Loading...
HomeMy WebLinkAboutRESO 9500Resolution No. 9500 Resolution of the Council of the City of Palo Alto Amending Water, Gas, and Wastewater Connection and Capacity Fees and Miscellaneous Utility Charges (Utility Rate Schedules W-5, G-5, S-5, AND C-1) The Council of the City of Palo Alto RESOLVES, as follows: Section 1. Pursuant to section 12.20.010 of the Palo Alto Municipal Code, Schedule W-5 (Water Service Connection Fees) of the Palo Alto Utilities Rates and Charges is hereby amended to read as attached and incorporated. The foregoing Utility Rate Schedule, as amended, shall become effective May 1, 2015. Section 2. Pursuant to section 12.20.010 of the Palo Alto Municipal Code, Schedule G-5 (Gas Service Connection Fees) of the Palo Alto Utilities Rates a11dCharges is hereby amended to read as attached and incorporated. The foregoing Utility Rate Schedule, as amended, shall become effective May 1, 2015. Section 3. Pursuant to section 12.20.010 of the Palo Alto Municipal Code, Schedule S-5 (Wastewater Service Connection Fees) ofthe Palo Alto Utilities Rates and Ch.arges is hereby amended to read as attached and incorporated. The foregoing Utility Rate Schedule, as amended, shall become effective May 1, 2015. Section 4. Pursuant to section 12.20.010 of the Palo Alto Municipal Code, Schedule C-1 (Utility Miscellaneous Charges) of the Palo Alto Utilities Rates and Charges is hereby amended to read as attached and incorporated. The foregoing Utility Rate Schedule, as amended, shall become effective May 1, 2015. Section 5. The Council finds that the fees and charges adopted by this resolution are charges impqsed for a specific government service or product provided directly to the payor that are not provided to those not charged, and do not exceed the reasonable costs to the City of providing the service or product. II II II II II 1 150306 mf 6053235 Section 6. Council finds that the adoption of this resolution is statutorily exempt from the California Environmental Quality Act (CEQA), pursuant to California Code of Regulations Title 14, Chapter 3, Section 15273(a), because the fees and charges proposed are necessary to recover the cost of providing utility service and meet operating expenses. After reviewing the reports presented, the Council incorporates these documents herein and finds that sufficient evidence has been presented setting forth with specificity the basis for this claim of CEQA exemption. INTRODUCED AND PASSED: March 2, 2015 AYES: BERMAN, BURT, FILSETH, HOLMAN, KNISS, SCHARFF, SCHMID, WOLBACH NOES: ABSENT: DUBOIS ABSTENTIONS: ATIEST: / ~V?ut9~ 0~ityCierk ~ APPROVED A TO FORM: Mayor APPROVED: Cit~eflt~ Direct~ ~irector of Administrative Services 2 150306 mf 6053235 ATTACHMENT B GAS SERVICE CONNECTION FEES UTILITY RATE SCHEDULE 0-5 A. GENERAL: 1. TERRITORY: This Rate Schedule applies everywhere the City of Palo Alto provides Gas Service. B. FEES: Plan review fees must be paid prior to permit approval by the Utilities Department. Construction or connection fees must be paid prior to the scheduling of any construction. Depending on material availability and scheduling constraints, Utility Service will be installed between 30 and 40 days following receipt of full payment. Regular work hours are 8 AM to S PM, Monday through Friday. Any work the City deems necessary to be performed during non-regular work hours shall be charged 1.1 S times the stated fee to recover the overtime labor cost. These conditions include but are not limited to perfonning work on arterial streets, in business districts, in front of major commercial establishments, and near schools. Any work required to be performed during non-regular work hours where the work is scheduled at the Customer's convenience shall be charged 1.25 times the stated fee to recover the overtime labor cost. All invoices are valid for 90 days from date of issuanc~. I. COMMERCIAL PLAN REVIEW: New commercial building or remodeling permit valuation greater than$200,000 ............ $2,316.00 New subdivision residential unit (Gas only) ................................................................. $348.00/unit System extension 2-inch polyethylene (PE) Gas main ....................................................... $12.00/ft 2. RESIDENTIAL PLAN REVIEW: New single-family residential (SFR) building or SFR remodeling permit valuation greater than$ 1 00,000 ......................................................................................................................... $848.00 3. DISTRIBUTION SYSTEM EXTENSION CHARGE: Charge per lineal foot ....................................................................................................... S 173.00 /ft 4. CONNECTION CHARGE FOR SERVICE INSTALLED ON EXISTING MAIN: The Service connection fees include up to 40 feet of Service Line installation inside the property line. CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5-1 dated 8-8-2008 CITY OF PALO AUO UTILITIES Effective 05-01·20 IS Sheet No. G-5-1 ATTACHMENT B GAS SERVICE CONNECTION FEES UTILITY RATE SCHEDULE G-5 Size l-inch directionally bored connection ................................................................................ $4,343.00 2-inch directionally bored connection ................................................................................ $5,250.00 Excess length fee for directionally bored connection ...................................................... $49.00 /ft.* 1-or 2-inch trenched connection ........................................................................................ $St976.00 2-inch main installation in contractor provided trench ...................................................... $60.00 /ft Above 2-inch connection ......................................................................................... Utility Estimate *Excess Length Fee: An additional Charge ($49.00 /foot) will apply to an extension greater than forty feet from the street property line to the Gas Meter location, measured along a line perpendicular to the street property line. Service Location: The Service Line will be installed along the shortest, most practical route, as determined by the Utilities Department (from the Gas main in the adjoining street, alley,lane road, or easement to the nearest suitable Meter location at the building or structure). S. METER CHARGES: 250 Cubic Foot Per Hour (CFH) House Meter ..................................................................... $850.00 2SO CFH Curb Meter ......................................................................................................... $1,805.00 400 CFH House Meter .......................................................................................................... $961.00 400 CFH Curb Meter ......................................................................................................... $2,023.00 630 CFH House Meter ....................................................................................................... $1,329.00 630 CFH Curb Meter ·········································~·······························································$2,285.00 800 CFH Diaphragm-Commercial House Meter ............................................................ $), 781.00 1000 CFH Diaphragm -Commercial House Meter .......................................................... $} ,886.00 1500 CFH Rotary-Commercial House Meter .................................................................... $2,487.00 2000 CFH Rotary-Commercial .......................................................................................... $3,417 .00 3000 CFH Rotary-Commercial .......................................................................................... $3,431.00 5000 CFH Rotary-Commercial .......................................................................................... $3,837.00 7000 CFH Rotary-Commercial .......................................................................................... $4,418.00 11000 CFH Rotary-Commercial .............................. ; ....................................................... $11,405.00 16000 CFH Rotary-Commercial ....................................................................................... $12,472.00 23000 CFH Rotary-Commercial ...................................................................................... $ 14.760.00 Electronic Volume Corrector System ................................................................................ $5,808.00 AMR Encoder Receiver Transmitter-Diaphragm Meter .................................................... $1 55.00 CITY OF PALO ALTO UTILITIES Issued by the City Council SupetSedfts Sheet No.G-5-2 dated 8-8-2008 CITY OF PALO ALTO UTILITIES Effective 05-0 1-20 I 5 Sheet No. G-5-2 ATTACHMENTS GAS SERVICE CONNECTION FEES UTILITY RATE SCHEDULE 0-5 AMR Encoder Receiver Transmitter-Rotary Meter ........................................................... $208.00 Vent line for Gas Regulator .................................................................................................. $305.00 2-inch bollard (to protect Gas Meter) installation fee ........................................................... $339.00 4-inch bollard (to protect Gas Meter) installation fee .......... : ................................................ $494.00 Other Meter sizes ..................................................................................................... Utility Estimate 6. ADDITIONAL METERS ON CONNECTION: (Applies to small Meters up to 630 CFH) Per Meter With new connection ............................................................................................................ $529.00 On existing metered connection ......................................................................................... $1, 193.00 Charges for Meters above 630 CFH will be based on the Utilities Department's estimate. 7. SERVICE RELOCATION: Service riser reiOcation ............................................................................................. -......... $1 ,422.00 Service riser relocations will only be performed on l-inch and larger polyethylene (PE) pipe Service Lines that have been approved by Utilities Department. All "other material pipe" Service Lines must be replaced from the main to the Meter at the fees listed in Section B(4) of this Rate Schedule. Curb Meter-Riser relocation on existing l-inch PE pipe ..................................................... $796.00 Curb Meter-Riser relocation on same alignment of existing Service ............................... $] ,274.00 Curb Meter· New Service from main to house .................................................................. $2,038.00 8. RELOCATION OF FACILITIES: Approved relocation of Service and other facilities will be done at the cost of the person requesting the relocation. Payment of estimated cost is required before relocation work begins. 9. TAPPING THE GAS MAIN FOR CONTRACTOR INSTALLED SERVICES: Tap Gas main for 1-to 2-inch Service ................................................................................ $1,603.00 Tap Gas main for 4-to 6-inch Service ................................................................................ $2,212.00 C. OTHER REQUIREMENTS AND CONDITIONS: CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5-3 dated 8-8-2008 CITY OF PAlO ALTO UTILITIES Effective 05-01-2015 Sheet No. G-S-3 ATTACHMENT B 1. INSTALLATION: GAS SERVICE CONNECTION FEES UTILITY RATE SCHEDULE G-5 The City of Palo Alto installs all Gas Services unless directed otherwise and approved by the City of Palo Alto Utilities Department. 2. SERVICE CHARGES: (A) Additional Service connections are available with payment of additional Service connection Charges shown in Section B. (B) Replacement of Service connections made necessary because of ordinary wear and deterioration will be made without Charge. However, if the need for replacement arises due to meeting an increase in load, the new Service will be charged as a new Service under Section B. (C) In commercial or industrial areas where a surface Meter installation is impractical, Meters may be placed in underground vaults. Vaults must be provided and _installed by the owner in accordance with the Gas utility's specifications. The vault lid sections shall not exceed 70 pounds. All lids shall be centered above the Gas Meter to allow visibility of the Meter face for Meter reading purposes. 3. UNDER UNUSUAL CONDITIONS: (A) A condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater will result in a cost higher than the fees in Section B, will be classified as unusual. The Charge for an unusual installation will be based on the Engineering Manager, Water-Gas-Wastewater estimate of the total costs of all materials, labor, and other costs incidental to the installation. (B) In the event Gas Service to a premise is requested and insufficient capacity exists to provide such Service, the Applicant shall bear the total cost for designing and enlarging the Distribution System to accommodate serving the Applicant. The Engineering Manager, Water-Gas-Wastewater may require the Applicant to make arrangements for the design and construction of said expansion in accordance with City standards and specifications. Altematively, the Engineering Manager may elect for City forces or contractors to design and install respectively such facilities at the Applicant's expense. Full credit to the Applicant will be provided for any over sizing or extra facilities installed to meet Service demands above CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5-4 dated 8-8-2008 CITY OF PALO ALTO UTILITIES Effective 05-01-2015 Sheet No. G-5-4 ATTACHMENTB GAS SERVICE CONNECTION FEES UTILITY RATE SCHEDULE G-5 the specific capacity needs of the Applicant as defined in the Utility's rules and Regulations. 4. MASTER METERED GAS SERVICE For Master-Meter Services using high volumes of Gas, the Applicant must provide all required Meters, sending units, regulators, and other necessary flow control equipment as specified by the City and approved by the Engineering Manager, Water-Gas-Wastewater. D. OTHER SERVICE CHARGES: 1. OTHER SERVICE FEES: The following fees will apply to utility work perfonned by outside contractors, which may be done only with the prior approval of the Utilities Department: (A) Engineering service fee .. u .................................................................................... $151.00/llr (B) Inspection serVice fee: i. Inspection during regular work hours (M-F 8 AM to 5 PM) ............................ $118.00/hr ii. Inspection during non-regular work hours ....................................................... $139.00/hr iii. Inspection during non-regular work hours for Customer's convenience ........ $159.00/hr CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No.G-5-5 dated 8-8-2008 CITY OF PALO ALTO UTILITIES {End} Effective 05-01-2015 Sheet No. G-5-5 ATTACHMENTD WATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE W -5 A. GENERAL: I. TERRITORY: This Rate Schedule applies anywhere the City of Palo Alto provides Water Service. B. FEES: Plan review fees must be paid prior to permit approval by the Utilities Department. Construction or connection fees must be paid prior to the scheduling of any construction. Depending on material availability and scheduling constraints, Utility Service will be installed between 30 and 40 days following receipt of full payment. Regular work hours are 8 AM to 5 PM, Monday through Friday. Any work the City deems necessary to be performed during non-regular work hours shall be charged 1.15 times the stated fee to recover the overtime labor cost. These conditions include but are not limited to performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. Any work required to be performed during non-regular work hours where the work is scheduled at the Customer's convenience shall be charged 1.25 times the stated fee to recover the overtime labor cost. All invoices are valid for 90 days from date of issuance. I. PLAN REVIEW: New commercial building or remodeling pennit valuation greater than $200,000 ........... $3,072.00 New subdivision residential unit (Water only) ............................................................. $348.00/unit System extension 8-inch high-density polyethylene (HOPE) Water main ......................... $12.00/ft 2. DISTRIBUTION SYSTEM EXTENSION CHARGE: City stalldard 8-inch maint Charge per foot ........................................................................... $206.00 3. SERVICE CONNECTION CHARGES: Water Service: Domestic. Irrigation. and Fire Size Amount 2-inch connection ............................................................................................................. $4,863.00 4-inch connection ............................................................................................................. $7, I 56.00 6-inch connection ............................................................................................................... $8, 137.00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. W-5-1 dated 7-2-2010 CITY OF PALO ALTO UTILITIES Effective OS-0 1-2015 Sheet No. W-5-1 ATTACHMENT D WATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE W-5 8-inch connection .................................................................................................................. $9,469.00 1 0-inch connection ............................................................................................................ $) 0,625.00 Additional Domestic or Irrigation Services For Service installations connecting to a pre-existing, larger Service. 2-inch conneciion ........................................................................................................ ~ ....... $3, 122.00 4-inch connection ................................................................................................................. $4,449.00 6-inch connection ................................................................................................................ $4,842.00 Combination Domestic or Irrigation Water Service and Fire Service For requests of combination domestic and fire Water Services, two Service connection Charges will apply: the Charge for connection of a fire Service and the Charge for domestic or irrigation Service installation connection to a larger Service. Approval from the Utilities Department is required for combination water service connections. Master Water Service Approval by the Director of Utilities is required for a connection that serves domestic Water Service and fire protection through a detector Meter. The Charge for master Water Service will be based on the Engineering Manager•s, Water-Gas-Wastewater, estimate of the total costs, including: materials, labor, metering not listed in Section 8(4), and other costs incidental to the installation. For Service connections of 4-inch through 8-inch sizes and Meter sizes of 4-inch through 6-inch, the new owner must provide and install a concrete vault with meter reading lid covers to house Meters and other required control equipment in accordance with the Utilities Department's specifications. An approved backflow prevention device with bypass assemblies must be provided by owner on all fire Services. 4. METER CHARGES: 5/8-inch x 3/4-inch E-Meter .................................................................................................. $698.00 l-inch E-Meter ...................................................................................................................... $862.00 I !~!-inch E-Meter ............................................................................................................... $1 ,444.00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. W-5-2 dated 7-2-2010 CITY OF PALO AL lO UTILITIES Effective 05-01-201 5 Sheet No. W-S-2 ATTACHMENTD WATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE W-5 2-inch E-Meter ..................................................................................................................... $1,635.00 4-inch Compound Meter .................................................................................................... $5,740.00 6-inch Compound Meter .................................................................................................... $8,05 1.00 AMR Encoder Receiver Transmitter .................................................................................... s 1 08.00 5. ADDmONAL METERS ON CONNECTION: With new connection ..........•.•........•.............................................................••................ $1 ,264.00 On existing connection ..................................................................................................... $1 ,866.00 6. RELOCATION OF FACILITIES: Approved relocation of Service, hydrants, or other facilities will be done at the cost of the person requesting the re-location. Payment of estimated cost is required before relocation work begins. 7. CAPACITY FEES: Capacity fees will be charged for new Utility Services and added demand on existing Services Domestic: 5/8-inch x 3/4-inch E-Meter ............................................................................................... $5,000.00 l-inch E-Meter ···············~~··································~~································································$9,400.00 1 Y2-inch E-Meter ·······························~~······························~··············································$ 18,850.00 2-inch E-Meter ................................................................................................................. $56,250.00 4-inch Compound Meter ................................................. estimate at $125/FU; minimum 5,000 FU {5,000 FU is mid-range operating capacity of 4-inch Meter) 6-inch Compound Meter .................................................. estimate at $125/FU minimum 7,000 FU {7,000 FU is mid-range operating capacity of6-inch Meter) Added demand on an existing Water Service will be calculated at $125.00/FU Note: FU is fixture unit (1 FU= 1 5gpd) Fire Service Capacity Fees: 2-inch .................................................................................................................................... $750.00 4-inch ............................................................. : ................................................................... $9,000.00 6-inch ............................................................................................................................... $22,530.00 8-inch ................................................................................................................................ $43,080.00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. W-~3 dated 7-2-2010 CITY OF PALO ALTO UTILITIES Effective OS-01-2015 Sheet No. W-5-3 ATTACHMENTD WATER SERVICE CONNECTION FEES UTILITY RA IE SCHEDULE W -5 1 0-inch ............................................................................................................................. $69,51 0.00 If a Customer is upgrading the capacity of an existing Service, then the capacity Charge will be the difference between the new Service size and the existing Service size. C. OTHER REQUIREMENTS AND CONDITIONS 1. INSTALLATION: The City of Palo Alto installs all Water Services unless directed otherwise .and approved by City of Palo Alto Utilities Department. 2. SERVICE CHARGES: (A) Additional Service connections are available with payment of an additional Service connection Charge as shown in Section B. (B) Replacement of Service connection made necessary because of ordinary wear and deterioration will be made without Charge. Replacement due to inadequacy because of additional demand or load will be charged as a new Service connection. 3. INSTALLATION UNDER UNUSUAL CONDITIONS: (A) Any ~ndition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater will result in a cost higher than the Charges set forth in Section B will be classified as unusual. The Charge for an unusual installation will be based on Engineering Manager, Water-Gas- Wastewater's estimate of the total costs of all materials, labor, and other costs incidental to the installation. (B) In the event Water Service to a Premise is requested and insufficient capacity exists to provide such Service, the Applicant shall bear the total cost for enlarging the Distribution System to accommodate serving the Applicant. The Engineering Manager, Water-Gas-Wastewater may require the Applicant to make arrangements for the design and construction of said expansion in accordance with City standards and specifications. Alternatively, the Engineering Manager, Water-Gas-Wastewater may elect for City forces or contractors to design and install respectively such facilities at the Applicant's expense. 4. EXCEPTIONS: CITY OF PALO ALTO UTILITIES Issued by the City Council SupetSedes Sheet No. W-5-4 dated 7-2-2010 CITY OF PALO ALTO UTILITIES Effective 05-01-2015 Sheet No. W -5-4 ATTACHMENTD WATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE W-5 (A) Water Service Areas 3 & 4, connections served directly from supply main: The Distribution System Charges (Section B) will be based on a maximum frontage of660 feet. This exception applies to single applications for Service and does not apply to subdivisions or tracts. (B) The subdivision developer will furnish and install the Water system at his or her expense and in accordance with City's specifications. D. OTHER SERVICES: 1. 2 METER MANIFOLD: (A) 2-inch ................................................................................................................................ $724.00 2. ABANDONMENT: (A) Small Service 2-inch and less .................................................................................... $2,653.00 (8) Large Service more than 2-inch ................................................................................. $3, 715.00 3. METERINSTALLATION: Charges for large Meter installations by third parties, i.e. contractors, developers, etc. 8-inch to 12-inch Meters .................................................................................................... $3,235.00 4. FIRE HYDRANT: (A) Install new hydrant without lateral.. ........................................................................... $2,552.00 (B) Install new hydrant with lateral ................................................................................ $12,840.00 (C) Relocation behind curb (up to S feet) ........................................................................ $6,841.00 Relocations more than 5 feet will require a new lateral and the existing lateral will be disconnected and abandoned at the main. 5. TAPPING THE WATER MAIN FOR CONTRACTOR INSTALLED SERVICES: (A) Tap Water main for 2-inch Service ............................................................................ $1,649.00 (8} Tap Water main for 4-inch Service ....................................................................... .,. .... $2, 162.00 (C) Tap Water main for 6-inch Service ............................................................................ $3,288.00 (D) Tap Water main for 8-inch Service ............................................................................ $4,498.00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. W·S.S dated 7·2·2010 CITY OF PALO ALTO UTILITIES Effective 05-01-2015 Sheet No. W-S-5 ATTACHMENTD WATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE W -5 6. OTHER FEES: The following fees will apply to utility work perfonned by outside contractors: (A) Engineering fee (per hour) ............................................................................................ $ IS 1.00 (B) Utility inspection fee (per hour): i. Inspection during regular work hours (M-F 8 AM to 5 PM) ................................ : .... $118.00 ii. Inspection during non-regular work hours ................................................................ $139 .00 iii. Inspection during non-regular work hours for Customer's convenience .............. $1 59.00 (C) Engineering and inspection for new 2-inch Service .................................................. $! ,618.00 (D) Engineering and inspection for new 2-inch Service connected to larger Service ...... $1 ,078.00 (E) Engineering and inspection for new 4-inch to 8-inch Service ................................... $2,426.00 (F) Engineering and inspection for new hydrant and Service .......................................... $2,426.00 (G) Engineering and inspection for abandonment of2-inch and smaller Service .............. $809.00 (H) Engineering and inspection for abandonment of 3-inch and larger Service .............. $) ,078.00 (I) Engineering and inspection for new 8-inch main (per linear foot) ................................. $27 .00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supemedes Sheet No. W-5-6 dated 7-2-2010 (End} CITY OF PAlO ALTO UTILITIES Effective 05-01-2015 Sheet No. W-5-6 ATTACHMENTF WASTEWATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE S-S A. GENERAL: 1. TERRITORY: This Rate Schedule applies anywhere the City of Palo Alto provides Wastewater Service. B. FEES: Plan review fees must be paid prior to permit approval by the Utilities Department. Construction or connection fees must be paid prior to the scheduling of any construction. Depending on material availability and scheduling constraints, Utility Service will be installed between 30 and 40 days following receipt of full payment. Regular work hours are 8 AM to 5 PM, Monday through Friday. Any work the City deems necessary to be performed during non-regular work hours shall be charged 1.15 times the stated fee to recover the overtime labor cost. These conditions include but are not limited to performing work on arterial streets, in business districts, in front of major commercial establishments, and near schools. Any work required to be perfonned during non-regular work hours where the work is scheduled at the Customer's convenience shall be charged 1.25 times the stated fee to recover the overtime labor cost. All invoices are valid for 90 days from date of issuance. 1. PLAN REVIEW: New commercial building or remodeling pennit valuation greater than $200,000 ........ $2,316.00 New subdivision residential unit (Wastewater only) ................................................. $160.00/unit System extension 8-inch HOPE Wastewater main .......................................................... $22.00/ft 2. COLLECTION SYSTEM EXTENSION CHARGE: City standard 8-inch main ............................................................................................. $204.00/ft 3. CONNECTION CHARGES: 4-inch connection 6 feet and below ................................................................................ $6,589.00 6-inch connection 6 feet and below ................................................................................. $7,124.00 4-lnch lateral depth between 6 feet_and 10 feet .............................................................. $8,225.00 6-inch lateral depth between 6 feet and I 0 feet ............................................................... $8, 748.00 Rehabilitate existing lateral by pipe bursting .................................................................. $4,233.00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supe18edes Sheet No. S-5-1 dated 7-02-2010 CITY OF PALO ALTO UTILITIES Effective 05-01-2015 Sheet No. S-5-1 ATTACHMENT F WASTEWATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE S-5 Sewer laterals over 25 feet in length will be charged for the additional footage at a rate of$1 06/Ln, Ft. for 4-inch connections and $11 0/Ln. Ft for 6-inch connections. Special arrangements must be made to provide for the cost of a connection larger than 6-inch. The City will estimate the cost which will serve as the basis for a Customer deposit. Upon receipt of this deposit the City will install the connection and the Customer shall pay the actual cost net of the deposit. 4. RELOCATION OF FACILITIES: Approved relocation of Service, and other facilities will be done at the cost of the person requesting the re-location. Payment of estimated cost is required before relocation work begins. 5. CAPACITY CHARGES: 4-:inch connection with 5/8-inch Water Meter (WM) ..................................................... $5,250.00 4-inch connection with l-inch WM .............................................................................. $15,750.00 4-or 6-inch connection with 1-1/2-inch WM ............................................................... $31 ,668.00 6-inch connection with 2-inch WM .................................................................. : ........... $94,500.00 6-inch and larger connection with 4-inch or larger WM ........................... By estimate at $21 0/FU Note: FU is fixture unit (1 FU = I 5 gpd). If a Customer is upgrading the capacity of an existing Service, then the capacity Charge will be the difference between the new Service size and the existing Service size. C. OTHER REQUIREMENTS AND CONDITIONS I. INSTALLATION: The City of Palo Alto installs all Wastewater Services unless directed otherwise and approved by City of Palo Alto Utilities Department. 2. SERVICE CHARGES: (A) Additional Service connections are available with payment of additional Service connection Charge as shown in Section B3. CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. 8-5-2 dated 7·02·2010 CITY OF PALO ALTO UTILITIES Effective 05-01-2015 Sheet No. S-5-2 ATTACHMENT F WASTEWATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE S-5 (B) Replacement of Service connections made necessary because of ordinary wear and deterioration will be made without Charge. Replacement due to inadequacy because of increased demand or load will be charged as a new connection. 3. INSTALLATION UNDER UNUSUAL CONDITIONS: (A) Any condition which, in the opinion of the Engineering Manager, Water-Gas-Wastewater will result in a cost higher than the Charges set forth in Section B above will be classified as unusual. The Charge foran unusual installation will be based on the Engineering Manager's estimate of the total costs of all materials, labor, and other costs incidental to the installation. (B) In the event Wastewater Service to a Premise is requested and insufficient capacity exists to provide such Service, the Applicant shall bear the total cost for flow monitoring the existing main to determine remaining capacity, design of new sewer main and construction cost for enlarging the collection system to accommodate serving the Applicant. The Engineering Manager, Water-Gas-Wastewater may require the Applicant to make arrangements for the design and construction of said expansion in accordance with City standards and specifications. Alternatively, the Engineering Manager, Water-Gas-Wastewater may elect for City forces or contractors to design and install respectively such facilities at the Applicant's expense. 4. PUMPING PLANTS: Where pumping facilities are needed to drain Wastewater into the Wastewater collection system, the capital cost of construction of the pumping plant and the on-going plant operation and maintenance costs will be at the expense of the third parties, i.e. contractors, developers, etc. D. OTHER SERVICE CHARGES: I. INSTALL MANHOLE: (A) Depth 6 feet and less ............................................................................................ $10,743.00 (B) Depth more than 6 feet ................................................................................................. $13,726.00 2. ABANDONMENT & DEMOLITION: CITY OF PALO ALTO UTILITIES Issued by the City Council SupetSedes Sheet No. ~3 dated 7-02-2010 CITY OF PALO AlTO UTILITIES Effective 05-01-2015 Sheet No. S-S-3 ATTACHMENTF WASTEWATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE S-5 (A) Sewer Lateral ......................................................................................................... $2, 753.00 3. IN'STALL SEWER CLEANOUT .................................................................................... $2,109.00 4. OTHER SERVICE FEES: The following fees will apply to Utility work perfonned by outside contractors: (A) Engineering service fee (per hour) ............................................................................ $1 S 1.00 (B) Inspection service fee (per hour): i. Inspection during regular work hours (M-F 8 AM to S PM) ................................. $118.00 H. Inspection during non-regular work hours ............................................................ $139.00 iii. Inspection during non-regular work hours for Customer's convenience ............. $ I 59.00 (C) Engineering and inspection for new lateral... ......................................................... $2, 157.00 (D) Engineering and inspection for new main (per lineal foot) ......................................... $34.00 (E) Engineering and inspection for new manhole.; ...................................................... $2,696.00 (f) Engineering and inspection for lateral abandonment ............................................. $1,348.00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. S-5-4 dated 7-02-2010 CITY OF PALO ALtO UTILITIES (End} Effective 05-01-2015 Sheet No. S-5-4 ATTACHMENT H UTILITY MISCELLANEOUS CHARGES UTILITY RA IE SCHEDULE C-J Customer Charges under this schedule, except for discoMection or restoration of Service for non-payment, may be added to the regular monthly Utilities bill of the Customer receiving the Service, and payment thereof will be subject to the Utilities Rules and Regulations regarding discoMection of Service for non· payment. All Charges related to disconnection or restoration for non-payment, are due and payable prior to the restoration of Utilities Service. Regular work hours are 8 AM to 5 PM, Monday through Friday. A. SERVICE CALLS AND OTHER SERVICE WORK: 1. Setting Electric Meter (for Water Meters see Utility Rate Charges During Charges After Regular Hours Regular Hours Schedule W-5, for Gas Meters see Utility Rate Schedule G-5) No Charge $300.00 2. Dispatch ofCPAU staffto disconnect Service at Meters for non-payment of Utilities bill 3. Restoration of Service at Meters following disconnection for non-payment of Utilities bill $147.00 $147.00 Not applicable $300.00 4. Restoration of Electric Service at power pole following disconnection for non-payment of Utilities bill $294.00 $504.00 B. LABOR RATES PER HOUR PER PERSON: 1. Service provided during regular work hours 2. Service provided on overtime basis where the · overtime is scheduled at the City's convenience. 3. Service provided on overtime basis where the overtime is scheduled at the Customer's convenience. $123.00 Not applicable Not applicable $144.00 Not applicable S 166.00 C. RETURNED PAYMENT FEES: See City of Palo Alto Municipal Fee Schedule. D. LAJE PAVMENT CHARGE: E. DEPOSITS: I. Customer deposit for Meter accuracy test CITY OF PALO ALTO.UTILITIES Issued by the City Council Supersedes Sheet No.C.1-1 dated 3-18-2013 Two percent (2%) of unpaid balance ofUtilities Bill $0-300.00 {End} CITYOI' PALOAUO . UTILITIES Not applicable Effective 05-01-20 I 5 Sheet No.C-1-1