Chairperson Wolbach called the meeting to order at 6:06 P.M. in the
Community Meeting Room, 250 Hamilton Avenue, Palo Alto, California.
Present: DuBois, Kniss, Kou, Wolbach (Chair)
Absent:
Agenda Items
1. Policy and Services Committee Recommends the City Council Accept
the Status Updates of the Audits for the Citywide Cash Handling and
Travel Expense; and the Audit of Cable Franchise and Public, Education
and Government (PEG) Fees.
Chair Wolbach: Alright so let’s start this off with our first – actually, do we
have any Oral Communications from the public?
Jessica Brettle, Assistant City Clerk: Not this evening, no.
Chair Wolbach: Ok and as far as Action items, we have three all related to
audits so the first the City-wide cash handling and travel expense and the
audit of cable franchise and public education and government PEG fees. So,
I’ll turn it over to the City Auditor to start us off.
Harriet Richardson, City Auditor: Thank you Mr. Chair and Members of the
Committee; Harriet Richardson, City Auditor. I’m actually going to turn this
item over to Ed Shikada, Deputy City Manager because they report the initial
status and then if you have questions about our agreement I’ll answer those.
Chair Wolbach: Ok, Assistant City Manager Shikada.
Ms. Richardson: Assistant City Manager, I get those – all those new titles, I
have to get them right.
TRANSCRIPT
Page 2 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Chair Wolbach: We’re also joined by Deputy City Manager Rob De Geus who,
for those who haven’t heard, is now our main liaison from the City Manager’s
Office to this Committee but because of the Assistant City Manager running
utilities, he’s definitely here for this one.
Mr. Shikada, General Manager for Utilities: Yes, I’m wearing that hat
primarily tonight so actually, I’m sorry, I wasn’t prepared to report out on
these items. I’m happy to answer questions and we do have Staff available
here in terms of both the City-Wide cash handling, travel expenses, as well
as our cable franchise PEG fee audit. We’ve got an action that’s been
ongoing on both of these elements or both of these audits and again, I’m
happy to respond to any questions.
Chair Wolbach: Do we have any Staff Report on these – on this first one at
all? Well, then I’ll look to my colleagues and ask do you have any questions?
Council Member Kou: Actually, may I?
Chair Wolbach: Go ahead, Lydia.
Council Member Kou: I was reading this and is – you know being new to
Council and so forth, is there – can you give me a briefing on how the cable
joint powers and how they are all related over there and how the Media
Center came about to be under all of this?
Mr. Shikada: Oh my, it’s a lot of history.
Council Member Kou: I mean I don’t know where cable comes in.
Mr. Shikada: Well, in terms of the City’s role – perhaps the way – the best
way to describe it is to follow the money and that with respect to the cable
services that provide – that are provided by Comcast, AT&T or effectively
cable services, there is a portion of the bills that’s called the PEG Fees. So,
the public education government fees that all subscribers pay and the City of
Palo Alto receives that fee, it’s remitted by the cable providers, and we have
an agreement with the Media Center to provide the services – although the
cable fees – I’m sorry, the PEG Fees themselves are restricted to capital
expenditures. So, it’s part of the mix in what goes into the actual provision
of both our City Council meeting streaming and televising, as well as
educational programs so that’s kind of the relationship. The audit itself
identified a number of issues related to the use of the PEG Fees and since
the audit, we have been in negotiations and in consultation with the City
TRANSCRIPT
Page 3 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Attorney’s Office on how to go forward in terms of ensuring that the PEG
Fees are used in a legally permissible manner while at the same time
advancing the City’s interest in the provision of the services so that
negotiation has been ongoing. There has been some turnover and as I
mentioned, in light of PEG programming and the eligibility uses of the funds
are regulated actually at both the federal and State level. As a result of that,
really then in consultation on an ongoing basis with the City’s Attorney’s
Office with how we proceed. For the Media Center, they’ve actually got – had
some turnover in Staff and that the long time Executive Director retired at
the end of last year and so we have been restarting those negotiations with
the new Staff so that’s the ongoing work here.
Vice Mayor Kniss: Were you here when that became sort of a – let me think.
A very large issue that filled the chambers?
Mr. Shikada: I believe so, yes.
Vice Mayor Kniss: So, you might give a little bit more background on that
because it was very complicated and very much affected the citizens and the
Center and so forth and it became heated is probably the best word. I think
that’s important because what you just said was we’re limiting this to capital
expenses and my recollection was that was the area we were going to
explore carefully as to whether or not there could be another interpretation.
Mr. Shikada: Or a realignment of how the funds are used and that’s really
where our focus has been.
Ms. Richardson: I can probably address that. So when we did the audit, we
had a lot of legal consultation on what the interpretation of that law was and
our City Attorney actually contracted with an expert – a legal expert in
communications who deals primarily with cable and franchise fees. The legal
interpretation we got was based on his opinion, his input and actually, the
attorneys who responded on behalf of the Media Center on that audit during
a meeting we had with them, they actually told us – told the Media Center
that they were incorrectly using the money. That it really was restricted to
capital expenditures and the issue in the audit was that they were using the
money for operating expenses. That became a big issue because it seemed
like people interpreted the audit to mean that we were saying take away the
money, close down the Media Center, and our recommendation wasn’t that
at all. It was really looking at options for how – whether to make that
funding whole in some other way and that’s really what the City’s Manager’s
Office is looking at; how can they use the PEG Fees for capital expenditures
in a way that doesn’t financially hurt the Media Center. There was one
TRANSCRIPT
Page 4 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
footnote in the Audit that was misinterpreted and put out there as – to mean
something that it didn’t and people bought into that and that’s what
happened.
Vice Mayor Kniss: So, everything is (inaudible) at the moment?
Ms. Richardson: I think so.
Mr. Shikada: Yes, it is.
Ms. Richardson: I think the City Manager can answer that.
Mr. Shikada: Yes, that is correct. Since we are in conversation with the
Media Center on again, trying to flush out the specifics of how the funding
can be used in an eligible manner.
Vice Mayor Kniss: I’m just reflecting that it was a complicated and spirited
discussion that night and...
Mr. Shikada: It’s still complicated…
Vice Mayor Kniss: There many people there…
Mr. Shikada: … and I think we’ve toned down the spirit.
Vice Mayor Kniss: …and lots of discussion if you remember about the legality
of it with two different sides; one side arguing one way and one side arguing
the other way including someone who came in on the phone from New York
as I recall.
Ms. Richardson: The person who came on the phone was the attorney who
had advised us.
Vice Mayor Kniss: Thank you but Lydia had asked for more background. I
think that’s what they call providing the color.
Mr. Shikada: Yes, thank you.
Council Member Kou: Thank you.
Chair Wolbach: Tom.
TRANSCRIPT
Page 5 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Council Member DuBois: So, I’ll pick up on that so where’s the discussion
about trying to help them buy the building and how is that going to get
resolved?
Mr. Shikada: So, that’s kind of the essence of the conversation that’s
ongoing. With the turnover in Staff, we wanted to ensure that everyone was
up to speed and that we had done our homework in – really consultation on
our side to ensure that our proposal met the legal requirements for the use
of the funds. At this point I think we’re just about to restart the more active
negotiations with the Media Center on – the basic outline was to use the PEG
funds as pay down toward a purchase of the building that the Media Center
owns. So, in that way maintain an eligible use and there is a number of
operational restrictions that would then be placed on the building in order to
be sure that it does meet it’s or meets the requirements for the same
limitations on the use of the dollars.
Council Member DuBois: Are they on board or is there disagreement?
Mr. Shikada: It’s ongoing. We really haven’t gotten to a point of
disagreement yet so I think we’re still discussing the specifics.
Council Member DuBois: Yeah, I mean to echo Liz, I think a lot of people
came out to talk about the value the Media Center particularly and new
technologies and I think the community appreciates it so we want to find a
way to make it work. Also, I’m interested in the AT&T negotiation and I just
– can you give a little color, I mean was that pretty easy or did it go back
and forth?
Ms. Richardson: Want me to answer that one too? The AT&T negotiations
were very easy. The City’s Attorney’s Office sent a demand letter and there
was a brief conversation between them and they came to a quick
settlement. It’s the Comcast one that’s still…
Council Member DuBois: Right, so can that settlement be used with
Comcast? I mean now that we have a settlement with AT&T.
Ms. Richardson: No, Comcast has different concerns and one of them is the
resolution of the PEG Fee issue before they will actually settle I think.
Council Member DuBois: What PEG Fee issue?
TRANSCRIPT
Page 6 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Ms. Richardson: The one that – how the PEG fees were used and wanting
some assurance that they are being used properly. So, one of the…
Council Member DuBois: So, Comcast is using that to refuse to pay the fee?
Ms. Richardson: At this point they had – they also have a concern about the
accuracy so they are trying to separate the two issues but the issue
regarding PEG Fees, what they – they want some assurance. So once the
City negotiates a way -- for example, if they purchase the building, there’s a
period of time that the Media Center can go back and restate their financial
statements to show that they used the money for other purposes – for
capital purposes and the capital purpose would be part of the, I’m assuming
the down payment for the building. So, they can then restate their financial
statements to show that they didn’t use it for operating expenses and that’s
what Comcast is waiting for.
Council Member DuBois: So, this is an issue that we brought up, Comcast
didn’t bring it up…
Ms. Richardson: Correct.
Council Member DuBois: … and now we have a clock ticking that if we don’t
resolve it, we can’t get that money?
Ms. Richardson: Once we identify it in the Audit the clock starts ticking as far
as once we start the Audit, we can go back still for that period of time. So
that was part of our legal advice on how far back we could go and once we
started the audit then we could still – that part become the open period of
time for which we could go back and collect.
Council Member DuBois: Right, that seems like a bigger deal. I mean is
there no way we can separate these issues until the City is accepting this
use and not make it a Comcast issue?
Ms. Richardson: There’s been an ongoing discussion with Comcast so it’s not
just being ignored, there is an ongoing discussion with Comcast…
Council Member DuBois: Right, I’m just saying can we…
Ms. Richardson: … primarily with Administrative Services Department (ASD)
and the – our cable coordinator and Comcast and the City’s Attorney’s Office
have been involved too.
TRANSCRIPT
Page 7 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Council Member DuBois: I guess what I am asking the City Attorney is can
we separate this issue of how the City applies the funds from whether
Comcast owes money or not?
Terence Howzell, Principal Attorney: What I would suggest is in this – this is
not the setting that I would necessarily want to disclose…
Council Member DuBois: The negotiations.
Mr. Howzell: …our negotiation kind of position but in a different setting we
could have that discussion.
Council Member DuBois: Ok, and it’s relatively small amount of money?
Mr. Howzell: Yes.
Council Member DuBois: Then my last question – thank you – is on the
meals. I mean so are we saying that if we provide meals to employees, that
has to show up as income?
Ms. Richardson: That’s an Internal Revenue Service (IRS) regulation, yes.
Council Member DuBois: So, is that…
Ms. Richardson: If it’s not reimbursement like for a travel expense, there are
some rules around meals and so the question is – for example, at a meeting
like tonight where it’s not a routine meal and the City reimburses for a meal,
that’s a taxable item according to IRS.
Council Member DuBois: So, is that different for public agencies and private
companies?
Ms. Richardson: No.
Council Member DuBois: It seems like almost nobody does this, right? I
mean companies provide meals for employees and it’s not tracked. I mean is
there another way this would…
Ms. Richardson: They impute an average -- input an imputed average
income on their pay stub. For example, there are certain employee benefits
that are taxable and that’s one of them. Another example might be if they
TRANSCRIPT
Page 8 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
pay – if the employer offers a life insurance policy to employees and the
employer pays any amount that exceeds $50,000 that they would impute
that income onto the employees pay stub so they are taxing it.
Council Member DuBois: I know. I’m pretty sure though that most Silicon
Valley companies do not put it on the payroll so are we positive there’s no
way we can provide this as a benefit without it showing up as income?
Ms. Richardson: If we want to comply with IRS regulation then we should be
showing it as income.
Council Member DuBois: So, you think most of these companies are just
doing it wrong?
Ms. Richardson: I don’t know what the companies are doing, I can only
speak to what we should be doing.
Council Member DuBois: Alright.
Vice Mayor Kniss: What are we doing – I’m sorry, Tom can I just insert?
What are we doing? We just ate a sandwich (inaudible)
Council Member DuBois: Well, it’s going to show up on your paycheck Liz.
Ms. Richardson: There’s – we’re talking about that there are some things
that are administratively burdensome and you can use that as a way saying
it’s not taxable but there are other ways. For example, some of the
management professional compensation plan has a provision that employees
can get reimbursed up to twenty dollars when -- that reimbursement would
be taxable.
Council Member DuBois: I mean it’s more of a concern that it’s a benefit for
working late or putting in extra effort or working over your lunch period so if
you’re not giving somebody a break – again, the business practices I’ve seen
-I’ve never seen that tax and I just want to make sure that we’re – we’ve
got it covered and there’s not any other exception in the law that – I mean it
seems a shame to kind of take that away as a benefit for people working
late hours.
Vice Mayor Kniss: (Inaudible) sandwiches right before the meeting?
TRANSCRIPT
Page 9 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Council Member DuBois: Oh, you know during the day. I’m not worried
about us, I’m more worried about Staff.
Ms. Richardson: I – it’s a little bit different with Council when -- for example
when you tax – it’s administratively burdensome is the word that the IRS
likes to use when you have to track oh, you ate a sandwich tonight, you
didn’t eat one tonight. That becomes a burden but when you have the
receipts for reimbursement, they don’t consider that administratively
burdensome in the same way; that’s when it becomes more of an issue.
Council Member DuBois: Well, I mean that’s the issue of like a department
head or somebody puts it on a P-Card for a whole bunch of people who are
staying late. It does seem like a burden to break that down.
David Ramberg, Assistant Director of Administrative Services: Hi, my name
is David Ramberg and I am the Assistant Director of Administrative Services.
So, we’ve been working with Harriet and her team for – this is an audit as
you can see that was first issued in 2010 so it’s been – we’ve had a very
lengthy discussion on this particular item. We’ve addressed many of the –
virtually all of the other items on this audit so this is one that is kind of
sticking points for us and it really comes – for the Administrative Services
Department. We’re responsible for employee reimbursements so when an
employee travels there’s a travel expense form that’s filled out, signed by
several layers of management and ultimately submitted to the accounts
payable folks. We analyze and review the travel reimbursement and make
sure it complies with our travel policy. As City Council Members, some of you
have gone through that process through the Clerk’s Office and we issue
ultimately a reimbursement. What we are trying to do it tease out those
reimbursements that would fall on the employee’s paycheck and be taxable
so that we can comply with the IRS requirements. There are very few dollars
that we’re talking about in the big scheme of things, it’s – these aren’t large
dollars. These are very small dollars but we do have the electronic record in
a lot of cases or we have the receipt of the transaction. What we don’t have
an integration of those receipts or those transactions into our ERP system so
SAP is where we pay the – where we create the paycheck and issue the
payment that is taxable for the employee. We don’t currently have an
efficient automated way to bring the very minute meal charges over to the
paycheck right now. So, we’re looking at a way to do that and Harriet has
been flexible in allowing us to explore the best way to do that without having
it be too time-consuming.
TRANSCRIPT
Page 10 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Council Member DuBois: So, the amount is some minute in the cost to put
other processes in place. Can’t you just say that that’s too burdensome from
a tax perspective?
Ms. Richardson: It depends on how the IRS would look at it and we could
ask the IRS for advice. I think we’ve been trying to resolve it without doing
that but it depends – it really depends on if there’s a process that can be
managed. I think when the new ERP system comes in, it might be easier to
handle but because they’re more set up for – they are more set up with
current practices which would incorporate current IRS practices and being
able to update more regularly.
Council Member DuBois: Thank you.
Vice Mayor Kniss: Just a quick follow-up, how much money are we talking
about roughly?
Mr. Ramberg: I don’t have a number for you tonight – just—to put it in
perspective, we process a handful of meal reimbursements a week so that’s
less than ten probably – typically and virtually all of those are for lunch at
$16 maximum; these are IRS – these are GSA limits that are set at the
federal level that we apply here and most municipalities apply similar
standards or a lot do. It’s $9 for breakfast, $16 for lunch and $29 maximum
for dinner and most of these aren’t dinners, most of these are lunches and
so it’s a relatively few dollars in the big scheme of things.
Vice Mayor Kniss: It seems it would probably cost more to keep track of it
and pay back than it actually…
Ms. Richardson: There may come a point where the IRS looks at it that way.
A few years back they use to require when an employer gave a cell phone to
an employee to use, they use to require the employee to track their personal
use versus their business use and to be tracked – to be taxed on their
personal use. That really was a burden for employers but they did crack
down on it at one point and there was a lot of input I would say, from
employers about how difficult that was and IRS finally came around and
dropped that rule. They realized that most cell phone service plans are lump
sum anyway and they are not based on how many calls you make and they
dropped that and they make – they are constantly updating laws so they
may change that at some point.
TRANSCRIPT
Page 11 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Vice Mayor Kniss: David, I think you’re probably talking about $6,000-
$7,000 a year total if my math is correct.
Mr. Ramberg: That might – it’s probably more than that but if you did the
math on kind of the numbers I laid out, I think what we also are having a
trouble with is we have multiple systems that are collecting these charges
and we don’t have a nice aggregate way to report on them. SAP doesn’t
provide the detail when we have a reimbursement go through. Usually, we’ll
calculate a – we sometimes get asked for public records for this type of
information so we’ll calculate a sum at that point. Every department has an
expense item which they stay within for this category expense so that might
be a little bit more than that but it’s still relatively small dollars I think, is
that what you’re…
Vice Mayor Kniss: So, let me get into the weeds for just a minute, so we’ve
had a sandwich tonight. I’m going to presume that came out of our City
Council allotment for this purpose. So, therefore – so now, after you have
paid for it and then they are going to turn that over to you and then you are
going to tax it? I think that’s what I am hearing.
Mr. Ramberg: Well, we can’t because this I think gets back – right now we
can’t do that and this gets back to I think the allowance that the IRS has, is
that would be administratively burdensome for us to tax this type of meal
setting because we would have to get each one of you and anyone else who
ate a meal to log into a log. We would then need, I think a W-9 from you
and then we would need to run it through the payroll process…
Vice Mayor Kniss: To buy a $9 sandwich.
Mr. Ramberg: Yes, exactly so I think the IRS provides an allowance for that
setting to have some flexibility. What they are talking about is where there’s
a bona fide employee who has a work – a non or a working lunch or
otherwise a provided lunch, that is an instance that should be captured and
taxed; is kind of what they are saying. There is a distinction between the
different settings I think.
Vice Mayor Kniss: Thanks.
Mr. Ramberg: You’re welcome.
Chair Wolbach: Any other questions? Any Motions?
TRANSCRIPT
Page 12 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Vice Mayor Kniss: Do you want to move the recommendation? I so move.
Chair Wolbach: I’ll second it. So, we have the Staff recommendation moved
and seconded, any other discussion. Do you want to speak to your Motion? I
don’t need to speak to mine, any other discussion? Seeing none. All in favor?
Alright, passes unanimously.
MOTION: Vice Mayor Kniss moved, seconded by Chair Wolbach to
recommend the City Council accept the Status of Audit Recommendations for
the Audit of Cable Franchise and Public, Education, and Government (PEG)
Fees and the Audit of Citywide Cash Handling and Travel Expense.
MOTION PASSED: 4-0
2. Accuracy of Water Meter Billing Audit.
Chair Wolbach: Moving onto Item Number Two, the accuracy of water meter
billing audit. Again, I’ll look to the City Auditor to begin or to defer to
another member of Staff.
Harriet Richardson, City Auditor: We will begin as soon as she gets that
pulled up here.
Chair Wolbach: Take your time.
Ms. Richardson: Ok, there it is, ok.
Vice Mayor Kniss: I want to make sure we’ve got everything we need. Is the
one marked number two have everything in it?
Chair Wolbach: (Inaudible)
Vice Mayor Kniss: Ok, good because it said there was another one coming
and I don’t know whether (inaudible)…
Ms. Richardson: It was in your Packet last week.
Vice Mayor Kniss: Ok, good. Great.
Ms. Richardson: And the Audit, do you have the Audit Report itself? Ok.
TRANSCRIPT
Page 13 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Vice Mayor Kniss: Apparently, I’m all set.
Ms. Richardson: Ok.
Chair Wolbach: Go ahead and introduce yourself.
Ms. Richardson: Harriet Richardson, City Auditor and with me is Mimi
Nguyen. She was the Senior Performance Auditor who worked on this audit,
along with Deniz Tunc who has left our office. He accepted a Management
Analyst position with the San Mateo County Sheriff’s Office. So, I’ll go ahead
and start and then I will turn it over to Mimi. The objective of our audit was
to determine if water utility customers were accurately billed for their water
meter type, size, and related adjustments. We answered four questions to
address the subject, the first one was -- are meters by their serial or badge
number, size and type correctly billed to the customer? The second question
was, are billing adjustments identified and adjusted correctly and the third
question was, are the water meters used to measure consumption working
effectively and according to standards? The fourth question was do utilities
have a quality assurance quality control process to prevent, detect and
correct billing errors from occurring. The American Water Works Association
(AWWA) is – establishes the guiding principles that we use to inform our
audit. The AWWA is the largest organization of water supply professionals in
the world and the authoritative resource on safe water. Its Standards
Committee provides standards, manuals, and guides on selecting, installing,
testing and maintaining water meters. They have three principle manners for
– that they say should be used to measure meter accuracy. The first is the
physical accuracy of the meter as a flow measuring device. The second is the
appropriate sizing of the meter to fit the customer’s consumption profiles
and the third is the appropriate type of meter to best record variations in the
flow. This Audit should be used in conjunction with our prior Audit that we
published in March 2015 and that was an audit of utility meters and it was
the procurement inventory and retirement cycle. That audit focused on the
importance of having accurate meter data to ensure accurate customer
billings. This audit focused on verifying that actual billing errors and
determining the root causes of data inconsistencies. There is a little bit of
overlap between the audits – the two audits as you’ll see as Mimi gets into
some of the discussion. We focused specifically on identifying billing errors
that resulted in a discrepancy in the meter size records in any of five areas.
The first was the purchasing record, the second was the inventory record,
the third was the installation record, the fourth was the billing record and
the fifth was the physical meter installed at the location. Running a report,
Mimi identified 540 discrepancies that could potentially result in billing
TRANSCRIPT
Page 14 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
errors. So I’m going to turn it over to Mimi now and she’ll talk about what
she found when she did her work.
Mimi Nguyen, Senior Performance Auditor: Thank you. Mimi Nguyen, Senior
Performance Auditor, we found three findings in our review here and the first
finding that Utilities did not adequately prevent, detect, nor correct water
billing errors. Finding 2, utilities did install 1,178 E-Meters throughout the
City, however, the E-Meters do not have industry standards or testing
standards and the accuracy in performance and reliability of these E-Meters
are uncertain. The third finding was that the purchase of these E-Meters did
not conform to standardization and sole source policies and the E-Meter
expenditures were not monitored. For finding one, our next two slides show
how we identified the data discrepancies and the actual billing errors in SAP
by looking at those five areas that we identified in the background slide. In
this slide here, it shows that the E-Meter was purchased and also received
into inventory as a one inch meter. We know that the E-Meter is identified as
a one inch meter because the material number that is assigned to it, which
is 028802 is a one inch meter. The serial badge number assigned the meter
is 58817 and this meter number lets us track this meter through its entire
life cycle. On this next slide, as we tracked the meter number 58817 through
SAP, this slide shows that the one inch meter was installed in May 2014
replacing a 5/8-inch meter. You can see this in the change in the material
number in the last row of number three and in this specific example the
reason for changing the meter from a 5/8-inch to a one inch might be valid.
However, the change in the step number three did not trigger a change in
the price class which would have affected the billing to the customer. So, it
remained as the 5/8-inch billing rather than being changed to a 1-inch bill.
The work flow process did not catch the upgraded meter size and there was
no manual controls or oversight to identify and correct this type of error. So,
there were other variations of errors like this example that resulted in meter
size billing errors; this is just one example. In—after physically inspecting
and reviewing the records of all of the 520 data discrepancies that we looked
at, we found that 213 of them actually resulted in billing errors. These errors
were across various meter sizes as shown in this table here and although the
audit report says it’s a two-point seven percent error rate, we were really
unable to determine a true error rate due to the various types of
discrepancies in the meter data records and the various types of billing
errors. The audit really attempted to identify root causes for this single type
of error, not just the data discrepancies itself. We looked at addressing
systemic changes that need to be made to ensure that future errors of this
type are reduced or completely eliminated. It also emphasizes the need to
bill customers accurately, both for the service provided as well as the
equipment that they are receiving. The map here shows the location of all
the errors that were identified as the one, two and three sets in our report.
TRANSCRIPT
Page 15 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
You’ll see that they are not isolated and they are not contained to any one
area. The meter size errors are not only widespread by location throughout
the City but also in the type of data inconsistencies and the causes. So,
following the audit, the Utilities Department did find an additional 204 errors
– same type of errors so not only do the billing errors need to be corrected
but also the data, where possible, to ensure that accurate data is migrated
when utilities implement its new customer information system. So, moving
to findings two and three, we have it consolidated on this slide here. Utilities
did not adequately evaluate, test and transition E-Meters into the City’s
water infrastructure and the purchase of the E-Meters did not conform to the
City’s Standardization and Sole Source Policies and E-Meter expenditures
were not monitored. It’s important to recognize that ninety-four percent of
all City water meters are positive displacement meters. The utilities water –
Gas, Waste, Water and Engineering Standards do cite the AWWA as the
standard for this type of meter. The AWWA however, does not have
standards for the E-Meters and they don’t have standards for testing and
they don’t have the testing method that’s independent of the manufacturer.
The manufacturer does test each meter and they’ve claimed that the meters
do pass within the tolerance level – the error tolerance level but the
manufacturer does test the E-Meters on a displacement meter test bench
that is modified. So, because there are neither industry standards for E-
Meters for testing the accuracy and performance of the E-Meters, neither
utilities nor any other third party vendor has a reliable method for verifying
the accuracy of the City’s E-Meters. Also, we do not have a way to verify
the reliability of the manufacturer's modified test bench. For Findings 1and
2, this slide summarizes 8 recommendations and you know the Utilities
Department, based on these recommendations, it focuses the Utilities
Department on improving the accuracy of water meter rate billings and
ensuring the reliability of E-Meters prior to buying or installing any more of
them. Utilities agrees with six of the recommendations and partially agrees
with two of the recommendations, which are Recommendation Numbers 1.4
and 2.1 on Appendix 2, Pages 28 and 29. We question utilities partial
agreement with those two recommendations because their response appears
to be consistent with our recommendation and does not specifically say what
in the recommendation they do not agree with. Regarding finding three, this
slide summarizes three recommendations to the Administrative Services
Department, specifically the Purchasing Division,that focuses on ensuring
that the products go through the appropriate vetting process before being
approved as a standardized item or sole source purchase and that sole
source purchases are tracked to prevent overspending of approved amounts.
Ms. Richardson: So, we support the Utilities Action Plan and their targeted
work to prevent, detect and correct water meter billing errors and we note
that they have already started taking action to do so and also, to ensure
TRANSCRIPT
Page 16 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
that consumer confidence in the meter accuracy. We also support ASD’s
action plan to strengthen its procedures regarding sole source purchases and
note that they also have already started taking action to implement those
recommendations. We have a recommendation – a recommended motion
that Policy and Services Committee recommends that the City Council accept
the utilities accuracy of water meter billing audit and that concludes our
presentation and we are able to answer any questions you might have.
Chair Wolbach: Any public speakers on this? Any questions or comments
from my Colleagues? I have a couple but I will defer, go ahead, Tom.
Council Member DuBois: Just so I’m clear, so in the past when we detected
this we – do we refund the money to the people who were overbilled and
collect the money from people that were unbilled?
Mr. Shikada: Yes, we have a window of, I think it’s three years, correct? For
both, the refunds as well as back charges and in the case of where there’s
balance owed by the customer that we can work on a payment plan through
which that can be done.
Council Member DuBois: So, are we consistently applying what we did then
to these new ones?
Mr. Shikada: We have, one of the issues that we identify though is in
specifically this capital project that was completed in 1994 where there were
changes to the valve size based upon the capital project – the construction
of a new water main. That we –at the time the differential between the price
for a 5.8-inch valve and a 1-inch was fifty cents and so there were logical
reasons to upsize the valve. Since that time though the differential in valve
– in price – the fixed price on a monthly basis has increased to roughly $17
per month. So, given how at the time the decision made sense but in
hindsight, now 23–22-23-years later the differential as big as it is, we do
want to take a look at that differential. So, that’s an issue that we will be
coming back to City Council with. As the Council Members know, our rates
are set based on a pretty rigorous or extremely rigorous cost of service
analysis that takes into account the various components of this system. So,
we really want to ensure that as we bring back options for the Council, that
we’ve looked at not creating more of an issue than exist in order to address
on what appears to be a disparity; again, in hindsight.
Council Member DuBois: So, are you saying that for that one neighborhood,
we would treat it differently than for areas found in other parts of the City?
TRANSCRIPT
Page 17 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Mr. Shikada: That’s where we’re looking more deeply into it. Given that it
looks like that capital project, the construction project was a one-time
situation where a water main replacement actually resulted in a meter…
Council Member DuBois: That’s the Southgate project?
Mr. Shikada: …exchanges – yes, that’s correct.
Council Member DuBois: But that’s only a subset of the errors, right?
Mr. Shikada: Correct. So that’s the one circumstance under which we want
to look more closely at it and where it might be justifiable to do something
different, such as come up with a special rate, given the circumstances that
led to those meter change outs. Otherwise to your initial point, the back
billing and the refunding would apply.
Council Member DuBois: Ok, then it looks like there’s a little back and forth
about whether it was mostly about that project. If there was a more
systemic error, have you guys agreed on a path I guess moving forward?
Mr. Shikada: I think quite frankly, I will just speak for myself and behalf of
the Utilities Department and City Administration. The issue that we really
took issue with was the description of the concern as an equity issue and the
decision for how the meter changes were made. From Staff perspective, we
really don’t see that as an equity issue. It was really again, justifiable at the
point in time that the decision was made and so it was really more of the
characterization than anything else. With respect to – and I think beyond
that, it may either be a misinterpretation or miscommunication in terms of
whether how that disagreement played out because again, to your point, we
do believe that there are systemic issues with the potential for human error
to just exist indefinitely. Once an error was made when the installation was
done, since that time and really as a result of the audit so giving credit to
the City’s Auditor’s Office, we’ve now implemented regular checks. So, we’ve
now implemented monthly reconciliation of the installation with the billing
records. Now that said, it is a highly labor-intensive process so as we’re
going through it, there’s still the potential for human error to be a part of
what we need to look for. So, all of that leads to the other recommendation
which is as the new Customer Information System is part of the Enterprise
Resource Planning System is put together, that we really need to maximize
the automation and minimize the likelihood that human manual data entry
leads to these errors that can’t be corrected later.
TRANSCRIPT
Page 18 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Ms. Richardson: I want to add something to that last comment. If you look
back at Slide 4, those five different areas that we listed on Slide 4. The five
different places where there could be a discrepancy, in SAP each of those
are a manual point of entry and best practice is a single point of entry and
that’s what Ed was referring to when we’re talking about the new Customer
Information System. There would be a single point of entry, you enter it
once and it carries through to all the different places where that meter
number is used for billing and so you should automatically have a significant
reduction in the error rate by only having to enter it once.
Council Member DuBois: So, I have some questions about E-meters. I
assume we switched to E-Meters for a reason so what are the benefits of the
E-Meters?
Mr. Shikada: Let me make sure I cover some of those, let’s see. The
decision was really made in 2013 and let me certainly acknowledge, as was
pointed out in the audit, that there was a flawed process in how the decision
was made to proceed with that. In mismatch between the initial approval
and then what was purchased so the standardization and then implementing
it as a new standard really wasn’t – was not done correctly. With that said,
the rationale for going to the E-Meters related to one, the lighter weight of
the meters themselves so they are actually easier to install or remove the E-
Meters. Part of for us would be worth going through is a bit of an
understanding of the meters themselves. The suggestion E-Meters sounds
very high tech…
Council Member DuBois: Is it like you can read the value remotely?
Mr. Shikada: Not in and of itself. The fundamentally – it’s actually a brand
name or a series of the types of meters that are labeled E-Meters. The
primary difference is it’s not mechanical in the way that it measures the
water going through. It’s ultrasonic so it does pings; effectively a little sonar
system in there that allows the pinging to detect the rate of water flowing
through the pipe. So that’s the primary difference, it’s the method by with
(crosstalk) (inaudible)…
Council Member DuBois: Does it save us money in terms of reading water
meters?
Mr. Shikada: It could in the long term. It sets it up for what would
subsequently require the transmitter in order to remote read, as well as then
to have the data collection. So, it’s really – fundamentally it’s simply the
method by which the water measurement is taken as the primary difference.
TRANSCRIPT
Page 19 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
That said the – recognizing that we have had a history of injuries among the
meter technicians who do the installations and removals, that going to the
lighter weight, it is easier to handle a meter and that was a part of the
decision. I’m not seeing my notes in terms of other rationale so if Staff
wants to reinforce any other reasons for that. As well as, really, the
expectation that because relative to the solid state, the – really experienced
that mechanical meters have in that they slow down over time and that
would not be an issue with the E-Meters. So that would allow for a more
consistent recording going into the future and then the last piece is, to your
point, that when we do implement smart meter technology overall, this
model of the meter could be retrofitted for the purpose of the automated
read.
Council Member DuBois: That’s kind of my main concern, I guess the Report
says that we’re going to put them on hold but if we’re going to move to
smart meter scenarios, is it really worth putting them on hold if standards
are really going to come out this year? Should we just continue to
acknowledge that there’s an issue there but continue to install E-Meters.
Mr. Shikada: The other option that we are looking at is simply not installing
anymore and so…
Council Member DuBois: But I’m saying that if you did want to go back and
add the transmitter, why install meters that can’t be upgraded?
Mr. Shikada: Right, so again we could just hold off on installing new meters.
We do have a regular replacement schedule for meters that may be 20-
years old as an example. So, in anticipation of the new standard coming out
relatively quickly, we would put a hold on the routine replacement until the
standard is complete. Assuming that’s coming together in a timeframe that
we believe makes sense and at the same time, we do place a very high
priority on consumer confidence in the meters that are installed. While we’re
in this period before there’s the independent methodology established and
that we can implement that either in-house or through third party testing
labs. For that reason, we believe that it would be prudent not to proceed
with installing anymore.
Council Member DuBois: So, Staff is really comfortable with that?
Mr. Shikada: Yes.
Council Member DuBois: It’s not a big deal to put these on hold?
TRANSCRIPT
Page 20 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Mr. Shikada: Correct, correct. I think that given the relatively short
timeframe in anticipation, that holding on installing new should be fine in
terms of any risk associated. If there are mechanical problems with other
meters, then since those would be a one off replacing those with mechanical
meters would be the approach in the short term.
Council Member DuBois: Thank you and then – so I guess you’re just really
asking us to accept this Motion not to – I guess there’s agreement on
moving forward and we’re just accepting the Report tonight?
Ms. Richardson: That’s generally the approach, yes. I guess the one thing
that I would ask us to look at is whether those partially agrees based on the
response should be changed to agrees. The responses do read like they
agree and I’m not sure what isn’t…
Council Member DuBois: Well, before we go there…
Mr. Shikada: Just objecting to the equity term.
Council Member DuBois: Before we go there, it looked like you had an
update on E-Meter.
Mr. Shikada: Oh yes, just one other rationale for going to the E-Meters is
that the technology has a better sensitivity to extremely low flow. So to the
extent that our residents are implementing more and more water
conservation, that it allows us to have a more accurate read out at that low
end.
Council Member DuBois: Ok, thank you.
Mr. Shikada: There is a picture in the presentation – let me see.
Chair Wolbach: Yeah, Liz.
Vice Mayor Kniss: Yeah on Slide 10. If I may, I’m kind of looking for some
show and tell here.
Ms. Richardson: (Crosstalk) Then the Executive Summary on…
Vice Chair Kniss: When we have meetings like this, is it possible to bring
these devices with you?
TRANSCRIPT
Page 21 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Mr. Shikada: Yes, we should have thought of that but did not, but we would
be certainly happy to do that if that’s desired at the full Council. Just to give
you a sense of scale, the displacement meter as it’s labeled here is the
mechanical meter. It’s about this big, we’re talking about either a 5/8 or 1
inch.
Vice Mayor Kniss: That’s the one that most residences have?
Mr. Shikada: Correct, it’s either 5/8 or 1 inch; let’s see, I remember the
numbers – I think we have about – is it about 15,000 of the 5/8 -inch and
about – is it 1,000 or less of the 1 inch? 1,000 of the 1 inch so relatively
speaking there are a lot more of the 5/8-inch meters than the one inch.
That’s actually the test bench so that’s the set up that exists on the
municipal services center on the yard. So next year, we will make sure they
put that on the tour so you can see where the meters are actually lined up
and they’re tested. They go through a low flow test, a moderate flow test,
and a high flow test and we compare the reading on the meter to the
measured quantity of water that goes through. Our standard procedure is to
test ten percent as they come in. At the time that the majority of the errors
happened, we actually did not have a functional test bench in place. There
were some moves that were happening at the yard and as a result, it was
not operational. I believe we might have also not had water meter techs at
that time due to attrition or moving people to other positions. So, for a
number of reasons, this was not done correctly and so we’ve now put the
systems and people back in place although we still do have vacancies in the
water meter tech classifications, as well as a couple of the key management
positions that would be responsible for overall management of this as a
program.
Vice Mayor Kniss: So less specific and more general, how many people do
you get who call mentioning their water bill and how high it is and how
awful? Is – I hear that a lot as a Council Member and people say, you can’t
believe what my water bill was, it was unbelievable.
Mr. Shikada: I know that (crosstalk)…
Vice Mayor Kniss: I usually tell them to call you, Ed.
Mr. Shikada: Absolutely and they do. Now that said, I’d like to say that there
are at most a handful a year that actually have unusually high and by
unusually high I’ll say two or three ‘x’ of their normal monthly amount.
There are, I’m sure more frequent complaints raised about smaller increases
but we also have on an ongoing basis what’s called an implausible check. So
TRANSCRIPT
Page 22 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
as the meter readers go out, they – whether it be through data entry, error
or simply for some reason unusually high reads. The system does flag a read
that just doesn’t seem in range and so those will result in follow up from
Staff to the customer.
Vice Mayor Kniss: Would there be any way to tell, I don’t know how smart
this E-Meter is if you are away – if you had gone somewhere and something
overflows. Your washer overflows, which it just recently did with a friend,
are there any indications that we get something is amiss in somebody’s
house or is that just you wait till you come home?
Mr. Shikada: Well, not the E-Meters do provide the ability to identify some
unusual flow that suggests that there is a leak. We haven’t implemented all
of the features including the transmittal or transmission of the information
so we’re not there yet but that is the path we’re on and where we would like
to get. If nothing else, this does point out with your example, the potential
that the technology and the automation have to improve not only the
accuracy but also the quality of the services that are provided to catch leaks
as an example. We do have a prior referral on the topics of leaks that Staff
is working on and we hope to bring back to Council within the next month or
two. At the same time, our issue with E-Meters points out that how we
tackle and how we deal with the implementation of the technology is as
important as the technology itself. So, both in terms of the issue of
standards, how we do the procurement and the piece that wasn’t discussed
at all here is the communication to customers to ensure that – we learned
from issues that Pacific Gas and Electric (PG&E) had when it rolled out smart
meters and that communication is an integral part of how we would deal
with the roll out.
Vice Mayor Kniss: It interesting that you have so few complaints so it must
be that we get the complaints and then no one actually does anything about
it.
Mr. Shikada: Well, I wouldn’t say that. There’s quite a bit of follow up.
Vice Mayor Kniss: I think probably they just look at their water – two or
three people did it in the last week. I don’t know whether we’ve done
something different but have said my gosh, my water bill was and it was;
they were astronomical numbers. Maybe people have relaxed and started
watering in the summer because there was more water this year and
suddenly they said we can water the yard, the lawn, the flowers, whatever it
might be. Did you see any of those uptakes or upticks this summer?
TRANSCRIPT
Page 23 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Mr. Shikada: Yes, we are actually – yes, we did and part of it is to your
example, irrigation systems – sprinkler systems that hadn’t been used either
both over the winter or through the entire drought and so as a result, being
turned back on and finding breaks. So those have definitely led to an uptick
this year. I suspect this issue will lead to an uptick as well as there’s more
public awareness of this meter billing issue and so I, unfortunately, hate to
say it but you may get more calls and emails as will we. We’re absolutely
endeavored to deal with those directly and as quickly as possible. Part – I’m
sorry one last thing on the E-Meters that I do want to note that it is our plan
expecting that some customers will simply say they don’t want to have these
E-Meters installed, that we will remove those at the utility’s expense, not the
customer's expense on request.
Vice Mayor Kniss: It’s such a – it’s so fascinating because you deal with such
an absolutely essential item in our lives and in our budget and we have
incredibly good water; I mean no question about that. There is a cost to that
and I’m afraid we may have lost some of our drought awareness policies and
I frankly, am sorry Jerry Brown decided to get rid of those for the reasons
that were stated. It’s too bad we didn’t keep those in place and continue
those good policies we had for four years, five years? For quite some time so
that’s just an editorial comment but I’ve often thought we were all on such a
good path where we were going to have water resistance and take out our
lawns and so forth and so on. In some places that actually happened but in
many places, it didn’t. That’s it, that’s my editorial comment.
Chair Wolbach: Lydia, do you have any questions or comments at this time?
Council Member Kou: Ed, when you said that the transmittal of the flow from
the E-Meters, does that – can that be arranged to go to the customer or is
that usually to utilities and then utilities has to communicate to the
customer?
Mr. Shikada: Let’s see, we did have a pilot program that was ongoing for
some period of time that set up notifications that would allow a residence I
believe to receive that directly. I think it’s a question about how we can
figure it when we go forward with the roll out of smart meter systems and I
suspect that it should be able to be configured so that the customers
themselves would receive that notice but we just haven’t gotten to that point
yet.
Council Member Kou: What are some of the reasons that they don’t like –
they don’t want to have E-Meters installed?
TRANSCRIPT
Page 24 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Mr. Shikada: Well, you know I think right now the issue is the testing and
the availability of independent third-party testing and the standards through
which those tests would be conducted. The – I’ll say an unfortunate fact is
that we do have some residences that are concerned about the technology
and having that including the transmission capability be adjacent to their
home, concerns about RF radiation as the case may be. So being sensitive to
those, we do get requests or concerns that say just keep those smart meters
away from my home.
Council Member Kou: Will Utilities do testing of those to prove – to show –
have data to show that there isn’t electric-magnetic fields or any of those
sorts of stuff in order to help…
Mr. Shikada: I think we’ll provide as much information as we can when we’re
ready to go with the full roll out. I suspect that there will be some residents
who are not convinced in any case and I think we should be able to provide
allowance for that; at least in the short term to accommodate their
preferences.
Council Member Kou: Thank you.
Chair Wolbach: I have a couple questions, just first on those two
recommendations where the response from Staff was partially agreed; 1.4
and 2.1 on Pages 28 and 29 that are summarized in the audit. Just any
more clarity that City Auditor Staff can provide about that – about those two
– about 1.4 and 2.1? Where the – we’re hearing slightly different takes here
and I wanted to bring it back to the Auditor Staff having heard from the City
Manager Staff.
Ms. Richardson: Correct, so in 1.4 if you look at our recommendation and
you look at the second part up their response, the first part is really
commentary, the second part of what are they going to do and it’s really
directly addressing the recommendation. So, that’s why we – well, if you are
agreeing to look at that differential, why do you partially agree instead of
just agree so that was really our concern with that one.
Chair Wolbach: So, take let’s take that for a moment and turn back to City
Manager’s Staff and Utilities Staff and ask do you – also a question about
moving forward. Is there an interest in resolving the disagreement or further
communication before this comes to full Council?
TRANSCRIPT
Page 25 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Mr. Shikada: I think we could certainly have further discussion of it and not
to negotiate on the record here but my suggestion…
Chair Wolbach: Right, I don’t want to do that here but I want to ask – I like
that there is maybe room for further discussion. I’m wondering procedurally
if that can be done between this meeting and this coming to Council and
whether we need to put that in a motion or whether Staff can do that? I’m
also looking at the City Attorney’s Staff for direction and guidance on the
procedure?
Terence Howzell, Principal Attorney: There – I think that could be done at a
later time but they were maybe – is there negotiating happening right now?
Ms. Richardson: No, no, no…
Mr. Shikada: Just a suggestion.
Ms. Richardson: We have actually done that on a previous audit and I
believe it was the Workers Compensation Audit, where there was a little bit
– Policy and Services actually asked us to go back and before it went to
Council they had an updated response to those questions.
Mr. Howzell: That’s my recollection as well, there was some harmonizing
that done prior to it going to Council.
Chair Wolbach: So, when it comes times for motion, I think we may include
this suggestion that be attempted. Then…
Council Member DuBois: Could you repeat…
Chair Wolbach: Well, I haven’t made a Motion yet. My concern is that there
is, I’m about to turn to the second one just to see if it’s the same issue, on
recommendation 1.4 City Staff says that they partially agree in the report,
City Auditor looks at the response and says, my read of it is, you guys aren’t
just partially agreeing but you’re totally agreeing so what’s the issue? So, in
order to have greater clarity and have everybody on the same page when
this comes to full Council when it comes time for a motion, I’d like us to
provide direction that allows the Auditor’s Staff and City Manager’s Staff to
collaborate and try to find the resolution of that area of potential
disagreement. Let’s turn then to 2.1 and I want to again turn back to the
City Auditor and do you think this is another area where there maybe – is
there anything more we can say about this one? Is this another where you
TRANSCRIPT
Page 26 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
feel that you are actually on the same page or is there a true disagreement
here?
Ms. Richardson: I think we are somewhat on the same page. I think maybe
the differences are informational and we’re thinking a little bit more like
making Council more aware than just in an informational report. What we’re
looking at is ok, if you’re going to make a significant change to infrastructure
by going from displacement meters to some sort of an electronic meter, that
would be something that Council would want to – it’s a major infrastructure
change to us and that Council would want to be aware and have some
discussion. I think that they are saying that they do inform Council but they
are saying that it’s more informational so there may be a little bit of a
disagreement on how it’s done but I think the general concept of informing
Council is the same.
Chair Wolbach: Any other response to that, which just again, your take on
what we’re looking at here and how these are categorized as agree or
partially agree from the City Manager Staff.
Mr. Shikada: I would just echo what the City Auditor said in terms of the
distinction is really the recommendation states pretty explicitly to bring it
forward to Council for approval. From Staff’s standpoint the definition or sort
of the threshold at which it changes is significant or systemic. On a daily
basis, it can be a variety of interpretations so that’s where we would prefer
not to lock into the requirement for approval without a clear definition of
where that threshold for significances is.
Chair Wolbach: Are you worried about setting a precedent essentially?
Mr. Shikada: Or quite frankly an ongoing audit finding that doesn’t close,
which does happen; no offense.
Chair Wolbach: I understand the desire for clarity and being able to have
identifiable problems and action plans for resolving them. I think we would
all agree you don’t want something that can’t be resolved for which there’s
no clear path towards resolution. Moving on, I guess more commentary than
a question unless there’s any more that anyone on Staff – City Manager
Staff or the City Auditor’s Office about finding three. I’ll just say that this is
one that I found pretty concerning but I appreciate that it’s been discussed,
been identified, I appreciate that there’s no – there seems to be no
disagreement here about a path forward and that we’re looking to get this
resolved within the next seven months.
TRANSCRIPT
Page 27 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Ms. Richardson: I would say that I would agree that they are already
working towards that and have already started making some changes so I
think that one's on a path already to be completed as their schedule
indicates.
Chair Wolbach: In general, I had some questions or heard enough concerns
raised about purchasing and procurement etc. in the City and so I think that
this is a step in the right direction. I do appreciate, again the work is done
from the Auditor’s team and the City Manager’s team to really address this
and resolve it expeditiously. With that actually, since I was suggesting a
tweak to the Motion, if it’s alright with my Colleagues I’d like to try my hand
at a Motion on this one which is…
Vice Mayor Kniss: Before you do that, can I just one general question?
Chair Wolbach: Please.
Vice Mayor Kniss: Do we – in situations where they have been overcharged,
do we give a credit or do we actually give a refund?
Mr. Shikada: It is typically a credit.
Vice Mayor Kniss: Ok, so it just goes onto the next bill…
Mr. Shikada: Correct.
Vice Mayor Kniss: …and they are charged less. I think that must be fair more
effective than…
Mr. Shikada: It’s certainly far more efficient.
Vice Mayor Kniss: …than sending money back.
Mr. Shikada: Believe it or not we have cut checks for less than a dollar and
it’s been odd.
Vice Mayor Kniss: So, our practice is credit them for the next time. Thanks.
Chair Wolbach: Alright, so as for attempting a Motion, I’ll move the Staff
recommendation with a slight change and that would be that Policy and
Services Committee recommend that the City Council accept the utilities
TRANSCRIPT
Page 28 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
accuracy of water meter billing audit and that between this meeting and this
coming to full City Council, that the City Auditor’s Office and the City
Manager’s Office attempt to resolve disagreements on recommendations 1.4
and 2.1, if possible.
Vice Mayor Kniss: Second.
MOTION: Chair Wolbach moved, seconded by Vice Mayor Kniss to
recommend the City Council accept the accuracy of Water Meter Billing Audit
and direct the City Auditor’s Office and City Manager’s Office to attempt to
resolve the disagreements on recommendations 1.4 and 2.1 before this goes
to the City Council.
Chair Wolbach: I think I’ve spoken to my Motion if anyone has questions feel
free to ask me to clarify but otherwise I’ll forgo further comments at this
time. Would you like to speak to your second?
Vice Mayor Kniss: I only think that this is a really good conversation and I’m
glad that we’ve had it. I’m glad that we did this audit and Ed, I’m pleased
that you’re in the role that you’re in; I feel comfortable about it. I just think
our water is so precious and we sometimes don’t pay enough attention to it
and how it’s dispersed and tracked and so forth. I really appreciate your
presentation tonight and thank you and I’ve forgotten your first name.
Ms. Nguyen: Mimi.
Vice Mayor Kniss: Mimi, thanks, Mimi.
Chair Wolbach: Any other questions or comments on the Motion? Seeing
none. Alright, all in favor? Alright, that passes unanimously. Thank you.
MOTION PASSED: 4-0
3. Auditor's Office Quarterly Report as of June 30, 2017.
Chair Wolbach: Let’s move onto our third and final Action Item of the night.
Auditor’s Office Quarterly Report as of June 30, 2017, so again, Harriet to
present. Go ahead
Harriet Richardson, City Auditor: Thank you. This is our standard Quarterly
Report but I do have a couple format changes in here that I will talk about
as we go through. One of them was a request at our last presentation of our
TRANSCRIPT
Page 29 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
third quarter – at the presentation of our third quarter quarterly report; get
that straight. This is our fourth quarter update for April through June 2017
and a few highlights are we published and presented the auditor of the Cross
Bore Inspection Contract. We published and presented the continuous
monitoring of payments audits and we published and presented the audit of
green purchasing practices. We had four of my Audit Staff who participated
in a three-day onsite training on performance Auditor and I gave a
presentation along with Senior Performance Auditor Houman Boussina at our
Local Bay Area, Local Government Auditors’ Association of our cable
franchise and PEG Fees Audit. The Senior Performance Auditor Houman
Boussina participated on the peer review team for Multnomah County,
Oregon. The next section is our audit and project work so one little
difference here is I’ve usually put the audits that we completed in there with
just a little comment that it was completed but since I also put in the activity
highlights, I’ve decided to stop putting it in the project works since it’s kind
of redundant. The first one -- remembering that this is of the end of June so
there’s a little bit of a lag in time from presenting what happens than
through what’s happening now. The first one was that the audit you just
heard was still in process and was undergoing final review so the next
quarterly report will give the update that it’s completed. The continuous
monitoring audit of overtime is in the final stages of reporting. It's scheduled
for presentation at the September Policy and Services Committee. We have
started an audit of Enterprise Resource Planning (ERP), we actually have
several ERP planning audits on our audit plan. The first one is data and
system governance and security and the purpose of that audit is really to
look at the overarching governance policy regarding our IT systems and
data. So, this audit we expect to complete before the end of the calendar
year. It’s – we have some planning work that’s being done right now but it’s
going to be –field work is going to be pretty quick so this will be a very quick
audit to get done and we have some very good criteria to help us with that
audit. We are also doing an ERP planning audit of data reliability and
integrity so one of the things on this audit is we originally started thinking
this would be one audit but it’s become –as we started, we realized that this
really needs to be a series of audit reports to help the City to be able to
move along quicker as it starts getting ready to implement a new ERP
system. The idea of this is to try to prevent garbage out from becoming
garbage in in the new ERP system and making sure that the data is
consistent and reliable. One example of that is the meter audit you just
heard and so that we get to exclude from this audit because we already did
the data reliability piece on the meters. Another example was the vendor
master file which we did in our continuous monitoring audit of payments. So
those two are out of the way but in working with ASD and trying to identify
which would be more – what would be most helpful for them, we decided to
do a data standardization audit first as part of this and that’s really looking
TRANSCRIPT
Page 30 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
at data that is used throughout different sets of tables, they call them
tables, that collect data on different types of things in the system to make
sure it’s entered consistently. A good example of that is addresses where
someone might spell out the street, another person might put St, another
person might put St., someone else might put Str. and that happens with a
lot of different types of data. Even like with the meters, we’d see meters
spelled out, we’d see it mtr, and those kinds of things make it difficult when
you are trying to do reports and find similarities and do trends and all sorts
of different things that you can do for data analysis if you don’t have
consistency. So, we’re going to come up with some data standardization
guidelines that will help them with an implementation that they can
implement before they transition the data over. The next sets of those
audits will look more at specific data sets similar to what we just did on the
meter audit. We’re expecting the data standardization piece to be done by
the end of this calendar year. The next audit is segregation of duties and
that is also for ERP planning and that’s to help to make sure that when the
new ERP system is set up, that it’s set up so that there’s a concept called
Concept of Least Privilege which means that an employee only has access to
those tasks in the system that they need to do their job and no more. That
prevents people from doing things that they shouldn’t do that could
compromise the City’s assets in some way. So we are doing that and will be
giving a sort of different levels of security. The ideal would be the best –
there will probably be an intermediate layer and then a very basic level and
then we’ll identify mitigating controls that the City would need to implement
if they can’t do the highest level and they have to notch down on each of
those. We’re again, expecting that one by the end of this calendar year.
We’ve also started our code enforcement audit and that one is wrapping up
the planning phase and getting into field work and as part of that, the
Council approved a $20,000 budget for a custom survey that focuses on
code enforcement and some, a little bit of the built environment. That
survey as of June was still being drafted but that is with the NRC and will
start being mailed to residents next week. That will be used to help inform
our recommendations in the audit.
Vice Mayor Kniss: What was the amount?
Ms. Richardson: Twenty thousand dollars. Then our – we’re also doing an
ERP non-audit service where one of our auditors is sitting on – in on our
information – IT has a series of meetings with departments. They are
strategic planning meetings and there are technical planning meetings and
so our auditor is sitting in on those meetings and providing advice as she
sees things that are maybe not – that could impair a successful
implementation of the system – the new ERP system if they aren't
implemented – caught earlier so it’s really a preventive tool that we’re
TRANSCRIPT
Page 31 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
providing to IT. We – during this last quarter she attended 27 ERP system
validations sessions and three strategic and – I can’t speak here – tactical
team meetings and provided both verbal and written advice. So, we
provided some written memos to the IT Director with some
recommendations. They don’t have the same weight as our audit
recommendations in that they don’t have to respond to them in the same
way that they would in an audit. That’s an ongoing project that will – we
expect to just continue throughout the planning and design and
implementation phase of the ERP system. I also have on here the custom
citizen survey because it does – I put it as a separate item because this is
the one that I just mentioned that includes the code enforcement questions
but I put it as separate because it’s also a little bit broader and that includes
questions about the built environment and a little bit about housing. As I
said, that was in draft format at the end of June but it is finalized and going
out in the mail next week. I’ve started collecting input for custom questions
on our National Citizen Survey. I’m hoping to wrap that up this week and get
that out in the – over to the National Research Center to start mailing out –
it will be about mid-September when that goes out but it was – I was just
gathering input on the questions as of the end of June. Then we also do our
ongoing sales and use tax reviews and so for the fourth quarter, total tax
recoveries were $54,538 from our – my office’s inquiries and another
$48,387 from vendor inquiries for a total of $380,290 year to date. There
are still sixty potential misallocations waiting to be processed – researched
and processed at the State Board of Equalization; eighteen of those are from
our inquiries and forty-two are from our consulting vendor. This quarter is
the quarter each year that we also report on the tax – the sales tax that we
receive as a result of the Development Agreement with Stanford Medicine
regarding the hospital construction. So, for this year it was $879,000 and it
included $883,000 for this past calendar year but it was a reduction of – in
prior year adjustments because some adjustments that they had to make
were some things were misallocated. From -- since 2011 we’ve received
$2.9 million dollars by having this agreement in place. Then we continue to
do our advisory roles; sitting in on the Utilities Risk Oversight Committee
meetings, the Information Security Steering Committees and the
Information Technology Governance Review Board meetings as needed. So,
this next section is the status of audit recommendations and this is one
where I’ve made quite a change and I’m hoping the format works for you
given the size of the paper here; where I can press some columns together
but last time I was asked not to just put the number of open
recommendations but also to put a list of some of what those
recommendations were. I’ll go through the numbers and not read all of
these to you but if you have questions about any of them, feel free to ask;
again, remembering that these were as of the end of June. So, the Citywide
cash handling, we did receive – even though it was just presented tonight,
TRANSCRIPT
Page 32 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
we did receive the status of that as of the end of June and so we have one
recommendation left open which we discussed earlier tonight and there was
one that was implemented during the quarter. On the utility meters,
procurement inventory and retirement audit that has 15 recommendations.
They reported that 14 of those were closed and one was still open but we
did not have a chance to validate some of those. Some of those tie back to
the first set of meter discrepancies that we identified in finding one in the
Audit that we presented tonight so I think that we will – we separated those
out in the graph that we have attached here because we still feel like there
may be some that we disagree with. So, I put them kind of in a not yet
validated category and we’ll come back later and say whether they are or
not validated. We have the Animal Services Audit, that still has all eight
recommendations open but there is an update coming to Council very soon.
I’ve seen it on an agenda but I’m not sure if it’s the next meeting or the one
after that but there is an update coming to Council soon. It was last night,
ok, so – but those recommendations as of June were not implemented. The
Parking Funds Audit, that one had 8 recommendations and that one is
scheduled to come to Council in October – actually to Policy and Services in
October we all – did already receive the update on that and there are four
open recommendations and four that were implemented during the quarter.
The Disability Rates and Workers Compensation Audit, that one is also
scheduled for October and that one has 15 recommendations and those are
all still open and there has not been an update provided yet. Just a kind of
quick comment on those, the updates on these – there was kind of a – there
was a restructuring of how these updates were done and so it was hard
getting that practice – that protocol for that established so now I think we’re
on a good schedule for how they’re all scheduled to be presented. So, the
departments are working on these and I think as you are starting to see,
some of these are getting implemented where they were just sitting for a
little while because we didn’t have our protocols set up for that transition but
you’ll start seeing more of them when we get closed as the year goes on.
The Cable Franchise and PEG Fees Audit, as of June and as presented
tonight, there were nine recommendations with seven open and two
implemented during the quarter. The Community Services Department Fee
Schedule Audit, that had 3 recommendations, three of them are still open
and that one is due for its first update in October but I think it may not be
scheduled until November. I would have to go back and look but that one is
the first update, it’s not past due. The continuous monitoring payments that
had 7 recommendations and 7 were still open. It’s not scheduled for its first
update until February. Green Purchasing Practices Audit, that also had 8
recommendations and is not scheduled for a status report until February and
then same with utilities cross bore inspection contract audit for
recommendations due for that first status update in February. Then we
have a little graph here that shows what were implemented during the
TRANSCRIPT
Page 33 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
quarter so this is where you can start seeing some action happening after
got our protocols in place, it’s your Packet Page 27, where 9 of them were
implemented during the quarter and then the not yet verified are the 26 that
we have received but haven’t had a chance to go back and look at in detail.
The number of open recommendations has declined quite a bit, so it’s down
to 38 from prior fiscal years, 22 from the current Fiscal Year. So that
number had been up to about 70 and so it has come down quite a bit from
where it was a year ago. Then on the last page our fraud, waste and abuse
hotline, we did not receive any complaints or allegations during this year –
this quarter and all of the prior complaints have been closed. That completes
my presentation and I’ll answer any questions.
Chair Wolbach: Any questions or comments from my Colleagues?
Vice Mayor Kniss: That’s exhausting.
Council Member DuBois: I just want to say thank you for the format change,
I find that useful.
Ms. Richardson: Ok, thank you.
Chair Wolbach: I’ll agree with that. Anyone else? Any Motions? Alright, does
anyone want to move the Staff recommendation?
Vice Mayor Kniss: I maybe – I’ll move that. Go right ahead.
Chair Wolbach: Alright and I’ll second it. Would you like to speak to your
Motion?
MOTION: Vice Mayor Kniss moved, seconded by Chair Wolbach to
recommend the City Council accept the Auditor’s Office Quarterly Report as
of June 30, 2017.
Vice Mayor Kniss: I just have one question, one of the things that we used
to do – oh I’m sorry. We used to list what was going to come up in what
month and I can – I mean I can put it together but figuring out what month
you said it’s going to come up in but for example, what comes up in
September at 7 o’clock at Policy and Services on the 12th?
Ms. Richardson: We have – so the parking…
TRANSCRIPT
Page 34 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Vice Mayor Kniss: Am I missing the table?
Ms. Richardson: That date is changing.
Vice Mayor Kniss: It was where? Oh, At Places. Well, then…
Chair Wolbach: (Inaudible)
Vice Mayor Kniss: Maybe I just didn’t see that one among all of the other
papers. So, we’ve got one that says…(crosstalk)
Chair Wolbach: Did we all get this or did just I get a copy of this?
Jessica Brettle, Assistant City Clerk: Yes Liz, you should have received a
copy. Here, you can use mine for right now.
Vice Mayor Kniss: Thanks.
Ms. Brettle: You’re welcome.
Vice Mayor Kniss: It’s probably at the bottom of the bucket here. So, this is
very helpful, I hadn’t seen this before so thanks. That takes care of my
issue.
Chair Wolbach: Alright, I don’t need to speak to my second and anyone else
questions or comments before we vote? Alright, all in favor of the Motion
which is recommend to the City Council acceptance of the Auditor’s Office
Quarterly Report as of June 30, 2017. All in favor? Alright, that passes
unanimously. Thank you very much, City Auditor for sticking with us for all
these and providing all these report updates.
MOTION PASSED: 4-0
Future Meetings and Agendas
Chair Wolbach: That moves us to the last item of the evening, which is
future meetings and agendas. So, here I’ll turn to City Clerk but also Rob
de Geus who is now our Policy and Services liaison. Also since a lot of these
are audits, Harriet if you want to stick around while we discuss this. So,
everybody – I don’t know if everybody has found it but we did get this At
Places and it looks like everybody on the Committee has one. Is everybody
TRANSCRIPT
Page 35 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
comfortable with this tentative work plan? Are there things which are
missing which you would like to see? Tom.
Council Member DuBois: I’ve requested a couple times, I think it would be
interesting to get an update from the Magical Bridge crew. I mean they are
opening a new one…
Rob de Geus: Yeah, we certainly can do that, absolutely and by the way, I’m
glad to be here, it’s good to see you Council Members.
Chair Wolbach: Glad to have you as our point person to the City’s Manager’s
Office, thank you for staffing us. These are of course tentative and things
may come up between now and the end of the year. There are a couple of
civil rights issues that people in the City are exploring. They have been
mentioned in the past or recently; one is one that I have mentioned in the
past which is the potential for Palo Alto to become a CEDAW City. That’s the
convention against all forms of discrimination against women and I think
we’re still waiting to hear from Human Relations Commission with their
recommendations following on our December 2016 resolution about being a
protective and inclusive and welcoming community. As those
recommendations come back from the Human Relations Commission, some
of them may be referring back to Policy and Services or…
Mr. de Geus: Yeah and the Human Relations Commission are actively looking
at the Resolution and wanting to come back with some recommendations.
They have a Study Session planned with the full Council coming up in the
next couple of months and that will be the main topic of discussion.
Chair Wolbach: Another one that I think our City Manager and Mayor may be
looking at is something that a number of Cities in the Santa Clara County is
looking at in collaboration with the Anti-Defamation League but that’s kind of
a recent thing. If there’s a need, those or related or similar items that may
come to Policy and Services this year or at the start of the year, the Mayor
indicated and I think we were supportive of this Committee being a possible
place for discussion of those types of topics. Again, we’ll leave this open and
are there any other that people would like to mention before we wrap up
that they would really like to see that aren’t on this list?
Mr. De Geus: Chair Wolbach, just on the Animal Services, since it was a
significant update with the letter of intent. It might be better to have an
update in a couple months or three months after we’re further along with
the campaign feasibility study.
TRANSCRIPT
Page 36 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Chair Wolbach: I think that’s an excellent idea so let’s push off item three
from the tentative September date and actually, the other thing let’s…
Vice Mayor Kniss: Item 3?
Chair Wolbach: Yeah so let’s – Item 3, the Audit status report for Palo Alto
Animal Services, yeah let’s push that off unless the City Auditor objects
because we did just talk about it last night and there might be some big
changes over the next couple of months.
Ms. Richardson: Yeah, I’m fine with moving it; the difference of that update
doesn’t directly address each recommendation and this would address each
recommendation and where it is. So, I’m not sure how it ties into the…
Mr. de Geus: There’s no surprise that there weren’t any updates in the Audit
report. I’ll have to check with (inaudible) we’re probably behind in giving you
that but there’s been movement on a number of those eight
recommendations and that was defined in the Staff Report in the letter of
intent. In any case, I think we’ll provide a better presentation if we put it out
a couple months and I’ll consult with (inaudible) on this.
Ms. Richardson: So, we’ll just move – you’ll – we’ll decide what to – ok, can’t
be December; it has to October, November or move to January.
Chair Wolbach: Great and for September because of a – we recently
scheduled a discussion about CAO’s or Council Appointed Officers. We have
to move our date for the September meeting. City Clerk here has suggested
either the 20th or the 21st. If everyone could pull out their calendars and if
we could lock on of those down tonight, I think that would help all of us
including the City Clerk.
Jessica Brettle, Assistant City Clerk: Yes, thank you.
Vice Mayor Kniss: Did you just say why?
Chair Wolbach: Yeah because an additional meeting for the Council
regarding Council Appointed Officers will have to be scheduled on the date
when we originally planned to have our September meeting. That’s right,
which means this Committee will have to reschedule. So, instead of the 12th,
we’re now looking at the…
TRANSCRIPT
Page 37 of 37
Policy and Services Committee Special Meeting
Action Minutes 06/13/17
Ms. Brettle: The 20th or the 21st, which is a Wednesday and a Thursday in
the evening so it would start at 6 P.M.
Chair Wolbach: I am comfortable with either of those. Does anyone else on
the Committee have any conflicts on the 20th or the 21st of September?
Vice Mayor Kniss: I have conflicts on the 21st.
Chair Wolbach: Ok, well let’s look at the 20th. Does anyone have a conflict
on the 20th at 6 o’clock?
Terence Howzell, Principal Attorney: I would only note that is the first
day/night of Rosh Hashanah and I don’t to what extent the Committee’s take
that into consideration but I would just note that as a calendaring matter.
Ms. Brettle: Thank you, Terence. We can tentatively schedule it for the 20th
and then consider that in our – in finalizing that date.
Chair Wolbach: Let’s do that.
Ms. Brettle: Ok, no problem. September 20th at 6?
Council Member DuBois: I have a conflict on the 21st as well.
Ms. Brettle: Ok, I’ll talk to the City Clerk and we can confirm. Thank you,
Terence, that was good.
Chair Wolbach: Great and if that’s it, this meeting is adjourned, thanks.
ADJOURNMENT: Meeting was adjourned at 7:41 P.M.