Loading...
HomeMy WebLinkAbout2022-01-24 Ordinance 5541 1 245_20220127_ts24 Ordinance No. 5541 Ordinance of The Council of The City of Palo Alto Approving a Plan for Improvements to the Palo Alto Flood Basin Tide Gate Structure as part of the Palo Alto Flood Basin Tide Gate Structure Replacement Project The Council of the City of Palo Alto does ORDAIN as follows: SECTION 1. Findings. The City Council finds and declares that: (a) Article VIII of the Charter of the City of Palo Alto and Section 22.08.005 of the Palo Alto Municipal Code (PAMC) require that, before any substantial building, construction, reconstruction or development is commenced or approved, upon or with respect to a ny land held by the City for park purposes, the Council shall first cause to be prepared and by ordinance approve and adopt a plan therefor. (b) The Palo Alto Flood Basin Tide Gate Structure (Structure) is part of the Adobe Creek Loop Trail (Trail). The Structure is located in the City’s Baylands, which is dedicated parkland (See PAMC § 22.08.020 et seq.) Based on the Conditional Structural Assessment of the existing Structure and reduced functionality, the Structure is planned to be replaced. (c) The City of Palo Alto intends to authorize Santa Clara Valley Water District (Valley Water) to construct a replacement Structure. The new Structure will replace the existing 1957- built Structure which has outlived its intended service life and has been re commended for replacement. (d) The Plan of improvements shall comprise, as follows: (1) The Project will construct a replacement Structure near the existing Structure, and new levees to connect the Trail to the replacement Structure. The project will re-align a portion of the levees and Trail as required to accommodate the replacement Structure location. The existing Structure will be removed after the replacement Structure and levees are constructed. Select plan sheets showing the in-progress design are attached as Exhibit “A”. (2) The Project will require temporary closures to portions of the Trail to accommodate construction of the replacement Structure and connecting levee work. A diagram illustrating anticipated Trail closures is attached as Exhibit “B”. If the replacement Structure is not constructed, future degradation of the existing Structure will occur and would eventually require closure of the Trail for an unknown duration of time. DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 2 245_20220127_ts24 (3) The replacement Structure will include a dedicated concrete bay with motor driven sluice gate solely for the City’s use of maintaining water quality within the PAFB and controlling mosquito breeding. This new motor operated sluice gate will replace the existing motor operated sluice gate which is owned and operated by the City. The Structure will also include new water level sensors and Supervisory Control and Data Acquisition (SCADA) system to improve flexibility and efficiency for the City’s sluice gate operations. The new sluice gate will enable remote operation of the sluice gate. The replacement Structure with its improved operations and maintenance features and improved hydraulic performance is anticipated to reduce mosquito breeding within the PAFB compared to the existing conditions. (e) The Project described above and as otherwise depicted in the attached exhibit s is consistent with recreation and conservation purposes (f) The Council desires to approve the Plans for the Project described above and as depicted in Exhibit "A" and Exhibit “B”. SECTION 2. The Council hereby approves the Plan for construction of the Palo Alto Flood Basin Tide Gate Structure Replacement Project as described in this Ordinance. SECTION 3. Valley Water is the Lead Agency for the Project under the California Environmental Quality Act (CEQA). Valley Water performed an Initial Study and determined that a Mitigated Negative Declaration (MND) is the appropriate level of review. A resolution adopting the Final MND (Resolution) was signed by Valley Water’s Board on April 27, 2021. The Final MND and Resolution are available online from the project website: https://www.valleywater.org/pafbtidegates. The City Council finds that the City of Palo Alto is a responsible agency under CEQA for the Project and certifies that it has reviewed and considered the information contained in Valley Water’s MND. Valley Water has applied for regulatory permits from six resource agencies and are currently working with the resource agencies for mitigation requirements and permit conditions. // // // // // DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 3 245_20220127_ts24 SECTION 4. This ordinance shall be effective on the thirty-first day after the date of its adoption. INTRODUCED: January 10, 2022 PASSED: January 24, 2022 AYES: BURT, CORMACK, DUBOIS, FILSETH, KOU, STONE, TANAKA NOES: ABSENT: ABSTENTIONS: ATTEST: ____________________________ ____________________________ City Clerk Mayor APPROVED AS TO FORM: APPROVED: ____________________________ ____________________________ Deputy City Attorney City Manager ____________________________ Director of Community Services DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 E E E E E E E E E E E E E E E E E E E E TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC Y EXHIBIT A PAGE 1 OF 4 EXHIBIT A DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 EXHIBIT A EXHIBIT A PAGE 2 OF 4 DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 EXHIBIT A EXHIBIT A PAGE 3 OF 4 DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 EXHIBIT A EXHIBIT A PAGE 4 OF 4 DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 EXHIBIT B PAGE 1 OF 3 Dates above are tentative target dates subject to change pending project development and acquisition of all required project permits. Year 1 Construction 9/1/2022 1/31/2023 5 months CLOSED CLOSED CLOSED CLOSED CLOSED No Construction 2/1/2023 8/31/2023 7 months OPEN OPEN CLOSED OPEN OPEN Year 2 Construction 9/1/2023 1/31/2024 5 months CLOSED CLOSED CLOSED CLOSED CLOSED No Construction 2/1/2024 8/31/2024 7 months OPEN OPEN CLOSED OPEN OPEN Year 3 Construction 9/1/2024 1/31/2025 5 months CLOSED CLOSED CLOSED CLOSED OPEN No Construction 2/1/2025 8/31/2025 7 months OPEN OPEN OPEN OPEN OPEN Year 4 Construction 9/1/2025 11/30/2025 3 months CLOSED CLOSED CLOSED CLOSED OPEN Project completed 12/1/2025 Onward N/A OPEN OPEN OPEN OPEN OPEN Total Cummulative Trail Closure Duration Per Trail Location = 21.5 months 21.5 months 35.5 months 21.5 months 13.5 months Target Time Period Trail Location (See Map Below) Activity Start End Duration Segment #1 Tide Gate Structure Segment #2 Segment #3 Segment #4 3.5 18 months 18 months 32 months 18 months 10 months DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 OTHER TRAIL ROUTES & DETOUR OPEN ALL THE TIME Byxbee Park Parking Lot Emb a r c a d e r o R d H W Y 1 0 1 Sa n A n t o n i o R d EXISTING TIDE GATE STRUCTURE TRAIL SEGMENT #1 TRAIL SEGMENT #2 TRAIL SEGMENT #3 TRAIL SEGMENT #4 CONSTRUCTION SIGN EXHIBIT B PAGE 2 OF 3 DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 SIGN SIZE 4’ x 4’ 48” x 48” 5’ x 3” DETAIL - (TRUCK AND PEDESTRIAN USE) 12' TO 14' Construction Sign for Palo Alto Flood Basin Project EXHIBIT B PAGE 3 OF 3 DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41 Certificate Of Completion Envelope Id: 0212DB79F5E842B8AB33979184EDAB41 Status: Completed Subject: Please DocuSign: ORD 5541 Exhibit B - Temporary Trail Closures.pdf, ORD 5541 Exhibit A - In-Pro... Source Envelope: Document Pages: 10 Signatures: 5 Envelope Originator: Certificate Pages: 2 Initials: 0 Danielle Kang AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 250 Hamilton Ave Palo Alto , CA 94301 Danielle.Kang@cityofpaloalto.org IP Address: 199.33.32.254 Record Tracking Status: Original 1/27/2022 2:55:52 PM Holder: Danielle Kang Danielle.Kang@cityofpaloalto.org Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign Signer Events Signature Timestamp Tim Shimizu Tim.Shimizu@CityofPaloAlto.org Deputy City Attorney Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 67.169.5.157 Sent: 1/27/2022 2:58:10 PM Viewed: 1/27/2022 3:30:30 PM Signed: 1/27/2022 3:34:24 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Kristen O'Kane Kristen.O'Kane@CityofPaloAlto.org Assistant Director Community Services City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 67.188.116.181 Sent: 1/27/2022 3:34:34 PM Viewed: 1/27/2022 3:54:33 PM Signed: 1/27/2022 3:54:50 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ed Shikada Ed.Shikada@CityofPaloAlto.org Ed Shikada, City Manager City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 1/27/2022 3:55:04 PM Viewed: 1/31/2022 10:27:49 PM Signed: 1/31/2022 10:28:02 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Pat Burt pat@patburt.org Mr Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 98.35.161.52 Sent: 1/31/2022 10:28:10 PM Viewed: 3/7/2022 8:56:55 AM Signed: 3/7/2022 8:57:14 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Signer Events Signature Timestamp Lesley Milton Lesley.Milton@CityofPaloAlto.org City Clerk Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 3/7/2022 8:57:22 AM Viewed: 3/7/2022 7:20:57 PM Signed: 3/7/2022 7:21:11 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/27/2022 2:58:10 PM Certified Delivered Security Checked 3/7/2022 7:20:57 PM Signing Complete Security Checked 3/7/2022 7:21:11 PM Completed Security Checked 3/7/2022 7:21:11 PM Payment Events Status Timestamps