HomeMy WebLinkAboutRESO 3765888
M. 3a6s
Waif , IX
Orimoragi *AMWAY;;: OF Tim CITY IU.
001070MANACE WSJ TIAX. MAQUINSASAT8 Or THE OALLMAIOMAXAM
WOWS, the Collier -Unruh Local Tranaportatiaq, Develop-
ment`.,tct provides that:
' thin 60 dee following CIO. clove of each
vil ydarladh county vii {er
county shall file with the D rtm e`report
csvt .�"by�the localgoverning b
ibed y thee ishowing
te,expenditures of funds during the preceding
#1,..300er pursuant to Sections 186.1 through
MAMA, the attached report compiled in the form pre -
eat from records maintained
+�� '` a �:�� by this city
and showing expenditures during the 1963-1964 fiscal year
pursuant to Sections 186.1 through 186.7 of the Streets and
Highways Code, has been examined by this: City Council, and is
determined to be factual.
MOW TH,E98F09E BE IT RESOLVED that the City Council of the
City of Palo Alto hereby certifies the report attached hereto
marked EQil8IT A and by reference made a part hereof to be a
true record of expenditures by the City of Palo Alto during the
1963-1964 fiscal year in conformance with the requirements of the
Collier -Unruh Local Transportation Development Act; and
8E IT FURTHER RESOLVED that the City Clerk is hereby
instructed to transmit six copies of the report and three certified
1
•
•
•
4
copies of this resolution to the State of California, Department
of Public Works, Division of Highways, in care of the Engineer
in charge of its local District office.
U TRAltIJCID MD PASSED: August 24, 1964 by s unanimous vote.
ATTEST:
1ty -iy1, 4.
APPROVED AS TO FORM:
APPROVED AS TO CONTENT:
Nlig aeering� t
-2-
;lt✓. % 44-
Vf EichibAlt
it L-1 ,
,., AVM 00.5111
' COLLX R-UNRUH LOCAL TRANSPORTATION DZVELOP146NT ACT'
0 ANNUAL REPORT OP EXPENDITURES ?OR IMPROVYNO THE SELECT SYSTEM
FISCAL YEAR ENDI$0 JUNE 30, 19 64
(Report due within 60 daya.ot 010se of year)
, Tea State Of California
Department of Public Works From: City PO County 0 of
Division of Highways Palo Alto
(Through District Engineer)
In accordance with the require...nto of Section 186.8 of the Streets
and Highways Code the following summary and attached detail is submitted
to indicate
eth e pundit the by byoortonebehalf bl alfrof this agency for improv''K
the atSystem
STATUS OP SECTION 186.1 (1.044) FUNDS
1.(s) Unobligated Balance as of 6/30/1)?
(b) Unexpended Balance as of 6/30/�
44.(e) Allocations During Tisoal Year {Coll & 2)
M (b) Other Receipts (Col. 1 & 2)
3. Total Available (Item 1 plus Item 2)
*4004.(a) Obligations During Tear (Sec. 186.7 a deb)
(b) Expenditures During Year
5.(s) Unobligated as of 6/30/ (Item 3 lees Item 4a)
(0) Unexpended as of 6/30/ (Item 3 lees Item 4b)
SUMMARY OF MATCHING AND OTHER FUNDS
OBLIO EXPEIUNG) FOR CONSTRUCTION'
ONIiS N CT SYSTEM DURIMO YEAIt
er.O.(a) Matching Obligations by Agency(Seo.186.7 s 8e b)
(b) 1lstohiog Expenditures by Agency (Sec. 186.5)
1. Expenditures by Subdividers (Col. 1 A 2)
8. Intel Matching Obligations & Expenditures
4. Other Gas Tam Expenditures (sec. 2104, 2107 & 2101.5
10. Other Funds Expended
•
11. Intel of All Tmpendituree'for oonetructiom on Select Syetam
(Tbtsl of Items 4 & 8 through 11).
An additional information needed by the Department to verify that the
requirements beenfmototione is availlable2 tirough n the offffioe of then 195, or undersigned6tion
einoluee all Pirtle mderdSoo. 186.1(a)eendppor (b). H M. A. 7. t1rC)iELL
gnature Authoriz Ofttioiai
it En ineer City Controller
"Right of Way Section
d 86.1Sale o, .Y B Official Title
Interest from Section 186.1
fund inbestmente.
Column 1
0
r Nee
0
11112011111,
fi//Al&
112,064.13
104 314.38
112,064.13
. Column 2
rtegecord contract totals plus amounts y nd eDayndeLabor Work.
d for
. Engineering, Contingencies and Supplemental
:Attach Resolution of Board of SuperVisore or City Council certifying
report. If expenditures reported herein diffee from those In ,
: July 15 report, attach a revision of July 15 report
�.. .. ';r Pu,T.M•.. iY,NNW'ah0TkxWr11YPNMIRP"RBI'P.. r :.11'J :WA;atPWPZV 'r e.rwvM.rtxw�,e�r4
e
•
•
erg cnf[R4 fm. flees d�4t Hsemi Tear a�tnee 6/�e/ 64 A[eri0y City of Palo Alt;
?roject
dtaaber
stem A
Seotien 186.1 Btmde
Item 6
1�tehing by Agency
tom 7
mores
stem 9
Section 2104
3107 o 27AZS
stem 10
Otber
Panda
Totals
141
(a)0b1Sgated‘b)Etpended100blipttegb)E
ponied
- Expended
Expended
Expended
Expended
0
160,000.00
•
,il
-r
1
Di
r
r
0
72
76
7,749.75
0
3,874.87
0
0
160,000.00
.
0
0
7,749.75
0
3.874.87
0
160,000.00
. 0
0
160.000.00
l..
•
• On date of local agency contract sward enter in (a1 columns the *scouts of 1.040 red matChia6 1Uads inelude4 in total
of contract items end show edjustwats to final oust upon coeplation. All other entries ars to be ands only ',ben
Luanda are expended. Ilion 1.040 and matching funds are aspscded for day labor or engineering wort record them in both
1sT art (b) columns. Expenditures by apostles in sceozdance with Streets a Hi/b+sya Code. Section 2105. my to
regorged as one project if covered by a To CU -6c to which is attached a complete list of such projects. xinor
contributions is tbs.fors otamstrmotion-Or rights *filmy by private partiessay be Teoor48d in the sew cannon,.
•
0
rm CU -5a, Pagel. Exhibit L-3
COLLIER -VERVE! LOOAL TRANSPORTATIOI! DEVI IO NSET A0T
FROJECT COST SMART
PROJECT NO. 76
City ® County 0 of P43.0 Alto
DESCRIPTION OF PROJECT
Name of Street or Road Hillview Avenue
Termini of projeet
Junipero Serra Boulevard (Foothill Expressway)
to Arastradero Road Length Niles
The work mandated of
grading, paving, constructing curbs and
Right of way granted to City on 11/Z0/63 by Stanford University
gutters, etc., or the purchase of right of way
and was performed by -" under the direction of the
contract or day labor
city, county, etato
pate work began Date work completed 11/20/63
Contractor Bahr & Ledoyen
Resident Fdngineer City Engineer
Notes Minor eonetruction and rights of way projecte may y be covered
by a single form if listed in detail on upp eme to sheets.
TOLE 1
Work
Eligible for
Sec.186.1 or
Matching Punds
Ineligible for
eo.186.1 or
toping Funde
Totals
Preliminary Engineering.
Right of Way
$160,000.00
r
Construction Engineering
Day Labor.
Contract Items
Extra Work
Other
TOTALS
$160,000.00
$160,000.00
•
•
•
•
•
N
err ✓.
Form CU -5o, Page 2
Exhibit L-4
TABLE 2 •
Source of funds &
Qief'renoe to Form 5t
196 -64
Fisca Year �Fia
Isar �R'isaal
j
/Oar!
TALS
. .
OBLIGATIONS
Section 186 1
See Item e
Matching byy A�1gency
122.;11T 6(a)
EXPEND/TUNES
i ion 186.1
See Item 4(b)
o:
0
Matching Money
See /tem 6 b)
Matching by Sub-
dividers See Item 7
160,000.00
160 000.00
Section 2104, 2107
or 2107.5 funds
See Item .9
0
0
Other Funds
ASB Item.2O
o
0
TOTALS
(Expenditur.s only)
160,000.00
•
160,000.00
To the best or my knowledge, the above and attached data le a true
and correct c1 tement of the work performed:and expenditures made
in accordance with the requiremanta of the Collier -Unruh Local
Transportation Development Aot.
'-IL. M. ITBECKI
'1gned
City Engineer
, 'iUe
Note: ,In Table 1, Engineering costs may be prorated on'basie of
division of construction costa. Amounts of expenditures
and obligations for each fiscal year shown in Table 2 are
as reported on Forms 5a and 5b. Net totals on Lines 1 and
2 of Obligations should agree with totals 'on Lines 1 and 2
of expenditures.
•
•
DITY OF PA.O ALTO
RECEIVED
AUG 11 1964
anrcanne a P„auc Waft
OCPAMTMRNT OF PUSLIC WOlUlt
70 W[6T HEDD/IM D?R*.[T SAN .OSt, 0AUTODWIA *1110
August 10, 1964
City of Palo Alto
1313 Newell Road
Palo Alto, California'
.Attention: Me. John W. Zellhoefer, Right'of Way Agent'
Subject: Foothill Expressway 1 - Parcel 2821-17 •
Gentlemen;
' Your letter of July 20, 1964 addressed to Mr. Hodge,.
and concerning land values southerly of Junipero Serra
Boulevard was assigned to the undersigned for answer.
Our Appraisal Section made an appraisal dated June 1,
1963 of all of the parcels required for the Foothill
Expressway Unit 1, which extends from Page Mill Road to
Arastradero Road. Several of these parcels were quite
comparable to the parcels acquired by your City for the
construction of the new portion of Hillview Avenue.
Their zoning, contours and size were quite similar and
in two cases our parcels and your subject parcels consti-
tuted portions of the same current parcel., Our Staff
appraisal for the above parcels was at the rate of $25,000
an acre; and since the appraisal date closely approximates
the date of your acquisition, it might well serve to estab-
lish a realistic value for the parcels which were the
subject of your letter.
We hope that the above information will -serve your
purpose, and as explained on the telephone, the only reason
we are not furnishing you with the entire copy of the
Stanford Lands appraisal is that it contains considerable
confidential lease information supplied us by the University,
which aided us to some extent in arriving at our final estim- .
ated values.
very truly)rours,
F. B. SULLIVAN
Senior. Appraiser.
e
Form CU -3'
COLLIER-UNRUH'L0C4L TRANSPORTATION DEVELO •:ACT
REQUEST FOR PROJECT APPROVAL
Project No. 76
State of California Prom: City J County ❑ of •
Department of Public Works
Division of Highways
(Through District Engineer)
Palo Alto
Dates August 17, 1964
WitAIRIC approval is requested of the following projeot whieh:
❑ is designed in accordance with approved standards.
Q involves a deviation from approved etandarda.
❑ is designed to meet approved standards through "stage construction."
DESCRIPTION OP PROJECT
Name of Street or Road Hillview Avenue (replaces West Fremont Road)
Termini Foothill Expressway to Arastradero Road
e
Length 0.75 Kilos.
The proposed work consists of Dedication of right-of-way by Stanford University
j0rading, paving, constructing curbs arid
and will be performed by
gutters, etc., or the purchase or right-of-way)
-- under the direction of the
Contract or day labor
GEOMETRIC SECTION
,Number and width of traffic lanes
Width of curb parking lanes or
usable shoulders
Mledian Width
Total width between exterior curbs
or outside of usable shoulders
Width of Right -of -Way
STRUCTURAL SECTION*
Surface thickness and type
Baae thioknesa and type
City
city, county, state.
Existing
Proposed
Project
Planned
ttltimate
2at10'
4at11'
---
Lt.
Rt.
Lt.
Rt.
Lt.
Rt,
4'
4'
2'
2'
28'
48'
60'
80'
Exiati
Pro Deed
AC
3" AC
Unknown
9" AB
TRAFFIC
ADT upon completion
11,400
Design ADT 8,000 *
lEst.total In adl laved
0 yre.after completion)
*Types* BS -bituminous seal, RMAS-road-mix asphaltic surface
AC -asphaltic concrete, MB-oement treated base
PCC-Portland cement concrete, AB -aggregate base
Other AS-aggregnte subbase
Mote: Explain reason for less
than desirable widths and WITSECK A. J. MITCHEL
thiek-neasee, special con- Signature authorized official
etruction features, etc., II
on reverse side. Attach
sketches if necessary. Official Title
City Engineer City Controller
•
* The design ADT, 8,000, on Hillview Avenue is lower than the
present ADT, 11,400, because Foothill Expressway which is
currently under construction will provide an alternate, parallel,
and more direct route than Hillview.
The total width of 48' with no parking at any time was constructed
because of the general development in the area. Hillview goes
through a section of the Stanford Industrial Park. It is zoned for
low density light manufacturing with a minimum set back of 100',
a minimum lot size of five acres, and a maximum building cover-
age of 20%. The off-street parking requirements will provide for
100% of the parking needs.
The Stanford Industrial Park is a campus type development which
features no on -street parking within the entire development. The
land is leased by Stanford University to the various users and is
being developed with a minimum of building coverage and a maxi-
mum of landscaping.
The City of Palo Alto has a long standing standard of 11' travel
lanes. This standard has been used on numerous major arterials
within Palo Alto that were improved with 2107 funds. Arastradero,
Charleston, and Middlefield are some of the most recent construc-
tion jobs using an 11' travel lane.
•
•