Loading...
HomeMy WebLinkAboutRESO 5104• ORIGINAL / RESOLUTION NO. 5104 RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING SCHEDULE E-2 (COMMERCIAL ELECTRIC SERVICE) OF THE CITY OF PALO ALTO UTILITIES RULES AND RATES The Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto ?.funicipal Code, -Schedule E-2 (Commercial_ Electric Service) of the Palo Alto Utilities Rules and Rates is hereby amended to read as shown on "Sheet: Nos. 102d·; l03d, · arid" •l:04b" attached hereto and incorporated herein. SECTION 2. The foregoing change shall become effective July l, 1975. INTRODUCED AND PASSED: June 23, 197 5 AYES: Beahrs, Clay, Comstock, Henderson, Pearson, Rosenbaum, Sher NOES: None Berwald, Norton .· ' \ ; ------"--------------- v APP~~ Mayor ·/~ AT.Li.ST: ~J ::L-.1i.t,, .·.· APPROVED AS TO FORM: t!ty~ APPROVED~~-.~ -0 .. Cit~~ ~ : .. . ... • City of Palo Alto California Sheet No. 102d Canceling Sheet No. 102c UTILITY RATE SCHEDULE SCHEDULE E-2 COMMERCIAL ELECTRIC SERVICE APPLICABILITY: This schedule applies to electric service to all customers other than separately metered single-phase service to single-family domestic dwellings. This schedule applies to all three-phase electric service. TElra.ITORY: RATE: Within the incorporated limits of the City of Palo Alto and land owned or leased by the City. Monthly Service Charge. per meter • • . . . . . . . . . . $1.10 Energy Charge (to be added to service charge): Per Meter Per Month · Per Kilowatt-Hour . First Next Next All over 1, 000 kwil: • • • • • • 2,000 kwh • • • • • 3.000 kwh . ~ • • ' . . . . . . ' 6,000 kwh • • • • • • ... • • • $ .0343 .0287 ~0230 .0228 MaxilllUa Deaand Meter: Whenever the monthly·use of energy has exceeded 8,000 kwb for three· consecuti.ve· . .mtbs, a. mariwm demand meter will be insta1led ea promptly as is practicable and tbere.af ter continued in service until the .mthly use of energy h&s fallen below .. 6.000 kwb_fcn twelve consecutive amtha, where- upOL •. st the· option of the City, it uy be removed. The wud•• demand in. any a:>nth will be the -.rt•m average power in kµ.awatts taken during any ·15-w:lDute interval in the Dl01lth provided that :in case the load 18 intemittent or s~ject to violent flW:tuat:l.ODS• the City may use a 5-minute interval. A therU.1-type.deiiand •te:r which does not reset after a definite· tine interval..,. be uae4 at the City's . "option• . . (Cont~ued) Effective Date:· July 1, 1975 Issued by The CU:y Couucil '. ~ ; City of Palo Alto Califo!"".lia _ , UTILITY RATE SCHEDULE SCHEDlIT.E E-2 COMMERCIAL ELECTRIC SERVICE (Continued) • Sheet No. 103d Canceling Sheet No. 103c The billing demand to be used in computing charges under this schedule will be the mean of the actual maximum demand in 'kilowatts for the current month and the highest such demand occurring in the year ending with the current month. Where a maximum demand meter is installed, all consumption ™ 6,000 kwh will be charged as follows: Per Meter Per Month First Next 50 kwh per kw of billing demand • • 150 kwh per kw of.billing d~mand: First ioo.ooo kwh •• All over 100,000 kwh • • Next 100 kwh per kw of billing demand All over 300 kwh per kv of billing demand Minimum Charge:. Per Kilowatt-Hour . $ .0228 .0135 .0098 .0098 .0072 Where a demand meter is i.nstalled, the minimum charge will be $ .98 per month per kw of the billing· demand. Whert; a demand meter is not installed, the minimum charge will be $ ~ 70 per mmth per HP of all polyphase motors that may "be connected at the same time. · Primary Voltage Discount: ... When delivery hereuoder is.made at the same voltage as that of the line from which the:.jerdce is supplied. a discount of ._four percent· for 11 kv or higher available line voltages and three percent for available line voltages of from 2 kv to 10 ~will be allowed provided the City is not required to sui>ply eervice at a particular line voltage.where it has, or will iJlStall, ample fac:Uities for supplying at another voltage equally or bet~u'<1uited to the customer's electri- cal ~equireaants. The City retains the rigbt to change its line ~oltage at any tial, after reasonable· advance-11otice to -1 ~ -_ . Inued by The City courlcil ::-, (eontiilueci> Effective Date: July 1. 1975 • • • , • • City of Palo Alto California Sheet No. 104b canceling Sheet No. 104a UTILITY RATE SCHEDULE SCEEDULE E-2 COMMERCIAL ELECTRIC SERVICE (Continued) any customer receiving a discount hereunder and affected by such change, and such customer then has the option to -change his system so as to receive service at the new line voltage or to accept service (withouc voltage discount) through trnnsformers to be supplied by the City. '. ... \. t t> 1-8-d by .The City Comeil Effec.t1ve Date: July l, 1975