HomeMy WebLinkAbout2006-03-13 Ordinance 4897!'--"
ORDINANCE NO. 4897
ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING THE BUDGET FOR THE FISCAL YEAR 2005 06
TO ADJUST BUDGETED REVENUES AND EXPENDITURES IN
ACCORDANCE WITH THE RECOMMENDATIONS IN THE
MIDYEAR REPORT
The City Council of the City of Palo Alto does ordain as
follows:
SECTION 1. The City Council of the City of Palo Alto finds
and determines as follows:
A. Pursuant to the provisions of Section 12 of Article III
of the Charter of the City of Palo Alto, the Council on June 20,
2005 did adopt a budget for fiscal year 2005-06, including a
Table of Organization describing the staffing for each
department and a Municipal Fee Schedule; and
B. After reviewing the current budgeted revenues and
expenditures for fiscal year 2005-06, adjustments to the budget
are recommended to more accurately reflect year-end projections;
and
C. Various staffing adjustments require an amendment to
the Table of Organization including the elimination of 0.75 FTE
Senior Assistant City Attorney and the reclassification of 1.0
FTE Legal Secretary to Secretary to City Attorney in the City
Attorney's Office, the addition of 0.75 FTE Senior Administrator
in the Human Resources Department, reclassification of 1.0 FTE
Coordinator Library Circulation to Supervising Librarian in the
Library Department, reclassification of 1.0 FTE Offset Equipment
Operator to Offset Equipment Operator -Lead in the Printing and
Mailing Fund, the reclassifications of 1.0 FTE Electrical
Assistant I to Office Specialist and 1.0 FTE Asst. Director
Utilities/Engineering/Operations to Asst. Director
Utilities/Operations in the Utilities Department; and
D. The 2005 06 Adopted Municipal Fee Schedule requires
amendment to add or increase certain fees and to implement other
miscellaneous changes; and
E. City Council authorization is needed to amend the 2005-
06 budget as hereinafter set forth.
~~~~~. The General Fund Budget Stabilization Reserve is
hereby increased by the sum of Two Million Six Hundred Thirty-
Two Thousand Five Hundred Seven Dollars ($2,632,507), as
described in Exhibi t "A, II which is incorporated herein by this
reference. As a result of this change, the Budget Stabilization
Reserve will increase from $19,992,695 to $22,625,202.
Page 1 of 4
SECTION 3. The Capital Fund Infrastructure Reserve is
hereby decreased by the sum of Sixteen Thousand Three Hundred
Twenty Dollars ($16,320), as described in Exhibit "A." As a
result of this change, the Infrastructure Reserve will decrease
from $18,467,781 to $18,451,461.
SECTION 4. The Supply Rate Stabilization Reserve in the
Electric Fund is hereby increased by the sum of Three Million
Nine Hundred Thousand Dollars ($3,900,000) as described in
Exhibit A.
SECTION 5. The Distribution Rate Stabilization Reserve in
the Electric Fund is hereby decreased by the sum of One Hundred
Seventy-Five Thousand Four Hundred Twenty-Four Dollars
($175,424) as described in Exhibit A.
SECTION 6. The Supply Rate Stabilization Reserve in the
Gas Fund is hereby decreased by the sum of One Million Two
Hundred Twenty-Nine Thousand Dollars ($1,.229,000) as described
in Exhibit A.
SECTION 7. The Distribution Rate Stabilization Reserve in
the Gas Fund is hereby decreased by the sum of Four Hundred
Forty-Six Thousand Nine Hundred Nine Dollars ($446 /909) as
described in Exhibit A.
SECTION 8. The Rate Stabilization Reserve in the Wastewater
Collection Fund is hereby decreased by the sum of Six Hundred
Forty-Two Thousand Seven Hundred Ninety-Three Dollars ($642,793)
as described in Exhibit A.
SECTION 9. The Rate Stabilization Reserve in the Water Fund
is hereby decreased by the sum of Two Million Forty-Four
Thousand One Hundred Forty-Four Dollars ($2,044,144) as
described in Exhibit A.
SECTION 10. Funds in the amount of Six Thousand Dollars
($6 f 000) are hereby transferred from the General Fund to the
Refuse Fund as described in Exhibit A.
SECTION 11. Funds in the amount of Fifty Thousand Dollars
($50 1 000) are hereby transferred from the Capital Improvement
Fund to the General Fund as described in Exhibit A.
SECTION 12. Funds in the amount of Fi ve Thousand Three
Hundred Dollars ($5,300) are hereby transferred from the Capital
Improvement Fund to the Technology Fund as described in Exhibit
A.
SECTION 13. Adjustments to other various funds are made as
shown in Exhibi t A. These changes impact Special Revenue I
Internal Service 1 and other Funds Reserves as indicated in
Exhibit A.
Page 2 of4
SECTION 14. Adjustments to decrease or increase amounts
allocated to various Capital Improvement Projects are made as
shown in Exhibit B. These changes impact the General Fund
Budget Stabilization Reserve and the Infrastructure Reserve and
are reflected in the adjustments as shown in Exhibit A.
SECTION 15. Capital Improvement Program (CIP) PF-06005
Golf Course Maintenance Yard Sewer Line Replacement, is hereby
created as shown in Exhibit B and the sum of Thirty-Six Thousand
Two Hundred Dollars ($36,200) is hereby transferred from the
General Fund and appropriated to CIP Number PF-06005.
SECTION 16. Funds in the amount of One Hundred Ninety-Nine
Thousand Nine Hundred Fifty Dollars ($199,950) are hereby
transferred from the Electric Fund Public Benefit program to the
Capital Improvement Program for project PE-05001 for approved
grant funding.
SECTION 17. The Municipal Fee Schedule is hereby amended to
reflect the changes shown in Exhibit C, which is attached hereto
and incorporated herein by reference. These changes impact the
General Fund Budget Stabilization Reserve and are reflected in
the changes in Exhibit A.
SECTION 18. The Table of Organization is hereby amended to
reflect the changes shown in Exhibit D, which is attached hereto
and incorporated herein by reference. These changes impact
Reserves and are accounted for in the changes shown in Exhibit
A.
SECTION 19. As specified in Section 2.28.080 of the Palo
Alto Municipal Code, a two-thirds vote of the City Council is
required to adopt this ordinance.
SECTION 20. The Council of the City of Palo Alto hereby
finds that this midyear adjustment is not a project under the
California Environmental Quality Act and, therefore, no
environmental impact assessment is necessary. Capital
improvement projects described in this ordinance will be
assessed individually as appropriate.
SECTION 21. As provided in Section 2.04.330 of the Palo
Alto Municipal Code, this ordinance shall become effective upon
adoption; provided that all new or increased Planning Department
fees, more specifically described in Exhibit "C," shall become
effective sixty (60) days from the date of adoption.
II
II
II
II
Page 3 of 4
(t \.
II
INTRODUCED AND PASSED: March 13, 2006
AYES: BARTON, BEECHAM, CORDELL, DREKMEIER, KISHIMOTO,
KLEIN, KLEINBERG, *MORTON (with the exception of
notation below)
NOES:
ABSENT: MOSSAR
ABSTENTIONS: MORTON
*Council Member Morton did not participate in that portion of
the action appropriating $100,000 to the City Attorney budget
for litigation expense in connection with the utility users tax
as shown in Exhibit A to this ordinance due to family holdings
of telecommunications stock.
APPROVED AS TO FORM:
Asst. City Attorney City Manager
Director of Services
Page 4 of 4
/,
Revenues & Other Sources
Sales Tax
Property Tax
Transient Occupancy Tax
Utility Users Tax
Other Taxes and Fines
Charges for Services
Permits & Licenses
Return on Investment
Rental Income
From Other Agencies
Charges To Other Funds
Other
EXl!enditures & Qther Uses
City Attorney
City Auditor
City Clerk
City Council
City Manager
Administrative Services
Community Services
Fire
Human Resources
Library
Planning and Community Environment
Police
Public Works
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR FINANCIAL REPORT
GENERAL FUND
(In thousands of dollsrs)
19,036 19,036 985
16,986 16,986 1,256
6,173 6,173
8,341 8,341 181
6,845 6,845 984
18,760 18,760 22
4,084 4,084
2,215 2,215
12,332 12,332
204 204
8,924 8,924
1721 177
2,743 3,526 42
839 1,066
923 935 19
164 180
1,751 1,928 50
6,344 6,673
19,635 20,407 129
20,160 20,464 86
2,355 2,564 51
5.791 123
9,574 305
24,634 175
11,942 14
11
• Excludes encumbrances, reappropriatlons, and infrastructure reserve
"Adjusted Budget Is primarily due to the purchase of the Bressler Property.
General Fund Summaries - 1
-Pre I I I %of Encumbr Encumbr Actual Midyear
Budget
~
7,321
7,122
2,621
4,137
4,403
8,425
1,909
1,041
6,006
156
4,397
2 629 1,255
71 472
21 495
22 59
57 796
24 237 3,336
114 2,718 10,528
35 266 10,261
2 195 1,146
294 2,816
379 774 4,256
9 840 12,131
330 800 5,665
/
" Exhibit A
General Fund Details -2
, , I, I
and Equipment Purchases
Expenses
and leases
IAliocaltea Charges
•• Excludes encumbrances and reappropriation
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
ELECTRIC FUND
(In thousands of dollars)
(10)
(15)
Fund Summaries -2
61
25
330
2,265
129
64
25,224
5,324
570
358
1
350
,"
Sources of Funds
Net Sales
Interest Income
Other Income
Uses of Funds
Utility Purchases
Treatment Plant Chgs
Refuse Collections Svcs
Salaries & Benefits
Contract Services
Supplies and Malerials
Facility and Equipment Purchases
General Expenses
Rent and Leases
Allocated Charges
Debt Se ice
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
GAS FUND
(In thousands of dollars)
BUDGET;" ..
I Adopted I Adjusted I Midyear I Midyear
Budget Budget Budget Changes
35,802
673
636
20,320
···3,445
1.06.7 ;jsir
..•.....• 55
··;.c·~~i56
·.235
. :3,027
·947
34,761 ..
4,024
4,024
5,253
(7)
··5,246
(1,676)
•• Excludes encumbrances and reappropriation
66 9
353
95
4
7,042
Net Sales
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
WASTEWATER COLLECTION FUND
(in thousands of dollars)
.. BUDGET
I Adopted I Adjusted I Midyear I Midyear
Budget Budget Budget Changes
13,679
528
686
•• Excludes encumbrances and reappropriation
2,196
693
174 26
78 53
6.860
3.566
398
229
54
236
1,601
2.386
775
•• Excludes encumbrances and reappropriation
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
WATER FUND
(in thousands or dollars)
3,089
1,686
230 158
85 188
Purchases
reatment Plant Chgs
Refuse Collections Svcs
Salaries and Benefits
Contract SerVices
Supplies and Materials
Facility and Equipment Purchases
General Expenses
Rents and Leases
I Charges
8,466
3,564
3,566
349
.... Excludes encumbrances and reappropriation
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
REFUSE FUND
(In thousands of dollars)
6
Fund Summaries -6
221
10
1,022
278
3,899
1,713
1,025
1,831
1,551
2,144
IR~.ni<'nin'" Reserves
•• Excludes encumbrances and reappropriation
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
STORM DRAINAGE FUND
(in thousands of dollars)
Fund Summari . 7
442 47%
44 158 53%
12 24 36%
0%
2 25%
5 83%
.* Excludes encumbrances and reappropriation
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
WASTEWATER TREATMENT FUND
(in thousands of dollars)
Fund Summaries - 8
196
65
1,219
352
2
3,650
415
721
79
Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
EXTERNAL SERVICES FUND
(in thousands of dollars)
" Includes revenue for services rendered in Q4 2005, but billed in 2006
*" Excludes encumbrances and reappropriation
Fund Summaries-9
Exhibit A
2005·06 MIDYEAR BUDGET SUMMARY
DETAIL CHANGES TO THE ADJUSTED BUDGET
Exhibit A
Exhibit A
22000000
60471001
by
.::, ... Exhibit A
CITY OF PALO ALTO
2005-06 MIDYEAR BUDGET SUMMARY
DETAIL CHANGES TO THE ADJUSTED BUDGET
Exhibit A
Move budget from Facilities Cubberley (General Fund) to Refuse Fund to reflect
correct cost distribution
:.-.. :~ ,
"
Exhibit B
2005-06 Mid-Year CIP Adjustments
• This project was adopted prior to 2005·06; hence, CIP page is not proVided.
1 of 3
Exhibit B
2005-06 CIP Mid-Year CIP Adjustments
8
7
9
10
Increase in labor charges 16
• This project was adopted prior to 2005·06; hence. CIP page is not provided
2 of 3
BiCycle Boulevards Implementalion Projecl
REDUCTION OF APPROPRIATIONS.~ , . ';',.
ECRIChurchilllnlerseclion"
Middlelield Road Circl. Improvements-Midtown'
""Bikeway System Improvemenls'
Tolal Rli/ductlon Of Appropriations.; ""'.
TQTAL GAS.TAX FUN[).CIP .IIt'ID,YEAR. .'. AbJUSTMENTS:.-: . ' .• "" •. ;. :'.'.' '.': .,':
Exhibit 8
2005-06 CIP Mid-Year CIP Adjustments
GAS TAX FUND
PL·04010 $39,497 1 $39,497 Gas Tax Fund
$39,497 $39,497
PL-Ol017 ($100,000) Gas Tax Fund
PL·04oo3 ($55,000) Gas Tax Fund
PL·95024 ($39,497) ($39,497)~ Gas Tax Fund
' .. '. {$39,~7).··, .: ($194,497) "'.''"''
" .
• This project was adopled prior to 2005·06; hence, CIP page is nol provided.
3 of 3
and return to
appropriation and return 10
appropriation and return to
appropriation and return to
appropriation and return to
To transfer balance of reappropriation from
PL·950241o PL·04010
Delayed indefinitely as olher Iransportation
11
15
6
projecls have been prioritized See nole below
Cily will nol proceed with Ihe Middlefield
. Road Circulalion Improvemenl which was
intended 10 change Ihe lane configuration See nole below
To Iransler balance of reappropriation lrom
PL·95024 to PL-04010
,',".""
. : " .. '
~ '''. . . '.'.:""., "". '.'
NEW
CIP •
GOLF COURSE MAINTENANCE YARD SEWER LINE
REPLACEMENT (PF ... 06005)
Description: This project installed a new sewage grinder pump, 2" sewer
line from the grinder pump to the discharge point near the airport, a
separate 2" sewer line for the equipment wash pad, and cleanouts for each
line at every 100' of pipe length. This project will pay for the cost of
Utilities Department labor involved in this retrofit. This project will incur
no further costs.
Justification: When the equipment wash pad for the maintenance yard
was installed, it was connected to the existing sewer line. Since that time,
there have been continualHne backups. In 2005, the line backed up and
would not clear. The existing line was undersized at 1-1/4" and the loca-
tion of the original line was unknown. The Utilities Department assisted
Public WorkslFacilities Management to dig up the line, determine its loca-
tion, and replace it with two appropriately sized sewer lines.
Revenues:
Source of Funds: General Fund
CIP FACTS:
• New
• Project Status: Construction
• Timeline: FY 2005-06
• Overall Project Completion: 100%
• Managing Department: Public Works
• Comprehensive Plan: N/A
CIP -PHOTOVOLTAIC DESIGN AND INSTALLATIONS
(PE-OS001)
Description: This project will install photovoltaic solar panels on several
City buildings to maximize energy production from the use of this
renewable energy technology. In FY 2003-04, the City was granted $1.4
million by the Department of Energy (DOE) for Photovoltaic installations
on public buildings with matching funds provided by the City Utility
Department PV Partners program.
Justification: The City of Palo Alto and its City-owned utility search out
opportunities to improve the community's energy usage. The City actively
promotes sustainability and technologies that improve the quality of life
and are investments in our future. Encouraging use of photo vol taic solar
technology in Palo Alto has been a goal for the City. Installation of
photo voltaic panels on a number of City buildings will promote their
effectiveness and demonstrate the City'S commitment to alternative energy.
Supplemental Information: Other represents IMP staff support.
PY Budget $683,970
PY Actuals as of 12/31/2004 $70,981
Revenues:
Source of Funds:
CIP FACTS:
• Continuing
• Project Status: Pre-Design
• Timeline: FY 2004-2007
• Overall Project Completion: 80%
• Percent Spent: 10.38%
• Managing Department: Public Works
• Comprehensive Plan: Policy N-66 and Pro-
grams N-64 and N-65
• Board/Commission Review: ARB
IMPACT ANALYSIS:
• Environmental: Environmental report may be
required.
• DeSign Elements: This project may be subject
to ARB review.
• Operating: Utility costs would be reduced for
each facility .
. • Telecommunications: None
Council Policy Direction:
1. This project is not in planned General Fund IMP and/or does not have an identified fund-
ing source.
2005-07 Budget
2. This project requires the diversion of staffing and/or City funds due to outside funding
opportunity.
City of Palo Alto 2
STREET MAINTENANCE (PE-86070)
Description: This project provides for annual resurfacing, slurry seal,
crack seal and reconstruction of various city streets. The list of streets to be
included in this project will be pribritized and coordinated with Utilities
Department undergrounding projects.
Justification: The Pavement Maintenance Management System (PMMS)
has identified streets whose condition requires maintenance. This program
systematically schedules the highest priority repairs. By providing a
systemized method of bi-annually rating streets for improvements and a
yearly maintenance program, the City addresses the need to provide a
functioning street system while reducing the maintenance backlog.
Supplemental Information: Other represents IMP staff support.
PRIORVEARS
PY Actuals as of
Revenues:
Source of Funds:
CIP FACTS:
• Continuing
• Timeline: FY 2006-2010
• Managing Department: Public Works
• Comprehensive Plan: Program C-20
• Board/Commission Review: None
IMPACT ANALYSIS:
"Environmental: Categorically exempt from
CEQA under Section 15301.
• Design Elements: Reasonable efforts will be
made to match existing pavement
• Operating: Reduces street maintenance costs.
ROOFING REPLACEMENT (PF-00006)
Description: This project provides for ongoing roofing maintenance at
various City facilities including major repairs, replacement, roof deck, and
sheet metal repair or replacement:
Justification: The life expectancy of most roofs at City facilities is 20 to
25 years. There are facilities in the inventory with roof systems that are at
or near their life expectancy. This project provides the means to re-roof
facilities that are failing, or will soon fail.
ongoing
$0
CIP FACTS:
• Continuing
• Project Status: Other
• Timeline: FY 2006-2010
• Managing Department: Public Works
• Comprehensive Plan: Furthers Policy C-24 &
Program C-19.
IMPACT ANALYSIS:
• Environmental: Project is categorically exempt
under CEOA Section 15301.
• Design Elements: There may be ARB and/or
HRB review required.
$100,000 $100,000 $100,000
Revenues:
Source of Funds: Infrastructure Reserve
2005-07 Budget City of Palo Alto 4
FACILITY INTERIOR FINISHES REPLACEMENT
(PF-02022)
Description: This project allows for the replacement of worn interior
finishes at various City facilities. Finishes include ceilings, paint, carpet or
other floor finishes, as well as window coverings
Justification: As part of the Infrastructure Management Plan, interior
finishes throughout City facilities are designated for replacement. Finishes
are typically upgraded as other renovation projects are undertaken. For
those facilities that will not be renovated for several years, this project
provides the resources to accomplish this work.
PRIORVEARS
PY Budget ongoing 1----.:...-----------------+------1 PY Actuals as of $0
Revenues:
Source of Funds: Infrastructure Reserve
'i' ritu nf Pnl" A Ito
CIP FACTS:
• Continuing
• Project Status: Construction
• Timeline: FY 2006-2010
• Managing Department: Public Works
• Comprehensive Plan: Furthers Policy C-24 &
Program C-19.
IMPACT ANALYSIS:
• Environmental: Project is categorically exempt
under CEQA Section 15301
• Design Elements: May require design review
for historic structures.
2005-07 BudJ!et
BICYCLE BOULEVARDS IMPLEMENTATION PROJECT
(PL-04010)
Description: This project funds the design and construction of physical
changes to local and collector streets to implement the network of bicycle
boulevards identified as high priority projects in the Bicycle Transportation
Plan. These eight bike boulevards are: El Camino WaylMaybelllDonald
Drive; Homer Avenue; Matadero AvenuelMargarita Avenue; Castilleja!
Park BoulevardIWilkie Way; Everett A venuelPalo Alto Avenue; Chaucer!
Boyce/Melville and the extension of the Bryant Street bicycle boulevard.
Justification: The bicycle boulevard network is identified as a high
priority in the Transportation Strategic Plan and Bicycle Transportation
Plan. Bicycle boulevards provide safer, traffic-calmed biking routes with
reduced conflicts with motor vehicles, as alternatives to more congested
arterial streets. Bicycle boulevards are designed to serve the needs of
cyclists of all abilities, but the network has been designed with particular
attention to improving bike safety along school commute routes.
$100,000
$0
Revenues:
Source of Funds:
CIP FACTS:
• Continuing
• Project Status: Construction
• Tlmeline: FY 2004-2010
• Overall Project Completion: 10%
• Percent Spent: 0.00%
• Managing Department: Planning and Commu-
nity Environment
• Comprehensive Plan: This project furthers
Program T-22.
IMPACT ANALYSIS:
• Environmental: An environmental assess-
ment may be required.
• Operating: Minor ongoing maintenance will be
required.
Council Policy Direction: This project is not in planned General Fund IMP and/or does not have an identified funding
2005-07 Budget City of Palo Alto 6
CIP •
FIBER OPTIC CUSTOMER CONNECTIONS
(EL-06006) (Formerly EL-98002)
Description: This project provides funds for the installation of fiber optic
infrastructure for new service connections. These new service connections
cost nothing to the Electric Utility after reimbursements since requesting
parties will be billed for the interconnection and the utilities ongoing costs
of ownership. Typical activities in this CIP include: purchasing, upgrading,
and installing fiber optic cable, conduits, and splice enclosures.
Justification: This project promotes the formation of a competitive
market for telecommunications in Palo Alto, accelerating the pace at which
high-quality, low-cost advanced telecommunications services are delivered
to residents and businesses, while limiting the negative impacts on Palo
Alto's environment by using existing conduit and poles. Finally, it enables
the Electric Utility to generate additional revenues through the enhanced
use of its conduit and poles.
Supplemental Information: Revenue from others represent fiber optic
license fee.
PRIOR YEARS
PY Budget ongoing I
PY Actuals as of $0 I
CIP FACTS:
• Continuing
• Managing Department: Utilities
• Comprehensive Plan: This project furthers
Programs 8-4 and L-81.
IMPACT ANALYSIS:
• Environmental: Categorically exempt under
Section 15302 of CEQA.
• Design Elements: Screening of pad-mounted
equipment will be included.
• Operating: Infrastructure will require more
funding.
$2,472 $200,000 $200,000 $200,000 $802,472
Source of Funds: i Electric Fund with the following reimbursements: Others($802,472)
?O()')-()7 RIlr/r>l>t
CIP FIBER OPTIC NETWORK SYSTEM IMPROVEMENTS
•. (EL-06005) Formerly (EL-98001)
Description: This project extends the "dark" fiber optic network around
Palo Alto which, in turn, is leased to parties providing telecommunication
services to citizens and businesses in Palo Alto. Included in the project are
increases in system capacity, development of fiber sub-rings, and general
improvements to the fiber system. Additional fibers will be reserved for
future use by the City.
Justification: This project promotes the formation of a competitive
market for telecommunications in Palo Alto, accelerating the pace at which
high-quality, low-cost advanced telecommunications services are delivered
to the residents and businesses of Palo Alto. It does so while limitingthe
negative impacts on Palo Alto's environment by using pre-existing conduit
and poles. Finally. it enables the Electric Utility to generate additional
revenues through the enhanced use of its conduit and poles.
PRIOR YEARS
py Actuals as of
Revenues:
! Source of Funds: Electric Fund
8 of Palo Alto
CIP FACTS:
• Continuing
• Project Status: Other
• Managing Department: Utilities
• Comprehensive Plan: This project furthers
Programs 8-4 and L-81.
IMPACT ANALYSIS:
• Environmental: Categorically exempt under
Section 15302 of CEQA.
• Design Elements: Screening of pad-mounted
equipment will be included in the design.
• Operating: Additional infrastructure will require
more funding.
2005-07 Budget
CIP •
FIBER OPTIC NETWORK SYSTEM IMPROVEMENTS
(EL-98001)
Description: This project extends the "dark" fiber optic network around
,Palo Alto which, in turn, is leased to parties providing telecommunication
services to citizens and businesses in Palo Alto. Included in the project are
increases in system capacity, development of fiber sub-rings, and general
improvements to the fiber system. Additional fibers will be reserved for
future use by the City.
Justification: This project promotes the formation of a competitive
market for telecommunications in Palo Alto, accelerating the pace at which
high-quality, low-cost advanced telecommunications services are delivered
to the residents and businesses of Palo Alto. It does so while limiting the
negative impacts on Palo Alto's environment by using pre-existing conduit
and poles. Finally, it enables the Electric Utility to generate additional
revenues through the enhanced use of its conduit and poles.
PRIOR fEARS
PY Budget ongoing
PY Actuals as of $0
Revenues:
Source of Funds: Electric Fund
CIP FACTS:
• Continuing
• Project Status: Other
• Managing Department: Utilities
• Comprehensive Plan: This project furthers
Programs 8-4 and L-81.
IMPACT ANALYSIS:
• Environmental: Categorically exempt under
Section 15302 of CEQA.
• Design Elements: Screening of pad-mounted
equipment will be included in the design.
• Operating: Additional infrastructure will require
more funding.
"
CIP •
FIBER OPTIC CUSTOMER CONNECTIONS
(EL .. 98002)
Description: This project provides funds for the installation of fiber optic
infrastructure for new service connections. These new service connections
cost nothing to the Electric Utility after reimbursements since requesting
parties will be billed for the interconnection and the utilities ongoing costs
of ownership. Typical activities in this eIP include: purchasing, upgrading,
and installing fiber optic cable, conduits, and splice enclosures.
Justification: This project promotes the formation of a competitive
market for telecommunications in Palo Alto, accelerating the pace at which
high-quality, low-cost advanced telecommunications services are delivered
to residents and businesses, while limiting the negative impacts on Palo
Alto's environment by using existing conduit and poles. Finally, it enables
the Electric Utility to generate additional revenues through the enhanced
use of its conduit and poles.
Supplemental Information: Revenue from others represent fiber optic
license fee.
PRIOR YEARS
. PY Budget ongoing
PY Actuals as of $0
CIP FACTS:
• Continuing
• Managing Department: Utilities
• Comprehensive Plan: This project furthers
Programs B-4 and L-81.
IMPACT ANALYSIS:
• Environmental: Categorically exempt under
Section 15302 of CEQA.
• Design Elements: Screening of pad-mounted
equipment will be included.
• Operating: Infrastructure will require more
Source of Funds: lectric Fund with the following reimbursements: Others($197.528)
2005-07 Budget City of Palo Alto 10
NEW
CIP LIBRARY CIRCULATION SELF-SERVICE CHECKOUT
• . STATIONS (TE .. 06000)
Description: This project will fund the purchase of two express self-
service stations that will be used by library customers to checkout their own
materials. One station will be placed at each of the Downtown and College
Terrace branch libraries. The equipment, similar to that in place at the
Mitchell Park and Main libraries, will be networked to the library system
that manages all circulation transactions.
Justification: A major goal of the Library is to implement technologies
that will improve customer service and help control staffing costs. Express
checkout stations achieve this goal by enhancing self-service options for
library service, increasing privacy for customers, improving turnaround
time, reducing repetitive stress injuries among staff, and enabling the
library to handle increased circulation activity without adding staff. This
technology is already in place in two of the five libraries.
I Revenues:
Source of Funds:
II r'ih) nf PrJln A Itn
CIP FACTS:
-New
-Project Status: Other
-Timeline: FY 2005-2006
-Percent Spent: 0.00%
-Managing Department: Administrative Ser-
vices
-Comprehensive Plan: This project furthers
Policies C-3, and C-9
CIP ACQUISITION OF NEW COMPUTERS (TE .. 99010)
•
Description: This project funds the acquisition of new computers for the
City. Currently planned acquisitions include four "rugged-ized" laptops for
the Utilities Department.
Justification: Field service staff are the "first responders," 24171365, to
aU utility emergency calls. These computers with wireless capabilities will
be used by the fieJd service staff to identify and locate water or gas main
leaks.
PRIOR YEARS
PY Budget ongoing I
PY Actuals as of $0 I
Source of Funds:
12 City afPalo Alto
CIP FACTS:
• Continuing
• Project Status: Other
• Managing Department: Administrative Ser-
vices
• Comprehensive Plan: T-10 and T-12 of the
Comprehensive Plan.
IMPACT ANALYSIS:
• Environmental: This project is categorically
i exempt from CEQA.
2005-07 Budget
CIP •
EGOV-WEB INFRASTRUCTURE & ApPLICATIONS
(TE-02014)
Description: This project will put in place the infrastructure required for
small to medium sized web applications. Projects will be developed when
further enhancements are needed for deli very of similar functionality. This
project will also analyze, design, build, and implement some initial web
applications. This applications may include a number of department-wide
functions; such as customer access to Utility billing information and online
registration to Enjoy classes.
Justification: With the growing demand for web applications, the City's
Information Technology Division must first design and implement the
appropriate infrastructure to support the new applications. Once the
infrastructure is in place, application delivery will follow.
PRIORVEARS
PY Budget $300,000
PY Actuals as of 12/31/2004 $0
Revenues: $S6,400
CIP FACTS:
• Continuing
• Project Status: Other
• Overall Project Completion: 60%
• Percent Spent: 0.00%
• Managing Department: Administrative Ser-
vices
• Comprehensive Plan: Furthers Policy G-31
Programs T -SIT -1 OIT -12/G-4/G·5
IMPACT ANALYSIS:
• Environmental: Not a project under CEQA
• Operating: Ongoing annual maintenance costs
of $25.000
Source of Funds:
Technology Fund with the following reimbursements: Electric Fund($145.800); Gas
Fund($64,SOO); Refuse Fund($54,000); Storm Drainage Fund($5,400); Wastewater Collec-
tion Fund($16.200); Wastewater Treatment Fund($27,OOO); Water Fund($32,400)
Ii rit""f' Pol" A 7to
CIP
$2
CITYWIDE GIS DATA, INFRA. & ApPLICATIONS
(TE-02015)
Description: This project will improve the capabilities of the City's
Geographic Infonnation System (GIS) and expand its use by City staff and
the public. Included are applications to support Public Works and Utilities
Infrastructure Management and Police and Fire operations. Applications
will also perfonn document storage and retrieval for Planning and the City
Clerk's office, and update the spatial data set that is the foundation of the
system.
Justification: The GIS has become a core information asset for the City
by providing parcel-related and infrastructure data. It has grown from
being a set of special purpose computer applications to being an
information tool that serves all segments of the City.
$1,285,794
CIP FACTS:
• Continuing
• Project Status: Other
• Overall Project Completion: 40%
• Percent Spent: 35.77%
• Managing Department: Administrative Ser-
vices
• Comprehensive Plan: Proj. furthers Policies
G-3, G-12, G-4, T-10, T-38
IMPACT ANALYSIS:
• Environmental: Not a project under CEQA
• Operating: There will be ongoing annual main-
tenance costs.
Revenues: $70,314 $167,404
Source of Funds:
2005-07 Budget
Technology Fund with the following reimbursements: Electric Fund($193,221); Gas
Fund($89,179); Refuse Fund($74,316); Storm Drainage Fund($7,432); Wastewater Collec-
tion Fund($22,295); Wastewater Treatment Fund($37, 158); Water Fund($44,589)
City of Palo Alto 14
CIP •
PERMIT INFORMATION TRACKING SYSTEM
(TE-95016)
Description: This project is to implement an automated Permit
Information Tracking system. The system will be used to track and
monitor many types of permits and other activities such as applications,
licenses, inspections, and code enforcement. One of the most advantageous
uses of the system will be to monitor the complete development project
from planning to occupancy. The system will calculate fees, place holds,
route information, monitor conditions of approval, and monitor special
fees.
Justification: The Interdepartmental Cooperation Subcommittee of the
Customer Service Committee has identified over 50 different types of
permit procedures that require interdepartmental approval and
coordination, and a need for improved tracking systems. The Hughes Heiss
evaluation also recognized this need, as have members of the public who
obtain various City approvals. Most of these permit procedures can be
significantly improved through the use of an automated permit tracking
system.
PRIOR YEARS
PY Budget $1,040,000 !
i PY Actuals as of 12/31/2004 $741,073 I
Revenues:
Source of Funds: Technology Fund
15 I:itv ()f Palo AZtn
CIP FACTS:
• Continuing
• Project Status: Other
• Overall Project Completion: 80%
• Percent Spent: 71.26%
• Managing Department: Administrative Ser-
vices
• Comprehensive Plan: Furthers Policies C-
10,G-3,G-12,& Prog. G-4rr·10
IMPACT ANALYSIS:
• Environmental: Categorically exempt from
CEOA
• Operating: Annual software maintenance at
$45,000 starting 2000.
CIP •
WATER SERVICE HYDRANT REPLACEMENT
(WS-B0014)
Description: This project replaces system control valves, deteriorated
galvanized service lines, lead goosenecks, and fire hydrant valves and
assemblies as a result of Fire Department flow testing; upgrades fire
hydrants in main replacement project areas; and replaces existing
undersized or deteriorated copper water services. Upgrading hydrants and
system control valves is consistent with fire protection policies.
Justification: In order to maintain a high water quality standard for Palo
Alto's water supplies, it is necessary to replace old, lead, galvanized, and
corroded copper water service lines when found. The City has made a
concerted effort toreplace lead and galvanized service lines, but
periodically these service lines are discovered and need to be replaced.
PRIOR YEARS
PY Budget
i PY Actuals as of
Source of Fu nds: Water Fund
2005-07 Budget
CIP FACTS:
• Continuing
• Project Status: Construction
• Managing Department: Utilities
• Comprehensive Plan: This project furthers
Policy N·19.
IMPACT ANALYSIS:
• Environmental: Categorically exempt under
Section 15302 of CEOA.
• Design Elements: Screening may be required
on above-grade equipment.
• Operating: Decrease in water system mainte·
nance costs.
• Telecommunications: None
$96,000
City qf Palo Alto 16
CIP GMR -PROJECT 15 (GS-05002) -
Description: This project replaces leaking, inadequately sized, and
structurally deficient Acrylonitrile-Butadiene-Styrene (ABS) gas mains
and services as a first priority. By researching the maintenance and leak
histories of the mains in the gas distribution system, staff identifies mains
and services with these problems. This gas system analysis, along with
computer modeling of the proposed improvements to the gas distribution
system, is used to select candidates for main replacement.
Justificati on: Gas mains must be replaced when leaks present a potential
safety hazard and when repairs are no longer cost effective. Cathodic
protection of steel mains continues, but as mains corrode, such protection
has decreased effectiveness. The GMR program was increased from 7,000
to 20,000 linear feet per year in FY 1992-93 and increased to 30,000 linear
feet per year in FY 1999-2000. The completion of the ABS GMR program
will occur in 2010, 5 years earlier than planned.
Supplemental Information: Based on bids received GMR Project 15
may include: Forest (Bryant to Waverley); Gilman (Hamilton to Forest);
Florence (Lytton to University); Alley on Waverley just east of University;
Cowper (University to Hamilton); Everett Ct. (Cowper to Webster);
Hawthorne (Bryant to Waverley); Lytton (Middlefield to Guinda);
Channing (Webster to Guinda); Hamilton (Middlefield to Hamilton Ct.);
Hamilton Ct. (All); Hamilton (Lincoln to Newell); Fulton (University to
Hamilton); Seneca (University to Forest); Forest (Guinda to Hale); Forest
Ct. (All); Dana (Center to Newell); Pitman (Lincoln to Center); Louisa Ct.
(Newell to End); Channing (Hutchinson to Greer); Newell (Channing to
Hopkins); Rhodes (Channing to Edgewood); Hillbar (Rhodes to Rhodes);
Alannah Ct. (All); Hamilton (Rhodes to Greer); Greer (Hamilton to N.
California); N. California (Bellview to Embarcadero); Emerson (Channing
to Forest); Emerson Hamilton to University; Homer (Ramona to Emerson).
PRIOR YEARS
PY Budget ongoing !
PY Actuals as of $0 I
Gas Fund
CIP FACTS:
• Continuing
• Project Status: Design
• Managing Department: Utilities
• Comprehensive Plan: This project furthers
Policy N-44.
IMPACT ANALYSIS:
• Environmental: Categorically exempt under
Section 15302 of C EQA.
• Design Elements: Project will be coordinated
with Public Works.
• Operating: Project will reduce future mainte-
nance and expenses.
I • Telecommunications: None
CIP ART IN PUBLIC PLACES (AC .. S6017)
•
Description: This project supports innovative programs for both interior
and exterior public spaces by commissioning orpurchasing works by living
artists. In addition, funds may be used to obtain professional consultants to
assist in selecting artists and works; preserve meritorious works; and defray
capital expenses. This project is exclusively for the purchase and
installation of public art. .
Justification: This project places art in public buildings or parklands and
other sites open to frequent public view. It is expected that a sense of
community pride and ownership in the City of Palo Alto will be the result
of installing Art in Public Places. Art in Public Places preserves the long-
term viability of the built environment, and helps set a standard for
aesthetic variety in the community.
ongoing
$0
Source of Funds:
2005-07 Budget
CIP FACTS:
• Continuing
• Overall Project Completion: 0%
• Managing Department: Community Services
IMPACT ANALYSIS:
• Environmental: This project is categorically
exempt from CEQA.
• Design Elements: Location and installation of
Public Art reviewed by PAC
• Operating: Siting, installation and maintenance
• review by PAC and staff
City of Palo Alto J 8
Junior Museum Science Program
Junior Museum Science Outreach Unit
Junior Museum & Zoo birthday parties
Sport Team Registration (Youth and Adult)
Cancellation Charge
"""""'~t""M for Tournaments
EXHIBIT C
plus 15% (if more
51 % of participants
non-residents)
Fee plus 15% (if more
than 51 % of participants
are non-residents)
Up to 50% of fees paid
15.00/hour
* Effective December 21,2005, a 25%, 50%, or 15% fee discount is provided for low-income and/or disabled residents. Income eligibility is determined
using the Community Development Block Grant (CDBG) Low-Income Guidelines. The Low-Income Guidelines are established at 80% of the Santa
Clara County median income level. The income level for disabled residents is established as 100% of the Santa Clara County Median Income. Each
family or individual accepted into the program can access a maximum annual subsidy of $300 for an individual or $300 times each individual family
memberfor a family. (Example: A family of 4 would have a total of $1,200 usable subsidy. 4 Family Members X $300 = $1,200) Discount
percentage will be based on income level.
Municipal Fee Schedule -Page 1
EXHIBITC
Fee Non-Resident Fee
Up to 50% of fees paid
Birthday Parties at Foothills Park
* Effective December 27, 2005, a 25%,50%, or 75% fee discount is provided for low-income and/or disabled residents. Income eligibility is
determined using the Community Development Block Grant (CDBG) Low-Income Guidelines. The Low-Income Guidelines are established at
80% of the Santa Clara County median income level. The income level for disabled residents is established as 100% of the Santa Clara County
Median Income. Each family or individual accepted into the program can access a maximum annual subsidy of $300 for an individual or $300
times each individual family member for a family. (Example: A family of 4 would have a total of $1.200 usable subsidy. 4 Family Members X
$300 = $1,200) Discount percentage will be based on income level. .
Municipal Fee Schedule -Page 2
EXHIBITC
COMMUNITY SERVICES DEPARTMENT
Rentals and Reservations
Open Space Areas (Baylands, Greer Park and EI
Camino Park Multipurpose Field)
Tennis Courts (palo Alto Based Youth Sports Groups)
1<> /' .,JU-$375.00/use
Fee
per
-$375.00Iuse
(residents only) participant per season
(residents only)
Fee Fee
. overtime/City
Holiday
PAJMZ Attendant $26.00lhour per attendant
PAJMZ Attendant -oveltime and holidays $39.00lhour per attendant Not applicable $39.00lhour per attendant
Municipal Fee Schedule· Page 3
EXHIBIT C
CUBBERLEY COMMUNITY CENTER
Theatre Fee Schedule ---
Profit
Rates 2
y INFREQUENT
Basic
Rates Rates 2
Municipal Fee Schedule -Page 4
Basic
Rates Ii
INFREQUENT
Basic
Rates Ii
EXHIBITC
FIRE DEPARTMENT
, I
I I) r } ! I I;' j
--~ -~-~~ -~~ ~-~~~-~~----------------,----------~---~----.---~-~~ --------
G Dry Cleaning Plant only $350.00/annual each
H Fixed Medical Gases only or inert Compressed Gases only
Late Fee for Hazardous Materials Storage Permits 15% of
Prevention Bureau) When work is started without first obtaining a permit, an investigation fee in addition to the permit fee shall be collected
or not a is then or issued. The fee shall be to the amount of the fee
Fees charged for additional re-inspections after the first re-inspection. 0.00 for up to 2 hourslre-inspection
After hours inspection fee (before or after normal business hours;
weekends and holidays included, and is to be paid in advance of
inspection)
Day Care Fire and Safety Inspections
$105.00Ihour (during business
Municipal Fee Schedule -Page 5
for up to 2 hours/re-inspection
$llO.OOlhour (during business
111.001hour
Additional plan review required by changes,
additions, or revisions to plans (112 hour
Inspections for which no fee is specifically
indicated (2 hour minimum)
Inspections outside of normal business hours (2-
hour
Permit Automation Fee (applies to all
Permit Reactivation
EXHIBITC
00.00 plus Other Application Fees on
68
$250.00 or reactivation fee per PAMC
Section 16.04.100
Municipal Fee Schedule -Page 6
'''''.JV.'N plus Other Application Fees on
$2.00
$300.00 or reacti vation fee per P AMC
Section 16.04.100
Projects
Regular
EXHIBITC
Single familyl 'iillrMirlMIf'pIResidential: Single familyl :J> Ils4/lreSJderiCei
10>1\,1101."-'10 (or $1, 121/residence larger than
3,000 square feet); Multi-family $493/unit
(or $247/unit smaller than or equal to 900
square feet)
Nonresidential: Commercialllndustrial
$0. 19/square foot; HotellMotel
$0.08/square foot
Initial deposit of $3,000.00 plus Other
Application Fees on page 68. 100 percent
of processing costs will be recovered plus
V.llU'-,,,<,, Impact Assessment plus
any other entitlements necessary to
complete the project, whether indicated as
100 percent cost recovery in this schedule
residence (or $1 , 166/residence larger than
3,000 square feet); Multi-familY $513/unit
(or $257/unit smaller than or equal to 900
square feet)
",,.'u,-,mou. CommerciaVIndustrial,
198.00 per 1,000 square feet;
HotellMotel, $83.00 per 1,000 square feet
Initial deposit of ,000.00 plus Other
Application Fees on page 68. 100 percent
of processing costs will be recovered plus
VWU".Ha. Impact Assessment plus
any other entitlements necessary to
complete the project, whether indicated as
100 percent cost recovery in this schedule
or not. or not.
.OO/annual per Board or Commission per Board or Commission
,,"-"V.C/VJ<lIl1IUdJ per Board or Commission
deposit of 100 percent of estimated Initial deposit of 100 percent of estimated
sts due upon application plus Other costs due upon application plus Other
1-'1-',.1\..0'''''11 Fees on page 68. If estimated Application Fees on page 17-5. If
exceed $100,000 alternative deposit estimated costs exceed $100,000
payment schedule arrangements may alternative deposit and payment schedule
made at the discretion of the Director of arrangements may be made at the
Planning and Community Environment. of the Director of Planning and
100 percent of processing costs will be Environment. 100 percent of
recovered. costs will be recovered.
$830.00 plus Other Application Fees on
page 68
$996.00 plus Other Application Fees on
page 17-5
. For.ihepufposeso/ (i.siligi~de~achedh()use on a lot hi any zone .. All subse.f.!u.ent units ,,' 71T17rI1IPfl'
ordeta~hed)~onsirll~ted rj!ulti~ftin:,iiyii:jtf.'i' ~,..... .
* Document is also aVallable'freeon-Jine on the <;:fty's intern¢t ~eb site: hiip:l/~\\!w.cityofpaloalto.org
Municioal Fee Schedule -Paae 7
luevel()PlTlent Agreement
Development Agreement -Annual Review
EXHIBITC
deposit of
plication Fees on page 6S. ] 00 percent I "'I'I-","a,.vu
processing costs will be recovered plus
EnVIr,orunelltaJ Impact Assessment and
other entitlements necessary to complete
the project, whether indicated as 100
percent cost recovery in this schedule or
not.
of processing costs will be
recovered plus Envirorunental Impact
Assessment and any other entitlements
necessary to complete the project, whether
indicated as 100 percent cost recovery in
this schedule or not.
,SOO.OO plus Other of $5,SOO.00 plus Other
l"'IJ(JlJ''''''"V'' Fees on page 6S. 100 percent 1I>I'(J""''''vu Fees on page 17-5. 100
of processing costs will be recovered plus of processing costs will be
IFrlVi.'nnmp.nt,,] Impact Assessment plus plus Environmental Impact
other entitlements necessary to Assessment plus any other entitlements
I <';U'll,,)JCIC the project, whether indicated as necessary to complete the project, whether
100 percent cost recovery in this schedule indicated as 100 percent cost recovery in
or not. this schedule or not.
Initial deposit of $2,000 plus Other
Application Fees on page 6S. 100 percent
of processing costs will be recovered.
of $2,000 plus Other
on Fees on page 17-5. 100
of processing costs will be
Additional development impact fees for Traffic andfor Housing in-Lieu are specified in the Municipal Code (Chapter 16).
Parks
Community Centers
1.r..<;MUICJ1l.1~. Single family'
!residence (or $12,44S/residence
than 3,000 square feet); Multi-
$5,457/unit (or $2,759/unit smaller
than or equal to 900 square feet).
Nc,nn~1(lenl'al: CommerciallIndustriaI
$3.54/square foot; HotellMotel
$1.60/square foot
11'H)nr,eSHJen,UaJ: CommerciallIndustriaI
foot; HotellMotel
$0.09/square foot
/,{e!.idenpatl: .. Singlefamilyt~'.».·.,.. _ ..
h '7()/rp.dilpnr··'p·· ... .12: 94~re~jdenre":
v .... v.~., ..• _ .. ".MtiItFi . ..
1~"~·~'U'''lHl.'H: Single familyl
1~:l,:l4l:S/r;esl(lenCe (or $3,364lresidence
than 3,000 square feet); Multi-
$1,479/unit (or $7461unit smaller
or equal to 900 square feet)
. For the purposes of this fee, "singlejamily'! is d.ejifled asa single detached hou~e qn a lot in any zone. Allsubsecpient units ( attached
or detached) cons~rUcted ohalohviil be cnargeriatth'e m~ltija~ilYriJte;, . . . '.
Municipal Fee Schedule -Page 8
Commercial and Manufacturing
Fence
Residential
EXHIBITC
$2,625.00 plus Other Application Fees on
page 68 plus Environmental Impact
Assessment Fee as needed.
$693.00 plus Other Application Fees on
page 68
Act Contract· Establish or Withdraw deposit of $1,575.00 plus Other deposit of $1,575.00 plus Other
Minor Change to Planned Community Zone
Planned Community Zone Change
Regular
Application Fees on page 68. 100 percent Application Fees on page 17-5. 100
of processing costs will be recovered, of processing costs will be
including any charges for specialized including any charges for
consultants. specialized consultants.
plus Other Application Fees on h"~''''V.VV plus Other Application Fees on
68
deposit of $6,000.00 plus Other Initial deposit of $6,000.00 plus Other
,.n.fJp .. " .... vuFees on page 68. 100 ..... r"A",t'Application Fees on page 17-5. 100
processing costs will be recovered plus percent of processing costs will be
Environmental Impact and any other recovered plus Environmental Impact and
entitlements necessary to complete the any other entitlements necessary to
project. whether indicated as 100 percent complete the project, whether indicated as
cost recovery in this schedule or not. 100 percent cost recovery in this schedule
or not.
Initial deposit of $5,000.00 plus Other Initial deposit of $5,000.00 plus Other
Application Fees on page 68, 100 percent Application Fees on page 17-5. 100
of processing costs will be recovered plus percent of processing costs will be
Environmental Impact Assessment and recovered plus Environmental Impact
any other entitlements necessary to Assessment and any other entitlements
complete the project, whether indicated as necessary to complete the project,
100 percent cost recovery in this schedule whether indicated as 100 percent cost
or not. recovery in this schedule or not.
Municipal Fee Schedule· Page 9
Major
Minor Change
Subdivision (five or more parcels)
EXHIBITC
Initial deposit of $5,000.00 plus Other
Application Fees on page 68. 100 Fees on page 17-5. 100
of processing costs will be recovered plus percent of processing costs will be
t,n'V1f()nrnerltal Impact and any other recovered plus Environmental Impact and
entitlements necessary to complete the any other entitlements necessary to
ect, whether indicated as 100 percent complete the project, whether indicated
recovery in this schedule or not. 100 percent costrecovery in this schedule
$772.00 plus Other Application Fees on
page 68
not.
$926.00 plus Other Application Fees on
page 17-5
subdivision proposals require Environmental Impact Assessment apl1llCall,rms
Map $5,691.00 plus Other Application Fees on ffifEJai--eel**itH~~~,w-t*l:HH::Imer-::·
page 68 plus Environmental Impact
Assessment
Final Maps $2,263.00 plus Other Application Fees on $2,716.00 plus Other Application Fees on
page 68 17-5
Municipal Fee Schedule -Page 10
TDR Projects
Use
Day Care Center ,
Regular
Change to Existing
Minor
EXHIBIT C
deposit of $500 plus Other Initial deposit of $500 plus Other
Application Fees on page 68. 100 Application Fees on page 17-5. 100
processing costs will be recovered, of processing costs will be
plus Environmental Impact Assessment vered, plus Environmental Impact
and any other entitlements necessary to Assessment and any other entitlements
complete the project, whether indicated to complete the, project,
100 percent cost recovery in this schedule indicated as 100 percent cost
or not. recovery in this schedule or not.
$126.00 plus Other Application Fees on
page 68 plus Environmental Impact
Assessment
$151.00 plus Other Application Fees on
page 17 -5 plus Environmental Impact
Assessment
,625.00 plus Other Application Fees onlffl!:l¥lW6f*!lffi;*~P:4:l~~W!~~Fw,
page 68 plus Environmental Impact
$667.00 plus Other Application Fees on
68
.00 plus Other Application Fees on
68
32,00 plus Other Application Fees on
page 68
Munici al Fee Schedule -Paae 11
158-00 plus Other Application Fees on
17-5
EXHIBIT C
POLICE DEPARTMENT
Animal Services ___ ~r~
Fee established by Animal Fee established by Animal Superintendent
animals owner-surrendered animals for rabies
cost, including transportation
expense, will be charged to house the
animal at the appropriate facility.
$3.00
Municipal Fee Schedule -Page 12
Actual cost, including transportation
expense, will be charged to house the
animal at the appropriate facility.
$3.00
EXHIBIT C
$885.00 $3,000.00
in Public Right-of-Way (including $200.00 minimum, or 5% of contract $200.00 minimum, or 5% of contract
or private subdivision streets) work work
avement
Condition Score *
Municipal Fee Schedule -Page 13
$lO.OO per sq. ft.
of trench
.50 per sq. ft. of $7.50 per sq. ft. of
trench
per sq. ft. of $5.00 per sq. ft. of
trench
per sq. ft. of $2.50 per sq. ft. of
15%
ExhibitD
2003-04 2004-05 2005-06 2005-06 2005-06 Mid-2005-06
Adjusted Adjusted Adopted Changes to Year Budget Adjusted
Budget Budget Budget Date Change Budget
GENERAL FUND
Library Department
Administrative Assistant 0.00 1.00 1.00 0.00 0.00 1.00
Coordinator, Library Circulation (1) 0.00 1.00 1.00 0.00 -1.00 0.00
Coordinator, Library Programs 0.00 2.00 3.00 0.00 0.00 3.00
Director, Libraries 0.00 1.00 1.00 0.00 0.00 1.00
Librarian 0.00 6.00 6.00 0.00 0.00 6.00
Library Assistant 0.00 5.50 5.50 0.00 0.00 5.50
Library Associate 0.00 4.00 4.00 0.00 0.00 4.00
Library Specialist 0.00 7.75 7.75 0.00 0.00 7.75
Manager, Main Library Services 0.00 1.00 1.00 0.00 0.00 1.00
Office Specialist 0.00 0.50 0.50 0.00 0.00 0.50
Senior Librarian 0.00 10.25 9.25 0.00 0.00 9.25
Supervisor, Librarian (1) 0.00 4.00 4.00 0.00 1.00 5.00
I Total Library 0.00 44.00 44.00 0.00 0.00 44.00
Footnotes:
(1) Reclassification of 1.0 FfE Coordinator, Library Circulation to Supervisor, Librarian
Table of Organization - 1 of 1
Exhibit D
2003-04 2004-05 2005-06 2005·06 2005·06 Mid-2005·06
Adjusted Adjusted Adopted Changes to Year Budget Adjusted
Budget Budget Budget Date Change Budget
GENERAL FUND
Human Resources Department
Administrative Assistant 1.00 1.00 1.00 0.00 0.00 1.00
Administrator, Human Resources 5.00 5.00 5.00 0.00 0.00 5.00
Business Analyst 1.00 0.00 0.00 0.00 0.00 0.00
Mailing Services Specialist 1.00 1.00 1.00 0.00 0.00 1.00
Human Resources Assistant-Conf. 3.10 3.10 3.60 0.00 0.00 3.60
Manager. Employee Relations . 1.00 1.00 1.00 0.00 0.00 1.00
Manager. Human Resources and Development 1.00 1.00 1.00 0.00 0.00 1.00
Manager, Risk and Benefits 1.00 LOO LaO 0.00 0.00 1.00
Office Specialist 0.00 0.00 1.00 0.00 0;00 1.00
Senior Business Analyst 0.00 1.00 0.00 0.00 0.00 0.00
Footnotes:
(1) Add 0.75 FIE Senior Administrator
Table of Organization - 2 of 7
GENERALFUND
Library Department
Administrative Assistant
.'1
Director, Libraries
Librarian
Library Assistant
Library Associate
Library Specialist
Manager, Main Library Services
Office .specialist
Senior Librarian ,.
Footnotes:
Exhibit D
2003-04
Adjusted
Budget
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2004-05
Adjusted
Budget
1.00
1.00
6.00
5.50
4.00
7.75
1.00
0.50
10.25
(1) Reclassification of 1.0 PrE Coordinator, Library Programs to Business Analyst
2005-06
Adopted
Budget
1.00
1.00
6.00
5.50
4.00
7.75
1.00
0.50
9.25
(2) Reclassification of 1.0 PrE Coordinator, Library Circulation to Supervisor, Librarian
Table of Organization' 3 of 7
2005-06 2005-06 Mid-2005-06
Changes to Year Budget
. Date Change
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Adjusted
Budget
1.00
1.00
6.00
5.50
4.00
7.75
1.00
0.50
9.25
Exhibit D
2003·04 2004·05 2005-06 2005·06 2005·06 Mid· 2005·06
Adjusted Adjusted Adopted Cbanges to Year Budget Adjusted
. Budget Budget Budget Date Change Budget
ENTERPRISE FUNDS
Administration, Electric, Gas, Wastewater Collection and Water
Account Representatives 3.00 3.00 3.00 0.00 0.00 3.00
Accounting Specialist 1.00 1.00 1.00 0.00 0.00 1.00
Administrative Assistant 1.00 1.00 1.00 0.00 0.00 1.00
Mailing Services Specialist 1.00 0.00 0.00 0.00 0.00 0.00
Asst. Director Utilities/Administrative Services 1.00 1.00 0.00 0.00 1.00
Asst. Director UtilitieslResource Management 1.00 1.00 1.00 0.00 0.00 1.00
Associate Power Engineer 1.00 1.00 1.00 0.00 0.00 1.00
Business Anjllyst 1.00 1.00 1.00 0.00 0.00 1.00
Cathodic Technician 1.00 1.00 1.00 0.00 0.00 1.00
Cement Finisher 1.00 1.00 1.00 0.00 0.00 1.00
Communications Specialist 1.00 1.00 1.00 0.00 0.00 1.00
Contracts Administrator 1.00 1.00 1.00 0.00 0.00 1.00
Coordinator, Utils. Safety & Security 1.00 1.00 1.00 0.00 0.00 1.00
Coordinator, Utility Projects 2.00 2.00 2.00 0.00 0.00 2.00
Customer Service Representative 5.00 5.00 5.00 0.00 0.00 5.00
Customer Service Specialist 3.00 2.00 2.00 0.00 0.00 2.00
Customer Service Specialist-Lead 0.00 1.00 1.00 0.00 0.00 1.00
Director, Administrative Services 0.00 0.15 0.15 0.00 0.00 0.15
Director, Utilities 1.00 1.00 1.00 0.00 0.00 1.00
Electric Project Engineer 3.00 3.00 3.00 0.00 0.00 3.00
Electric Underground Inspector 2.00 2.00 2.00 0.00 0.00 2.00
Electric Utility Compliance Technician 2.00 2.00 3.00 0.00 0.00 3.00
Electric Utility Com liance Tech.-Lead 1.00 1.00 1.00 0.00 0.00 1.00
Electrician 14.00 14.00 14.00 0.00 0.00 14.00
Electrician-Lead 7.00 7.00 7.00 0.00 0.00 7.00
Engineer 4.00 4.00 4.00 0.00 0.00 4.00
Engineering Manager, Electric 1.00 1.00 1.00 0.00 0.00 1.00
Engineering Manager, WOW 1.00 1.00 1.00 0.00 0.00 1.00
Engineering Technician III 2.00 2.00 2.00 0.00 0.00 2.00
Equipment Operator 2.00 2.00 2.00 0.00 0.00 2.00
Executive Secretary 1.00 0.00 0.00 0.00 0.00 0.00
T able of Organization· 4 of 7
Exhibit D
2003-04 2004-05 2005-06 2005-06 2005-06 Mid-2005-06
Adjusted Adjusted Adopted Changes to Year Budget Adjusted
Budget Budget Budget Date Change Budget
ENTERPRISE FUNDS
Administration, EJectric, Gas, Wastewater Co]]ection and Water
Gas System Technician 2.00 2.00 2.00 0.00 0.00 2.00
Heavy Equipment Operator 9.00 9.00 9.00 0.00 0.00 9.00
Inspector, Field Services 4.00 4.00 4.00 0.00 0.00 4.00
LinepersonlCable Splicer 10.00 10.00 10.00 0.00 0.00 10.00
LinepersonlCable Splicer-Lead 5.00 5.00 5.00 0.00 0.00 5.00
Maintenance Mechanic 2.00 2.00 2.00 0.00 0.00 2.00
Manager Utilities Telecommunication l.00 1.00 1.00 0.00 0.00 l.00
Manager, Communications 1.00 1.00 1.00 0.00 0.00 l.00
Manager, Electric Operations 1.00 1.00 1.00 0.00 0.00 1.00
Manager, Energy Risk 1.00 1.00 1.00 0.00 0.00 1.00
J Manager, Field and Customer Service 1.00 1.00 1.00 0.00 0.00 1.00
Manager, Supply Resources 1.00 1.00 1.00 0.00 0.00 1.00
Manager, Utilities Marketing Services 1.00 1.00 1.00 0.00 0.00 1.00
Manager, Utilities Operations WGW 1.00 1.00 1.00 0.00 0.00 1.00
Manager, Utilities Rates 1.00 1.00 1.00 0.00 0.00 1.00
Marketing Engineer 1.00 1.00 1.00 0.00 0.00 LOa
Meter Reader 5.00 5.00 5.00 0.00 0.00 5.00
Meter Reader-Lead 1.00 1.00 1.00 0.00 0.00 1.00
Program Assistant 4.00 4.00 4.00 0.00 0.00 4.00
Project Engineer 6.00 6.00 6.00 0.00 0.00 6.00
Proj~~t Manager 0.75 0.75 0.75 0.00 0.00 0.75
Public Relations Specialist 0.00 0.00 0.00 0.00 0.00 0.00
Resource Planner 4.00 4.00 4.00 0.00 0.00 4.00
Senior Administrator 0.00 1.00 1.00 0.00 0.00 1.00
Senior Business Analyst 0.00 1.00 1.00 0.00 0.00 1.00
Senior Electric Project Engineer 5.00 5.00 5.00 0.00 0.00 5.00
Senior Field Services Representative 1.00 1.00 1.00 0.00 0.00 1.00
Senior Market Analyst 2.00 2.00 2.00 0.00 0.00 2.00
Senior Project Engineer 4.00 4.00 4.00 0.00 0.00 4.00
Senior Resource Originator 1.00 1.00 1.00 0.00 0.00 1.00
Senior Resource Planner 4.00 4.00 4.00 0.00 0.00 4.00
Senior Technologist 1.00 0.00 0.00 0.00 0.00 0.00
Senior Water System Operator 1.00 1.00 1.00 0.00 0.00 1.00
Table of Organization - 5 of 7
Exhibit D
2003·04 2004·05 2005·06 2005·06 2005·06 Mid·
Adjusted Adjusted Adopted Changes to Year Budget
Budget Budget Budget Date Change
ENTERPRISE FUNDS
Administration, Electric, Gas, Wastewater Collection and Water
Staff Secretary 6.00 7.00 7.00 0.00 0.00
Storekeeper LOO 1.00 LOO 0.00 0.00
Supervisor Electric Systems 6.00 6.00 6.00 0.00 0.00
Supervisor Shop and Field WGW 1.00 0.00 0.00 0.00 0.00
Supervisor, Meter Readers & Field Services 1.00 1.00 1.00 0.00 0.00
Supervisor. Utility Construction 2.00 2.00 1.00 0.00 0.00
Supervisor, Wastewater, Gas. Water 4.00 4.00 4.00 0.00 0.00
Tree Maintenance Person 1.00 1.00 1.00 0.00 0.00
Truck Driver 1.00 1.00 1.00 0.00 0.00
. Utilities Acc6unting Technician 1.00 1.00 1.00 0.00 0.00 ,
Utilities Credit/Collection Specialist 1.00 l.00 1.00 0.00 0.00
Utilities Engineering Estimator 6.00 6.00 6.00 0.00 0.00
Utilities Field Service Representative 8.00 8.00 8.00 0.00 0.00
Utilities InstallerlRepairer 14.00 14.00 14.00 0.00 0.00
Utilities InstallerllRepairer Assistant 1.00 1.00 LOO 0.00 0.00
Utilities InstallerllRepairer-Lead 6.00 5.00 5.00 0.00 0.00
Utilities Key Account Representative 3.00 3.00 3.00 0.00 0.00
Utilities Locator 3.00 3.00 3.00 0.00 0.00
Utilities Rate Analyst 1.00 1.00 1.00 0.00 0.00
Utilities System Operator 5.00 5.00 5.00 0.00 0.00
Water Meter/Cross Connection Technician 2.00 2.00 2.00 0.00 0.00
Water System Operator II 3.00 5.00 5.00 0.00 0.00
Water Transmission Specialist 0.00 0.00 0.00 0.00 0.00
Water Transmission Specialist -Lead 0.00 0.00 0.00 0.00 0.00
Water Transmission Supervisor 1.00 LOa LOO 0.00 0.00
Footnotes:
(1) Reclassification of 1.0 FTE Asst. Director UtilitieslEngineering/Operations to Asst. Director Utilities/Operations
(2) Reclassification of 1.0 FTE Electrical Assistant I to Office Specialist
Table of Organization - 6 of 7
2005·06
Adjusted
Budget
7.00
1.00 .
6.00
0.00
1.00
1.00
4.00
1.00
1.00
1.00
1.00
6.00
8.00
14.00
1.00
5.00
3.00
3.00
1.00
5.00
2.00
5.00
0.00
0.00
1.00
INTERNAL SERVICE FUND
Printing and Mailing Services
Accounting Specialist -Lead
Assistant Director, Administrative Services
Buyer
Mailing Services Specialist
Manager, Purchasing and Contract Administration
;!'W~:~F'~:~~l1r~f":::~~;'2";-,O.':,:',l;;:c:;_;':: ;;'};,I';;:~
Senior Financial Analyst
Supervisor Reproduction and Mailing
Footnotes:
Exhibit D
2003-04
Adjusted
Budget
0.05
0.00
0.05
1.00
0.05
0.00
1.00
2004-05
Adjusted
Budget
0.05
0.00
0.05
1.00
0.05
0.00
1.00
2005·06
Adopted
Budget
0.05
0.05
0.05
1.00
0.05
0.50
1.00
(1) Reclassification of 1.0 FIE Offset Equipment Operator to Offset Equipment Operator -Lead
Table of Organization· 7 of 7
2005-06 2005-06 Mid· 2005·06
Changes to Year Budget
Date Change
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Adjusted
Budget
0.05
0.05
0.05
1.00
0.05
0.50
1.00
< '
ATTACHMENT 4
** NOT YET APPROVED **
RESOLUTION NO. __ _
RESOLUTION OF THE COUNCIL OF THE CITY OF
ALTO AMENDING THE COMPENSATION PLAN
MANAGEME~T AND PROFESSIONAL PERSONNEL
COUNCIL APPOINTEES ADOPTED BY RE$OLUTION
8554 TO CHANGE FOUR CLASSIFICATIONS
PALO
FOR
AND
NO.
The Council of the City of Palo Alto does RESOLVE as
follows:
SECTION 1. Pursuant to the provisions of Section 12 of
Article III of the Charter of the City of Palo Alto, the
Management Compensation Plan, adopted by Resolution No. 8554, is
hereby amended to change four clas fications, as set forth in
Exhibit "An, attached hereto and incorporated herein by
reference, effective Ju I, 2005.
SECTION 2. The
authorized to implement
forth Section 1.
Director of Administrative
the amended compensa on
Services
plan as
is
set
SECTION 3. The Council finds that this is not a project
under the California Environmental Quality Act and, therefore,
no environmental impact assessment is necessary.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Deputy City Attorney
Mayor
APPROVED:
City Manager
Director of Administrative
Services
Director of Human Resources
EXHIBIT A
2005-06 Midyear Budget
ManagementlProfessional Compensation Plan Changes
Joh'··
,Co'de .
TBD Asst Dir Utilities/Ops
(Rec1ass from Asst Dir Utilitiesl
Engineer 10 s
78 Supervisor Librarian
(Rec1ass from Coordinator
Library Circulation
91 Business Analyst
(Rec1ass from Coord Lib
Programs)
TBD . Secretary to City Attorney
. (Reclass from Le al Secreta )
s:hr/ercomplbudget/exhibitA Mid year 0506 Mgmt.doc
43
37
48
···C;optrol" :~;1~. pr .. u'(?a •. ?Cl:.· .. ~.· ..•. · .• ,··.· .. · ... ,1I.t .... : .... : .. o .•..•. ; .. ~ ... : .. r.).Y;,· ·}>oiiit:.: • rulll .
$11,610 $139,318 $66.98
$6,654 $79,851 $38.39
$7,741 $92,893 44.66
$5,860 $70,325 33.81
follows:
ATTACHM.ENT 5
** NOT YET APPROVED **
RESOLUTION NO.
RESOLUTION OF THE COUNCIL OF THE CITY OF PALO
ALTO AMENDING THE COMPENSATION PLAN FOR
CLASSIFIED PERSONNEL (SEIU) ADOPTED BY
RESOLUTION NO. 8452, BY CHANGING
TWO CLASSIFICATIONS
The Council of the Ci ty of Palo Al to does RESOLVE as
SECTION 1. Pursuant to the provisions of Section 12 of
Article III of the Charter of the City of Palo Alto, the
Compensation Plan for Classified Personnel (SEIU), adopted by
Resolution 8452 ,is hereby amended by changing two employee
classifications, as set forth in Exhibi t "A", at tached hereto
and incorporated herein by reference, effective July 1, 2005.
SECTION 2. The Director of Administrative Services is
,authorized to implement the amended compensation plan as set
'forth in Section 1.
SECTION 3. The Council finds that this is not a project
under the California Environmental Quality Act and, therefore,
no environmental impact assessment is necessary.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Deputy City Attorney
Mayor
APPROVED:
City Manager
Director of Administrative
Services
Director of Human Resources
, '
200
EXHIBIT A
2005-06 Midyear Budget
SEID Compensation Plan Changes
. Offset Equip Operator-Lead
(Reclass from Offset E ui 0 er)
Office Specialist
(Reclass from Electrical Asst)
5
5 $4,272
s:hr/ercomplbudgetIMidyear exhibitA 0506 DRAFT
$50,103 $24.09
$51,261 $24.64