HomeMy WebLinkAbout2017-04-03 Ordinance 54101
Ordinance No. 5410
Ordinance of the Council of the City of Palo Alto Amending Chapter 16.28 of the
Municipal Code to Require Testing, Monitoring and Protective Measures for
Temporary ConstructionRelated Groundwater Pumping (Dewatering)
The Council of the City of Palo Alto does ORDAIN as follows:
SECTION 1. Findings and Declarations. The City Council finds and declares as follows:
A. Temporary pumping and discharge of groundwater during construction of below
ground basements and garages removes tens of millions of gallons of groundwater in Palo Alto
each year, and discharges this water to the storm drain system.
B. For many years, Palo Alto has prohibited pumping of groundwater after the
completion of basement construction.
C. In recent years, concerns have arisen regarding dewatering and its impacts, including
significant waste of a community resource, potential damage to neighboring structures, trees
and vegetation, and possible impacts on the groundwater system.
D. To begin to address these concerns and gather additional information for potential
future action, the Palo Alto City Council adopts this ordinance requiring testing, monitoring and
protective measures where temporary constructionrelated groundwater pumping
(dewatering) will occur.
SECTION 2. Section 16.28.030 of Chapter 16.28 (Grading and Erosion and Sediment
Control) of the Palo Alto Municipal Code is hereby amended to read as follows:
16.28.030 Definitions.
When used in this chapter, the following words shall have the meanings ascribed to
them in this section.
(a) "Applicant" means any person, corporation, partnership, association of any type,
public agency, or any other legal entity who submits an application to the building official for a
permit pursuant to this chapter.
(b) "Asgraded" means the surface conditions extant on completion of grading.
(c) "Bedrock" means inplace solid rock.
(d) "Bench" means a relatively level step excavated into earth material on which fill is
to be placed.
(SGY7MKR)RZIPSTI-(**&)'*%)%)'(
170203 th 0140175 2
(e) "Best management practices" means a technique or series of techniques which,
when used in an erosion control plan, is proven to be effective in controlling construction
related runoff, erosion, and sedimentation.
(f) "Borrow" means earth material acquired from an offsite location for use in grading
on a site.
(g) "Building official" means the chief building official of the city of Palo Alto and
his/her duly authorized designees.
(h) "City engineer" means the city engineer of the city of Palo Alto and his/her duly
authorized designees.
(i) "Civil engineer" means a professional engineer registered in the state of California to
practice in the field of civil works.
(j) "Civil engineering" means the application of the knowledge of the forces of nature,
principles of mechanics, and the properties of materials to the evaluation, design, and
construction of civil works for the beneficial uses of mankind.
(k) "Compaction" means the densification of a fill by mechanical means.
(l) "Drainageway" means a natural or manmade channel which collects and
intermittently or continuously conveys storm water runoff.
(m) "Earth material" means any rock, natural soil, or fill, and/or combination thereof.
(n) "Engineering geologist" means a geologist experienced and knowledgeable in
engineering geology and certified by the state of California to practice engineering geology.
(o) "Engineering geology" means the application of geologic knowledge and principles
in the investigation and evaluation of naturally occurring rock and soil for use in the design of
civil works.
(p) "Erosion" means the wearing away of the ground surface as a result of the
movement of wind, water, and/or ice.
(q) "Final erosion and sediment control and storm water pollution prevention plan
('final plan')" means a set of best management practices or equivalent measures designed to
control surface runoff and erosion and to retain sediment on a particular site after all other
planned final structures and permanent improvements have been erected or installed.
(SGY7MKR)RZIPSTI-(**&)'*%)%)'(
170203 th 0140175 3
(r) "Grade" means the vertical location of the ground surface. "Existing grade" means
the grade prior to grading. "Rough grade" means the stage at which the grade approximately
conforms to the approved plan. "Finish grade" means the final grade of the site which conforms
to the approved plan.
(s) "Grading" means any land disturbance or land fill, or combination thereof.
(t) "Interim erosion and sediment control and storm water pollution prevention plan
('interim plan')" means a set of best management practices or equivalent measures designed to
control surface runoff and erosion and to retain sediment on a particular site during the period
in which preconstruction and constructionrelated land disturbances, fills, and soil storage
occur, and before final improvements are completed.
(u) "Key" means a designed compacted fill placed in a trench excavated in earth
material beneath the toe of a proposed fill slope.
(v) "Land disturbance" or "landdisturbing activities" means any moving or removing by
manual or mechanical means of the soil mantle or top six inches (6") of soil, whichever is
shallower, including but not limited to excavations.
(w) "Land fill" means any human activity depositing soil or other earth materials.
(x) "Manual of standards" means a compilation of technical standards and design
specifications published by the Association of Bay Area Governments.
(y) "Permittee" means the applicant in whose name a valid permit is duly issued
pursuant to this chapter and his/her agents, employees, and others acting under his/her
direction.
(z) "Sediment" means earth material deposited by water or wind.
(aa) "Site" means any lot or parcel of land, or contiguous combination under the same
ownership where grading is performed or permitted.
(bb) "Slope" means an inclined ground surface, the inclination of which is expressed as
a ratio of horizontal distance to vertical distance.
(cc) "Soil" means naturally occurring superficial deposits overlying bedrock.
(dd) "Soils engineer" means a professional civil engineer experienced and
knowledgeable in the practice of soils engineering and licensed by the state of California for
practice in that field.
(SGY7MKR)RZIPSTI-(**&)'*%)%)'(
170203 th 0140175 4
(ee) "Soils engineering" means the application of the principles of soils mechanics in
the investigation, evaluation, and design of civil works involving the use of earth materials and
the inspection and/or testing of the construction thereof.
(ff) temporary pumping of
groundwater to facilitate construction of underground structures such as basements and
garages.
(ffgg) "Wet season" means the period from October 1 to April 15.
SECTION 3. Section 16.28.060 of Chapter 16.28 (Grading and Erosion and Sediment
Control) of the Palo Alto Municipal Code is hereby amended to read as follows:
16.28.060 Permit required.
No person may grade, fill, excavate, store, or dispose of soil and earth materials or
perform any other landdisturbing or landfilling activity, or engage in temporary construction
related dewatering, without first obtaining a permit as set forth in this chapter, except when
the activity is performed in accordance with one or more of the general or specific exemptions
set forth in Sections 16.28.070 and 16.28.080. Exemption from the requirement to obtain a
permit does not provide relief from the requirement to conduct all grading activities in
conformance with the general grading requirements contained in Sections 16.28.270 through
16.28.340 of this chapter.
SECTION 4. Section 16.28.070 of Chapter 16.28 (Grading and Erosion and Sediment
Control) of the Palo Alto Municipal Code is hereby amended to read as follows:
16.28.070 General exemptions.
All landdisturbing or landfilling activities or soil storage, and all temporary
constructionrelated dewatering, shall be undertaken in a manner designed to minimize surface
runoff, erosion, and sedimentation and to safeguard life, limb, property, and the public welfare.
A person performing such activities need not apply for a permit pursuant to this chapter, if all
the following criteria are met:
(a) The site upon which land area is to be disturbed or filled is 10,000 square feet or
less, except where temporary constructionrelated dewatering will be required.
(b) Natural and finished slopes are flatter than 10:1.
(c) Volume of soil or earth materials stored is 100 cubic yards or less.
(d) Rainwater runoff is diverted, either during or after construction, from an area
smaller than 5,000 square feet.
(SGY7MKR)RZIPSTI-(**&)'*%)%)'(
170203 th 0140175 5
(e) An impervious surface, if any, of less than 5,000 square feet is created.
(f) No drainageway is blocked or has its storm water carrying capacities or
characteristics modified.
(g) The activity does not take place within 100 feet by horizontal measurement from
the top of the bank of a watercourse, the mean high watermark (line of vegetation) of a
body of water or the boundary of the wetlands associated with a watercourse or water
body, whichever distance is greater.
SECTION 5. Section 16.28.155 is hereby added to Chapter 16.28 (Grading and Erosion
and Sediment Control) to read as follows:
16.28.155 Additional Requirements for Temporary ConstructionRelated Dewatering
(a) In addition to applicable requirements in this Chapter 16.28, where temporary
constructionrelated dewatering will be required, applicants also shall:
(1) Submit a dewatering geotechnical study conforming to regulations issued by
the City Engineer, adhere to its findings, and make modifications as directed by
the City Engineer.
(2) Install and maintain at least one fill station meeting standards established by
the City Engineer.
(3) With the consent of neighboring property owners, water trees and other
vegetation on adjacent properties.
(4) Verify the anticipated drawdown curve in the dewatering geotechnical study
with a pump test performed on monitoring wells installed on the project site, as
specified by the City Engineer.
(5) Prior to pumping, survey and mark elevations on structures on adjacent
parcels.
(6) Submit periodic measurements and reports as required by the City Engineer.
(7) Continuously comply with all permit conditions, performance measures,
regulations and requirements established by the City Engineer. Promptly
implement corrective actions identified by the City to address any compliance
issues.
(SGY7MKR)RZIPSTI-(**&)'*%)%)'(
170203 th 0140175 6
(b) Prior to pouring a basement slab, groundwater may be pumped no deeper than
three feet below the depth of the slab, measured at the center. After the slab is poured,
groundwater may be pumped no deeper than one foot below the center.
(c) Dewatering may not be conducted before April 1 or after October 31. Pumping
permits for single family residential basements are limited to ten (10) weeks, with an additional
two (2) week startup period. At the end of the startup period, the applicant must demonstrate
compliance with all performance and water quality standards established by the City Engineer.
The City Engineer may adopt a regulation specifying time limitations for commercial property
pumping.
(d) The City Engineer is authorized to establish and from time to time revise regulations
to implement this Section and advance the goals of minimizing temporary constructionrelated
dewatering and reducing its impacts.
(e) Where pumping is continuously limited to no more than 30 gallons per minute, the
City Engineer is authorized to waive requirements for a geotechnical study, verification
procedures and pump time limitations.
SECTION 6. Severability. If any provision, clause, sentence or paragraph of this
ordinance, or the application to any person or circumstances, shall be held invalid, such
invalidity shall not affect the other provisions of this Ordinance which can be given effect
without the invalid provision or application and, to this end, the provisions of this Ordinance
are hereby declared to be severable.
SECTION 7. CEQA. The City Council finds and determines that this Ordinance is not a
project within the meaning of section 15378 of the California Environmental Quality Act
directly or ultimately. In the event that this Ordinance is found to be a project under CEQA, it is
subject to the CEQA exemption contained in CEQA Guidelines section 15061(b)(3) because it
can be seen with certainty to have no possibility of a significant effect on the environment in
that this Ordinance simply clarifies existing local regulations.
/ /
/ /
/ /
/ /
/ /
/ /
(SGY7MKR)RZIPSTI-(**&)'*%)%)'(
170203 th 0140175 7
SECTION 8. Effective Date. This ordinance shall be effective on the thirtyfirst date after
the date of its adoption.
INTRODUCED: March 7, 2017
PASSED: April 3, 2017
AYES: DUBOIS, FILSETH, FINE, HOLMAN, KNISS, KOU, SCHARFF, TANAKA, WOLBACH
NOES:
ABSTENTIONS:
ABSENT:
ATTEST: APPROVED:
City Clerk Mayor
City Manager
City Attorney Director of Public Works/City Engineer
(SGY7MKR)RZIPSTI-(**&)'*%)%)'(
'IVXMJMGEXI3J'SQTPIXMSR
)RZIPSTI-H**&)'*%)%)'( 7XEXYW'SQTPIXIH
7YFNIGX4PIEWI(SGY7MKRXLMWHSGYQIRX36((I[EXIVMRK'LETXIV*MREPTHJ
7SYVGI)RZIPSTI
(SGYQIRX4EKIW 7MKREXYVIW )RZIPSTI3VMKMREXSV
7YTTPIQIRXEP(SGYQIRX4EKIW -RMXMEPW /MQ0YRX
'IVXMJMGEXI4EKIW
%YXS2EZ)REFPIH
)RZIPSTI-H7XEQTMRK)REFPIH
8MQI>SRI98'
4EGMJMG8MQI97
'EREHE
4E]QIRXW ,EQMPXSR%ZI
4EPS%PXS'%
OMQFIVP]PYRX$GMX]SJTEPSEPXSSVK
-4%HHVIWW
6IGSVH8VEGOMRK
7XEXYW3VMKMREP
%1
,SPHIV/MQ0YRX
OMQFIVP]PYRX$GMX]SJTEPSEPXSSVK
0SGEXMSR(SGY7MKR
7MKRIV)ZIRXW 7MKREXYVI 8MQIWXEQT
1SPP]7XYQT
1SPP]7XYQT$'MX]SJ4EPS%PXSSVK
'MX]%XXSVRI]
'MX]SJ4EPS%PXS
7IGYVMX]0IZIP)QEMP%GGSYRX%YXLIRXMGEXMSR
2SRI
9WMRK-4%HHVIWW
7IRX%1
:MI[IH%1
7MKRIH%1
)PIGXVSRMG6IGSVHERH7MKREXYVI(MWGPSWYVI
2SX3JJIVIHZME(SGY7MKR
.17EVXSV
1MOI7EVXSV$'MX]SJ4EPS%PXSSVK
4YFPMG;SVOW(MVIGXSV
7IGYVMX]0IZIP)QEMP%GGSYRX%YXLIRXMGEXMSR
2SRI
9WMRK-4%HHVIWW
7IRX%1
:MI[IH%1
7MKRIH%1
)PIGXVSRMG6IGSVHERH7MKREXYVI(MWGPSWYVI
2SX3JJIVIHZME(SGY7MKR
.EQIW/IIRI
NEQIWOIIRI$GMX]SJTEPSEPXSSVK
'MX]1EREKIV
'MX]SJ4EPS%PXS
7IGYVMX]0IZIP)QEMP%GGSYRX%YXLIRXMGEXMSR
2SRI
9WMRK-4%HHVIWW
7MKRIHYWMRKQSFMPI
7IRX%1
:MI[IH41
7MKRIH41
)PIGXVSRMG6IGSVHERH7MKREXYVI(MWGPSWYVI
%GGITXIH41
-(JIEEGFFHEGI
,+VIKSV]7GLEVJJ
KVIKWGLEVJJ$GMX]SJTEPSEPXSSVK
1E]SV
'MX]SJ4EPS%PXS
7IGYVMX]0IZIP)QEMP%GGSYRX%YXLIRXMGEXMSR
2SRI
9WMRK-4%HHVIWW
7MKRIHYWMRKQSFMPI
7IRX41
6IWIRX41
:MI[IH41
7MKRIH%1
)PIGXVSRMG6IGSVHERH7MKREXYVI(MWGPSWYVI
2SX3JJIVIHZME(SGY7MKR
7MKRIV)ZIRXW 7MKREXYVI 8MQIWXEQT
&IXL1MRSV
&IXL1MRSV$'MX]SJ4EPS%PXSSVK
'MX]'PIVO
'MX]SJ4EPS%PXS
7IGYVMX]0IZIP)QEMP%GGSYRX%YXLIRXMGEXMSR
2SRI
9WMRK-4%HHVIWW
7MKRIHYWMRKQSFMPI
7IRX%1
:MI[IH%1
7MKRIH%1
)PIGXVSRMG6IGSVHERH7MKREXYVI(MWGPSWYVI
2SX3JJIVIHZME(SGY7MKR
-R4IVWSR7MKRIV)ZIRXW 7MKREXYVI 8MQIWXEQT
)HMXSV(IPMZIV])ZIRXW 7XEXYW 8MQIWXEQT
%KIRX(IPMZIV])ZIRXW 7XEXYW 8MQIWXEQT
-RXIVQIHMEV](IPMZIV])ZIRXW 7XEXYW 8MQIWXEQT
'IVXMJMIH(IPMZIV])ZIRXW 7XEXYW 8MQIWXEQT
'EVFSR'ST])ZIRXW 7XEXYW 8MQIWXEQT
2SXEV])ZIRXW 7MKREXYVI 8MQIWXEQT
)RZIPSTI7YQQEV])ZIRXW 7XEXYW 8MQIWXEQTW
)RZIPSTI7IRX ,EWLIH)RGV]TXIH %1
'IVXMJMIH(IPMZIVIH 7IGYVMX]'LIGOIH %1
7MKRMRK'SQTPIXI 7IGYVMX]'LIGOIH %1
'SQTPIXIH 7IGYVMX]'LIGOIH %1
4E]QIRX)ZIRXW 7XEXYW 8MQIWXEQTW
)PIGXVSRMG6IGSVHERH7MKREXYVI(MWGPSWYVI