HomeMy WebLinkAboutRESO 5104• ORIGINAL
/
RESOLUTION NO. 5104
RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING SCHEDULE E-2 (COMMERCIAL ELECTRIC SERVICE)
OF THE CITY OF PALO ALTO UTILITIES RULES AND RATES
The Council of the City of Palo Alto does RESOLVE as
follows:
SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto
?.funicipal Code, -Schedule E-2 (Commercial_ Electric Service) of
the Palo Alto Utilities Rules and Rates is hereby amended to
read as shown on "Sheet: Nos. 102d·; l03d, · arid" •l:04b" attached hereto and incorporated herein.
SECTION 2. The foregoing change shall become effective
July l, 1975.
INTRODUCED AND PASSED: June 23, 197 5
AYES: Beahrs, Clay, Comstock, Henderson, Pearson, Rosenbaum, Sher
NOES: None
Berwald, Norton
.· ' \ ; ------"---------------
v
APP~~
Mayor ·/~
AT.Li.ST: ~J ::L-.1i.t,, .·.·
APPROVED AS TO FORM:
t!ty~
APPROVED~~-.~ -0
.. Cit~~
~ :
.. . ... •
City of Palo Alto
California
Sheet No. 102d
Canceling Sheet No. 102c
UTILITY RATE SCHEDULE
SCHEDULE E-2
COMMERCIAL ELECTRIC SERVICE
APPLICABILITY:
This schedule applies to electric service to all customers other
than separately metered single-phase service to single-family
domestic dwellings. This schedule applies to all three-phase
electric service.
TElra.ITORY:
RATE:
Within the incorporated limits of the City of Palo Alto and land
owned or leased by the City.
Monthly Service Charge. per meter • • . . . . . . . . . . $1.10
Energy Charge (to be added to service charge):
Per Meter Per Month · Per Kilowatt-Hour
. First
Next
Next
All over
1, 000 kwil: • • • • • •
2,000 kwh • • • • •
3.000 kwh . ~ • • ' . . . . . .
' 6,000 kwh • • • • • • ... • • •
$ .0343
.0287
~0230
.0228
MaxilllUa Deaand Meter:
Whenever the monthly·use of energy has exceeded 8,000 kwb
for three· consecuti.ve· . .mtbs, a. mariwm demand meter will
be insta1led ea promptly as is practicable and tbere.af ter
continued in service until the .mthly use of energy h&s
fallen below .. 6.000 kwb_fcn twelve consecutive amtha, where-
upOL •. st the· option of the City, it uy be removed.
The wud•• demand in. any a:>nth will be the -.rt•m average
power in kµ.awatts taken during any ·15-w:lDute interval in
the Dl01lth provided that :in case the load 18 intemittent or
s~ject to violent flW:tuat:l.ODS• the City may use a 5-minute
interval. A therU.1-type.deiiand •te:r which does not reset
after a definite· tine interval..,. be uae4 at the City's
. "option• . . (Cont~ued)
Effective Date:· July 1, 1975
Issued by
The CU:y Couucil
'. ~ ;
City of Palo Alto
Califo!"".lia _
,
UTILITY RATE SCHEDULE
SCHEDlIT.E E-2
COMMERCIAL ELECTRIC SERVICE
(Continued)
•
Sheet No. 103d
Canceling Sheet No. 103c
The billing demand to be used in computing charges under this
schedule will be the mean of the actual maximum demand in
'kilowatts for the current month and the highest such demand
occurring in the year ending with the current month.
Where a maximum demand meter is installed, all consumption ™ 6,000 kwh will be charged as follows:
Per Meter Per Month
First
Next
50 kwh per kw of billing demand • •
150 kwh per kw of.billing d~mand:
First ioo.ooo kwh ••
All over 100,000 kwh • •
Next 100 kwh per kw of billing demand
All over 300 kwh per kv of billing demand
Minimum Charge:.
Per Kilowatt-Hour
. $ .0228
.0135
.0098
.0098
.0072
Where a demand meter is i.nstalled, the minimum charge will be
$ .98 per month per kw of the billing· demand.
Whert; a demand meter is not installed, the minimum charge will
be $ ~ 70 per mmth per HP of all polyphase motors that may "be
connected at the same time. ·
Primary Voltage Discount:
...
When delivery hereuoder is.made at the same voltage as that
of the line from which the:.jerdce is supplied. a discount
of ._four percent· for 11 kv or higher available line voltages
and three percent for available line voltages of from 2 kv
to 10 ~will be allowed provided the City is not required
to sui>ply eervice at a particular line voltage.where it has,
or will iJlStall, ample fac:Uities for supplying at another
voltage equally or bet~u'<1uited to the customer's electri-
cal ~equireaants. The City retains the rigbt to change its
line ~oltage at any tial, after reasonable· advance-11otice to -1 ~ -_ .
Inued by
The City courlcil
::-,
(eontiilueci>
Effective Date: July 1. 1975
•
• • , • •
City of Palo Alto
California
Sheet No. 104b
canceling Sheet No. 104a
UTILITY RATE SCHEDULE
SCEEDULE E-2
COMMERCIAL ELECTRIC SERVICE
(Continued)
any customer receiving a discount hereunder and affected
by such change, and such customer then has the option to
-change his system so as to receive service at the new line
voltage or to accept service (withouc voltage discount)
through trnnsformers to be supplied by the City.
'. ...
\. t
t>
1-8-d by
.The City Comeil
Effec.t1ve Date: July l, 1975