HomeMy WebLinkAbout2014-04-07 Ordinance 5240ORDINANCE N0.5240 ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 2014 TO PROVIDE AN APPROPRIATION OF $2,257,200 TO CAPITAL IMPROVEMENT PROGRAM PROJECT NUMBER WQ-80021, DUAL MEDIA FILTER OPTIMIZATION AND SECONDARY CLARIFIERS PROJECT, OFFSET BY A REDUCTION TO WQ-04011, FACILITY EQUIPMENT ASSESSMENT AND RETROFIT PROJECT, IN THE WASTEWATER TREATMENT FUND. The Council of the City of Palo Alto does ordain as follows: SECTION 1. The Council of the City of Palo Alto finds and determines as follows: A. Pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Council on June 10, 2013 did adopt a budget for fiscal year 2014; and B. In July 2012, the City Council accepted the Long Range Facility Plan for the Regional Water Quality Control Plant; and, C. The Long Range Facility Plan identified the need to use ongoing CIP Wastewater Treatment projects to reinvest in the Dual Media Filter (DMF) and clarifiers, to rehabilitate these facilities, and to keep these facilities in a state of proper maintenance and operational readiness. The DMF removes suspended solids from the upstream secondary clarifiers prior to discharge to the bay; and D. In April 2013, the City Council approved a contract with Kennedy-Jenks Consultants to prepare construction bid documents for the process design modifications to optimize the performance of the Dual Media Filter (DMF) and make improvements to the Secondary Clarifiers; and, E. A project has been developed to optimize the secondary clarifiers and DMF performance by making modifications to the Secondary Clarifiers (weirs, scum drives, mechanical piping and valves, and concrete) to improve their performance and to install air blowers with mechanical piping for a new air scour system to optimize the performance of the DMFs; and F. Staff seeks City Council approval to authorize the City Manager or his designee to execute a contract with Anderson Pacific Engineering Construction, Inc. in the total amount of $2,052,000 for the DMF Optimization and Secondary Clarifiers project at the Regional Water Quality Control Plant; and G. Staff seeks City Council approval to authorize the City manager or his designee to negotiate and execute one or more change orders to the contract with · Anderson Pacific Engineering Construction, Inc. for related, additional but unforeseen work which may develop during the project, the total value of which shall not exceed $205,200; and H. The sum of $2,257,200 is recommended to be added to the Plant Equipment Replacement project {WQ-80021) with an offsetting reduction to the Facility Equipment Assessment and Retrofit Project {WQ-04011); and I. City Council authorization is needed to amend the 2014 budget as hereinafter set forth. SECTION 2. The sum of Two Million Two Hundred Fifty Seven Thousand and Two Hundred Dollars ($2,257,200) is hereby appropriated to CIP Project WQ-80021, Plant Equipment Replacement Project, increasing the project from $5,088,141 to $7,345,341. SECTION 3. The sum of Two Million Two Hundred Fifty Seven Thousand and Two Hundred Dollars ($2,257,200) is from CIP Project WQ-04011, Facility Equipment Retrofit Project, decreasing the project from $1,076,519. hereby reduced , Assessment and $3,333,719 to SECTION 4. As provided in Section 2.04.330 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption. SECTION 5. The Council of the City of Palo Alto hereby finds that the recommended action is exempt from review under the California Environmental Quality Act pursuant to CEQA Guidelines Section 15301 (b), which includes maintenance of publicly-owned wastewater facilities involving negligible expansion. INTRODUCED AND PASSED: April 7, 2014 AYES: BERMAN, HOLMAN, KLEIN, KNISS, PRICE, SCHARFF, SCHMID, SHEPHERD NOES: ABSTENTIONS: ABSENT: BURT ATTEST: APPROVED AS TO FORM: Senior Assistant City Attorney Mayor Public Works