HomeMy WebLinkAbout1997-09-22 Ordinance 4448ORDINANCE NO. 4448
ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING SECTION 18.08.040 OF THE PALO ALTO
MUNICIPAL CODE (THE ZONING MAP) TO CHANGE THE
CLASSIFICATION OF PROPERTY KNOWN AS 4290 EL CAMINO
REAL FROM PC -PLANNED COMMUNITY (ORD. NO. 2006) TO
PC- PLANNED COMMUNITY
The Council of the City of Palo Alto does ORDAIN as
follows:
$SCTIQN 1.
(a) The Planning Commission, after a duly noticed public
hearing held J21y 9, 1997, and the Architectural Review Board, upon
consideration at its meeting of June 19, 1997, have recommended
that Section 18.08.040 (the Zoning Map) of the Palo Alto Municipal
Code be amended as hereinafter set forth.
(b' The Council, after due consideration of the
recommendations, finds that the proposed amendment is in the public
interest and will promote the public health, safety and welfare, as
hereinafter set forth.
SECTION 2. Section 18.08.040 of the Palo Alto Municipal
Code, the "Zoning Map," is hereby amended by changing the zoning of
certain property known as 4290 El Camino Real (the "subject
property") from "PC Planned Community District (Ord. No. 2006)" to
'PC Planned Community.' The subject property, consisting of
approximately 6.82 acres, is shown on the map labeled Exhibit "A,"
attached hereto and incorporated herein by reference.
SECTION 3. The City Council hereby finds with respect to
the subject property that:
(a) The site is so situated, and the hotel uses and
improvements proposed for the subject property are of such
characteristics that the application of general districts or
combining districts will not provide sufficient flexibility to
allow the proposed development, in that the existing improvements
were constructed under a PC -Planned Community District. Most of
the major improvements, including the hotel tower, are to remain.
While the subject property could be rezoned to either the CC(H)or
CS(H) Districts, application of the standards for these traditional
districts would not be appropriate given the uniqueness of the
existing hotel land use and property improvements, the uniqueness
of the site location and size, and proximity of the site to
existing residences. With the exception of parking requirements
and height limitations, the other required site development
1
971006 Wa01 539
standards and allowed uses under these districts would be more
permissive than is the subject PC district. This would potentially
result in a development that would be less compatible with the
adjacent residential uses. Therefore, application of a new PC
District is appropriate given the existing zoning and the pre-
existing use of the property and improvements.
(b) Development of the site under the provisions of the
PC Planned Community District will result in public benefits not
otherwise attainable by application of general districts or
combining districts, as follows:
(i) The project as developed under the PC Planned
Community District will provide desirable street improvements along
El Camino Real, These improvements include the installation of a
minimum of two new pedestrian -scale street light standards to be
located on the east and west sides of the Adobe Creek bridge (El
Camino Real creek over crossing).
(iii The project as developed under this PC Planned
Ccu;munity District will provide 'gateway" improvements, consisting
of substantial landscaping and monument -type entry signage at the
southeast corner of the property.
(c) The uses permitted and the site development
regulations applicable within the district are consistent with the
Palo Alto Comprehensive Plan, and with the mix of residential and
commercial uses which presently exist in the surrounding
neighborhood. Specifically, the project would be consistent with
the Palo Alto Comprehensive Plan "Service Commercial" Land use
Designation for this site in that it would continue to permit a
hotel land use, which is acceptable under this designation. The
proposed project would be consistent and compatible with the
development pattern and intensity allowable for commercial lands in
the south El Camino Real area. Finally, while Policy 10 of the
Open Space Element and Policy 4 of the Schools and Parks Element
encourage public access along creeks, this Council finds that, in
this case, public access along this portion of the creek is not
feasible or recommended due to: 1) the constraints of the hotel
parcel and the location of present improvements as they relate to
the location of the creek banks, and 2) the potential of creating
an access which could introduce unacceptable use of neighboring
residential streets for overflow hotel parking.
(d) The parading and loading plan for the project, which
includes 284 vehicular parking spaces, and 20 bicycle parking
spaces is feasible and adequate given the restrictions and
conditions on the permitted uses for the site, and justifies
modification of the requirements of Chapter 18.83 with respect to
number of parking spaces. Relevant studies, prepared by an
2
471006 La 0030339
engineer qualified in traffic and circulation, have been submitted
by the project applicant to support a modification to the minimum
on -site parking apace requirement. These studies are further
supported by a hotel parking and occupancy survey completed by the
Department of Planning and Community Environment (included in
Environmental Assessment 96-EIA-321. Similar hotel projects
located in the Bay Area were surveyed for parking demand, and based
on this information it has been concluded that the project's
proposed parking, with implementation of a parking performance plan
as set forth in Section 4 of this ordinance, will be adequate to
serve a hotel facility of the size permitted under this ordinance.
In addition, the provisions of this ordinance will allow the City
to require changes in the parking performance plan and/or the
allowed uses in the district, in the event that overflow parking is
experienced and the performance plan measure are not effective.
SECTION 4. Those certain plans entitled "Cabana --Palo Alto
Hotel, PC Zone Change" prepared by Carrasco and Associates, dated
December 19, 1996, inclusive of revisions dated March 25, 1997,
May 5, 1997, May 12, 1997, May 23, 1997, and June 19, 1997, and
resubmitted and approved by the Architectural Review Board on
June 19, 1997, copy on file in the Planning Division office, and to
which copy reference is hereby made, are hereby approved as the
Development Plan for the subject property, pursuant to Palo Alto
Municipal Code Section 18.68.120. Said Development Plan is
approved for the following uses, and subject to the following
conditions:
(a) Permitted Uses. The permitted uses shall be limited
to a hotel and ancillary uses incidental thereto, as described
herein and with the following limitations:
(i) Operation of up to 200 guest rooms;
(ii) Operation of dining room restaurant, and
bar/lounge;
(iii) Ancillary uses including but not limited to
lobby area, swimming pool and similar recreation facilities,
kitchen, administrative office and storage;
(iv) Use of conference and meeting rooms; and
(v) Until March 1, 1999: Use of the large banquet
and meeting room area depicted as the "Banquet Rooms and Conference"
area on sheet A2.0.1 of the plans entitled "Cabana --Palo Alto,
Ground Floor Reference Plan" and dated May 5, 1997, and sheet A2.2
of plans entitle "Cabana --Palo Alto Hotel, Second Floor Plan:
Phase II" dated May 5, 1997.
3
971006 lac 0080539
(b) Conditional Uses. The following uses shall be
permitted in this District after March 1, 1999, only upon issuance
of a conditional use permit: Use of the large banquet and meeting
room area depicted as the "Banquet Rooms and Conference" area sheet
A2.0.1 of the plans entitled "Cabana --Palo Alto, Ground Floor
Reference Plan" and dated May 5, 1997, and sheet A2.2 of plans
entitle "Cabana --Palo Alto Hotel, Second Floor Plan: Phase II"
dated May 5, 1997.
(c) $ie Development Regulations. All improvements and
development shall be substantially in accordance with the approved
Development Plan and the Conditions of Project Approval adopted by
the Council in conjunction with approval of this ordinance. The
following are site development regulations which establish rules
for modifications or additions to any building, accessory structure
or landscaping on the subject property. Definitions of terms used
shall be in accordance with Chapter 18.04 (Definitions) of Title 18
(Zoning; of the Palo Alto Municipal Code.
(i) Final plans, including materials and colors,
complete lighting and photometric plans, detailed landscaping and
irrigation plans encompassing on- and off -site plantable areas, and.
signs shall be reviewed and approved by the Architectural Review
Board ("ARB") prior to issuance of building permits. All utility
meters, lines, transformers, backflow preventers, electric panel
switchboards, and any other required utilities shall be shown on
the final plans and shall show that no conflict will occur between
the utilities and landscape materials and shall be screened in a
manner which respect the building design and setback requirements.
(ii) Any other exterior changes to the buildings
or any new construction not specifically permitted by the
Development Plan or by these site development regulations shall
require an amendment to this Planned Community Zone or, if
eligible, approval under Chapter 18.99 of the Municipal Code.
(iii) The approved Development Plan permits some
tree removal and requires the preservation and protection of a
number of mature trees within the development. No future
development or improvement proposed for the subject property
following initial construction authorized by Architectural Review
Approval 96-ARB-168 shall result in the removal or destruction of
trees without the approval of the City of Palo Alto in accordance
with applicable procedures. Any trees permitted to be removed be
replaced at a ratio of 2:1; replacement trees shall be planted in
a fifty-fifty ratio of 24 -inch and 36 -inch box size trees, or as
determined by the Planning Arborist.
(iv) Total hotel building area square footage shall
not exceed 180,000 square feet. Total area for conference meeting
4
971006 lac 0060539
rooms and banquet facilities shall not exceed 12,000 square feet.
Any square footage proposed to exceed these limits shall require an
amendment to this PC District unless the Director determines the
change is minor and therefore eligible for approval under Chapter
18.99 of the Municipal Code.
(v) Maximum building height shall be not exceed
100 feet, inclusive of rooftop mechanical equipment enclosures.
(vi) Screened planting setbacks are required and
shall be maintained around the perimeter of the subject property.
A ten (10) foot wide landscape screen area and solid fence of 5' 8"
in height are required and shall be maintained along the northern
and western property boundaries. A landscape screen planting area
shall be maintained along the southern (Adobe Creek frontage)
border of the site. Ali landscaping and fencing shall be installed
and maintained in accordance with the final approved landscape
plans.
(d) parking and Loading Requirements. The parking for
the subject property shall be in accordance with the Development
Plan. Pursuant `-o PAMC section 18.68.110(d) and the findings set
forth above, the requirements of Chapter 18.83 are hereby modified
for this project to allow reduction in the required number of
vehicular parking spaces and the development and operation of a
special on -site parking and circulation plan for the proposed hotel
and ancillary uses. The parking plan shall be as depicted in the
Development Plan prepared by Carrasco & Associates, dated
December 19, 1996, revised June 19, 1997, and on file with the
Department of Planning and Community Environment. The Development
Plan approves and requires the provision on 284 on -site vehicular
parking spaces, subject to the following conditions:
(i) Of the 284 total spaces, 207 shall be self -
park spaces, 58 shall be for valet parking, and 19 spaces shall be
reserved for employees only. Minor modifications in the parking
mix can be authorized by the Director of Planning and Community
Environment. In addition, a minimum of 20 bicycle parking spaces,
of which 12 (racks/lockers) shall be provided and maintained at the
northern (employee/loading area) entrance to the hotel. The 20
bicycle spaces represent 75 percent of the spaces required by the
PAMC. This ordinance acknowledges and permits the 25 percent
reduction as acceptable given the nature of the property use.
(ii) The hotel operator shall implement a Parking
Performance Plan which is designed and intended to manage on -site
parking and to ensure parking adequacy during peak seasons/period
of hotel facility use. The Parking Performance Plan shall be
approved by the Director of Planning and Community Environment
prior to removal of any existing parking spaces on the subject
5
971006 lac 0080539
property, and shall include the following measures, as set forth in
the plan prepared by DKS Associates, dated April 9, 1997, on file
with the Department of Planning and Community Environment:
aa. No parking shall be permitted in any
of the fire and travel lanes at any time.
bb. No hotel parking shall be permitted
on nearby residential streets at any time.
cc. No hotel parking shall be permitted
on any of the private parking lots of nearby commercial uses unless
approved by the City in accordance with applicable procedures.
dd. Events and activities shall be
scheduled so that there is no overlap of full conference/meeting
room: use during the peak periods of hotel room occupancy.
ee. A year-round van/shuttle service for
hotel guests shall be provided and operated.
ff. Valet parking shall be provided on
a daily basis during peak hours. Extended hours of valet parking
shall be implemented during the peak season of February through
Novenmbe r .
gg. A TDM program for employee
The program shall address modes of transportation used
employees (e.g., single -occupancy vehicle, carpooling
transit, bicycling). Independent of the required schedule
review of parking performance plan, the TDM program
reviewed by the City on an annual basis.
parking.
by hotel
, public
for City
shall be
hh. Following completion of construction
and commencement of full operation of the hotel facilities, a
status report on the success of the Parking Performance Plan shall
be submitted by the hotel operator to the Director of Planning and
Commanunity Environment. The report shall be submitted no later than
twelve (12) months after adoption of this ordinance, or six (6)
months after approval of the final subdivision map for 96 -SUB -5,
whichever date is later. The report shall be prepared by a
licensed traffic engineer and shall analyze parking occupancy and
vacancy an the subject property, including separate analysis of
employee and visitor/guest parking. The report shall include
information on the modes of transportation utilized by employees
and data regarding parking demand and occupancy based on surveys
taken during peak hours as determined by the Director.
6
97100d1r:00t0539
The City may require peer review of the report by an
independent traffic engineer, retained by City at the expense of
the hotel operator.
A second parking status report shall be submitted to
the Director within twelve (12) months after the initial report.
Should the Director, based upon review of the reports and any other
pertinent information, determine that during peak hotel operation
periods overflow parking is experienced, the Director may require
modifications to the Parking Performance Plan to ensure the
provision of adequate hotel parking and implementation of the
changes. The modifications may include but shall not be limited
to: (1) increase in shuttle availability; (2) provision of off -
site parking for use by employees and/or for overflow parking
accessible by valet or hotel patrons; (3) restrictions on use of
certain hotel facilities during times of highest parking demand.
(e) Special Conditions.
(i) Street Lights. The project includes
installation of new street light standards to be located on the
east and west sides of the Adobe Creek bridge (El Camino Real creek
overcrossing) . These improvements shall include a minimum of two
light standards (actual number and designed to be as determined by
the Architectural Review Board). The lighting standards shall be
selected based on consultation with Public Works Engineering,
Planning Division, and Utilities Engineering and shall be approved
by the Architectural Review Board. These improvements shall be
installed no later than May 15, 1999.
(ii) Median Landscaping/Irrigation Improvements.
The project includes installation of landscaping improvements to
the El Camino Real center median located immediately north of the
Adobe Creek Bridge. These improvements shall include installation
of four new trees, planted at minimum 24 -inch box size,
installation and replacement of existing shrubs and ground cover
(as determined by the Community Services Department and the
Planning Arborist) and repair of the existing irrigation system
(including replacement of backflow preventers and update of control
system) . These improvements shall be depicted on a detailed plan
prepared by at licensed architect or landscape architect. This
plan shall be submitted for approval by the Architectural Review
Board prior to the issuance of a building permit for the hotel
improvements subject to ARB approval 96-ARB-168 or the approval of
at final subdivision map (96 -SUB -5), whichever date first occurs.
These improvements shall be installed no later than May 15, 1999.
(iii) Gateway Feature. The project includes
installation of substantial landscaping and monument -style entry
signage to Palo Alto at the southeast corner of the property.
9710061w 0080539
• •
These improvements shall be designed and installed in accordance
with City specifications, generally as depicted on Sheet L-1,
prepared by Royston, Hanamoto, Alley and Abey, Dated December 19,
1996, and on file with the Department of Planning and Community
Environment. These improvements shall be completed by May 15,
1999.
(f) Development Schedule. Construction of the project
shall commence on or before June 1, 1998, and shall be completed
and ready for occupancy on or before May 15, 1999.
(g) Mitigation Measures. All mitigation measures
described in the Negative Declaration for the project shall be
implemented as conditions of project approval, and the Mitigation
Reporting and Monitoring Program shall be implemented.
SECTION 5. The Council finds that this project, as
mitigated, will not have a significant environmental effect.
SECTION 6. This ordinance shall be effective on the
thirty-first day after the date of its adoption.
INTRODUCED:
PASSED:
AYES:
NOES:
SEPTEMBER 8, 1997
SEPTEMBER 22, 1997
EAKINS, FAZZINO, HUBER, KNISS, MCCOWN, C4-11. DER, WHEELER
ANDERSEN
ABSTENTIONS:
NOT PARTICIPATING: ROSENBAUM
ABSENT:
ST:
Cit Clerk
APP OVED AS T
Senior Asst. City Attorney
THIS DOCUMENT IS CERTIFIED TO BE AN
ORDINANCE DULY PASSED BY THE COUNCIL
OF THE CITY OF PALO ALTO AND
THEREAT TER POSTED )N TH COUNCIL
CHAM2ER; ON 4V30 7 (WITHIN TS
DAYS OF ITS PASSAGE)
"I certify tor declare) under penalty
at perjury that tho tore g is true
and correct."
to li err%
& "MA 006 lac 0030539 She
8
Director of Planning and
Community Environment
Project: 4290 El Camino Real
1. Zone change of 6.82 acres
from Planned Community (PC)
to Planned Community (PC)
for Hotel land use.
ALTOS
Project: 4290 El Carrrino Rea,
2.Comprehensive Plan Amendment
from Service Commercial to Single -
Family Residential and Zone Change
from Planned Community (PC) to
Single -Family Residential (R-1)
of 3.24 acres.
Project: 4290 El Camino Real
T. Zone change of 6.82 acres from Planned
Community (PC) to Planned Community (PC) for
Hotel Land use
2 Comprehensive Plan Amendment from Service
Commercial to Single -Family Residential and Zone
Change from Planned Community (PC) to Single -
Family Residential (R-1) of 3.24 acres.
File Nos: 96 -CPA 4; 96-ZC-13 ( pate:? ? 9a
North