Loading...
HomeMy WebLinkAbout2008-08-04 Ordinance 4998ORDINANCE NO. 4998 ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 2008-09 TO PROVIDE AN ADDITIONAL APPROPRIATION OF $3,436,713 TO CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECT PF-OI002, CIVIC CENTER INFRASTRUCTURE IMPROVEMENTS The Council of the City of Palo Alto does ordain as follows: SECTION 1. The Council of the City of Palo Alto finds and determines as follows: A. Pursuant to the provisions of Section 12 of Article _______ ---"-I-""Ic.!.I-------'o_~E~harter of th~Cit_y_o£~~lo~ltfr,-t~C-Qllnci~.u.n~---­ June 9, 2008 did adopt a budget for fiscal year 2008-09; and B. Since fiscal year 2000-01 through fiscal year 2007-08, the City Council appropriated a total of $7,494,000 for CIP Project PF-OI002, Civic Center Infrastructure Improvements (Project) to cover the costs of improvements which include elevator upgrades, Americans with Disabilities Act (ADA) improvements, electrical system upgrades, generator replacement, mechanical system upgrades and building exterior sealing and painting; and C. The elevator upgrade was completed in 2005. Design services were awarded in 2005 (CMR: 282:05) for the remainder of the work which includes electrical system upgrades, generator replacement, mechanical system upgrades, and exterior sealing and painting. Due to the cost of the project, construction of the remaining work has been broken into three phases and will be bid in three stages; and D. Work in Phase 1 will include replacement of the main nuilaing generafor, noiler, ana refurnisnmenf or replacemenf of major garage and building mechanical and electrical systems. Future phases will upgrade the balance of the mechanical systems. A contract for Construction Management Services was awarded in March 2008 to assist City staff with management of construction of Phase 1; and E. The work to be completed under Phase 1 will be completed by four multiple prime contractors responsible for General Interior/Exterior Work Items and Finishes; Mechanical and Controls; Plumbing, Fire Sprinklers and Fuel Oil System; and Electrical and Fire Alarm. Use of this delivery method, coupled with a construction management firm, provides reduced overhead cost for the specialty contractors, increased competition for each contract, and augments project management services of the limited staffing available in-house; and F. Phase 1 of this project was put out to bid; the low bid is higher than the amount available, and an additional appropriation is required to provide the funds; and G. Additional services such as green building consultant, testing services, hazardous materials removal and other miscellaneous activities are additional services identified to complete Phase 1 of this Project. The existing appropriation balance of this Project is $2,546,662 and is not sufficient to cover the Project Phase 1 costs of $5,983,375. Details are broken down as follows; and Description Amount Nexgen Builders, Inc. -for $ 548,800 ~eneFa±--~Rte~i0~fe*~e~i0r--w0F~ items and finishes* '~-ACCvEngirieerea Systems,TIic. . $-2 ,871, 27!)' for mechanical and controls* ACCO Engineered Systems, Inc -$1,575,800 for plumbing, fire sprinklers and fuel oil system* Rosendin Electric -for $ 537,500 electrical and fire alarm* Green building consultant $ 200,000 Testing services $ 75,000 Hazardous materials removal $ 125,000 Other miscellaneous expenses $ 50,000 (printing, mailing, etc. ) Total $5,983,375 Existing appropriation balance $2,546,662 Amount needed $3,436,713 *contract amount lncludes 10% contlngency H. City Council authorization is needed to amend the ------~---2-0-08-0_9-budget.-t.o~It(ake~a-V-ai-lahle-Llre-:tuuds~needed-foL--CIR---------- Project PF-01002, Civic Center Infrastructure Improvements; and I. The total additional appropriation of $3,436,713 will be funded by the infrastructure reserve; and J. City Council authorization is needed to amend the 2008-09 budget to make available the funds required for construction of CIP Project PF-01002, Civic Center Infrastructure Improvements. SECTION 2. The Capital Project Fund Infrastructure Reserve is hereby decreased by Three Million Four Hundred Thirty Six Thousand Seven Hundred Thirteen Dollars ($3,436,713) with a remalnlng balance of Million One Hundred fty Seven Thousand Two Hundred Eighty Seven Dollars ($8,157,287) as shown in Exhibit A. SECTION 3. The sum of Three Million Four Hundred Thirty Six Thousand Seven Hundred Thirteen Dollars ($3,436,713) is hereby appropriated to CIP Proj ect PF-01002 , Civic Center Infrastructure Improvements. SECTION 4. As specified in Section 2.28.080(a) of the Palo to Municipal Code, a two-thirds vote of the City Council is required to adopt this ordinance. ==~~=-~. As provided in Section 2.04.330 of the Palo Al to Municipal Code, this ordinance shall become effective upon adoption. ==~~~-=' The Council of the City of Palo Alto hereby ~~~~to.uh","l.kJ· s~:px:ojectmis exem~provisionammilfmmthe;~~~~_ Environmental Quality Act (CEQA) pursuant to therefore, no environmental impact assessment is necessary. INTRODUCED AND PASSED: AYES: NOES: ABSTENTIONS: ABSENT: APPROVED AS TO FO August 04, 2008 BARTON, BURT, DREKMEIER, ESPINOSA, KISHIMOTO, KLEIN, MORTON, SCHMID, YEH APPROVED: Director