Ordinance No. 5541
Ordinance of The Council of The City of Palo Alto Approving
a Plan for Improvements to the
Palo Alto Flood Basin Tide Gate Structure as part of the
Palo Alto Flood Basin Tide Gate Structure Replacement Project
The Council of the City of Palo Alto does ORDAIN as follows:
SECTION 1. Findings. The City Council finds and declares that:
(a) Article VIII of the Charter of the City of Palo Alto and Section 22.08.005 of the Palo Alto
Municipal Code (PAMC) require that, before any substantial building, construction,
reconstruction or development is commenced or approved, upon or with respect to a ny land
held by the City for park purposes, the Council shall first cause to be prepared and by ordinance
approve and adopt a plan therefor.
(b) The Palo Alto Flood Basin Tide Gate Structure (Structure) is part of the Adobe Creek
Loop Trail (Trail). The Structure is located in the City’s Baylands, which is dedicated parkland
(See PAMC § 22.08.020 et seq.) Based on the Conditional Structural Assessment of the existing
Structure and reduced functionality, the Structure is planned to be replaced.
(c) The City of Palo Alto intends to authorize Santa Clara Valley Water District (Valley
Water) to construct a replacement Structure. The new Structure will replace the existing 1957-
built Structure which has outlived its intended service life and has been re commended for
replacement.
(d) The Plan of improvements shall comprise, as follows:
(1) The Project will construct a replacement Structure near the existing Structure, and
new levees to connect the Trail to the replacement Structure. The project will re-align a
portion of the levees and Trail as required to accommodate the replacement Structure
location. The existing Structure will be removed after the replacement Structure and
levees are constructed. Select plan sheets showing the in-progress design are attached as
Exhibit “A”.
(2) The Project will require temporary closures to portions of the Trail to accommodate
construction of the replacement Structure and connecting levee work. A diagram
illustrating anticipated Trail closures is attached as Exhibit “B”. If the replacement
Structure is not constructed, future degradation of the existing Structure will occur and
would eventually require closure of the Trail for an unknown duration of time.
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
2
245_20220127_ts24
(3) The replacement Structure will include a dedicated concrete bay with motor driven
sluice gate solely for the City’s use of maintaining water quality within the PAFB and
controlling mosquito breeding. This new motor operated sluice gate will replace the
existing motor operated sluice gate which is owned and operated by the City. The
Structure will also include new water level sensors and Supervisory Control and Data
Acquisition (SCADA) system to improve flexibility and efficiency for the City’s sluice gate
operations. The new sluice gate will enable remote operation of the sluice gate.
The replacement Structure with its improved operations and maintenance features and
improved hydraulic performance is anticipated to reduce mosquito breeding within the
PAFB compared to the existing conditions.
(e) The Project described above and as otherwise depicted in the attached exhibit s is
consistent with recreation and conservation purposes
(f) The Council desires to approve the Plans for the Project described above and as
depicted in Exhibit "A" and Exhibit “B”.
SECTION 2. The Council hereby approves the Plan for construction of the Palo Alto
Flood Basin Tide Gate Structure Replacement Project as described in this Ordinance.
SECTION 3. Valley Water is the Lead Agency for the Project under the California
Environmental Quality Act (CEQA). Valley Water performed an Initial Study and determined
that a Mitigated Negative Declaration (MND) is the appropriate level of review. A resolution
adopting the Final MND (Resolution) was signed by Valley Water’s Board on April 27, 2021. The
Final MND and Resolution are available online from the project website:
https://www.valleywater.org/pafbtidegates. The City Council finds that the City of Palo Alto is
a responsible agency under CEQA for the Project and certifies that it has reviewed and
considered the information contained in Valley Water’s MND.
Valley Water has applied for regulatory permits from six resource agencies and are
currently working with the resource agencies for mitigation requirements and permit
conditions.
//
//
//
//
//
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
3
245_20220127_ts24
SECTION 4. This ordinance shall be effective on the thirty-first day after the date of its
adoption.
INTRODUCED: January 10, 2022
PASSED: January 24, 2022
AYES: BURT, CORMACK, DUBOIS, FILSETH, KOU, STONE, TANAKA
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
____________________________ ____________________________
City Clerk Mayor
APPROVED AS TO FORM: APPROVED:
____________________________ ____________________________
Deputy City Attorney City Manager
____________________________
Director of Community Services
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
Y
EXHIBIT A
PAGE 1 OF 4
EXHIBIT A
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
EXHIBIT A EXHIBIT A
PAGE 2 OF 4
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
EXHIBIT A EXHIBIT A
PAGE 3 OF 4
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
EXHIBIT A EXHIBIT A
PAGE 4 OF 4
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
EXHIBIT B PAGE 1 OF 3
Dates above are tentative target dates subject to change pending project development and acquisition of all required project permits.
Year 1 Construction 9/1/2022 1/31/2023 5 months CLOSED CLOSED CLOSED CLOSED CLOSED
No Construction 2/1/2023 8/31/2023 7 months OPEN OPEN CLOSED OPEN OPEN
Year 2 Construction 9/1/2023 1/31/2024 5 months CLOSED CLOSED CLOSED CLOSED CLOSED
No Construction 2/1/2024 8/31/2024 7 months OPEN OPEN CLOSED OPEN OPEN
Year 3 Construction 9/1/2024 1/31/2025 5 months CLOSED CLOSED CLOSED CLOSED OPEN
No Construction 2/1/2025 8/31/2025 7 months OPEN OPEN OPEN OPEN OPEN
Year 4 Construction 9/1/2025 11/30/2025 3 months CLOSED CLOSED CLOSED CLOSED OPEN
Project completed 12/1/2025 Onward N/A OPEN OPEN OPEN OPEN OPEN
Total Cummulative Trail Closure Duration Per Trail Location = 21.5
months 21.5 months 35.5
months
21.5
months
13.5
months
Target Time Period Trail Location (See Map Below)
Activity Start End Duration Segment #1 Tide Gate Structure Segment #2 Segment #3 Segment #4
3.5
18 months 18 months 32 months 18 months 10 months
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
OTHER TRAIL
ROUTES & DETOUR
OPEN ALL THE TIME
Byxbee Park
Parking Lot
Emb
a
r
c
a
d
e
r
o
R
d
H
W
Y
1
0
1
Sa
n
A
n
t
o
n
i
o
R
d
EXISTING
TIDE GATE
STRUCTURE
TRAIL SEGMENT #1 TRAIL SEGMENT #2
TRAIL SEGMENT #3
TRAIL SEGMENT #4
CONSTRUCTION
SIGN
EXHIBIT B PAGE 2 OF 3
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
SIGN SIZE
4’ x 4’
48” x 48”
5’ x 3”
DETAIL - (TRUCK AND PEDESTRIAN USE)
12' TO 14'
Construction Sign for Palo Alto Flood Basin Project
EXHIBIT B PAGE 3 OF 3
DocuSign Envelope ID: 0212DB79-F5E8-42B8-AB33-979184EDAB41
Certificate Of Completion
Envelope Id: 0212DB79F5E842B8AB33979184EDAB41 Status: Completed
Subject: Please DocuSign: ORD 5541 Exhibit B - Temporary Trail Closures.pdf, ORD 5541 Exhibit A - In-Pro...
Source Envelope:
Document Pages: 10 Signatures: 5 Envelope Originator:
Certificate Pages: 2 Initials: 0 Danielle Kang
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Danielle.Kang@cityofpaloalto.org
IP Address: 199.33.32.254
Record Tracking
Status: Original
1/27/2022 2:55:52 PM
Holder: Danielle Kang
Danielle.Kang@cityofpaloalto.org
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign
Signer Events Signature Timestamp
Tim Shimizu
Tim.Shimizu@CityofPaloAlto.org
Deputy City Attorney
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 67.169.5.157
Sent: 1/27/2022 2:58:10 PM
Viewed: 1/27/2022 3:30:30 PM
Signed: 1/27/2022 3:34:24 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Kristen O'Kane
Kristen.O'Kane@CityofPaloAlto.org
Assistant Director Community Services
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 67.188.116.181
Sent: 1/27/2022 3:34:34 PM
Viewed: 1/27/2022 3:54:33 PM
Signed: 1/27/2022 3:54:50 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Ed Shikada
Ed.Shikada@CityofPaloAlto.org
Ed Shikada, City Manager
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 1/27/2022 3:55:04 PM
Viewed: 1/31/2022 10:27:49 PM
Signed: 1/31/2022 10:28:02 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Pat Burt
pat@patburt.org
Mr
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 98.35.161.52
Sent: 1/31/2022 10:28:10 PM
Viewed: 3/7/2022 8:56:55 AM
Signed: 3/7/2022 8:57:14 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Signer Events Signature Timestamp
Lesley Milton
Lesley.Milton@CityofPaloAlto.org
City Clerk
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 3/7/2022 8:57:22 AM
Viewed: 3/7/2022 7:20:57 PM
Signed: 3/7/2022 7:21:11 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 1/27/2022 2:58:10 PM
Certified Delivered Security Checked 3/7/2022 7:20:57 PM
Signing Complete Security Checked 3/7/2022 7:21:11 PM
Completed Security Checked 3/7/2022 7:21:11 PM
Payment Events Status Timestamps