Loading...
HomeMy WebLinkAbout2014-08-04 Ordinance 5263140423 dm 0160077 circuit; (4) 50 ampere wiring; terminating in (5) a 50 ampere NEMA receptacle in a covered outlet box. (d) EVSE Installed. "EVSE Installed" shall mean an installed Level 2 EVSE. A5.106.5.3.2 Non-Residential Structures Other than Hotels. The following standards apply newly constructed non-residential structures other than hotels. (a) In general. The property owner shall provide Conduit Only, EVSE-Ready Outlet, or EVSE Installed for at least 25% of parking spaces, among which at least 5% (and no fewer than one) shall be EVSE Installed. (b) Accessible spaces. The percentage calculations and substantive requirements imposed by this section shall be applied separately to accessible parking spaces. Parking at accessible spaces where an EVSE is installed shall not be limited to electric vehicles. (c) Minimum total circuit capacity. The property owner shall ensure sufficient circuit capacity, as determined by the Chief Building Official, to support a Level 2 EVSE in every location where Circuit Only, EVSE-Ready Outlet or EVSE Installed is required. (d) Location. The EVSE, receptacles, and/or raceway required by this section shall be placed in locations allowing convenient installation of and access to EVSE. Location of EVSE or receptacles shall be consistent with all City guidelines, rules, and regulations. A5.106.5.3.3 Hotels. The following standards apply newly constructed hotels. (a) In general. The property owner shall provide Conduit Only, EVSE-Ready Outlet, or EVSE Installed for at least 30% of parking spaces, among which at least 10% (and no fewer than one) shall be EVSE Installed. (b) Accessible spaces. The percentage calculations and substantive requirements imposed by this section shall be applied separately to accessible parking spaces. Parking at accessible spaces where an EVSE is installed shall not be limited to electric vehicles. (c) Minimum total circuit capacity. The property owner shall ensure sufficient circuit capacity, as determined by the Chief Building Official, to support a Level 2 EVSE in every location where Circuit Only, EVSE-Ready Outlet or EVSE Installed is required. (d) Location. The EVSE, receptacles, and/or raceway required by this section shall be placed in locations allowing convenient installation of and access to 4