOUBLE TIME FOR WORK PERFORMED ON SUNDAYS OR THE SEVENTH (7TH) CONSECUTIVE DAY. '· • • REFRIGERATION MEN* !!Q.Y!~ BASIC WAGE RATE HEALTH & WELFARE PENSION VACATION & HOLIDAY TRAINING FUND EFFECTIVE 5/1/72 $9.53 .61 .95 • 72* .12 EFFECTIVE 5/1/73 $10.03 .61 .95 .72* .14 34. EFFECTIVE 12/1/73 $9.93 • 61 1.05 .72* .14 *INCLUDED IN BASIC WAGE RATE. THE EMPLOYER TO DEDUCT FRCJof THE BASIC HOURLY WAGE RATE FOR EACH HOUR WORKED AND DOUBLE TIME -$1.44 TO BE PAID INTO THE VACATION FUND. a) GENERAL FOREMAN -203 OF BASIC WAGE RATE INCLUDl?C VACATION AND HOLIDAY. FOREMAN -10% OF BASIC WAGE RATE INCLUDIR; VACATION AND HOLIDAY. b) APPRENTICE RATE -FIVE YEAR PROGRAM; STARTING SCALE 45% OF JOURNEYMAN'S RATE, 5% INCREASES AT SIX MONTH INTERVALS. c) OVERTIME -ALL DOUBLE d) JOBBING AND REPAIR -TIME AND ONE-~LF: $1.08 TO BE DEDUCTED BY EMPLOYER. e) 36 HOUR WEEK *BASIC WAGE RATE, FRit«;E BENEFITS, AND OTHER CONTRACT TERMS SAME AS FOR JOURNEYMAN PLUMBER, EXCEPT NEW C.ONTRACT DATES. (SEE PAGE 32) • HEALTH & WELP'ABE • 36 .46 • Sl VACATION l.00 1.00 1.00 PENSION • 53 • 63 • 73 DUES CHECK OFF .10 .10 • 10 PROK>TIONAL FUND • 05 • 05 • 10 a) ALL PAY STAR.TS FROM TIME LEAVING SHOP TO GO TO .JOB SITE AND ENDS WHEN EMPLOYEE IS RETURNED TO SHOP . b) EXTRA K'1f -ANY OTHER EMPLOYEE WHO IS NOT QUALlnED AS .JOURNEYMAN OR APPBENTICE; PAID AT 901 OF JOUBNE!MAN BATE d e) MECHANIZED JOB ... $0.25 PD. BOUll PllMIUK PAY 70 BACH MEMBER OF THE CREW ) APPRENTICE RATE -'J.'RIEE YEA.a PIOGBAM: FIRST SIX ll>llTR PERIOD, 70'% OF .JOURNEYMAN'S RATE; 5'% IRCBEASE FOR EACH SIX Jl>lft'B PERIOD TBEUAP'rER. e) OVERTIME: FOR THE F11lST 1.'WO ll>URS 9 TIME ARD 08-BALF; OOUBLE TIME THEREAF'l'ER AND P'OR SATURDAY, SURDAY AND HOLIDAYS. • SHEET METAL •• • HOURLY BASIC WAGE RATE HEALTH & WELFARE PENSION *VACATION. EFFECTIVE 7-1-72 $8.10 .38 .81 .81 EFFECTIVE 7 .. 1 ... 73 $8.45 .38 .825 .845 EFFECTIVE* 1-1-73 $8.45 • 38 1.135 .845 a) NO HEALTH & WELFABE, PENSION AND INDUSTRY FURD IS TO BE PAID BY EMPLOYER DURING EMPLOYEE' s VACATION TIME. THIS IS PAID ONLY roa HOUR WORICED. b) FOitE*N -$.75 PEil BOUR ABOVE BASIC WAGE BATE. EFFECTIVE 7-1-73 GENERAL FOREY.tAN -$1.00 PER. HOUR ABOVE BASIC WAGE BA'l'E. EFFECTIVE 7-1-73 c) APPRENTICE BATE -FOUR YEAR PROGBAM -FIRST SIX !IJRTH PDIOD, 451 OF JOURNEYMAN'S RATE; 5'%. INCREASE FOB. EACH PERIOD TBEBBAF'l'Ell UP TO ARD INCLUDING SIXTH PERIOD; 101 INCREASES POil SEVEtml AND ElGH'lH PERIOD. THESE MISES FOB. APPRENTICES ARB EARNED RAISES AND NOT AlTl"OK\TIC. d) SHIFT WORK: THE JOB MUST BE OVER FIVE (5) CONSECUTIVE DAYS DulAfION, OR DOUBLE TIME TO BE PAID FOR THE FIRST FIVE (S)DAYS. IF JOB IS OF SIX (6) DAYS DURATION OR K>RE, THE FOLLOWING SHALL PBE'IAIL: SWING SHIFT: 4 DAYS 7% HOURS, FRIDAY 3 3/4 HOURS FOR 36 HOURS PAY PLUS lO't. GRAVEYARD: 4 DAYS 7 HOURS, FRIDAY 3% .. HOURS FOR 36 HOURS PAY PLUS 15~. · e) OVERTIME • ALL DOUBLE TIME f) 36 HOUR WEEK *VACATION PAY IS nGURED AT 107. OF 1.'111 GIOSS PAY WHICH MEANS l<n. OF BASIC WAGE OF JOURNEYMAN, OR APPRENTICE OR POllMAB. - NOTE: WAGES WITH EFFECTIVE DATE OF 1-1-73 WAITIS POR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION CO!MIT"l'EE. COB'l'IAC?OJlS SHOULD VEllin CUllENT WAGE RATES PRIOR TO PAYMENT. • ------------------------------------------------------- ·SIGN ARTISTS ,/ EFFECTIVE EFFECTIVE EFFECTIVE HOURLY 7-1.-71 7-1-72 7-1-73 BASIC WAGE RATE JOURNEYMAN $6.875 $7.375 $7.875 SHOW CARD WRITER 5.935 6·.435 6.935 DISPLAY MA.N 5.935 6.435 6.935 SCREEN PROCESS 5.125 5.675 6.125 HELPERS 6.125 6.675 7.175 DISPLAY HELPERS 5.105 5.605 6.105 SCREEN PROCESS HELPERS 4.325 4.825 5.325 HEALTH & WELFARE .275 .275 .375 VACATION * 5.51. 5.5% 5.51. PENSION .15 .15 .25 a) b) HEALTH & WELFARE, VACATION, AND PENSION ARE NOT PAID IN EXCESS OF A FORTY HOUR WEEK. APPRENTICE RATE -FIVE YEAR PROGRAM -FIRST SIX K>NTH PERIOD.! 50% OF JOURNEYMAN'S RATE: Sl INCREASE FOR EACH SIX t«>Nnl PERIOD THEREAFTER. i 7. , c) TRAINEE PROGRAM: NO EXPERIENCE • 701 OF RATE FOR DISPLAY HELPERS OR SCREEN PROCESS HELPERS. FTRST SIX !IJNTHS -soi OF BATE FOR DISPLAY HELPERS OR SCREEN PROCESS HELPDS. SECOND SIX !l>NTHS -90-X OF RATE FOR DISPLAY HELPERS OR SCREEN PROCESS HELPERS. . . • d) THIRD SIX H>NTHS -10~ OF RATE FOR DISPLAY HELPERS OR SCREEN PROCESS HELPERS • OVERTIME • TIME AND ONE-HALF. PAID HOLIDAYS. e) * 5.0% SHALL BE EFFECTIVE UNTIL THE BY•LAWS CHANGES REQUIRED BY AGREEMENT HAVE BEEN APPROVED BY UNION MEMBERSHIP. • • TEAMSTER WAGE RATES -CLASSIFICATIONS ALL DUMP TRUCKS (SINGLE OR MULTIPLE DUMP UNITS INCLUDING SEMIS AND DOUBLE AND TRANSFER UNITS) EFFECTIVE 6-16-72 UNDER 4 YDS. (WATER LEVEL) $6.475 4 YDS. AND UNDER 6 YDS. (WATER LEVEL) 6 0 57 6 YDS. AND UNDER 8 YDS. (WATER LEVEL) 6. 77 8 YDS. A?U> INCUJDING 12 YDS. (WATER LEVEL) 7.01 OVER 12 YDS. AND INCWDING 18 YDS ~ (WATER LEVEL) 7. 05 OVER 18 YDS. AND INCWDING 24 YDS. (WATER LEVEL) 7 .155 OVER 24 YDS. AND INCWDING 35 YDS. (WATER LEVEL) 7.21 OVER 35 YDS. AND INCLUDING 50 YDS. (WATER LEVEL) 7. 36 OVER 50 YDS. AND UNDER 65 YDS. (WATER LEVEL) 7.51 65 YDS. AND INCLUDING 80 YDS. (WATER LEVEL) 7.66 OVER 80 YDS. AND INCWDING 95 YDS. (WATER LEVEL) 7 .81 - BULK CEMENT SPREADER (W OR W/O AUGER) USE DUMP TRUCK RATE DUMPCRETE TRUCK -USE DUMP TRUCK RATE SKID TRUCK (DEBRIS BOX) USE DUMP TRUCK RATE TRUCKS (DRY PRE-BATCH CONCRETE MIX) USE DUMP TRUCK RATE 38. TRIPLE HEADERS USE DUMP TRUCK RATE PLUS $1.00 PER SHIFT DRY DISTRIBUTOR TRUCK (A BOOTMAN WHEN EMPLOYED ON SUCH EQUIPMENT SHALL RECEIVE THE RATE SPECIFIED FOR 'IliE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTMAN) AMMONIA NITRATE DISTRIBUTOR DRIVER AND MIXER COMBINATION DUMP TRUCK AND DUMP TRAILER (WHEN ANY BOARDS OR OTHER APPARATUS ARE ADDED TO A DUMP TRUCK FOR TiiE PURPOSE OF INCREASING CARRYING CAPACITY, 'lllE RATE APPLICABLE TO THE INCREASED CARRYING CAPACITY SHALL BE PAID.) ALL TRANSIT MIX OR AGITATOR TRUCKS UNDER 6 YDS. -. 6 YDS. AND UNDER 8 YDS. 8 YDS. THROUGH 10 YDS. OVER 19 YDS. 'mROUGH 12 YDS. OVER 12 YDS. ThROUGH 14 YDS. OVER 14 YDS. niROUGH 16 YDS. _ TRANSIT MIX WI~_ BOOM SHALL RECEIVE 12~¢ PER HOUR ABOVE 'lllE APPROPRIATE YARDAGE CLASSIFICATION RATE OF PAY WHEN SUCH BOOM IS.USED. 7. ()5 7.155 6.625 6.725 6.825 6.925 7.025 7.155 • • TEA:-ISTER WAGE RATES -CLASSIFICATIONS (CONT.) WATER TRUCKS -GALLONAGE CAPACITY SHALL BE CLEARLY INDICATED ON ALL TANKS UNDER 2,500 GALS 2,500 AND UNDER 4»000 GALS 4,000 AND UNDER 5,000 GALS 5,000 AND UNDER 7,000 GALS JETTING TRUCK (USE APPROPRIATE WATER TRUCK RATE) OW lO's, 20's, 2l's AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT: WHEN PULLING AQUA/PAK OR WATER. TANK TRAILERS WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS, OR OTHER MISCELLANEOUS TRAILERS VACUUM TRUCKS UNDER 3,500 GALS 3,500 GALS AND UNDER 5,500 GALS 5,500 GALS AND UNDER 7,500 GALS NIPPER TRUCK (WHEN FLAT-RACK TRUCK IS USED APPROPRIATE FLAT RACK RATE SHALL APPLY) CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK RATE SHALL APPLY) CONCRETE PUMP MACHINE SCISSOR TRUCK EFFECTIVE 6-16-72 $6.585 - 6.685 6.785 6.885 7.46 7.21 6.655 6.735 6.835 6.475 6.475 6.475 6.67 7.51 39. HELICOPTER PILOT (WHEN TRANSPORTING MEN OR MATERIALS INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE) DUMPSTER OR SIMILAR TYPE RUBBER TIRED MUCK CAR (NOT SELF-LOADED) RUBBER TIRED TRUCK JUMBO USE APPROPRIATE FLAT RACK RATE USE APPROPRIATE FLAT RACK RATE 6.745 (MEN REGULARLY EMPLOYED UNDERGROUND ON TUNNEL WORK SHALL BE PAID $1.00 PER DAY PREMIUM FOR SUCH WORK, PROVIDE!> THAT SUCH EMPLOYMENT UNDERGROUND ON TUNNEL WORK CONTINUES FOR AT LEAST TWO (2) HOURS.) - LIFT JITNEYS AND FORK LIFT WINCH TRUCK AND "A" FRAME DRIVERS FUEL AND/OR GREASE TRUCK DRIVER OR FUELMAN TEAMSTER OILER AND/OR GREASER AND/OR SERVICE_MAN TIRE REPAIRMAN (SHALL APPLY ONLY WHERE A FULL TIME EMPLOYEE OF THE CONTRACTOR IS ASSIGNED TO '1llE WORK) 6.785 6.605 6.785 6.64 6.55 7.01 • • TEAMSTiR WAGE SCALES· CLASSIFICATIONS (CONT.) TRUCK REPAIRMAN TRUCK REPAIRMAN HELPER SINGLE SNIT FLAT RACK {2 AXLE UNIT) SINGLE UNIT FLAT RACK (J AXLE UNIT) HEAVY DUTY TRANSPORT (HIGH BED) HEAVY DUTY TRANSPORT (GOOSENECK LOW BED) DOUBLE GOOSENECK (7 OR MORE AXLES) HEAVY. DUTY TRANSPORT TILLER MAN COMBINATION BOOTMAN AND ROAD OILER ROAD OIL TRUCKS OR BOOTMAN HEATER PLANER ) ASPHALT BURNER ) SCARFIER BURNER ) SNOW BUGGIES (SHALL APPLY ONLY WHERE A FULL TIME EMPLOYEE OF THE CONTRACTOR IS ASSIGNED TO lllE WORK AT llfE SOLE DISCRETION OF THE CONTRACTOR) SNOW GO AND/OR PLOW SLURRY TRUCK FUEL ISLAND ATIENDA'fi', OR COMBINATION PIT AND/OR GREASE RACK AND FUEL ISLAND A'l'TENDANT (SHALL APPLY ONLY WHERE A FULL TIME EMPLOYEE OF nlE CONTRACTOR IS ASSIGNED TO nIE WORK AT THE SOLE DISCRETION OF TII~ CONTRACTOR) FIRE GUARD (WHERE A FULL TIME EMPLOYEE OF THE CONTRACTOR IS ASSIGNED TO ~E WORK) TILT BED TRAILER OR FLAT BED PULL TRAILERS STEAM CLEANI~m (WHEN AN EMPLOYEE IS ASSIGNED TO mis WORK ON A FULL TIME BASIS) SMALL RUBBER TIRED TRACTOR (WHEN USED WI'lllIN TEAMSTERS JURISDICTION) COMBINATION WINCH TRUCK WI'ni HOIST HYDRO-LIFT OR SWEDISH CRANE TYPE (INCLUDING WHEN SWEDISH CRANE IS USED FOR JE'n'lNG) BUGGYMOBILE HYDRO-LIFT EXTENSION OR RETRACTING CRANE (BOOM TYPE) RO::> HYSTER AND SIMILAR STRADDLE CARRIER EFFECTIVE 6-16-72 $7.145 6.645 6.57 6.67 6.79 7.02 7.07 7.07 6.915 6.565 USE APPROPRIATE RATE FOR POWER UNIT 6.475 7.01 USE APPROPRIATE DUMP TRUCK RATE 6.64 APPROPRIATE RATE FOR lliE EQUIPMENT UTILIZED 12\¢ PER HOUR ABOVE RATE FOR TOWING UNIT 6.475 6.67 6.725 7.14 6.785 7.14 6.815 40. • • TEAMSTERS WAGE RATES -CLASSIFICATIONS (CONT.) SELF-PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN P.B. OR SIMILAR TYPE SELF-LOADING TRUCK BUS OR MANHAUL DRIVER ESCORT OR PILOT CAR DRIVER PICKUP TRUCKS HELPERS HOOK TENDERS (WHEN DOING WORK IN TEAMSTER JURISDICTION, INCLUDING LOADING AND UNLOADING) TEAM DRIVERS WAREHOUSEMEN WAREHOUSE CLERK/PARTS MAN (JOB SITE CONSTRUCTION PERMANENT YARDS WHERE AN EMPLOYEE COVERED BY 'mIS AGREEMENT IS PRESENTLY ASSIGNED TO THE WORK) TRUCK DISPATCHER (SHALL APPLY ONLY WHERE A FULL TIME EMPLOYEE OF TIIE CONTRACTOR IS ASSIGNED TO THE WORK AT THE SOIE DISCRETION OF 'rnE CONTRACTOR) TOOL ROOM ATTENDANT (REFINERIES) UTILITY AND CLEAN-UP TRUCK EFFECT!VE 6-16-72 $7.01 7.11 6.475 6.475 6.475 6.475 6.475" 6.475 6.475 6.60 6.86 6.475 USE APPROPRIATE FLAT RACK OR DUMP TRUCK RATE 41. 42. TEAMSTERS HOURLY EFFECTIVE 1-1-72 EFFECTIVE EFFECTIVE 6-16-72 1-1-73 • HEALTii & WELFARE HOSPITAL, MEDICAL & SURGICAL(*)(**) $ • 765 DENTAL CARE VISUAL CARE PRESCRIPTION DRUGS RETIRED EMPLOYEES HEALTH PENSION(***) & WELFARE .01 VACATION & HOLIDAY .75 $ .60 .85 * TRUSTEES TO WORK OUT APPLICiATION OF $.01 PER HOUR FOR EMPLOYEE CLAIM ADMINISTRATION. ** MAY BE USED FOR ANY OF THE OTIIER HEAL'nl & WELFARE BENEFITS. OTIIERWISE TO BE APPLIED TO WAGES. *** IF NOT NEEDED FOR INCREASED PENSION BENEFITS, MAY BE APPLIED TO WAGES. a) b) FOREMEN-FOREMAN (10 OR MORE TEAMSTERS) -$ .40 PER HOUR ABOVE HIGHEST CIASSIFICATION SUPERVISED. WORKING FOREMAN (7 OR MORE TEAMSTERS) -$ .25 PER HOUR ABOVE HIGHEST CLASSIFICATION SUPERVISED. SHIFT WORK -IF THERE ARE TWO OR nIREE SHIFTS EACH SHIFT RECEIVES 8 HOURS PAY FOR 7 HOURS WORK • • c) OVERTIME -TIME AND ONE-HALF; DOUBLE TIME FOR SUNDAY AND HOLIDAYS. . TEAMSTERS SUBMITTED A $.52 PACKAGE INCREASE TO THE CONSTRUCTION INDUSTRY STABILIZATlJN COMMITTEE. CISC APPROVED $.40. AS OF 11/12/73, THE TF.AMSTERS HAVE NOT DECIDED AS TO HOW THE $.40 IS TO BE ALLOCATED•. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT. $ .865 .01 • 70 .85 • • • TERRAZZO HELPERS NOTE: HOURLY BASIC WAGE RATE HEAL'rn & WELFARE PENSION VACATION INDUSTRY FUND HELPERS BASE MACHim: OPERATORS EFFECTIVE 7-1-72 $6.745 7.145 .355 .30 .65 .15 EFFECTIVE EFFECTIVE 1-1-73 7-1-73"' $6.895 $7.395 7. ~5 7.795 .455 .sos .30 .30 • 65 . 70 .15 .15 a) APPRENTICE RATE -ONE YEAR TRAINING PROGRAM -FIRST THREE MONTHS, 80% OF HELPERS RATE; 5% INCREASE FOR EACH T:iREE MONTHS PERIOD TIIEREAFTER b) SHIFT WORK -SECOND, THIRD SHIFTS GET SEVEN HOURS PAY FOR 6~ HOURS WORK. c) TRAVEL TIME -$3.i5 PER D,AY FOR JOBS 25 MILES OR LESS, BUT MORE niAN 15 MILES FROM TIIE CITY HALL IN TIIE CITY WHERE THE SHOP IS LOCATED. $6.75 PER DAY FOR JOBS 50 MILES OR LESS, BUT MORE TIIAN 25 MILES FROM TiiE CITY HALL IN THE CITY WHERE THE SHOP IS LOCATED. $12.00 PER DAY FOR JOBS 50 MILES OR MORE FROM TIIE CITY HALL WHERE THE SHOP IS LOCATED. d) OVERTIME -TIME AND ONE-HALF AFTER 3:30 P.M ... ~ND ON SATURDAY. OUTSIDE MEN -FIRST TWO HOURS OVERTDfE AT TIME AND ONE-HALF; THEREAFTER AT DOUBLE TIME (WEEK DAYS ONLY). DOUBLE TIME ON SUNDAY, HOLIDAYS; AFTER MIDNIGHT ON REGULAR WORK DAY AND AFTER 3:30 P.M. ON SATURDAY • e) 35 HOUR WEEK (SEVEN HOUR DAY) WAGES WITH EFFECTIVE DATE OF 7-1-73 WAITING FOR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATION COMMI'ITEE. CONTRACTORS SHOULD VERIFY CURRENT WAGE RATES PRIOR 1'0 PAYMENT. 43 • ------------------------------------------~--~~--~--~~~----44. • • TILE HELPERS HOURLY BASIC WAGE RATE HF.ALTH & WELFARE PENSION VACATION & HOLIDAY INDUSTRY FUND* EFFECTIVE 3-1-72 $6.65 .38 .36 8% BASIC WAGE .10 a) TRAINEE HELPERS -80% OF HELPERS BASIC WAGE EFFECTIVE 4-23-73 $7.11 .38 .36 8% BASIC WAGE .10 b) $. 35 PER HOUR ABOVE SCALE FOR WORKING WITH RESINOUS OR EPOXY CEMENT, OR STEAM CLEANING c) $. 7 5 PER HOUR ABOVE SCALE FOR UNDERGROUND WORK d) MILEAGE ALLOWANCE: FRCM CITY HALL OF CITY WHERE EMPLOYER HAS HIS PRlNCIPAL PLACE OF BUSINESS TO CITY OR TOWN CENTER IN WHICH JOB IS LOCATED. $4.00 -MORE THAN 20 MILES UP TO AND INCLUDING 30 MILES 5. 00 .. MORE THAN 30 M:u;s ·. aP TO AND INCLUDING 40 MILES 8. 00 -K>RE ·THAN 40 MILES BUT LESS THAM 60 Jllll.LES N:JRE THAN 60 MILES BUT LESS THAN 100 MILES -$18.00 PER DAY FOR SUBSISTENCE PLUS TRAVEL PAY AFTER 100 HILES -$18.00 PER DAY (7 DAYS A WEEK) PLUS TRAVEL PAY AND MILEAGE e) BRIDGE, FERRY AND OTHER TOLLS, AND NECESSARY PARKING IN PUBLIC PARKING LOT PAID BY EMPLOYER · f) OVERTIME -ALL DOUBLE TIME • • TILE LAYERS HOURLY BASIC WAGE RATE HEALTH & WELFARE PENSION VACATION & HOLIDAY TRAINING FUND INDUSTRY FUND EFFECTIVE 4-1-72 $7 .. 25 .56 .60 .so .015 .10 EFFECTIVE 4-1-73 $7.65 .62 .70 .so .015 .10 a) FOREMEN .. SUPERVISING 1 TO 3 JOURNEYMEN -$2.00 PER DAY OVER JOURNEYMAN'S.WAGE. SUPERVISING 4 TO 11 JOURNEnEN-$4.00 PER DAY OVER JOURNEYMAN'S WAGE. I .- *-#). SUPERVISING 11 OR K>RE JOURNEYMEN -$8.00 PER DAY OVER JOURNEYMAN'S WAGE. b} c) APPRENTICE RATE -THREE YF.AR PROORAM -FIRST SIX ltlNTH PERIOD, 80'1 OF JOURNEYMAN'S RATE: SECOND SIX t«>NTH, 844%.; THIRD AND FOURTH SIX K>NTH PERIODS, 89%; FIFTH AND SIXTH !l>NTH PERIODS, 94'1. $.35 PER HOUR IN ADDITION TO REGULAR WAGE WHILE WORKING Wlnt EPOXY OR RESINOUS CEMENT. d) MILEAGE ALLOWANCE -FROM CITY HALL OF CITY WHERE EMPLOYER HAS HIS PRINCIPAL PLACE OF BUSINESS TO CITY OR TCMN CENTER IN WHICH JOB IS LOCATED. $4.00 -MORE THAN 20 MILES UP TO AND INCLUDING 30 MILES. 5.00 • ~RE THAN 30 MILES UP TO AND INCLUDING 40 MILES. 8.00 • !tlRE THAN 40 MILES BU'l' LESS THAN SO MILES. OVER 50 MILES -$18.00 PER DAY 1 DAYS A WEEK • e) BRIDGE TOLLS AND REQUIRED PARKING IN PUBLIC PARKING LOT PAID BY EMPLOYER. f) OVER'rIME -ALL DOUBLE TIME. TRAFFIC DELINEATORS HOURLY I JOURNEYMAN TRAFFIC DELINEATING DEVICE APPLICATOR TRAINEE FOR TRAFFIC DELIN&4.TING DEVICE APPLICATOR AFTER 3 !«>NTHS AFI'ER 6 l«>NTHS, JOtJRNEY!MN RATE II TRAFFIC SURFACE PROTECTIVE COATING APPLICATOR HELPER EFFECTIVE. 10-1•72~'-. $6.27 5.77 6.02 6.27 S.77 EFFECTIVE 10-1-73* $6.52 6.02 6.27 6.52 6.02 4L EFFECTIVE 4-1-74* $6.82 6.32 6.57 6.82 6.32 • III .JOURNEYMAN \'HEEL STOP INSTALLER 6.27 6.52 6.82 • HELPER IV JOURNEYMAN TRAFFIC SURFACE SANDBLASTER HELPER V JOURNEYMAN STRIPE::: HELPER BEGINNING HELPER STRIPER AFTER 3 M>NTHS AFrER 6 MON'l11S· ... HELPER RATE VI SERVICEMAN HOURLY HEALTH AND WELFABE PENSION INDUSTRY FUND HOLIDAYS VACATION -FIRST YEAR OF EMPLOnERT SECOND YEAR OF EMPL01MDT FIFrll BAR OF EMPLODmll' TENTH YEAR OF EMPLOYMD'l' 5.77 6.27 5.77 7.37 6.27 5.77 6.12 5.75 6.02 6.32 6.52 6.82 6.02 6.32 7.62 7.92 6.52 6.82 6.02 6.32 6.37 6.67 5.75 5.75 UFECTIVE 10-1-73 $ .40 .20 .20 .17 .10 .20 .30 .40 NOTE: WAGES WITH EFFECTIVE DATES OF 10-1-73 !O 4-1-74 WAITDtG POR APPROVAL OF CONSTRUCTION INDUSTRY STABILIZATIOH COMIITTEE. COltTRAC10RS SHOULD VERIFY CURRENT WAGE RATES PRIOR TO PAYMENT. • • 47. TRAFFIC DELINEATORS, Cont'd. a) RECONGNIZED HOLIDAYS SHALL BE NEW '!EARS DAY, MEK>RIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY REGABDLESS OF nm DAY OF THE WEEK ON WHICH THEY FALL. WHEN HOl.mAYS FALL ON SUNDAY, THE FOLLOWING H>NDAY SHALL BE OBSERVED AS A HOLIDAY. EMPLODES BEQUIRED TO WORK ON ANY OF THE PAm HOLIDAYS SHALL RECEIVE TWO TIMES TdEIR STRAIGH'I' TIME HOUHLY RATE. b) VACATIONS -EMPLOYEES SHALL BE ENTITLED 'l'O ONE ( 1) WEEK VArATION An'ER ONE . YEAR OF SERVICE: two (2) WIE1CS VACATION AFTER 'l'WO YBAas OF SERVICE; THREE (3) WEEKS VACATION AF'l'Ell FIVE (5) 'iEARS OF SERVICE; POUR (4)WEEICS VACATION AFTER TEN (10) YEARS OF SERVICE. · . c) OVERTIME -EIGHT HOURS IN ANY ONE DAY SHALL CONSTITUTE A DAY'S WOU.. FORTY HOURS IN ANY ONE WEEK SHALL CONSTITUTE A WEEK'S WORK. OVDXIME SHALL BE PAID AT THE RATE OF ONE AND ONE-RALF TIMBS THE UGULil RATE AS FOLI.aiS: OVER EIGHT HOURS IN ANY ONE DAY, OVER FOR.TY IKilJR.S Ilf AMY ONE WEEK. TIME OFF SHALL NOT BE TAKEN TO COMPENSATE FOR OVERTIME WORKED. d) DUES CHECK OFF • EMPLOYER AGREES TO CHECK OFF FROM THI WAGES OF EMPLOYEE SPECIAL ADMINISTRATIVE DUES IN THE SUM OF $ .10 PER HOW FOR ALL HOURS l«>RXED AND WILL REMIT TO THE UNION AT EACH PAY PDIODi.~VIDED THE EMPLOYEES IN QUESTION HAVE SIGNED A VALID AtmlOllIZATION '-'AIW • • .. • • UPHOLSTERERS HOURLY BASIC WAGE RATE PENSION HEALTH & WELFABE DENTAL $32. 65 PER M>NTH $ 8.10 PER N:>NTH EFFECTIVE 1-1-72 $4.945 41. 4( • EFFECTIVE 7-1-73 $ 5.16 41 32.65 . 8.10 a) PAID VACATION -ONE WEEK AFTERCOMPLETING 1 YEAR SERVICE; TWO WEEKS AFl'ER 2 YEARS SERVICE, 3 WEEKS AFTER FIVE OR lt:>IE YEARS OF S!;RVICE WITH ANY ONE EMPLOYER. !>) PAID HOLIDAYS -NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEK>RIAL DAY, INDEPENDENCE DAYf LABOR DAY L~IVING DAY, CHRISTMAS DAY, EMPLOYEE'S IND VIDUAL BIR'.rHDA Y. . c) FOREMEN -$1. 25 PER HOUR ABOVE JOURNEYMAN'S WAGE RATE. d) APPRENTICE RATE -THREE YEAR PROGRAM FIRST SIX !«>NTH PERIOD 60% OF JOURNEYMAN'S WAGE SECOND SIX lfJNTR PERIOD, 66 3/4'1. OF JOURBEYMAN'S WAGE THIRD SIX K>NTH PElllOD, 73 1/2% OF JOURNEYMAN'S WAGE FOURnt SIX K>lmt PEB.IOD, 80 1/4'1. OF JOURHEYMlN'S WAGE FIFTH SIX HJNTR PEUOD, 871 OF JOUBNEYMAM 'S WAGE SIXTH SIX !l>M'l'H PERIOD, 93t. OF JOURNEYK\N'S WAGE ' e) OVERTIME -ALL DOUBLE TIME. .. .. .. ' EXPIRATION DATE UNION OF CONTRACT ASBESTOS WORKERS Jt.'LY 31, 1976 BOILERMAKERS .JUNE 30, 1974 BRICKLAYERS JURE 30, 1975 CARPET, LINO Jtn.Y 31, 1975 CARPENTERS JULY 1, 1974 CEMENT MASONS JUNE 16, 1974 ELECTRICIANS MAY 31, 1974 ELEVATOR CONSTRUCTORS SEPTFJ4BER 1, 1977 • Etr;INEERS .JURE 15, 1974 FENCE WORKERS JUNE 30, 1974 GLAZIERS JUNE 30, 1976 HOD CARRIERS -PLASTER JUNE 30, 1974 -BRICK JUNE 30, 1974 IRONWORKER$ JUNE 30, 1974 LABORERS JUNE 15, 1974 LATHERS JUNE 30, 1974 MARBLE SETrERS HELPERS JUNE 30, 1976 PAINTERS JUNE 30, 1974 PLASTERERS JULY 1, 1974 PLUMBERS .JANUARY 1, 1975 REFRIGERAnON JANUARY 1, 1975 RADIO & TV OCTOBER 31 1974 ROOFERS JULY 31, 1974 SHEET METAL JUNE 30, 1974 SIGN ARnSTS JUNE 30, 1974 • TEAMSTERS JUNE 15, 1974 TERRAZZO JULY 1, 1974 TILE HELPERS FEBRUARY 284 1974 TILE LAYERS MARCH 31, 1 75 UPHOLSTERERS JUNE 30, 1974 TRAFFIC DELINF.ATORS OCTOBER 1, 1974 '~ l • • BUILDING TRADES HOLIDAYS DAY BEFORE NEW YF.ARS *** NEW YEAR'S DAY WASHINGTON'S BIRTHDAY MEMORIAL DAY (DECORATION DAY) FOURTH OF JULY (INDEPENDENCE MY) LABOR DAY ADMISSION DAY * COLUMBUS DAY** THANKSGIVING DAY DAY BEFORE CHRISTMAS *** CHRIS'IMAS DAY *OBSERVED BY ELEVATOR CONSTRUCTORS BUT NOT A PAID HOLIDt\Y **OBSERVED BY CARPET-LINO & SOFT TILES ***OBSERVED BY PLUMBERS, BOILERMAKERS 1/2 DAY BEFORE CHRISTMAS -IRON WORKERS EXCEPTIONS DO NOT OBSERVE ADMISSION DAY ASBESTOS WOR.l{ERS BOILERMAKERS. BRICKLAYERS BUILDIR; TRADES COUNCIL r.ARPEN'l'ERS CARPET-LINO & SOFT TILES CEMENT MASONS GLAZIERS so. IRON WORICERS-FIELD ERECTION OPERATI!E E~INEERS PAINTERS PLUMB?~ RADIO 6 TV ER:;INEERS REFRIGERATION ROOFERS SHEET METAL WORKERS SIGN ARTISTS TEAMSTERS TILE LAYERS DO NOT OBSERVE WASHI?ETON'S BIRTHDAY PAINTERS SIGH ARTISTS TRAFFIC DELIHF.ATORS OBSERVE VETERAN'S DAY ROOFERS OBSEllVE DAY AF'l'Ell THANKSGIVIIE DAY ASBESTOS WORKERS BOILERIWCEJlS. BlUClCLAYEllS CARPET, LIRO & SOFT TILE CARPEll'l'ERS CEMEN'I' MASONS ELECTRICIANS EIEUIEEllS FENCE WORKERS LATHEltS BUILDlll; DADES COUNCIL GLAZIERS IRON WORKERS FIELD ERECTION LABORERS oPERAnNG ENGINEERS PLtllBERS RADIO & TV E!EINEERS REFll!GERATION SHEET.METAL WORKERS TF.AMSl'ERS