HomeMy WebLinkAboutRESO 9347Resolution No. 9347
Resolution of the Council of the City of Palo Alto Authorizing the Use
of a Design-Build Project Delivery Method for the Design and
Installation of a Dimmer Replacement and Lighting System for
Cubberley Community Theater (CIP CC-09001)
RECITALS
A. The City's Cubberley Community Theater (the "Theater") is a revenue-generating
focal point for community events in Palo Alto.
B. The Theater's existing analog dimming lighting system, installed in 1985, is now
sorely outdated, its functionality and utility is questionable, replacement parts are
no longer available, and the upgrading to a digital soft-patch dimming system will
modernize the Theater's lighting system, address any potential safety hazards.
C. The replacement of the existing dimming system and requires highly specialized
knowledge in the electrical engineering of theatrical lighting systems, which City
staff lacks.
D. The successful installation of a new dimming system normally includes the design at
no additional cost~
E. Palo Alto Municipal Code ("PAMC") section 2.30.300 recognizes that public works
projects, which include the improvement of any public building, or part thereof,
after adoption of a resolution may use 'design-build' as an acceptable alternate
project delivery method, as this will allow staff to advertise the project with
sufficient information for a specialized contractor-designer team to finalize the
design and proPose a fee for the total project.
F. The term "design-build" is defined by California Public Contracts Code section
20133(c)(2) as "a procurement process in which both the design and the
construction of a project are procured from a single entity."
G. The award of any contract for the Cubberley diming lighting project will not involve
or require any funding by bonded indebtedness of the City or by assessment against
any particular property of the City.
130611 dm 00710241
1
The Council ofthe City of Palo Alto RESOLVES as follows:
SECTION L Findings. The City Council finds and determines that each of the findings
set forth above are true and correct.
SECTION 2. Authorization for Design-Build Project Delivery Method. The Council
hereby determines that the findings noted above support the use of a design-build project
delivery and solicitation method for the Dimmer System Replacement Project at the Cubberley
Community Theater.
SECTION 3. Criteria for Contract Award. City staff will select the design-build team
for contract award, using the following criteria:
II
II
II
II
II
II
II
II
(A) Quality and completeness of the proposal.
(B) Proposer's understanding ofthe scope of work outlined in the RFP.
(C) The proposer's stated work plan including: text, preliminary drawings, equipment
control strategies, etc.
(D) Quality of materials and equipment to be furnished, beyond what is required in the
proposal and on which the bid price was based.
(E) Any realistic and innovative ideas proposed.
(F) Evidence that the proposer can meet the schedule, such as from the description of
project management method or clarity of the work plan in terms of task detail and
interrelationship ofthe activities.
(G) Cost proposal.
(H) Staff experience on similar projects.
130611 dm 00710241
2
SECTION 4. The replacement of the dimmer system at the Cubberley Community
Theater is categorically exempt from the California Environmental Quality Act (CEQA) pursuant
to Section 15301, "existing facilities".
INTRODUCED AND PASSED: June 17, 2013
AYES: BERMAN, BURT, HOLMAN, KLEIN, KNISS, PRICE, SCHARFF, SCHMID, SHEPHERD
NOES:
ABSENT:
ABSTENTIONS:
APPROVED AS TO FORM:
~.cq
Senior Assistant City Attorney
130611 dm 00710241