Loading...
HomeMy WebLinkAboutRESO 98706055287 Resolution No. 9870 Resolution of the Council of the City of Palo Alto Authorizing the City of Palo Alto to Participate in the California Electric Vehicle Infrastructure Project (CALeVIP) to Incentivize Installation of Electric Vehicle Chargers, Including the Contribution of Matching Funds, and Authorizing the City Manager to Execute Implementing Agreements R E C I T A L S A. On November 28, 2016, City Council approved the Sustainability Climate Action Plan (S/CAP) to lower the greenhouse gas emissions of the Palo Alto community; On December 11, 2017 Council accepted the Sustainability Implementation Plan which identified the need to development electric vehicle charging infrastructure to meet the community’s greenhouse gas reduction goals. B. City of Palo Alto has adopted a multi-faceted approach to install and facilitate the installation of EV charging in Palo Alto, primarily with the use of grant funds and revenues derived by City of Palo Alto Utilities (CPAU) participation in the California Air Resources Board’s Low Carbon Fuel Standards Program. C. The California Energy Commission (CEC) has approved funding of up to $200 Million (CEC Funds) for the design and implementation of an electric vehicle charger installation project – the California Electric Vehicle Infrastructure Project (CALeVIP) – throughout California, and in turn contracted with the Center for Sustainable Energy (CSE) to implement CALeVIP. D. At the request of CPAU and other Bay Area electricity providers, the CEC has authorized CSE to utilize $33 Million of the CALeVIP CEC Funds towards an incentive program in Santa Clara and San Mateo counites, the Peninsula/Silicon Valley Incentive Project (P/SVIP). The CEC has designated $1 Million of the P/SIP funds for City of Palo Alto utility customer rebates. The CEC funds will provide cash rebates for installation of EV chargers at multi-family residential, mixed use and commercial buildings in Palo Alto. E. In order to access the CEC Funds, the City of Palo Alto must enter into an implementing agreement with CSE and provide matching funds in the amount of $1 Million. $70,000 of the Matching Funds will be used for CSE’s program administration costs, with the remaining $930,000 being used to provide additional utility customer rebates for installation of EV chargers. F. It is anticipated that participation in the P/SBIP CALeVIP will facilitate the installation of approximately 180 Level 2 chargers and 180 Level 3 DC fast chargers, thereby helping to meet the City’s Sustainability and Climate Action Plan goal of reducing the City’s carbon footprint by 80% by 2030. DocuSign Envelope ID: 8E8B779F-8E74-4232-8DE3-069BC05890D6 6055287 The Council of the City of Palo Alto does hereby RESOLVE as follows: SECTION 1. The Council hereby adopts the resolution Authorizing the City of Palo Alto to Participate in the California Electric Vehicle Infrastructure Project (CALeVIP) to Incentivize Installation of Electric Vehicle Charging Stations, Including the Contribution of $1 Million in Matching Funds, and Authorizing the City Manager to Execute Implementing Agreements. SECTION 2. The Council further grants the City Manager the authority to execute and approve any future implementing documents or agreements, within the parameters of the CALeVIP program. SECTION 3. The Council finds that the adoption of this resolution does not require environmental review under the California Environmental Quality Act (CEQA) because it is not a “project” within the meaning of CEQA Section 21065, and CEQA guideline 15378, because it does not have a potential for resulting in a direct or indirect physical change in the environment. INTRODUCED AND PASSED: November 18, 2019 AYES: CORMACK, DUBOIS, FILSETH, KNISS, KOU, TANAKA NOES: ABSENT: FINE ABSTENTIONS: ATTEST: City Clerk Mayor APPROVED AS TO FORM: APPROVED: Assistant City Attorney City Manager Director of Utilities Director of Administrative Service DocuSign Envelope ID: 8E8B779F-8E74-4232-8DE3-069BC05890D6 DocuSign Envelope ID: 8E8B779F-8E74-4232-8DE3-069BC05890D6 Certificate Of Completion Envelope Id: 8E8B779F8E7442328DE3069BC05890D6 Status: Completed Subject: Please DocuSign: RESO 9870 Participate in the California Electric Vehicle Infrastructure Projec... Source Envelope: Document Pages: 3 Signatures: 6 Envelope Originator: Certificate Pages: 2 Initials: 0 Kim Lunt AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 250 Hamilton Ave Palo Alto , CA 94301 kimberly.lunt@cityofpaloalto.org IP Address: 12.220.157.20 Record Tracking Status: Original 12/2/2019 1:23:20 PM Holder: Kim Lunt kimberly.lunt@cityofpaloalto.org Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign Signer Events Signature Timestamp Joan Borger Joan.Borger@CityofPaloAlto.org Special Counsel Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 107.77.229.123 Signed using mobile Sent: 12/2/2019 1:26:30 PM Resent: 12/3/2019 9:10:20 AM Viewed: 12/4/2019 12:45:00 PM Signed: 12/4/2019 12:46:39 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Kiely Nose kiely.nose@cityofpaloalto.org Director, Administrative Services/CFO City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 76.103.200.28 Sent: 12/4/2019 12:46:41 PM Viewed: 12/4/2019 12:50:58 PM Signed: 12/4/2019 12:51:26 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Dean Batchelor Dean.Batchelor@CityofPaloAlto.org Director of Utilities Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 12.220.157.20 Sent: 12/4/2019 12:51:28 PM Viewed: 12/4/2019 12:54:01 PM Signed: 12/4/2019 12:54:13 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ed Shikada ed.shikada@cityofpaloalto.org Ed Shikada, City Manager City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 24.23.214.110 Sent: 12/4/2019 12:54:15 PM Viewed: 12/6/2019 12:47:15 PM Signed: 12/6/2019 12:47:26 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Signer Events Signature Timestamp Eric Filseth eric.filseth@cityofpaloalto.org Mayor Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 108.169.4.229 Sent: 12/6/2019 12:47:28 PM Viewed: 12/6/2019 5:22:34 PM Signed: 12/6/2019 5:22:45 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Beth Minor Beth.Minor@CityofPaloAlto.org City Clerk City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 174.85.96.67 Signed using mobile Sent: 12/6/2019 5:22:47 PM Viewed: 12/6/2019 10:32:22 PM Signed: 12/6/2019 10:32:44 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 12/6/2019 5:22:47 PM Certified Delivered Security Checked 12/6/2019 10:32:23 PM Signing Complete Security Checked 12/6/2019 10:32:44 PM Completed Security Checked 12/6/2019 10:32:44 PM Payment Events Status Timestamps