HomeMy WebLinkAboutRESO 9549DocuSign Envelope ID: 6C775EOA-AD87-471D-903F-4CDOBOD5AB99
Resolution No. 9549
Resolution of the Cou neil of the City of Palo Alto Accepting a Modification to the
City's Long Range Facilities Plan for the Regional Wastewater Quality Control
Plan which includes the Recycled Water Project and Authorizing the City
Manager or his Designee to Initiate Preliminary Design and Prepare a Funding
Plan for the Project
RECITALS
A. Potable water is one of our most precious natural resources and is becoming
increasingly scarce in the semiarid State of California.
B. The use of treated, nonpotable water for construction, toilet and urinal flushing
and irrigation will increase the amount of potable water available for other uses in the City.
C. Extending the Recycled Water Distribution System will allow the City to maximize
recycled water as a supplemental water source, thereby improving potable water supply
reliability by conserving drinking water, which is currently use for irrigation and other non-
potable uses.
D. Recycled water provides a dependable, drought-proof, locally controlled non-
potable water source .
E. Increasing recycled water use from the Regional Water Quality Control Plant will
reduce discharge to the San Francisco Bay.
F. Increasing recycled water use will reduce reliance on imported water.
G. Council certified the Program Environmental Impact Report for the projects
identified in the 1992 Water Reclamation Master Plan for the Regional Water Quality Control
Plant (CMR: 217:95); the current project is Phase 3 of the Water Reclamation Master Plan.
H. In 2006 Council approved proceeding with preparation of a Recycled Water
Facility Plan and the development of environmental documentation for expanding the recycled
water distribution system in Palo Alto (CMR: 415:06).
I. Council approved the Long Range Facilities plan for the Regional Water Quality
Control Plant (CMR: 2914: 12).
J. The Council has certified the Final Environmental Impact Report for the
Proposed Recycled Water Distribution Project (Resolution XX)
NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows:
150807 jb 0131478
DocuSign Envelope ID: 6C775EOA-AD87-471D-903F-4CDOBOD5AB99
SECTION 1. The Council approves a modification to the Long Range Facilities Plan for
the Regional Wastewater Quality Control Plant, which was previously accepted by the City
Council on July 2, 2012, and modified in October 2012. That Plan shall now include the City's
planned improvements described in detail in the City of Palo Alto Recycled Water Project Final
Environmental Impact Report (State Clearinghouse No. 2011062037) ("the Final EIR"), subject
to further Council action to consider and approve funding applications, financing, design and
construction. The Final EIR is now part of the Long Range Facilities Plan . The Council hereby
directs the City Manager and City staff to proceed with evaluation of funding opportunities and
return to Council for further consideration regarding development of the Recycled Water Project.
INTRODUCED AND PASSED: September 28, 2015
AYES: Berman, Burt, Filseth, Holman, Kniss, Scharff, Schmid, Wolbach
NOES:
ABSENT:
ABSTENTIONS: DuBois
ATIEST:
~~
City Clerk Mayor
Senior Assistant City Attorney
Director of Administrative Services
150807 jb 0131478
Certificate Of Completion
Envelope Number: 6C775EOAAD87471D903F4CDOBOD5AB99
Subject: Please DocuSign: RESO 9549 Modification to Long Range Facilities Plan for RWQCP.pdf
Source Envelope:
Document Pages: 2
Certificate Pages: 5
AutoNav: Enabled
Envelopeld Stamping: Enabled
Record Tracking
Status: Original
10/1/2015 3:52:43 PM PT
Signer Events
Cara Silver
cara .silver@cityofpaloalto.org
Senior Assistant City Attorney
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Accepted: 7/15/2015 5:07:16 PM PT
ID: 11910ed1-61d1-4ff3-9cf9-f4eb5a0768e2
Lalo Perez
lalo.perez@cityofpaloalto.org
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered
ID:
J M Sartor
Mike.Sartor@CityofPaloAito.org
Public Works Director
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered
ID:
James Keene
james.keene@cityofpaloalto.org
City Manager
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Accepted: 4/14/2015 5:40:07 PM PT
I D: 44 fe333a-6a81-4cb 7 -b 7 d4-9254 73ac82e3
In Person Signer Events
Editor Delivery Events
Signatures: 4
Initials: 0
Holder: Tabatha Boatwright
tabatha.boatwright@cityofpaloalto.org
Signature
({DocuSigned by:
~:.0~:::,.
Using IP Address: 199.33.32.254
(/'DocuSignod by:
~o!~ ..
Using IP Address: 199.33.32.254
G OocuSigned by:
La~Es~:~:
Using IP Address: 199.33.32.254
0 0ocuSigned by:
L1t:2:t!.
Using IP Address: 24.7.29.7
Signature
Status
Docu~ . ... •sECURED
Status: Completed
Envelope Originator:
Tabatha Boatwright
250 Hamilton Ave
Palo Alto , CA 94301
tabatha.boatwright@cityofpaloalto.org
IP Address: 199.33 .32.254
Location: DocuSign
Timestamp
Sent: 10/1/2015 3:58:42 PM PT
Viewed: 10/1/20154:11:53 PM PT
Signed: 10/1/2015 4:12:17 PM PT
Sent: 10/1/2015 4:12:18 PM PT
Viewed: 10/1/2015 4:13:01 PM PT
Signed: 10/1/20154:13:47 PM PT
Sent: 10/1/2015 4:13:48 PM PT
Viewed: 10/1/2015 4:42:35 PM PT
Signed: 10/1/2015 4:44:28 PM PT
Sent: 10/1/2015 4:44:29 PM PT
Viewed: 10/12/2015 4:03:18 PM PT
Signed: 10/12/2015 4:03:31 PM PT
Timestamp
Timestamp