Loading...
HomeMy WebLinkAboutRESO7330• • RESOLUTION NO. 7330 RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING UTILITY. RATE SCHEDULES W-5, G-5, S-5, C-1 AND E-5 OF THE CITY OF PALO ALTO UTILITIES RATES AND CHARGES PERTAINING TO WATER, GAS, WASTEWATER AND ELECTRIC CONNECTION FEES The Council of the City of Palo Alto does hereby RESOLVE as follows: SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Schedule W-5 (Water Service Connection), Schedule G-5 (Gas Service Connection), Schedule E-5 (Electric Service Connection), and Schedule S-5 (Wastewater Service Connection) of the Palo Alto Utilities Rates and Charges are hereby amended to read in accordance with Sheets W-5-1, W-5-2, G-5-1, E-5-1, E-5-2, C-1-1 and S-5-1, attached hereto and incorporated herein by reference. The foregoing Utility Rate Schedules, as amended, shall become effective July 1, 1994. SECTION 2. The Council finds that the revenue derived from the authorized adjustments of the respective water service connection, gas service connection, wastewater connection, and electric connection fees shall be used only for the purposes set forth in Article VII, Section 2, of the Charter of the City of Palo Alto. SECTION 3. The Council finds that the adoption of this resolution does not constitute a project under the California Environmental Quality Act, California Public Resources Code section 21080, subdivision (b)(8). INTRODUCED AND PASSED: June 20, 1994 AYES: ANDERSEN, FAZZINO, HUBER, KNISS, MCCOWN, ROSENBAUM, SCHNEIDER, SIMITIAN, WHEELER NOES: ABSENT: ABSTENTIONS: ATTEST:, City Clerk APPROVED AS TO FORM: Senior Asst. CityAttbrney APPROVED: y Manger a tor ire of Finance Le- Directdr of Ut es 940613 yn 00'70585 WATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE W-5 A. TERRITORY: Inside the incorporated limits of the City of Palo Alto and on land owned or leased by the City of Palo Alto. B. FEES: All fees must be paid prior to the scheduling of any construction. Depending on material availability and scheduling constraints, utility service will be installed between 30 and 45 days following receipt of full payment. 1. DISTRIBUTION SYSTEM EXTENSION CHARGE Street frontage charge per foot $70.00 2. SERVICE CONNECTION CHARGES: Category 1 - Domestic Water Service Size Amount 1 -inch connection $1,820 1-1/2 inch connection 2,500 2 -inch connection 2,800 4 -inch connection 5,300 6 -inch connection 5,900 8 -inch connection 6,900 Category 2 - Fire Service Size Amount 4 -inch connection $4,100 6 -inch connection 4,700 8 -inch connection 5,100 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. W-5-1 dated 7-1-92 Effective 7-1-94 Sheet No W-5-1 WATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE W-5 (Continued) Category 3 - Combination Domestic Water Service and Fire Service These charges apply to the following combination of Water Service (W.S.) and Fire Service (ES.): Size 1" W.S. 1 1/2" W.S 2" W.S. 4" W.S. 4" F.S. $4,500 $4,800 $5,100 N/A 6" F.S. 5,000 5,300 $5,600 $6,900 8" F.S. 5,400 5,700 $5,900 $7,300 Category 4 - Master Water Service Approval by the Director of Utilities is required for a connection that serves domestic water service and fire protection through a detector meter. The charge for master water service will be based on the engineering manager, water -gas -wastewater's estimate of the total costs of all materials, labor and other costs incidental to the installation. For service connections of 4 -inch through 8 -inch sizes, the new owner must provide and install a concrete vault with meter reading lid covers to house meters and other required control equipment in accordance with the Water Utility's specifications. An approved backfiow prevention device with bypass assemblies must be provided by owner on all fire services. An exception may be made where only an automatic fire sprinkler system is served, provided the sprinkler control equipment is within ten feet of the end of the street portion of the fit service. In this instance, a detector meter may be installed around the sprinkler system check valve. 3. ADDITIONAL METERS ON CONNECTION: Per Meter With new connection $200 On existing connection 300 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. W-5-2 dated 7-1-92 Effective 7-1-94 Sheet No W-5-2 GAS SERVICE CONNECTION FEES UTILITY RATE SCHEDULE G-5 A. TERRITORY: Inside the incorporated limits of the City of Palo Alto and on land owned or leased by the City of Palo Alto. B. FEES: All fees must be paid prior to the scheduling of any construction. Depending on material availability and scheduling constraints, utility service will be installed between 30 and 45 days following receipt of full payment. 1. DISTRIBUTION SYSTEM EXTENSION CHARGE: Street frontage charge per foot $60.00/ft. 2. CONNECTION CHARGE FOR SERVICE INSTALLED ON EXISTING MAIN: Size 1 -inch connection 1,720.00 2 -inch connection 2,500.00 Excess Length Fee: An additional charge of $13.00/foot will apply to an extension greater than forty (40) feet from the street property line to the gas meter location, measured along a line perpendicular to the street property line. Service Location: The service line will be installed along the shortest, most practical route, as determined by The Utilities Department, from the gas main in the adjoining street, alley, lane road, or easement to the nearest suitable meter location at the building or structure. Services requiring a connection greater than 2 inch shall be based on the Utility estimate. 3. ADDITIONAL METERS ON CONNECTION: Per Meter With new connection $ 50.00 On existing metered connection 125.00 CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. G-5-1 dated 7-1-92 Effective 7-1-94 Sheet No G-5-1 ELECTRIC SERVICE CONNECTION FEES UTILITY RATE SCHEDULE E-5 A. APPLICABILITY: This schedule applies to all connections, expansions, and upgrades to the City's electric distribution system except those which serve street lighting or traffic signals. B. TERRITORY: All territory within the incorporated limits of the City and land owned or leased by the City. C. PREPAYMENT OF FEES: All fees must be paid prior to the scheduling of any construction or connections to the City's electrical distribution system. Customer is responsible for the actual costs where an estimate is shown herein. Adjustments will be made if actual costs vary significantly from estimated costs. D. SUMMARY OF FEES: The following cheduie is for summary purposes. Section E herein describes the specific fee and conditions :n detail. 1. UNDEFGROUND SYSTEMS: (A) Service; Connection Fee Residential - Single Family 200 ampere maximum $1,120.00 Other By Estimate Commercial/l^dustrial 2C ti; ampr.tre maximum Ott ler (13) On -site Distribution System Fee - Residential - Single Family Commercial/Industrial (C) Off -site Distribution System Fee - Residential - Single Family Four lots or less Other Commercial/Industrial Transformer on lot Other $800.00 By Estimate Underground Underground By Estimate By Estimate By Estimate Per Rule & Regulation 17 Per Rule & Regulation 17 By Estimate CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-94 Sheet No. E-5-1 Supersedes Sheet No. E-5-1 dated 7-1-92 • • ELECTRIC SERVICE CONNECTION FEES UTILITY RATE SCHEDULE E-5 2. OVERHEAD SYSTEMS: Overhead Replacement Fee Basic fee No Charge Mid -span $300.00 Different Pole $300.00 Other By Estimate 3. TEMPORARY SERVICES: Overhead Temporary Service Fee 200 ampere, 100 foot maximum $440.00 Other By Estimate Underground Temporary Service Fee 200 ampere $300.00 Other By Estimate E. FEES: 1. UNDERGROUND SYSTEMS Connection fees for new or replacement services to the underground electrical system consist of one or more of the following: Service Connection Fee, On -site Distribution System Fee and/or Off -site Distribution System Fee, where applicable. (A) Service Connection Fee - Underground: Where the City connects any Customer to the underground electrical distribution system, a service connection fee shall be charged. A waiver of this fee is granted for services connected during an underground conversion district and for replacement of existing underground services. (1) Residential - Single Family These fees apply to development in which electric metering will be on a single- family basis. (a) For a 250 volt maximum, 200 ampere maximum service the fee shall be $1,120. (b) For any connection requiring greater capacity the fee shall be the estimate of the installation cost or $1,120.00, whichever is greater. CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-94 Supersedes Sheet No. E-5-2 dated 7-1-92 Sheet No. E-5-2 UTILITY SERVICE CALLS UTILITY RATE SCHEDULE C-1 A. SERVICE CALLS: Charges During Charges After Rates: Business Hours ..agAIga.ftia Meter Set Restoration for service at meter following turn-off for non-payment Restoration of service at power pole following turn-off for non-payment No Charge $20.00 $85.00 Exchange meter for accuracy test (Rule 12) $25.00 $ 75.00 $ 40.00 $170.00 Service not Available Charge will be refunded if meter is found to be more than two percent (2%) over -registering. B. ALL OTHER SERVICE WORK: Other services requested by the customer and provided by the Utilities Department staff, including Underground Service Alert marking of underground facilities. Hourly Labor Rates: 1. Services provided during normal working hours, per hour per person $ 50.00 2. Services provided on overtime basis where the overtime is scheduled at the City's convenience, per hour per person $ 75.00 3. Services provided on overtime basis where the overtime is scheduled at the customer's convenience, per hour per person $100.00 C. SPECIAL PROVISION: Charges made under this schedule may be added to the regular monthly utilities bill of the person receiving the service and payment thereof will be subject to Rule 4 and Rule 7 of the Utilities Rules and Regulations. CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. C-1-1 dated 7-1-92 Effective 7-1-94 Sheet No C-1-1 • • WASTEWATER SERVICE CONNECTION FEES UTILITY RATE SCHEDULE S-5 A. TERRITORY: Inside the incorporated limits of the City of Palo Alto and on land owned or leased by the City of Palo Alto. B. FEES: All fees must be paid prior to the scheduling of any construction. Depending on material availability and scheduling constraints, utility service will be installed between 30 and 45 days following receipt of full payment. 1. COLLECTION SYSTEM EXTENSION CHARGE: Street Frontage Charges Per Foot Wastewater Service Areas 1 & 2 $ 80.00 Wastewater Service Areas 3 & 4 100.00 2. SERVICE CONNECTION CHARGES: 4 -inch connection $3,200.00 6 -inch connection 3,800.00 Sewer laterals over 25 feet in length will be charged for the additional footage at a rate of $100/Ln. Ft. for 4 inch connections and $104/Ln. Ft for 6 inch connections. Special arrangements must be made to provide for the cost of a connection larger than six-inch. The City will estimate the cost which will serve as the basis for a customer deposit. Upon receipt of this deposit the City will install the connection and the customer shall pay the actual cost net of the deposit. 3. RELOCATION OF FACILITIES: Approved relocation of services or other facilities will be done at the cost of the person requesting the relocation of facilities on services. Deposit of the estimated cost is required before work begins. CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. S-5-1 dated 7-1-92 Effective 7-1-94 Sheet No S-5-1