Loading...
HomeMy WebLinkAboutRESO 827' 1 ~ I I -,, f. l ! ' I ~ ~~'tfW~• llltA:All"""'_,_,..._ __ ...,,_.., ____ ,~•~w~-~-rM•~~-~.f'llOJ""""-~lM~~IW~~~'t\th?JII(1IjiiWGt&Z: .. ti!CRC r-l.l '-~' I .. Li R E S 0 L U T I 0 N N 0 • 827 ----------~ ..... ---- IN 'I'HE MA'r'l'EH OF f.C_3UI3IT'!:0N AN~ IMPROVEMENT D!.2,T:RIC~ NO.1 OF THE CITY OF PAIJ:J ALTO -ORDER DIRECTING PREPARATION OF 3PEC!I<'ICATIONS ................... " ·-----~---- WHEREAS, the public interest and necessity require the acqu181t1one end improvements hereinAfter aet forth: NOW THEREFORE, 3E IT RESOLVED, That J. F. BYXBEE, a public officer, to-wit: the City Engineer of the City of Palo Alto, ie hereby apnointed and d~signated and dix•tjcted to ~)repare and furn!ah SPECIFICATIONS for the proposed acquisition and improvement ot California Avenue batween tha northeasterly line ot El Camino Real and the south- westerly line of Alma Street as her~1nafter described, said SPECIFICATIONS to include descriptions of all property to b~ ac~lired, together with a map or plat showing the same, the total sum of the estimated expense of said ac-tu1s1tion {which expenses shall include the est!Lmatad amount of just compensation and damagus, the esti~eted expenses chargeable to the plaintiff in the condemnation action, and the incidental expenses o.f the proceeding), and all plana, profiles, croms-aect1ons and specifications necessary for the improvement, togeth4:'r with a statement of the estimated cost of the same lincluslve of inciuuntal oxpensea and costs of the proeeed1n~), and also a description or the proposed district to be ~ene!ited by said acqllisi tion and improvement end to be lnown as the 1' Assess- men District", and a map or plat showing the aame, togather with the different zones within said district and a statement as to what percentage shall be raised from each zone; the said '1istr1ct to be known as "Acquisition and !mprovement District No. 1 of the City of Palo Alto". Said acqu131tions and improvements include the following: Thet California Avenue from the northeasterly line of El C~~ino Renl to the southwesterly line of Alma Street be wictened from 60 feet tn width to 90 feet. being wid~n~d 15 feet on each side; That California Avenue from the northeasterly line of El Camino Real to the southwesterly line of Alma Street be graded to official line end grade; that water and sewer connections be 1natallad l:>etwaen said points; that cement concrete sidewalks, cement concrt!tte sidewalk corners, cement concrete curbs, concrete gutters, cement concrete driveways be constructod; that the roadway between said points be paved with a cement concrete base and an asphaltic surface; and that ele~trol1ers be constructed between said points. The material for said work and the work to be done in accordance with the said plans and specifications prepsrad by the City Engineer. l hereby certify that the above and foregoing r'dsolut1cn Wl:l..lJ duly passed by the COl.UlC1l or the City or 189 '{,....._..,., __ , .. ,-~ • ,.,_.~ .,,_,.r •• ~--~•.,•\•• I ..... -·~ ,_ .. *f"<•,.o••-•~·-•,...·-•••-••• • ~,.,,.,,., .. ,.~ ·~·~.,,..,, .... .,,_ •. ,....,..,.,..,.., .. ,.,_-u.~ .... ··-·-.,.._,.,..,_,_,.~-•-A•""1"' -... ~_..... -~<-•......,.....,-,___... .. ___ .,._ ~ ........ ,,..,_, __ ......... _ .......... ,.,...,..~.--..-'¥>-••..,,_.,...__ i ,. ~ l' ~ ~ ~ ~ 'f· f ! 190 Palo Alto at its rHgular meeting held on the 12th day of ~ovember 1 1929, bt the following vote: AYES: NOES: Miss Baugh. Bertsche, Cathcart, Christensen. Johnson, Kelly~ Lausten~ Mosher, Tbo1ta, Earl Thomas, Mrs. Margaret Tnomas. None. ABSENT: Hobart, Reyr~olds, iJhisler, Wood. ///~ Attest:~£ / City ~~ Approved: e.~~ Mayor ..... 'J) .:'%") -!iii I') A• ~J ] • •