Loading...
HomeMy WebLinkAboutRESO 8659follows: RESOLUTION NO. 8659 RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO APPROVING ARCHITECTURAL REVIEW (05PLN-00) FOR· 850 WEBSTER STREET -CHANNING HOUSE HEALTH CARE BUILDINGi CHANNING HOUSE, APPLICANT) FOR PLANNED COMMUNITY ZONE CHANGE PC-4919 The Council of the City of Palo Alto does resolve as SECTION 1. Background. The City Council finds, determines, and declares that: A. Channing House ("the applicant") has requested approval of the demolition of an existing one story building and adjacent parking lot at 532 Homer Avenue, and the construction of a two story building including 26 skilled nursing units, 27 assisted living units, associated staff and resident spaces, service areas and underground parking garage (the "Project"). B. The City Council has adopted Ordinance No. 4919 approving the amendment to the existing Planned Community (PC), Variance and Negative Declaration for the Project. C. The Architectural Review Board, at duly noticed hearings on July 6, 2006 and August 3, 2006 reviewed and considered the design of the Project and recommended approval upon certain conditions. D. The Planning and Transportation Commission held duly noticed public hearings on the Project on March 22, 2006 and August 30, 2006 and recommended approval of the design of the Project based upon the findings and upon the conditions set forth below. E. The City Council held a duly noticed public hearing on the Project on October 10, 2006 and heard and considered all public testimony, both oral and written, presented to it, together with all staff reports and the record of the proceedings before the Architectural Review Board and Planning and Transportation Commission. SECTION 2. Design Approval. The City Council hereby approves Planning Application No. 05PLN-00290, regarding the 1 060905 sdl 0120173 architecture, site planning and related site improvements, subject to th~ conditions set forth below, finding that: a. The design and architecture of the proposed imp:!;,ovements, as conditioned, furthers the goals and purposes of Architectural Review as it complies with the Architectural Review findings as required in Chapter 18.76 of the Palo Alto Municipal Code ("PAMC"). b. The design, as conditioned, compatible with applicable elements of the Plan in that the Project is consistent significant policies and programs: is consistent and city's Comprehensive with the following Policy H-18: Support housing that incorporates facilities and services to the healthcare, transit, or social service needs of households with special needs, including seniors and persons with disabilities. The Project will provide improved healthcare to senior residents of the Channing House. Pol L-5: Maintain the scale and character of the City. Avoid land uses that are overwhelming and unacceptable due to their size and scale. Scale is the relationship of various parts of the environment to each other, to people, and to the limits of perception. It is what establishes some neighborhoods or streets as pedestrian-oriented and others as automobile- oriented. In older portions of Palo Alto, the grid of City blocks, small rectangular parcels, and narrow streets establishes a pattern that is generally pleasant for the pedestrian. The pattern is reinforced by streets that are lined with trees, residential buildings set back behind front gardens, and buildings typically one to three stories in height. The Project includes new street trees, maintaining the required front yard setback and adding landscaping throughout the subject property to benefit the neighborhood, and the building would be two-stories in height. Policy L-6: Where possible, avoid abrupt changes in scale and density between residential and non-residential areas and between residential areas of different densities. To promote compatibility and gradual transitions between land uses, place zoning district boundaries at mid-block locations rather than along streets wherever possible. The Project's two-story building will act as a transition between the existing Channing House and neighboring multi-story residential buildings. 2 060905 sdl 0120173 Poli L-12: Preserve the character of residential neighborhoods by encouraging new or remodeled structures to be compatible with the neighborhood and adjacent structures. The new building would meet the adj acent zones' regulations for height and setbacks, would meet the daylight plane requirements of the adjacent RM-30 zone and substantially meet the daylight plane requirements of the adjacent RM-15 zone. The building has been reviewed by the City's Architectural Review Board, who voted unanimously that the design is architecturally compatible with the adjacent buildings. Poli L-17: Treat residential streets as both public ways and neighborhood ameni ties. Provide continuous sidewalks, healthy street trees, benches, and other amenities that favor pedestrians. The Project includes pedestrian safety improvements, with a reduction in the number of driveway curb- cuts along Homer Avenue and the re-painting of the crosswalk. Additionally, the Project includes new street trees, significant landscaping along the edges of the property, and amenities for pedestrians. L-48: Promote high quality, creative design and site -:-----"'":------: planning is compatible with surrounding development and public spaces. The Project includes high quality materials and creative composition and site planning. L-49: Design buildings to revitalize streets and ---'---'-''''-----'--public spaces and to enhance a sense of community and personal safety. Provide an ordered variety of entries, porches, windows, bays and balconies along public ways where it is consistent with neighborhood character; avoid blank or solid walls at street level; and include human-scale details and massing. The Project will infill an existing parking lot and will provide a residential character along the street. The walls are well articulated with windows, planters, cast stone ornaments, trellises, and clay tile to provide human-scale details, with an entry protected by a glass awning and accessible via a staircase and ramp. Poli L-75: Minimize the negative physical impacts of parking lots. Locate parking behind buildings or underground wherever possible. The Project includes demolition of an existing, surface parking lot and construction of a subterranean parking lot, thereby removing the negative physical aspects of the existing surface parking lot. These additional policies are also applicable to the Project: 3 060905 sdl 0120173 • Policy L-70: Enhance the appearance of street and other public spaces by expanding and maintaining Palo Alto's street tree system. • Policy L-77: Encourage alternatives to surface parking lots to minimize the amount of land that must be devoted to parking, provided that economic and traffic safety goals can still be achieved. • Policy T-23: Encourage pedestrian-friendly design features such as sidewalks, street trees, on-street parking, public spaces, gardens, outdoor furniture, art, and interesting architectural details. • Policy N-20: Maximize the conservation and efficient use of water in new and existing residences, businesses and industries. • Policy N-21: Reduce non-point source pollution in urban runoff from residential, commercial, industrial, municipal, and transportation land uses and activities. • Policy N-22: Limit the amount of impervious surface in new development or public improvement projects to reduce urban runoff into storm drains, creeks, and San Francisco Bay. • Policy N-35: Reduce solid waste generation through salvage and reuse of building materials, including architecturally and historically significant materials. • Policy N-39: Encourage the location of land uses in areas with compatible noise environments. • Policy N-40: Evaluate the potential for noise pollution and ways to reduce noise impacts when reviewing development and activities in Palo Alto and surrounding communities. • Policy N-47: Optimize energy conservation and efficiency in new and existing residences, businesses, and industries in Palo Alto. c. The design is compatible with the immediate environment of the site in that the Project would convert an underutilized building and surface parking lot to a health care building available to seniors with special needs. The height of the building would be compatible with the height of the adjacent residential buildings, and the RM-30 daylight plane will be met, and the RM-15 daylight plane will be met adjacent to the RM-15 zoned property, with the exception of building corners; d. The design is appropriate to the function of the Project in that the design accommodates the physical and 4 060905 sdl0120173 progranunatic needs and objectives of the skilled nursing and assisted living program of the Channing House: e. The design promotes harmonious transitions in scale and character in areas between different designated land uses in that the building will be transitional between the existing Channing House facility and the residential neighborhood. The building will encroach into the special PC daylight plane but is designed to be compatible with the adjacent uses and incorporates evergreen landscape buffers; f. The design is compatible with approved improvements both on and off the site in that the Project includes the replacement of a surface parking lot and improved landscaping on the entire Channing House property, and the existing two-way portion of the private Lane 56, providing access to the existing facility and the adjacent townhomes, will be maintained and widened near the intersection with Channing Avenue; g. The planning and siting of the various functions and buildings on the site create an internal sense of order and provide a 'desirable environment for occupants, visitors and the general conununity in that the design is focused on improving the outdoor spaces. The new building is oriented towards the Channing House, which creates a central usable outdoor space above an existing roof terrace. The parking will be placed below grade to allow for more landscaped areas; of open space is of the structures in the building will roof terrace, and serve the unique h. The amount and arrangement appropriate to the design and the function that landscape buffers will be provided, improve handicap accessibility to the outdoor appropriate outdoor spaces are provided to needs of all users and visitors to the site; i. Sufficient ancillary functions are support the main functions of the Proj ect and compatible with the Project's design concept in auto, accessible and bicycle parking spaces conveniently below grade in the building basement. provided to the same are that adequate are located j . Access to the property and circulation thereon is safe and convenient for pedestrians, cyclists and vehicles in that the existing access ways off Channing Avenue, Webster Street and Homer Avenue will be maintained. The Project will provide a safer pedestrian environment by eliminating two 5 060905 sdl 0120173 driveways along Homer Avenue, re-striping the crosswalks and adding traffic directional signs. k. Natural features have been appropriately preserved in that the redwood trees will be protected. 1. The materials, textures, colors and details of construction and plant material are an appropriate expression to the design and function and the same are compatible with the adjacent and neighboring structures, landscape elements, and functions in that a color and materials palette has been chosen, as well as a variety of tree and plant materials, to add vibrancy to the site and to assist its integration with the surrounding properties, such that the building will have a residential character compatible with the adjacent residential architecture; m. The landscape design concept for the site, as shown by the relationship of plant masses, open space, scale, plant forms and foliage textures and colors creates a desirable and functional environment in that the use of the site is enhanced with outdoor spaces and the parking area will be below grade; n. The plant material is suitable and adaptable to the site, capable of being properly maintained on the site, and is of a variety which would tend to be drought-resistant and to reduce consumption of water in its installation and maintenance; o. The design is energy efficient and incorporates renewable energy design elements including but not limited to: (i) Zero use CFC-based refrigerants in HVAC (ii) (iii) (iv) (v) (vi) systems, Use of Solar panels, Use of low-emitting adhesives, sealants, paints, coatings, carpet and composite wood, Daylight for all perimeter rooms, Water-use ficient landscape design, and Additional elements listed by the applicants. SECTION 3. Conditions of Approval. Planning and Community Environment Department: General Conditions: 6 060905 sd10120173 1. Prior to the start of construction and the issuance of a Streetwork Permit, the applicant shall submit a logistics plan for review and approval by Public Works and Planning staff. The logistics plan shall meet the Guidelines established by Public Works, and shall include information regarding the Project schedule, hours of construction, noise control measures, neighbor notification of construction, traffic control plan, material delivery, construction parking, materials storage, measures to protect adjacent properties, clean-up and maintenance of site and adj acent properties, refuse collection and recycling, site plan, map of truck routes, pedestrian protection plan, tree protection plan, and Stormwater Pollution Prevention Plan. 2. Prior to the start of construction, the Project shall return to the Architectural Review Board for approval of the final building details, landscape plan, and building materials. I 3. Prior to the start of construction, the applicant shall pay Community Facilities impact fees in the amount of $12,880.32. Building Conditions: 4. Permitting and inspections of the new Health Center shall be under the jurisdiction of the Office of Statewide Health Planning and Development (OSHPD). 5. The existing Channing House building and the new Health Center shall be physically separated so as to create two independent buildings. Each building shall have independent electric, gas, water and wastewater utility services. 6. The 2nd floor renovation and fire alarm upgrades to the existing Channing House building shall comply with current applicable City Building and Fire Code requirements. 7. Prior to issuance of a Building Permit for the 2nd floor renovation and fire alarm upgrades to the existing Channing House building, written evidence of an approved decommissioning of the building from the Office of Statewide Health Planning and Development (OSHPD) shall be provided to the Chief Building Official. 8. Prior to issuance of a Building Permit renovation and fire alarm upgrades to the House building, the owner shall retain a 7 060905 sdl 0120173 for the 2nd floor existing Channing code consul tant, approved by the Building Official, to conduct a code survey and analysis of the building to identify items of non- compliance with current Building and Fire Codes. The consultant shall prepare a report that identifies structural, non-structural disabled access, electrical, plumbing, mechanical and fire code deficiencies, and submit such report to the Building Official prior to issuance of a Building Permit. The owner, in consultation with the Building Official and Fire Marshal, will agree on a plan to correct the code deficiencies noted in the consultant's report either as part of the current project, or in conjunction with future projects, to be processed through the City. 9. A demolition permit, issued by the Palo Alto Building Division, shall be required for the removal of the existing cottage. Planning Arborist Conditions: 10. Ordinance Tree Mitigation Measure. The Tree Canopy Replacement Standard, Tree Technical Manual, Section 3.20 stipulates that the 36" oak tree be replaced with: two 48" box size and two 36" box size trees. Staff will accept an alternative of two 60" box size oaks upon request. The species shall be a selection of valley oak (Quercus lobata), black oak (Q. kellogii) or coast live oak (Q. agrifolia). In any case, an appropriate landscape area for each tree must be dedicated to the future growing space needed for each of the mi tigation trees, denoted on formal landscape improvement plans, and fitted with bubbler head irrigation during a 2-5 year establishment period. Maintenance of the mitigation trees shall be required for the duration of the Project, subject to condition monitoring and replacement if required. 11. Landscape plans. a. Raywood ash shall be deleted from the plant palette (disease prone). New trees in the right of way shall be planted per PW Detail #503. Species and location spacing shall be determined by Public Works Operations. b. Specify the variety of Japanese maples to be planted. 060905 sdl 0120173 For winter screening between the Channing place Homeowners Association, consider continuing the narrow evergreen canary island pines spaced between the new maple trees. Include the landscape areas flanking the 8 Webster Street access, including the entry island in the center. c. Removal of the old lvy (rodent habitat) and replacement with new groundcover and grasses (carpet rose, New Zealand Flax, lily turf, etc) at this time would benefit the residents and neighborhood. 12. The backflow-preventer device shall be concealed with an appropriate size decorative fiberglass boulder dark grey or brown in color (dekorraproducts.com or equivalent approved by planning staff). Cut sheet shall be added to the plans. The vegetation shall be planted appropriately around the boulder. Irrigation to all new trees shall specify bubbler heads mounted on flexible tubing placed at the edge of the root ball for each tree that is 15 gallon in size or larger. Add detail to the irrigation plans. Bubblers shall not be mounted inside the aeration tube. 13. Tree Protection Verification. A written statement from the contractor or project arborist verifying that the required protective Type I and II barriers are in place shall be submitted to the Building Inspections Division prior to demolition or grading. Damage to any street trees or trees to be protected during the course of construction will be subject to injury assessment and administrative penalty. The contractor is responsible immediate Damage Reporting protocol required in the City Tree Technical Manual, Section 2.25. 14. The following general tree preservation measures apply to all trees to be retained: No storage of material, topsoil, vehicles or equipment shall be permitted within the tree enclosure area. The ground under and around the tree canopy area shall not be altered. Trees to be retained shall be irrigated, aerated and maintained as necessary to ensure survival. 15. Prior to completion, the contractor shall contact Code Enforcement staff at 650-329-2358 for Planning staff inspection of the Proj ect to verify consistency with the approved plans, ordinance tree mitigation planting and conditions of approval. 16. Facilities Maintenance. For the life of the Project, all landscape as shown on the approved plans, including all trees, shall be reasonably well maintained, watered, 9 060905sdlOl20173 fertilized, and pruned according to Best Management Practices-Pruning (ANSI A300-2001), Nursery Standards and the City Tree Technical Manual, Section 3.00 and 5.00 (http://www.cityofpaloalto.org/planning-community/tree_index.html). Any vegetation that dies shall be replaced or failed automatic irrigation repaired by the current property owner within 30 days of discovery. Transportation Conditions 17. The Project shall establish left-turn arrows on the exit driveways off of Homer Avenue and Channing Avenue. It is preferable that this pavement marking be implemented using white thermo plastic rather than paint. 18. A non-standard one-way sign is presently provided at the most eastern project driveway off of Homer Avenue. The Proj ect shall replace this one-way sign to conform to the Manual on Uniform Traffic Control Devices in terms of size, shape and installation height. 19. The Project shall mark visitor parking spaces in the surface lot abutting Webster Street in order to facilitate access and avoid traffic rerouting. 20. The project shall re-establish the faded zebra crosswalk and "Ped xing" markings provided on Channing Avenue on the approach to Webster Street. It is preferable that this pavement marking be established using thermo plastic rather than paint. 21. The Project shall re-establish the faded pedestrian crosswalks presently provided at the all-way stop controlled intersection of Homer Avenue/Webster Street. 22. The Project shall paint a stop bar and a stop legend on site at the lighted "Car Coming" traffic sign to be facing motorists exiting from the existing underground parking. This will clearly give the right-of-way to traffic exiting from the new underground parking facility due to the constrained visibility conditions and ramp configuration. 23. The Project shall mark parking spaces number 19 & 20 as compact stalls. 24. Prior to the issuance of a grading permit, the Project shall submi t a logistics plan for review and approval by Public 10 060905 sdl 0120173 Works and Planning staff. As per our practice, information described and shown on the traffic plan must contain the truck routes to and from the site, parking arrangement during construction including parking of construction workers' vehicles, location of materials storage, any potential for temporary closure of a travel lane or sidewalk, any potential for temporary elimination of on- street parking, warning traffic control devices and flag persons, etc Public Works Department Engineering Conditions: 1. The garage floor drains must drain to the sanitary sewer. 2. The driveway and ramp shall be designed to not allow runoff from the driveway to flow down the ramp. Consider a valley gutter along the driveway at the interface with the ramp that will capture driveway runoff and direct it to the street. Also, the trench drain at the bottom of the ramp must connect to the storm drain system. 3. The rainwater leaders should discharge onto splashblocks, which direct water into landscaped areas so there is some infiltration and filtering of the water before it is released into the storm drain system. Recycling Conditions: 4. PAMC Chapter 5.20 Standard service for garbage and recycling collection does not include pull-out of bins from basement level. Service beyond the standard level will result in additional cost (hundreds of dollars per month) for garbage and recycling collection. The trash and recycling for the new building shall be transported to the existing trash pick-up area in the alley via the buildings service elevator. 5. The new buildings enclosure shall accommodate the following: Qty 1 - 4 cu. yd. bin-garbage Qtyl - 4 cu. yd. bin-cardboard Qty 6 96 gallon wheeled carts-single stream recycling (bottles, cans, plastic containers #1 #7, newspaper, mixed paper) Bin dimensions- 11 060905 sdl 0120173 2 cubic yard 81" (1) x 38" (w) x 46" (h) 4 cubic yard -bin 81"(1) x 54(w) x 59"(h) 96 gallon cart 34.5" (1) x 29.25" (w) x 46.75" (h) 6. PAMC Chapter 5.24 -requires salvage for reuse and recycling of construction and demolition debris. Fire Department Conditions: 1. Hydrants shall be located not further than 120 feet from the end of the fire access roadt and not further than 150 from all other points used for fire access. (PAMC §15.04.140) 2. Elevator car and lobbies on all floors shall be sized and configured for Fire Department gurney access requirements based on gurney dimensions of 24 in. x 82 in. plus a minimum of two emergency response personnel. (PAMC §15.04.120) 3. Approved 2%-inch hose valves shall be provided at each underground floor level landing in every stairwell for the underground parking structure. (PAMC §15.04.178) 4. All sprinkler drains t including those for floor control valves and inspector t s test valves t as well as the main draint shall not discharge within the building. Water discharged from these points shall be directed to an approved landscape location or to the sanitary sewer system. (99NFPA13 t Sec. 5-14.2.4.3) NOTE: Please check with Roland Ekstrand in Utilities for maximum flow capacity of sanitary sewer in the area. Main Drain test discharge flow rate shall be impounded and attenuated to below sanitary sewer capacity before discharge. Water Quality Conditions: 1. The oillsand separator needs to be plumbed to the sanitary sewert not the curb. The trench drain across the ramp goes to the storm drain/curb. II II II II 12 060905 sdl0120173 H SECTION 4. Effective Date. This resolution shall be effective upon the effective date of Ordinance _4~9~1=9~ __ __ entitled "ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE PLANNED COMMUNITY PC-4900, 850 WEBSTER STREET (CHANNING HOUSE), TO ALLOW CONSTRUCTION OF A HEALTH CARE BUILDING AND UNDERGROUND GARAGE, AND APPROVE A VARIANCE FOR ENCROACHMENTS INTO A SPECIAL DAYLIGHT PLANE ALONG TWO PROPERTY LINES. " INTRODUCED AND PASSED: October 10, 2006 AYES: BARTON, CORDELL, DREKMEIER, KISHIMOTO, KLEIN MORTON, MaSSAR NOES: ABSENT: BEECHAM ,KLEINBERG ABSTENTIONS: APPROVED AS TO FORM: ~~-~-----------Senior Deputy City Attorney 060905 sdl 0120173 APPROVED: 13 Planning a: d Environment