Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinance 5644
1 122_20241121_ts24 ORDINANCE NO. 5644 Ordinance of The Council of The City of Palo Alto Approving a Plan for Park Improvements at the City’s Baylands: Authorizing the Santa Clara Valley Water District’s Palo Alto Flood Basin Tide Gate Structure Phase 1: Seismic Retrofit and Rehabilitation Project The Council of the City of Palo Alto does ORDAIN as follows: SECTION 1. Findings and Improvements. The City Council finds and declares that: (a)Article VIII of the Charter of the City of Palo Alto and Section 22.08.005 of the Palo Alto Municipal Code (PAMC) require that, before any substantial building, construction, reconstruction or development is commenced or approved, upon or with respect to any land held by the City for park purposes, the Council shall first cause to be prepared and by ordinance approve and adopt a plan therefor. (b)The Palo Alto Flood Basin Tide Gate Structure (Structure) is part of the Adobe Creek Loop Trail (Trail). The Structure is located in the City’s Baylands, which is dedicated parkland (See PAMC § 22.08.020 et seq.) (c)The City of Palo Alto intends to authorize Santa Clara Valley Water District (Valley Water) to perform a seismic retrofit and rehabilitation of the 1957-built Structure. The retrofit intends to reduce seismic vulnerabilities and the rehabilitation aims to extend the existing Structure’s service life. Based on the Conditional Structural Assessment of the existing Structure and reduced functionality, the Structure is planned to be seismically retrofitted and rehabilitated. (d)The plan of improvements (Plan) shall comprise, as follows: (1)The Project will install a deep foundation system on each end of the existing Structure consisting of two reinforced concrete piles topped with a rectangular- shaped reinforced concrete pile cap. The pile cap contains steel dowels to positively connect the deep foundation system to the side of the existing Structure. Select plan sheets showing the in-progress design are attached as Exhibit “A”. (2)The Project will repair large cracks and spalls in the concrete surface of the existing structure and then apply a Polyester Polymer Concrete (PPC) overlay for added protection. Select plan sheets showing the in-progress design are attached as Exhibit “A”. (3)The Project will replace the existing 42” tall fence with a new 48” tall fence. Select plan sheets showing the in-progress design are attached as Exhibit “A”. Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 2 122_20241121_ts24 (4)The Project will create improved maintenance access from the deck to the flood basin with ladders and an opening in the trash rack. Select plan sheets showing the in-progress design are attached as Exhibit “A”. (5)The Project will require temporary closures to portions of the Trail to accommodate construction of the seismic retrofit and rehabilitation work. A diagram illustrating anticipated Trail closures is attached as Exhibit “B”. If the seismic retrofit and rehabilitation work to the Structure is not constructed, future degradation of the existing Structure will occur and would eventually require closure of the Trail for an unknown duration of time. (e)The Project described above and as otherwise depicted in the attached exhibits is consistent with “park, playground, recreation or conservation purposes” as required under PAMC section 22.08.020 et seq. (f)The City Council desires to approve the Plan for the Project described above and as depicted in Exhibit "A" and Exhibit “B”. SECTION 2. The City Council hereby approves the Plan for construction of the Palo Alto Flood Basin Tide Gate Structure Phase 1: Seismic Retrofit and Rehabilitation Project as described in this Ordinance. SECTION 3. Valley Water is the Lead Agency for the Project under the California Environmental Quality Act (CEQA). Valley Water performed an Initial Study and determined that a Mitigated Negative Declaration (MND) is the appropriate level of review for the previous Project scope of a Structure replacement. A resolution adopting the Final MND (Resolution) was signed by Valley Water’s Board on April 27, 2021. Since the work for the Seismic Retrofit and Rehabilitation Project is smaller in scope and has less impacts, an addendum to the Final MND has been completed stating that the modifications to the original Structure replacement project will not result in new significant impacts or increase the severity of the already disclosed impacts. On October 22, 2024, Valley Water’s Board considered the addendum to the Final MND and approved the Modified Palo Alto Tide Gate Replacement Project. The CEQA documents are available online from the project website: https://www.valleywater.org/pafbtidegates. The City Council finds that the City of Palo Alto is a responsible agency under CEQA for the Project and certifies that it has reviewed and considered the information contained in Valley Water’s MND as updated by the addendum. Valley Water will apply for new regulatory permits or amend the existing regulatory permits from six resource agencies and will be working with the resource agencies for updated mitigation requirements and permit conditions. Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 3 122_20241121_ts24 SECTION 4. This ordinance shall be effective on the thirty-first day after the date of its adoption. INTRODUCED: DECEMBER 9, 2024 PASSED: JANUARY 13, 2025 AYES: BURT, LAUING, LYTHCOTT-HAIMS, LU, RECKDAHL, STONE, VEENKER NOES: ABSENT: ABSTENTIONS: ATTEST: ____________________________ ____________________________ City Clerk Mayor APPROVED AS TO FORM: APPROVED: ____________________________ ____________________________ Assistant City Attorney City Manager ____________________________ Director of Community Services Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 EXHIBIT A PAGE 1 OF 4 EXHIBIT A Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 EXHIBIT A PAGE 2 OF 4 EXHIBIT A Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 EXHIBIT A PAGE 3 OF 4 EXHIBIT A Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 EXHIBIT A PAGE 4 OF 4 EXHIBIT A Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 EXHIBIT B PAGE 1 OF 2 5000 ft N ➤➤ N Image © 2024 AirbusImage © 2024 Airbus Byxbee Park Parking Lot PROJECT LOCATION Palo Alto Airport Palo Alto Flood Basin HW Y 1 0 1 Sa n A n t o n i o R d ±0.8 MILES TRAIL SEGMENTS CLOSED FOR 5 MONTHS (SEPTEMBER 2025 TO JANUARY 2026) OTHER TRAIL ROUTES & DETOUR OPEN ALL THE TIME Existing Tide Gate Structure FLAGGERS WILL BE PRESENT DURING HEAVY EQUIPMENT MOBILIZATION/DEMOBILIZATION ⚑ ⚑ ⚑ FLAGGERS WILL BE PRESENT DURING HEAVY EQUIPMENT MOBILIZATION/DEMOBILIZATION ⚑ ⚑ Coast Casey Pump Station ⚑ Emb a r c a d e r o R d E B a y s h o r e R d Fab e r P l Ad o b e C r e e k Loo p T r a i l Bay Trail TRAIL CLOSURE Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 SIGN SIZE 4’ x 4’ 48” x 48” 5’ x 3” Construction Sign for Palo Alto Flood Basin Project EXHIBIT B PAGE 2 OF 2 Docusign Envelope ID: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 Certificate Of Completion Envelope Id: 6C26206C-06FD-49C2-AD80-646AB95C6AA8 Status: Completed Subject: ORD 5644 - Baylands Flood Basin Tide Gate Source Envelope: Document Pages: 9 Signatures: 5 Envelope Originator: Certificate Pages: 2 Initials: 0 Christine Prior AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 250 Hamilton Ave Palo Alto , CA 94301 Christine.Prior@CityofPaloAlto.org IP Address: 199.33.32.254 Record Tracking Status: Original 1/16/2025 10:09:43 AM Holder: Christine Prior Christine.Prior@CityofPaloAlto.org Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign Signer Events Signature Timestamp Tim Shimizu Tim.Shimizu@CityofPaloAlto.org Assist. City Attorney City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 71.202.114.73 Sent: 1/16/2025 10:11:51 AM Viewed: 1/16/2025 10:20:20 AM Signed: 1/16/2025 10:20:27 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Kristen O'Kane Kristen.O'Kane@CityofPaloAlto.org Director Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 1/16/2025 10:20:31 AM Viewed: 1/16/2025 2:20:49 PM Signed: 1/16/2025 2:21:05 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ed Shikada Ed.Shikada@CityofPaloAlto.org Ed Shikada City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 73.231.231.68 Signed using mobile Sent: 1/16/2025 2:21:08 PM Viewed: 1/20/2025 8:03:41 AM Signed: 1/20/2025 8:04:20 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ed Lauing Ed.Lauing@CityofPaloAlto.org Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 67.188.59.65 Sent: 1/20/2025 8:04:24 AM Viewed: 1/21/2025 12:43:05 PM Signed: 1/21/2025 12:43:22 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Signer Events Signature Timestamp Mahealani Ah Yun Mahealani.AhYun@CityofPaloAlto.org City Clerk Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 76.132.2.224 Sent: 1/21/2025 12:43:26 PM Viewed: 1/29/2025 8:16:55 AM Signed: 1/29/2025 8:17:12 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/16/2025 10:11:51 AM Certified Delivered Security Checked 1/29/2025 8:16:55 AM Signing Complete Security Checked 1/29/2025 8:17:12 AM Completed Security Checked 1/29/2025 8:17:12 AM Payment Events Status Timestamps