Loading...
HomeMy WebLinkAbout2008-03-10 Ordinance 4994ORDINANCE NO. 4994 ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO APPROVING AND ADOPTING A PARK IMPROVEMENT PLAN FOR ALEXANDER PEERS PARK The Council ofthe City of Palo Alto does ORDAIN as follows: SECTION 1. Findings. The City Council finds and declares that: (a) Article VIII of the Charter of the City of Palo Alto and Section 22.08.005 of the Palo Alto Municipal Code require that, before any substantial building, construction, reconstruction or development is commenced or approved, upon or with respect to any land held by the City for park purposes, the Council shall approve and adopt a park improvement ordinance and a plan describing the proposed project. (b) Alexander Peers Park is dedicated to park purposes. ( c) The park's amenities, including a large turf meadow that can be used for organized youth sports, asphalt walking paths, a basketball court, two tennis courts, picnic tables and benches, and a recreation building with restrooms, have not been upgraded since the mid- 1970s and need replacement. The children's play area was renovated in the early 1990's. (d) The City intends to authorize certain replacement and improvement projects within Alexander Peers Park as shown on the Alexander Peers Park Improvement Plans including, without limitation, the following: (1) Removal and replacement of all children's play structures except the older age group swings and a small climbing structure. (2) Removal and replacement of the children's play area fencing and accessible safety surface. (3) Removal and replacement of all picnic tables an6-benches. (4) Installation of bollards and decorative boulders. (5) Removal of the existing deteriorated wood arbor. (6) Miscellaneous planting of new trees and shrubs. (e) The project improvements will avoid protected trees and other sensitive resources and all existing park uses will be restored following project construction. In addition, inconvenience to the public caused by aging equipment and paved surfaces will be eliminated. Accordingly, the improvements described above and as more specifically described on the Plans attached hereto as Exhibits "A-I" and "A-2" are consistent with park and conservation purposes. 1 080430 jb 0130268 (f) The Council desires to approve the projects described above and as more specifically described on the Plans attached hereto as Exhibits "A-I" and "A-2". SECTION 2. The Council hereby approves the Plan for replacement and construction of improvements in Alexander Peers Park and hereby adopts the Plans attached hereto as Exhibits "A-I" and "A-2" as part of the official plan for the construction of improvements in Alexander Peers Park. SECTION 3. The Council finds that the project to replace and improve certain facilities at Alexander Peers Park is categorically exempt from review under the California Environmental Quality Act (CEQA) pursuant to the provisions of Sections 15301 and 15302 of Title 14 of the California Code of Regulations. SECTION 4. date of its adoption. This ordinance shall be effective on the thirty-first day after the ---~INTROnUCED:-~EEBRUARY__19,2008---------- AYES: NOES: ABSENT: ABSTENTIONS: BARTON, BURT, DREKMEIER, ESPINOSA, MORTON, SCHMID, YEH KISHIMOTO, KLEIN ilV~ ~ Director of Public Works 2 080311 jb 0130268 ATTACHMENT A-I ALEXANDER PEERS PARK IMPROVEMENT PLAN Introduction Alexander Peers Park is a 4.7 neighborhood park located at 1899 Park Boulevard in Palo Alto. The entire park was last renovated in the mid 1970's, and the children's play area was renovated in the early 1990's. Park amenities include a large turf meadow that can be used for organized youth sports, asphalt walking paths, a basketball court, two tennis courts, picnic tables and benches, a children's play area and a recreation building with restrooms. Proposed Park Renovation Activities Proposed improvements to Peers Park include: • removal and replacement of all children's play structures except the older age group swings and a small climbing structure; _____ ~.~re~m~o'-"v"'al'--""'an<lt:~placement of the ctlildreJl'!J!lay area fencing and@C:~!I!lil)le~ __ _ safety surface; • removal and rep1acementofallg."ic",n""ic'"'~t""ab",l",e""s~",an",d",-",be",n""c",h"",es"---_______ ~~ _______ ~_~ • installation of bollards and decorative boulders; • removal of the existing deteriorated wood arbor • miscellaneous planting of new trees and shrubs Little if any change to the proposed layout of pathways, plazas, and site amenities is anticipated compared to current conditions. The project improvements will avoid protected trees and other sensitive resources. Construction Schedule Construction activity to implement the proposed improvement project is expected to last approximately 90 days, from March 2008 through June 2008. Construction would likely occur during weekdays from 8:00 a.m. to 5:00 p.m. Areas of the park that are not significantly impacted by construction activity such as the central turf meadow, tennis courts and recreation building will remain open to the public. Anticipated Results The anticipated benefits to be realized from the project include new play equipment and safety surfacing, updated site furnishings, more comfortable and accessible picnic ==:-:::-::====:-:::-:::-:::-:::-:::-:::-:::-:::-:::-::=======titaiJbiTjle~s-i=amn~dl=11beri~e~hiee~s,~mifoiiireiHeifif.fl'r.lCrnlenFtrafhG-Gontrol,-and-addlttonal-shade-trees-and---~---~--~ landScape shrubs. 3 080314 jb 0130268 o 00 S -... ...... 0-::: ...., ~ 00 ..(:>.. J' ';,' ~. ,;;' ATTACHMENT A-2 .~:~ ~'. --- ALEXANDER PEERS PARK RENOVATION Palo Alto. CA •• " .. ~ ............... 1'<1 " .. f>'. ~'l. IItIHIAIA \ ...... ·:·:tA:·:I' .... :·t;1'1 =::::=.::-~'::: -="'-~~ C/ ReAAPLAN &[=~~l~~