HomeMy WebLinkAbout2020-05-13 Stormwater Management Oversight Committee Summary MinutesStorm Water Management
Oversight Committee
1
Wednesday, May 13, 2020
1 pm to 3 pm
Special Meeting
****BY VIRTUAL TELECONFERENCE ONLY***
https://zoom.us/join Meeting ID: 971 6162 1501 Phone: 1(669)900-6833
Pursuant to the provisions of California Governor’s Executive Order N-29-20, issued on March
17, 2020, to prevent the spread of Covid-19, this meeting will be held by virtual teleconference
only, with no physical location.
Agenda posted in accordance Government Code Section 54954.2(a) or 54956.
PUBLIC COMMENT
Members of the public who wish to participate by computer or phone can find the instructions at the end of this
agenda. To ensure participation in a particular item, we suggest calling in or connecting online 15 minutes before
the item you wish to speak on.
Committee Members Present:
David Bower, Peter Drekmeier, Marilyn Keller, Hal Mickelson, Dena Mossar, Ron Owes, Bob
Wenzlau
Committee Members Absent: None
Public Members Present:
David Moss (Parks and Recreation Commission Liaison)
Staff Present:
Maybo Auyeung, Phil Bobel, Jon Hospitalier, Michel Jeremias, Karin North, Loretta Olmos, Jamie
Perez, Vicki Thai, Isabel Zacharczuk
Call to Order (5 min): 1:04 by Chairperson Mickelson
Oral Communications (5 min): None
Old Business (10 min)
1.Approval of Minutes From the February 13, 2020 Storm Water Management Oversight
Committee Meeting (5 min)
i.Minutes approved: 1:05 pm
2.Staff summarizes results from Survey Monkey (5 min)
i.Wenzlau: survey felt “boxed in” with ability to prioritize based on the set
topics. SWMOC has a fiduciary obligation first and foremost.
1.North: intent of the survey was to find other topics beyond
fiduciary topics that are tangentially tied to the SWMOC’s interests.
2 May 13, 2020
New Business
3.Staff Presentation on the Fiscal Year 2019 Fund Expenditures and Fiscal Year 2021
Proposed Budget for the Storm Water Management Fund (10 min)
i.North and Bobel: no projected shortfall in the Stormwater fund since it is
part of an Enterprise Fund. Budget shortfalls are focused on General Fund.
ii.Perez: operating budget included 2.5% CPI. Added an increase for annual
SCVURPPP membership fee. No changes to maintenance.
iii.Keller: budgets are protected compared to general fund, but are
expenditures impacted from construction being limited due to COVID?
1.Bobel: difficult to estimate impacts to construction at this point.
General feeling is that projects bid right now will get better prices.
2.Jeremias: larger, commercial projects are starting up next week.
Smaller projects, such as home remodels, are slowly ramping up.
3.Bobel: the City has not been issuing building permits for the past
two months so new projects have not been starting.
4.Bower: based on 2007 experience, it took a few years to get
projects through the pipeline. In June 2009, there was little work
available, so significant project savings could be found with a lot of
contractors chasing a small number of projects.
5.Wenzlau: should the development and violation fines/fees row be
lower? Is this something that the Committee makes a motion on or
is this more of an FYI?
a.Perez: proposed budget was developed prior to SIP and
COVID—Council and Finance Committee are currently in
talks for budget hearings, so we may receive direction to
adjust this number.
iv.GSI Preliminary Plan:
1.Hoping to get GSI Consultant RFP approved by Council end of June.
2.Bower: need to explain that consulting is the way that staff gets to
future projects since consulting takes up the bulk of the budget.
v.GSI Budget Plan:
1.Rebate Program will be partnering with Valley Water to further
promote our City program. Allocated $25k for that partnership.
2.Wenzlau: consider using this money for those in need to create a
social benefit with these economic resources.
a.North: mentioned intent to develop GSI Maintenance
Workforce Framework as part of EPA Grant submittal.
vi.Planned CIP Projects:
1.Bobel: acknowledged distinction between one-year budget and
five-year plan (which is not an authorization to spend).
3 May 13, 2020
4.Committee Discussion on Findings of the Fiscal Year 2019 Fund
Expenditures and Fiscal Year 2021 Budget Projections and adoption of
the Committee Memo on FY 2019 Fund and Committee Memo on
Expenditures FY 2021 Proposed Budget (15 min)
i. Mickelson: change dates on memo to make them current to when they
were considered and adopted.
ii.Mossar: last sentence regarding innovative funding is confusing given time
lapse. Did staff make changes? Are those changes reflected in the budget?
1.North: staff worked on the partnership with Valley Water since the
last meeting in February.
2.Mossar: change wording to “Committee continues to encourage
staff” to make the memo clearer.
iii. Mickelson: motion for FY19 Memorandum approved at 1:50. Moved
forward by David Bower and seconded by Dena Mossar.
iv.Mickelson: FY20 Memorandum—SWMF is only meant to be spent for
stormwater-related measures and projects. Cannot suggest any flexibility
that differs from that language.
1.Wenzlau: While we expend money solely for these said purposes,
staff should consider local employment based on COVID impacts.
2.Mickelson: Add a sentence similar to“consistent with application
solely for these purposes, the City should find modes of
implementation of these expenditures that address the
employment impacts and other social needs resulting from the
COVID-19 crisis” as the last sentence of the Memo.
v.Mickelson: motion for FY20 Memorandum approved at 2:02. Moved
forward by Dena Mossar and seconded by David Bower.
5.Staff Presentation on Capital Improvement Program Project (15 min)
i.Loma Verde going to Council for award of contract in June. Received seven
bids. Lowest bid was $1.9 million and highest was $4.1 million.
ii.Schaaf and Wheeler contract also going to Council in June for design for
the other three projects.
iii.Soliciting bids for Alma Box Culvert over Oregon Expressway to repair a
crack on the outside of the box to help extend the life of the box.
iv.Final EIR for Newell Road Bridge has been approved unanimously by ARB
on May 7th. Going to Council with EIR soon for project approval.
v.Mickelson: Is it typical to see such a wide range of dollar amounts for bids?
1.Jeremias: Yes, typical to see a wide range. It’s more surprising to
see so many consultants bidding (7 bids for this project).
6.Staff presentation on EPA Water Quality Improvement Fund Grant
Application and Rinconada GSI project (10 min)
4 May 13, 2020
i.Partnering with City of Santa Clara, County of Santa Clara, Grassroots
Ecology, San Jose Conservation Corps, and San Francisco Estuary Institute
ii.Grant Proposal includes three components:
1.Parking lot retrofits in Lot A in Palo Alto and Bower’s Park in City of
Santa Clara: includes bioretention, bike parking, tree plantings,
new refuse management, EV parking, and lighting
2.Guidebook for Greener Parking Facility Design: includes resources,
lessons learned, and cost estimates for retrofitting parking lots
3.GSI Maintenance Training and Workforce Framework: Bay Area has
a lack of qualified maintenance staff to address GSI. Framework will
review available trainings nation-wide to identify which training
programs would be the best fit to start training San Jose
Conservation Corp members and help build local workforce.
iii.Palo Alto using SWMF funds to provide cash match, in addition to cash
match from City of Santa Clara and significant in-kind matching.
7.Committee approval to send a support letter for the EPA Water Quality
Improvement Fund Grant Application (5 min)
i.SWMOC signed a support letter to be submitted with the EPA Water
Quality Improvement Fund Grant Application.
8.Staff Presentation on Stormwater Maintenance Program (20 min)
i.Presentation by Jon Hospitalier, Assistant Director for Public Works
Services Division
ii.3 full-time staff members (100% maintenance of pipeline) and Manager
1.1.0 staff electrician for monitoring sites; 0.5 staff IT support
iii.Hydroflushing truck used to hydroflush line and collect material that pulls
back within the pipe. Cleans trash-capture devices on Park Blvd.
1.Conduct pipeline repairs (mostly smaller-scale). Larger pipe repairs
go to Michel Jeremias’ group for repair.
iv.Winter Preparations: clean out the pump stations annually
1.Hydroflushing of known hot-spots throughout the City
v.Special Operations: Spill response emergencies, camera inspection at the
pipeline, and minor levy repairs
1.Mentioned San Francisquito annual creek walk to identify any
repairs that may need to occur prior to the start of the rainy season
vi.Calendar of planned work based on wet/dry seasons
vii.Owes: is most of the system designed for self-flushing without cleanout
velocity? If we’re in a drought, does it mean that staff has to perform more
flushing maintenance?
1.Hospitalier: not particularly, but usually staff has issues in areas
with a lot of construction.
5 May 13, 2020
Committee Member Comments and Announcements (10 min)
Tentative Agenda Items for Future Meetings and Review Action Items (5 min)
Tentatively scheduled for June 11th and August 13th. Staff will cancel June meeting so next
meeting will be on August 13th.
Adjournment
Moved by Dena at 3:05.