HomeMy WebLinkAbout2002-08-05 Ordinance 4758follows:
ORDINANCE NO. 4758
ORDINANCE OF THE COUNCIL OF THE CITY OF PALO
ALTO APPROVING AND ADOPTING A PLAN FOR
IMPROVEMENTS TO THE MEMORIAL GROVE AT
ELEANOR PARDEE PARK
The Council of the City of Palo Alto does ORDAIN as
SECTION 1. Findings and Declarations.
finds and declares as follows:
The City Council
(a) Article VIII of the Charter of the City of Palo
Alto and Section 22.08.005 of the Palo Alto Municipal Code
require that, before any substantial building, construction,
reconstruction or development is commenced or approved, upon or
with respect to any land held by the City for park purposes, the
Council shall first cause to be prepared and by ordinance
approve and adopt a plan therefore;
(b)
purposes;
Eleanor Pardee Park is dedicated to park
(c) The site and design review of the Eleanor Pardee
Park Memorial Grove Plan ("the Plan") has been conducted and the
Plan has been recommended for approval by the Ci ty boards and
commissions having jurisdiction over such matters, because it
conforms to the provisions of Chapter 18.82 of the Palo Al to
Municipal Code and the Palo Alto Comprehensive Plan: and
{d} The Council desires to approve enhancement of
that portion of land that lies within Eleanor Pardee Park, which
is approximately 60'L X 80'W or 4800 sq.ft in length being west
to east and the width north to south, as more specifically
described on the Plan attached hereto as Exhibit "A", including,
without limitation, the following:
(l) Reconstruction of Memorial Grove area of Eleanor
Pardee Park;
(2) Construction of irrigation system; and'
(3) The installation of new pathway, park benches,
boulder and landscaping.
020812 sm 7080077 1
SECTION 2. The Plan, a copy of which is attached hereto
as Exhibit "A" and incorporated by this reference is hereby
approved and adopted.
SECTION 3. The City Council hereby finds that it can be
seen with certainty that there is no potential for this action
to have a significant adverse effect on the environment.
SECTION 4. This ordinance shall be effective on the
thirty-first day after the date of its adoption.
INTRODUCED: July 15, 2002
PASSED: August 5, 2002
AYES: BURCH, FREEMAN, KISHIMOTO, KLEINBERG, MORTON, MOSSAR,
OJAKIAN
NOES:
ABSENT: BEECHAM, LYTLE
ABSTENTIONS:
MSOOCVMINr_ • .,....1OM.
OIDINAHCI! DULY MUlDDY-COUNCIl;
OF .... e ~nv OF(w"oA&:~
THEREAi-reIiPOSIIO ... ~~ ____
CliAMSERSON' iAOI -_,..,,,nnw.
OAYSOFITSPAS ,
'" certify (or ~ocl") UAdtr petIIIly
01 pelJ\lry that ttie fDNGOIng Is tnII
m~W:tu-
020812 sm 7080077
Mayor I
o unity
;:Of'!. f'AJI..-7.47 ,.rCt::64
2
CENTER DRIVE
~PARK'!JA~
"",--STDEW'ALK __
. DECIlMPOSED on; t it 0 .. " <-
GRANITE PATH'l [4' HIGH (MATURE) ........ ' .
TYP r-1 GAL BOXIJDDD ON
,. ~ -. / STAGGERED 24'
CENTERS IN 36'
"'IDE HEDGE (SEE
DET BELO"')
NE'" DRIP HEAD
1/2' \,/IDE
TEVEX HEADER
BOARD, TYP
DECOMPOSED
GRANITE
PATH. TIP
. I 1'1
-1 44' MIN r-
NE'" PATH IN LABYRINTH CA
SCALE) NTS
l-44' MIN-j
NE'" PATH (B
SCALE. NTS
/~'" (I 1 )
"':~
@!cmc AREA
IRRIGATION NOTES.
1/2' DTA PVC
NE\I SOLAR CO~
NE'" 1 1/2' IRRIGATION ISOLATION VALVE
TIE INTO EX. MAIN W / 1 1/2' TEE
COORDINATE "'ITH PARKS SUPERVISOR
1. PIPE SHALl.. BE 3/4' MIN SCHEDULE 40 PVC.
2. FLO"'ER BEDS SHALL HAVE RAINBIRD 1800
SERIES 4' PDP-UP SPRINKLERS
3. HEDGE IRRIGATION SYSTEM SHALL HAVE A
PRESSURE REDUCING VALVE SET TO 20 PSI ON
EACH ZONE AND AN IN-LINE FILTER W / DRIP HEADS
SlIT FOR EACH PLANT ON 2' CENTERS.
4. EACH CDNTRlJL VALVE SHALL HAVE A
FIBERGLASS COVER BOX.
5. PROVIDE 17 MDDEL 17 SOLAR CONTROLLER SET
IN CONC BASE DIRECT BURY "'IRE TO 6 ZONE
CONTROL VALVES.
LEGEND
to;.;.:.:.) __ _
o ~RVtoIUVE TREE QM11IlC
$ ~_D2
C-, ~IWJ.III __ HElIGt
~="7=""""""
""""",1£V_\IIIJIfl.IMIISQIj ~ IfD:ltulGSJMLAB\'RD!tfH
BOXWOOD PLANTING DETAIL
SCALE. NTS
v. ~ 'li< .. ..
ELEANOR PARK
MEMORIAL GROVE PLAN
SCALE. 1/16':: l' 0'
'"
'" ..
'" ..
'" v
'" '" .. '" ..
'" '. '" ., ..
'" '" -:J7'-C .. ----------
NOTE llJ 20' MATURE
DRIPUNE SHO"'N
'" .. ..
< • ...
HORTH~
NIlTES.
1. BENCH 1 -SMITH 8.
HAWKEN 6' TEAK GIVERNY
BENCH
2. BENCH 2 -SMITH 8.
HAWKEN 6' TEAK GIVERNY
BENCH OR 55 1/2' INVERNESS
BENCH.
3. MULCH SHALL BE 'In
4. DECOMPOSED GRANITE
SHALL BE 'In .
5. HEADER BOARD SHALL BE
1/2' "'IDE TEVEX IN 16'
LENGTHS CUT TO SHAPE IN
FIELD AND SET '" / STAKES.
27' 6. BENCHES SHALL BE BOL TED
WITH STAINLESS OR BRASS
VANDALPROOF FASTENERS INTO
CONCRETE BASE AND "'DOD
LEGS.
7. LANDSCAPE CLOTH SHALL
BE 'lin. .
'8.
9. SPRAY UNDER LANDSCAPE
CLOTH "'ITH PRE-EMERGENT
.HERBICIDE.
10. FIELDSTONES SHALL BE
4')(4'x5' BOULDERS.
11. NEW AKEBONO TREE
12. NE'" ERIGERON ON 3'
CENTERS ON MOUNDS MADE
<::0' 6' FROM PATH/MULCH
"" -EXCAVATIONS
~~
PHASES.
I. FLO"'ER BEDS/OLIVE GROVE
II. PATH/BENCH
III. ADDITIONAL PATH/BENCH
IV.. LABYRINTH
'OZIPLAN
.lE PESCl!I!'lIOH
MEMORIAL GROVE
ENHANCEMENT
ALTO
-=-;;;:;a-... -
13 of' 1