Loading...
HomeMy WebLinkAboutRESO 4052• • RESOLUTION NO. 4052 RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO APPROVING SCHEDULE OF ACTIONS TO BE TAKEN LEADING TO PROVISION OF SUPPLEMENTAL WASTES TREATMENT AND DISPOSAL FACILITIES IN ACCORDANCE WITH REGIONAL WATER QUALITY CONTROL BOARD RESOLUTION NO. 436 AND RESOLUTION NO. 67-53 AND DIRECTING THE CITY STAFF TO INITIATE THE NECESSARY WORK TO BE DONE AND RESCINDING RESOLUTION NO. 3876 WHEREAS, the Regional Water Quality Control Board of the State of California, by its Resolutions No. 436 and No. 67-53, did prescribe requirements as to the nature of waste discharge by the City of Palo Alto into tributary waters of San Francisco Bay; and WHEREAS, said Resolution requires the City to approve a schedule indicating actions and timing to expand existing facili- ties at such time as the waste flow volume reaches 8.5 million gallons per day; and WHEREAS, present waste flow volume exceeds 8.5 million gallons per day, and it is anticipated that waste flow volume will exceed 10 million gallons per day by June 1970; and WHEREAS, the City of Palo Alto is desirous of continuing its past record of civic responsibility in meeting the wastes treatment and disposal needs of its citizens as well as conform- ing to the prescribed requirements of the Regional Water Quality Control Board; and WHEREAS, the City Manager has recommended a schedule of actions to be taken, leading to provision of necessary supple- mental facilities before the waste flow volume reaches 10 million gallons per day. NOW, THEREFORE, the Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. That the following schedule of actions to be taken by the City leading to provision of necessary supplemental waste treatment and disposal facilities in accordance with the requirements of the Regional Water Quality Control Board be and the same hereby is approved as a general policy guide: TIME SCHEDULE 1. December 1967 Authorize preparation of engineering plans and specifications for project. 2. September 1968 Project financing completed. 3. November 1968 Project engineering plans and specifications completed. 4. December 1968 Council awards construction contract for project. 5. March 1970 Project completed, accepted and placed into operation. 6. June 1970 Operational procedures established. All requirements of the Regional Water Quality Control Board being met. SECTION 2. That the City Clerk is hereby authorized and directed to transmit a certified copy of this resolution to the Regional Water Quality Control Board, and the staff is hereby authorized and directed to proceed with the program outlined therein. SECTION 3. That Resolution 3876 of the Council of the City of Palo Alto is hereby rescinded. INTRODUCED AND PASSED: December 4, 1967 AXES: NOES: Arnold, Beahrs, Berwald, Clark, Comstock, Cooley, Dias, Pearson, Spaeth, Wheatley None - ABS ; Gallagher �t--s--C. 0 AS TO FORM: yy Attorney AFP ."(21111214-et4.'"17 APPROVED• ayor vd4.11 - /2/16