Loading...
HomeMy WebLinkAboutRESO 9549DocuSign Envelope ID: 6C775EOA-AD87-471D-903F-4CDOBOD5AB99 Resolution No. 9549 Resolution of the Cou neil of the City of Palo Alto Accepting a Modification to the City's Long Range Facilities Plan for the Regional Wastewater Quality Control Plan which includes the Recycled Water Project and Authorizing the City Manager or his Designee to Initiate Preliminary Design and Prepare a Funding Plan for the Project RECITALS A. Potable water is one of our most precious natural resources and is becoming increasingly scarce in the semiarid State of California. B. The use of treated, nonpotable water for construction, toilet and urinal flushing and irrigation will increase the amount of potable water available for other uses in the City. C. Extending the Recycled Water Distribution System will allow the City to maximize recycled water as a supplemental water source, thereby improving potable water supply reliability by conserving drinking water, which is currently use for irrigation and other non- potable uses. D. Recycled water provides a dependable, drought-proof, locally controlled non- potable water source . E. Increasing recycled water use from the Regional Water Quality Control Plant will reduce discharge to the San Francisco Bay. F. Increasing recycled water use will reduce reliance on imported water. G. Council certified the Program Environmental Impact Report for the projects identified in the 1992 Water Reclamation Master Plan for the Regional Water Quality Control Plant (CMR: 217:95); the current project is Phase 3 of the Water Reclamation Master Plan. H. In 2006 Council approved proceeding with preparation of a Recycled Water Facility Plan and the development of environmental documentation for expanding the recycled water distribution system in Palo Alto (CMR: 415:06). I. Council approved the Long Range Facilities plan for the Regional Water Quality Control Plant (CMR: 2914: 12). J. The Council has certified the Final Environmental Impact Report for the Proposed Recycled Water Distribution Project (Resolution XX) NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows: 150807 jb 0131478 DocuSign Envelope ID: 6C775EOA-AD87-471D-903F-4CDOBOD5AB99 SECTION 1. The Council approves a modification to the Long Range Facilities Plan for the Regional Wastewater Quality Control Plant, which was previously accepted by the City Council on July 2, 2012, and modified in October 2012. That Plan shall now include the City's planned improvements described in detail in the City of Palo Alto Recycled Water Project Final Environmental Impact Report (State Clearinghouse No. 2011062037) ("the Final EIR"), subject to further Council action to consider and approve funding applications, financing, design and construction. The Final EIR is now part of the Long Range Facilities Plan . The Council hereby directs the City Manager and City staff to proceed with evaluation of funding opportunities and return to Council for further consideration regarding development of the Recycled Water Project. INTRODUCED AND PASSED: September 28, 2015 AYES: Berman, Burt, Filseth, Holman, Kniss, Scharff, Schmid, Wolbach NOES: ABSENT: ABSTENTIONS: DuBois ATIEST: ~~ City Clerk Mayor Senior Assistant City Attorney Director of Administrative Services 150807 jb 0131478 Certificate Of Completion Envelope Number: 6C775EOAAD87471D903F4CDOBOD5AB99 Subject: Please DocuSign: RESO 9549 Modification to Long Range Facilities Plan for RWQCP.pdf Source Envelope: Document Pages: 2 Certificate Pages: 5 AutoNav: Enabled Envelopeld Stamping: Enabled Record Tracking Status: Original 10/1/2015 3:52:43 PM PT Signer Events Cara Silver cara .silver@cityofpaloalto.org Senior Assistant City Attorney City of Palo Alto Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Accepted: 7/15/2015 5:07:16 PM PT ID: 11910ed1-61d1-4ff3-9cf9-f4eb5a0768e2 Lalo Perez lalo.perez@cityofpaloalto.org Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered ID: J M Sartor Mike.Sartor@CityofPaloAito.org Public Works Director Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered ID: James Keene james.keene@cityofpaloalto.org City Manager City of Palo Alto Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Accepted: 4/14/2015 5:40:07 PM PT I D: 44 fe333a-6a81-4cb 7 -b 7 d4-9254 73ac82e3 In Person Signer Events Editor Delivery Events Signatures: 4 Initials: 0 Holder: Tabatha Boatwright tabatha.boatwright@cityofpaloalto.org Signature ({DocuSigned by: ~:.0~:::,. Using IP Address: 199.33.32.254 (/'DocuSignod by: ~o!~ .. Using IP Address: 199.33.32.254 G OocuSigned by: La~Es~:~: Using IP Address: 199.33.32.254 0 0ocuSigned by: L1t:2:t!. Using IP Address: 24.7.29.7 Signature Status Docu~ . ... •sECURED Status: Completed Envelope Originator: Tabatha Boatwright 250 Hamilton Ave Palo Alto , CA 94301 tabatha.boatwright@cityofpaloalto.org IP Address: 199.33 .32.254 Location: DocuSign Timestamp Sent: 10/1/2015 3:58:42 PM PT Viewed: 10/1/20154:11:53 PM PT Signed: 10/1/2015 4:12:17 PM PT Sent: 10/1/2015 4:12:18 PM PT Viewed: 10/1/2015 4:13:01 PM PT Signed: 10/1/20154:13:47 PM PT Sent: 10/1/2015 4:13:48 PM PT Viewed: 10/1/2015 4:42:35 PM PT Signed: 10/1/2015 4:44:28 PM PT Sent: 10/1/2015 4:44:29 PM PT Viewed: 10/12/2015 4:03:18 PM PT Signed: 10/12/2015 4:03:31 PM PT Timestamp Timestamp