HomeMy WebLinkAbout2023-10-05 Architectural Review Board Summary MinutesPage 1 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
ARCHITECTURAL REVIEW BOARD
MINUTES: October 5, 2023
Council Chamber & Zoom
8:30 AM
Call to Order / Roll Call
The Architectural Review Board (ARB) of the City of Palo Alto met on this date in Council Chambers and
virtual teleconference at 8:34 a.m.
Present: Chair Peter Baltay, Vice Chair Kendra Rosenberg, Boardmember Yingxi Chen, Boardmember
David Hirsch, Boardmember Adcock
Absent: None
Oral Communications
None
Agenda Changes, Additions and Deletions
Senior Planner and Architectural Review Board (ARB) Liaison Claire Raybould indicated there were no
Agenda changes, additions, or deletions.
Chair Baltay commented that Boardmember Hirsch would be making a statement at the end of the
meeting.
City Official Reports
1. Transmittal of 1) the ARB Meeting Schedule and Attendance Record, 2) Tentative Future Agenda
items and 3) Recently Submitted Projects
Senior Planner Raybould reported there are several packed future agendas and requested the Board let
her know their status for the December 21, 2023 meeting, and that the January 4, 2024 meeting is
scheduled to be canceled.
Vice Chair Rosenberg requested that the future meeting dates listed at the end of the agenda include
dates for a month or two out so she can confirm her calendar for the holidays.
Ms. Raybould stated there is an upcoming preliminary review for 616 Ramona, and they will be using
transfer development rights in the downtown area. The November 2 Agenda has a study session for the
Local advanced Water Purification System at the regional water quality control plant and a housing project
at 793 Sutter. November 16 will be the second study session for the North Ventura Coordinated Area Plan
(NVCAP). There were no new projects added to the upcoming projects list since the last meeting.
Page 2 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Vice Chair Rosenberg read that the 3000 El Camino project listed there had been a report out and she
didn’t recall there being a report and requested that be updated.
Ms. Raybould stated staff had held off on that report due to attorney conversations surrounding that
project, and staff is not yet sure how to move forward.
Chair Baltay asked if 3400 El Camino Real project should have a subcommittee since it is an SB 330 Builders
Remedy application and inquired about its status.
Ms. Raybould answered that it is a SB 330 pre-application in the very preliminary stage. They filed an SB
330 pre-application and have not yet filed a formal application. Staff’s plans for the project are still very
vague as the applicant submitted two very different plans under SB 330, which was when it was initially
reviewed.
Manager of Current Planning Jodie Gerhardt stated this is the Creekside Inn property and staff is still in
discussions with the applicant because they don’t believe they have a compliant SB 330 application, the
project under SB 330 is required to have two-thirds housing and it currently doesn’t appear to meet that
requirement.
Chair Baltay asked if she saw any value to assigning an ad hoc committee at this stage of the process.
Ms. Gerhardt responded not at this point. She believed there will be some changes that could happen,
and the implementation of the Housing Element will be moving forward which could potentially change
the zone of the area; new projects would also be required to adhere to those requirements as well. It is a
changing environment.
Chair Baltay reported that at a previous engagement he had the opportunity to speak with former
Planning Director Lait who mentioned there is a need to come up with revised guidelines for parklets in
Palo Alto. Chair Baltay volunteered an ARB ad hoc subcommittee to help in that process and asked if any
Boardmembers had an interest in serving on the committee with him.
Boardmember Chen expressed an interest in serving on the ad hoc subcommittee.
Ms. Gerhardt expressed that was a great idea and she, with Amy French, recently attended a Regional
meeting in the City of Campbell where they showed them their parklets. They have two specific designs
that were preauthorized and three parklets currently under construction. She could provide them as good
examples for the ad hoc committee. Los Gatos also has examples.
Chair Baltay commented that he would reach out to her separately and they could set the schedule for
the ad hoc to meet and moved on to the Action Item.
Boardmember Adcock stated that she was advised that she might consider recusing herself for the
Stanford Shopping Center item and requested the ARB’s opinion, as she didn’t believe there was a conflict.
She does projects at Stanford University but nothing on Stanford lands that are leased to other entities.
Chair Baltay stated that was an individual decision and the ARB could not weigh in and requested staff’s
opinion.
Page 3 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Ms. Raybould stated that it was at the advice of the City Attorney and it was determined that it would be
most appropriate for Boardmember Adcock to recuse herself in compliance with State Law.
Ms. Gerhardt commented that she has a housing presentation before the first Action Item unless the ARB
wanted to change the Agenda. With regards to Boardmember Adcock’s situation for the first Action item,
staff believes there is a conflict. She can choose to stay, but that could potentially jeopardize the approval
of the project if someone else believed there was a need for her to be recused.
Boardmember Adcock stated that none of her projects have anything to do with Stanford Shopping
Center, however, after the housing presentation she will recuse herself.
Ms. Gerhardt asked if the Board wanted her to wait on the housing presentation.
Chair Baltay apologized for having missed the item and requested staff provide their presentation.
Boardmember Hirsch inquired if it would be possible to receive more information to help the Board decide
when it’s necessary to recuse themselves.
Ms. Gerhardt explained that it is a personal choice for each Boardmember, and staff wouldn’t necessarily
disclose personal information about a Boardmember choosing to recuse themselves, however if there
were a generic question for the attorney, she could find that out.
Boardmember Hirsch said it might be helpful if the attorney could explain the language within the law as
to why it would be necessary.
Ms. Raybould commented that within the law it states that “for a source of income that is non-profit
organization, a conflict exists where the non-profit owns real property that is a subject of the decision
even if they are not the named applicant”. If, as a Boardmember, they obtained income from a certain
non-profit, under State Law, staff believes a conflict exists if that source of income is a named applicant
for an application, or the underlying landowner for that application. In this case, Stanford is the real
property owner.
Chair Baltay stated he did not want to continue the discussion and requested staff discuss it and decide
if they need to bring it to the Board as a whole to provide an answer at a later date. In today’s situation,
he was not willing to jeopardize the Board’s standing and the City’s advice should be taken seriously.
2. Staff Presentation Providing a Summary of State Housing Laws for Multi-family Housing Projects.
Chair Baltay called for staff’s presentation.
Manager of Current Planning Jodie Gerhardt explained that this presentation was about recent State
Housing laws and Palo Alto’s Streamlined Process that came out of the recent changes. There have been
many changes in recent years, even those in the planning profession are trying to keep up. In order to
combat the State’s housing crisis, the legislature passed a number of laws aimed at increasing the supply
of housing. The one’s reflected in the presentation including the Housing Element (HE) and Regional
Housing Needs Allocation (RHNA), the Housing Accountability Act, SB 330, and State Density Bonus Law
and how they apply to Palo Alto’s Objective Standards, and Palo Alto’s Streamlined Process. The Housing
Page 4 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Element must be updated every eight years, and a major component is RHNA. The 2023-2031 RHNA
requires California to plan for a total of 2.5 million new housing units, which is a significant increase from
the3 1.8 million units that were required in the 2019-2025 RHNA Plan. Palo Alto’s RHNA is 6.086 units
which makes them eligible for a number of state funding programs if they are able to fulfill the State’s
requirement. Additionally, compliance would ensure that Palo Alto maintains local control. Other housing
laws kick in if they are not able to comply with RHNA. The deadline to submit an updated Housing Element
to California’s Department of Housing and Community Development (HCD) was January 31, 2023. Council
adopted Palo Alto’s Housing Element on May 8, 2023. Builder’s Remedy is a streamlining tool that provides
housing development projects with at least 20% affordable housing that is not in conformance with a
jurisdiction’s zoning or Comprehensive Plan. Because the HE has not yet been approved by HCD, it puts
the city in a grey area in which Builder’s Remedy could potentially be possible. Without an HCD-certified
housing element, the city has limited ability to deny such a project. Currently there are three such pending
projects, the Creekside project, McDonalds/fish market project, and a project on Fabian (next to the JCC)
are the three pending projects. The next deadline is January 1, 2024, for upzoning HE properties to allow
housing. Staff have already started that portion of that process at the most recent City Council meeting.
Housing Development Projects (HDP) means a use consisting of any of the following: residential units only,
transitional or supportive housing, and mixed-use developments consisting of resident and non-
residential uses with at least two-thirds of the square footage designated for residential use. The housing
consultant Jean Eisberg put together different handouts regarding the Housing Accountability Act (HAA)
which passed in 1982 but has become more significant in recent years. The City cannot deny a project,
reduce its density, or otherwise make a project infeasible, when the HDP complies with all objective
standards. There are also hand-outs for Senate Bill (SB) 330. The most noteworthy change is that an
applicant can freeze development standards and fees for 180 days for SB 330 compliant pre-application,
based on the date an SB 330 application is submitted. New zoning codes put in place would not apply to
that project. When they get to the formal stage, there can be up to 20% tweaks to the project and still
remain in freeze status. Other parts of SB 330 compliant projects include the five hearing limit, including
appeals, for projects that are consistent with the Comprehensive Plan and Zoning. SB 330 prohibits cities
from enforcing subjective design standards established after January 1, 2020. Existing standards may
continue to be applied. Cities cannot reduce height, density, or floor area ration, increase open space, lot
size, setbacks, or frontage; or limit maximum lot coverage. The City may add objective condition. It
requires the replacement of any existing units and/or demolished “protected” residential units with at
least the same number of units/bedrooms. Once a project specific California Environmental Quality Act
(CEQA) is adopted, there are reduced timelines the City has to take action against an application, designed
to ensure a project continues moving forward. State Density Bonus Law (SDBL) allows developers to
increase the density of their projects in exchange for providing affordable housing units: up to 50% bonus
for projects that include at least 15% of very low income housing, up to 50% bonus for projects that include
24% low income units, up to 80% bonus for projects that are 100% affordable. These bonuses are in
combination with the 15% affordable that the City already requires. The projects that meet those
requirements are eligible for the bonus, without having to build additional units. Any project that qualifies
for the Density Bonus can take advantage of concessions and waivers. Waivers are unlimited and generally
for physical constraints such as height limits, daylight plane, setbacks, and most design standards.
Concessions are for financial limitations and projects are allowed one to four concessions dependent upon
the affordability of the project. Ground floor retail requirements or decreasing required open space could
Page 5 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
be examples of possible concessions. Reduced parking would be another concession. Object Design
standards went into effect in July of 2022. That information can be found on the City’s website. The entry
point for the Objective Design Standards applicability is for multi-family projects, mixed use projects
which require 2/3’s of the project be for residential, and transitional and supportive housing, but are
limited by the zones that allow multifamily housing (RMs, Cs, CDs, ROLMs, PTOD, PF). When staff redid
the Objective Design Standards (ODS), they also built a new streamlined process. HDP’s must meet entry
points, but they also have to meet ODS, and any area plans in order to qualify for the streamlined process.
If a project does not meet the entry points or the ODS, they can opt into the discretionary review which
is the standard ARB process, however they then would weigh themselves against the context based design
criteria. City Council chose to continue using those, and there are the ARB findings, and up to three
hearings. In the streamlined process there are two findings: 1) The application complies with all applicable
and objective standards in the Comprehensive Plan, the Palo Alto Municipal Code and other City plans or
policies, and 2) Approving the application will not result in a specific adverse impact upon the public health
or safety, which cannot feasibly be mitigated or avoided in a satisfactory manner. As used in the Section,
a “specific, adverse impact” means a significant quantifiable, direct, and unavoidable impact, based on
objective, identified written public health or safety standards, policies or conditions as they existed on
the date the application was deemed complete. Assembly Bill (AB) 2097 parking exemptions applies to all
projects in the city; however, hotels and event centers must still provide parking requirements. If a
housing project is within a half mile of a major public transit, then parking does not have to be provided.
Major public transit is defined as Caltrain stops and intersecting buses, but those must have a fifteen
minute headway. There are many buses on El Camino, there are not frequent buses on Page Mill and
other intersecting streets. Because of that, the only areas that apply to the parking exceptions are those
within a half mile radius of the University and Cal Ave CalTran stations; San Antonio CalTran station also
seeps into the city’s area. If they do provide parking staff would apply the same ratio’s for Americans With
Disabilities Act (ADA) and Electric Vehicle (EV) parking. Staff are also working on the Transit Demand
Management (TDM) program regulations in which developers can purchase train passes in lieu of
providing parking.
Chair Baltay opened the item to Board questions only as discussions are not allowed on informational
items.
Boardmember Hirsch commented that all of the information was impressive and inquired when the Board
will get copies of all of the information.
Ms. Raybould stated they would send it to him that day.
Vice Chair Rosenberg commented it was a great presentation and she may have questions in the future.
Boardmember Adcock commented that a PDF copy would be great and inquired if she could get a copy of
the Objective Standards that was created in 2020.
Ms. Gerhardt commented that staff have worked their way through most of the projects that came before
those, and they are starting to get into the projects in which Objective Design Standards apply. Staff are
on the cusp of that, so in their staff reports they will make sure the Board is aware of which side the line
the project is on.
Page 6 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Ms. Raybould commented that she was unaware of any projects that are not subject to the Objective
Standards.
Boardmember Chen inquired if the Bonus Density Law applied added units or added floor area to units.
Ms. Gerhardt responded that it could be applied to either. If they had a density restriction, then it is first
based on that. If there is not a density restriction, it becomes more based on Floor Area Ratio (FAR) and
how many units could be fit in that FAR and then calculating the number from that. It gets complicated
quickly.
Boardmember Chen commented there are three areas of Housing Development categories, one being
transitional and supportive housing and inquired if the transitional housing was also a mixed use, would
it meet those requirements.
Ms. Gerhardt stated she would have to get back to her on that answer.
Boardmember Chen if the standard ARB process always included three meetings or if that was new.
Ms. Raybould stated that it has always been that process.
Chair Baltay inquired if the implementation of a daylight plane is considered downzoning.
Ms. Gerhardt stated that would be a grey area as there are varying daylight planes.
Chair Baltay stated then it would be subjective.
Ms. Raybould responded if it affects density.
Chair Baltay stated that theoretically everything effects density and daylight planes are important; and
that with objective standards projects are still required to comply with design guidelines and area plans
and posed the question of those being subjective.
Ms. Raybould clarified that it’s only to the extent that they are objective.
Chair Baltay asked how that determination is published or made clear, what is the objective portion of
those standards and how does an applicant know that.
Ms. Raybould stated that was a good question and staff are currently trying to work on that.
Chair Baltay inquired regarding AB 2097 and a property being within a half mile of public transit if that
applied to the entire property or any corner of the property.
Ms. Gerhardt answered that she believed it was 75% of the property needed to be within a half mile of
the transit station. There are maps online that are detailed enough to show that.
Chair Baltay questioned if those maps are published at what that half mile radius zone is.
Ms. Gerhardt replied she was unsure if staff had placed those maps on the internet, however staff have
access to them and are available to the public at the asking.
Ms. Raybould stated at the development center staff can assist anyone in looking at GIS online.
Page 7 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Chair Baltay thanked staff for the presentation.
Action Items
3. PUBLIC HEARING / QUASI-JUDICIAL. 180 El Camino Real [23PLN-00155]:
Recommendation on Applicant’s Request for Approval of a Minor Architectural Review Board
Application to Allow Exterior Modifications, Including a Newly Designed Façade for the
Previously Approved Three-Story, Stand Alone Building, “Restoration Hardware” at the Stanford
Shopping Center. No Modifications are Proposed to any Site Design Details and There is no
Change of use. Zoning District: CC. Environmental Assessment: Exempt from CEQA per Section
15302 (Replacement or Reconstruction). Zoning District: CC (Community Commercial).
Chair Baltay asked if any of the Boardmembers wanted to recuse themselves.
Boardmember Adcock stated she would recuse herself for the item.
Chair Baltay introduced the item located at 180 El Camino Real [23PLN-00155] and asked for
Boardmember disclosures.
Vice Chair Rosenberg stated she visited the site, reviewed previous items, and familiarized herself with
the project.
Boardmember Chen stated she visited the site and reviewed the previous meeting videos.
Chair Baltay disclosed he visited the site and was on the Board for the previous meetings and noted that
Boardmember Hirsch had stepped away and he would ask him once he returned.
Tamara Harrison, with Michael Baker International, provided the staff report as the contract planner for
staff. The location is 180 El Camino Real and is for Restoration Hardware modifications.
Chair Baltay requested Boardmember Hirsch’s disclosures.
Boardmember Hirsch stated he had no disclosures to report.
Ms. Harrison continued and stated the project is for a new three-story standalone building that is currently
under construction at the site. The site is located within the Stanford Shopping Center, subject to the
Master Tenant façade and sign program and the Master program requires that tenants in free standing
buildings require City review. Restoration Hardware will be located at the Sand Hill Road and Shopping
Center Way entrance and the applicant seeks to modify the previously approved exterior façade of the
building. The building was previously approved as part of the Macy’s Men’s Redevelopment project
[19PLN-00110) on February 20, 2020. The applicant now proposes to modify the exterior façade of the
building to a lighter color palette, remove various large light sconces, remove green walls and green
fixtures, and have proposed to modify the door pulls and add Italian Limestone trim/cap in various areas
of the building. Ms. Harrison showed slides for each elevation with both the previously approved elevation
design and the current proposed changes. On the north elevation they are proposing to remove the green
wall on the third level and add Italian trim around the outside of the patio balcony area and to remove
the large light wall sconces for lighting. The south elevation has the same proposed changes as the north
Page 8 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
elevation. The east elevation is split into two sections on the upper floor. Additionally, the green walls
have been proposed for removal, and there are alternate landscaping features that are being proposed.
There are eight light sconces that have been proposed for removal, and they are requesting to replace the
green columns with potted plants. The west elevation also shows the implementation of the Italian
Limestone trim cap, four light sconces to be removed and reduced landscaping on both the top level and
the lower level of the elevation. They are also proposing new door pulls on the entrance doors. A slide
depicted the new proposed colors shown next to the previously approved color schemes. Key
considerations for the project included ARB findings and the Master Tenant Façade and Signage (MTFS)
program. Staff recommends that the ARB consider the proposed façade modifications and recommend
that the ARB continue the proposed project or recommend approval to the Director of Planning and
Development Services.
Chair Baltay requested the applicants presentation.
Michael Avellone with RH provided the applicant’s presentation and showed slides depicting the changes
to the building. With the original approval being several years ago, the applicants wanted to take the
opportunity to update the building in the company’s future color palette, the massing and the majority of
the building and landscaping will remain the same. They retained the character defining features such as
the awnings, balconies, and heritage olive trees around the perimeter of the building. The three changes
include a stoned parapet cap of Italian Limestone, which compliments the new light velvety finish of the
Mediterranean style light plaster, which is a lime based cementitious plaster composed of local sand and
seashell aggregate from the Monterey area. They are looking to update the exterior metal color to a light
warm champagne color. They have removed molding features around windows to enhance the plaster
and it’s workmanship. The finishes on the interior are also being updated to complement the exterior
finishes, which complements the product assortment for the gallery. The side elevations have been
updated to remove the sconce lighting. For a more maintenance free building they are proposing to
remove the hedging that was proposed on the back elevation of the building to screen the mechanical
walls on the third floor. They are open to the ARB’s feedback and looking to provide a more resilient
building and final product by finishing those walls with the plaster being used on the rest of the exterior.
Their design intent is to define the Palo Alto building as the next generation by not pulling in the old details
from past buildings.
Chair Baltay thanked the applicant and opened the item to Public Comment.
PUBLIC COMMENT
Ms. Dao stated there are no public comments.
Chair Baltay closed the meeting to public comment and inquired if there are any Board questions for staff
or the applicant.
Chair Baltay inquired where the champagne color sample was and if it is included on the material board.
Vice Chair Rosenberg held up the material board.
Chair Baltay asked the applicant why they chose to remove the light sconces instead of changing the style.
Page 9 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Mr. Avellone responded that they view those as the old design and architecture of their buildings, and
they require a lot of maintenance and waterproofing into the building. Their intent is to create a more
resilient building.
Chair Baltay commented that light fixture is part of Restoration Hardware sales and asked if they are
discontinuing the sale of light fixtures.
Mr. Avellone replied they are not.
Boardmember Hirsch commented that the assumption is the lighting of the building in the evenings will
be internally sourced and asked how it works with no windows on the side that is facing the shopping
center.
Mr. Avellone responded that they had retained the architectural lighting on the building, which includes
building up lights and a cornice up light from the previous approval. The sconces were more decorative
than useful, and the large sconces are not an RH product and not supportive for the company.
Boardmember Hirsch inquired about the perimeter hedging.
Mr. Avellone explained the perimeter hedging would remain. It is the third story hedging they propose to
remove.
Boardmember Hirsch inquired if the courtyard was still intended to have product and how that would
work after hours.
Mr. Avellone answered that the store staff would close the gates each evening.
Boardmember Hirsch commented he did not see anything regarding gates in the hedging.
Mr. Avellone stated that the gates were approved at the previous meeting and the only change would be
painting them to match the new façade.
Boardmember Hirsch asked if they would repeat the metal coloring of the awnings.
Mr. Avellone stated that was correct.
Boardmember Hirsch inquired if the top floor dining stayed lit during night hours.
Mr. Avellone responded that the area is lit during open hours of the evening and there is a night setting
for the light fixtures along the perimeter of the building. The majority of the internal lights would be off
during closing hours.
Boardmember Hirsch asked if the furniture at the entrance of the building would remain overnight.
Mr. Avellone answered that was correct, the furniture would remain.
Boardmember Hirsch inquired how they proposed to protect that from potential vandalism.
Mr. Avellone stated they cover the furniture during bad weather and have looked into ways to discreetly
anchor the furniture down and are working with the mall security who will also be monitoring the area.
Page 10 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Vice Chair Rosenberg thanked the applicant for the presentation and inquired if they have an LRV of the
new plaster color.
Mr. Avellone replied they have one for the metal color, not the plaster color. The LRV for the metal siding
is 36.66. He can provide that for the plaster.
Vice Chair Rosenberg asked if the updating of the door handles would be just a style change.
Mr. Avellone stated that was correct, there is a style change to the pull handles. There is a change in the
color with a minimal change to the style, it is still a large bar pull.
Vice Chair Rosenberg inquired if removing the green walls on the upper level was to provide easier
maintenance on the building.
Mr. Avellone responded that was correct.
Vice Chair Rosenberg asked Mr. Avellone to explain why they kept the uplighting on the sides of the
building but chose to remove the sconces.
Mr. Avellone explained the uplighting is to highlight the architecture of the building, capped with the
stepped corners lighting. The sconces often create large shadows on the building, which diminishes the
intent to highlight the architecture. They are looking to move into a more contemporary design with all
of their buildings moving forward.
Vice Chair Rosenberg commented that a lot of the windows and doors appear to be operable on the first
and second floor and asked if they actually are operable or are designed to look as if they do.
Mr. Avellone answered they are fixed and made to look like doors.
Vice Chair Rosenberg asked if they were concerned about people being confused and trying to open the
wrong doors.
Mr. Avellone replied that is part of the reason they no longer make them operable. They removed the
hardware on the inside of the building so people don’t think they are operable while on the sales floor.
Vice Chair Rosenberg requested clarification on which doors are operable.
Mr. Avellone stated the entry façade on the ground floor, the large 25’ opening, bi-fold open on both the
rear and the front of the building. All of the entries on the north and south sides of the building on both
levels one and two are fixed. Every opening on the terrace level is operable, three on each side. They are
all fixed on the rear of the building, with the exception of the main level 25’ door.
Vice Chair Rosenberg noted that on Sheet RH6.1 – North Elevation, it does show that one of the side
doors still has the swing operation.
Mr. Avellone said yes that was correct, it is still a swing door.
Boardmember Chen commented she visited the site the previous day and noticed work on the west side
of the building and inquired if what she saw was going to be the final finish or if there was still more work
to do.
Page 11 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Mr. Avellone stated that was very indicative of what the final result will be, the trellis changes still need
to be completed, but the plaster and the store front and the awnings would be indicative of the changes
being requested.
Chair Baltay noted there were no further questions and returned the item for Board comments.
Vice Chair Rosenberg commented that these were significant changes from what was originally submitted
and approved. She finds the project to be very aesthetically pleasing and it’s a beautiful creamy color
without being too bright. She would still like to know the LRV number for the plaster but based on the
samples in the Chambers for the review, Vice Chair Rosenberg felt they did a good job in finding a balance
between being lighter without being stark. Her two concerns include that the green walls on the top floor
provided an aesthetic break up in shadow and textures of the vertical features on the upper level. Now
that the building is white, it makes those elements much more noticeable. Additionally, she understands
removing some of the sconces, and even changing some of the fixtures. The wall sconces provided
wayfinding, safety, and a warm look to the building. There are a lot of doors on the building, her
preference would be to keep some of the sconces to highlight where the entries to the building are
located.
Boardmember Hirsch stated he agreed with Vice Chair Rosenberg’s comments about the building being
elegant, and they answered his questions regarding the uplighting. He agreed it’s a terrible idea to have
the shadows on a building that the sconces produce. Removing the sconces was a good idea. There is a
connection between the ground level greenery and the green wall on the upper level and didn’t feel the
green wall was out of place, but that is a choice matter for the designers. It works well on the opposite
side to not have the greenery wall. Every step along the way advances the design and he felt the changes
were a significant improvement. It’s interesting that can look at their past store’s and each time they are
able to do a little bit better than the previous stores. The elegance is continuing to grow with each building
they renovate. Boardmember Hirsch thanked the applicant for the presentation and the sequence of
interesting design.
Boardmember Chen thanked the presentation and commented that the lighter pallet in her opinion was
a good move, and it makes the building more elegant and more attractive, particularly on the rendering
of the night view. Her concern is with the champaign color of the metal hardware. She believed the colors
are too close to each other; there could be more contrast between the metal and the plaster on the walls.
During the daylight hours the sun will make the building appear even more bright, a subtle contrast
between the trellis and the wall is necessary and would add even more detail. It would also be nice if they
could reconsider keeping the green wall on the upper level. It would soften the building and eliminate
what could end up looking like a big blank wall, particularly with the added greenery in the landscape on
the ground level. She agreed with Vice Chair Rosenberg about keeping some of the lighting fixtures. All
of their buildings are like a showcase of their products, if they were to choose some of their own fixtures
for the exterior of the walls, it could be a selling point and good example of what you have to offer
potential clients.
Chair Baltay commented that he finds he agrees with what has been said by his colleagues. If this had
come to them originally with the lighter color, they would have approved the project. They would have
been more concerned with the bulkiness of the building. When they originally approved the project, one
Page 12 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
of the things the ARB appreciated was the greenery on the top level, as it reduced the apparent bulk. The
light fixtures helped to define more texture and diverted the attention from large blank walls and
suggested they keep some of them and replace them with something similar in scale. The contrasting trim
was also something he appreciated from the original plans. He agreed they should consider a higher
contrast on the trim. Having a lighter color on the trim accentuates the blankness of the walls without the
sconces. He believes the color should come back to a subcommittee and the green walls and the light
fixtures should remain as approved.
Boardmember Chen requested clarification of Chair Baltay’s request and asked if the applicant could
choose the style of the sconces or was his request to keep the same sconces in the same locations.
Chair Baltay stated it’s quite reasonable to say they want to upgrade the building and they can absolutely
choose a different style. He is excited to see what Restoration Hardware could come up with and doesn’t
feel that needs to be brought back to the subcommittee. He’s looking for compatibility with the
community, large light colored buildings are something they have a difficult time with. He agreed he would
like to see the LRV of the plaster siding as well.
Boardmember Hirsch stated for consensus purposes he agrees that in looking at RH-2 that the bulk of the
upper part of the building is emphasized way too much and the planting on the upper level could really
reduce the appearance of that bulkiness. He also agreed with Boardmember Chen’s comments about
having more contrast between the metal and plaster siding, and Chair Baltay’s point that those changes
could be done through a committee rather than returning to the ARB.
Chair Baltay stated they only thing he felt the ARB was not in consensus with was the light fixtures. He
suggested they could keep light fixtures of a similar scale with a new design and that wouldn’t need to be
returned to a subcommittee. It’s also possible to come up with a different design element, however, feels
that should return to an ad hoc committee.
Vice Chair Rosenberg stated she’s not as concerned about the removal of the sconces on the sides of the
building as she is on the entry façades. She was interested in hearing the Board’s thoughts on the applicant
removing the side fixtures and finding replacements for the front and rear elevations. She suggested they
keep the four fixtures on RH 5 and RH7 façades. On RH6 and RH8, she felt they could remove all of them.
Chair Baltay agreed that on the RH 6 side there are many oak trees, and those sconces typically are not
visible. He believes the opposite side is very visible and he’s not comfortable with having no fixtures. The
right two fixtures seem to him to be tacked on and applied. He could support no fixtures on the north
elevation, not the south.
Boardmember Chen agreed with removing the ones on the north elevation and replacing the fixtures on
the south elevation.
Boardmember Hirsch stated he was okay with that suggestion.
Vice Chair Rosenberg requested clarification of Chair Baltay’s comment about the right fixtures on the
south side.
Page 13 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Chair Baltay responded that his suggestion was that he wasn’t sure if light fixtures were the best design
solution on the right hand side, but he didn’t want to home in on that detail, as the review was to them
wanting to remove the fixture. The option is to approve that request or not. He was inclined to say keep
the fixtures on the south façade and believed it’s better to have them than not have them.
Chair Baltay asked the applicant if they had any comments regarding the ARB’s feedback pertaining to
keeping the greenery, keep the bulk of the light fixtures or come back with a different design element that
affects the same thing, and provide a different color for the contrasting metal.
Mr. Avellone commented that they are understanding of keeping the greenery, which makes sense for
the bulk of the building and new color, regarding the light fixtures, whatever they decide, they would do
a symmetrical layout on both the north and south side of the building. They would not return with
something on the south side that they had omitted on the north side. Regarding the metal, it is a
complimentary and custom finish to the plaster. He believes that looking at a building that is in progress
without landscaping, furniture and décor within the building causes the building to stand out more. It’s
supposed to enhance the plaster and blend in.
Chair Baltay inquired if they had already purchased those elements in that color or would it be possible
to make that change.
Mr. Avellone stated they have already purchased the paint for the large mockups that they’ve done and
applying it to the metal is already in process.
MOTION: Moved by Chair Baltay, seconded by Vice Chair Rosenberg, to approve the project with the
following conditions: the existing greenery from the previous design be retained, the light fixtures be
retained. They may be modified in design style but should maintain a similar. The color of the metal trim
around the windows and the canopy should be changed to a higher contrast and they should return to an
ad hoc committee for review approval.
Vice Chair Rosenberg stated she would like to make a friendly amendment.
FRIENDLY AMENDMENT
Vice Chair Rosenberg stated she doesn’t believe they need to maintain the vertical green walls, only the
top two on the upper level. She only heard concern about the two on the upper level as depicted in sheet
RH7 on the left and right.
Chair Baltay agreed that is acceptable. The Board is looking for them to retain the greenery on the upper
two greenery walls on the left and right.
Boardmember Hirsch commented they should not exclude the fixtures on only one elevation.
Chair Baltay stated that the applicant made comment to that effect and asked Vice Chair Rosenberg if
she was okay with removing the sentence about the north elevation.
Vice Chair Rosenberg agreed she was fine with that.
VOTE: 4-0-1 (Adcock Abstained by Recusal)
Page 14 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Chair Baltay assigned Boardmember Chen and Vice Chair Rosenberg to the ad hoc committee for this
project.
The ARB took a short break.
All members of the Board returned from break.
4. At-Places Memo Added
PUBLIC HEARING/QUASI-JUDICIAL. 420 Acacia [23PLN-00058]:
Request for a Streamlined Housing Development Review to Allow the Construction of an
Approximately 35,354 Square Foot (sf) Multi-Family Project Consisting of 16 Two- and Three-
Bedroom Condominium Units in Four 2- and 3-story Buildings on an Approximately 0.8-acre
(35,753 sf) Parcel. The Project would replace a paved, 68-space surface parking lot. The Project
includes two Units Provided at Below Market Rate and, Accordingly, Requests Concessions and
Waivers Pursuant to State Density Bonus Law. A Compliant Senate Bill Pre-Application was
Submitted on January 4, 2023; Therefore, this Project is Being Processed in Accordance with SB
330. Environmental Assessment: Exempt from the Provisions of the California Environmental
Quality Act in Accordance with CEQA Guidelines Section 15332 (in-fill development). Zoning
District: The Project Site has a Split Zoning Designation of RM-30 (Multiple-Family Residential)
and R-1 (Single-Family Residential). For More Information Contact the Project Planner Claire
Raybould at Claire.Raybould@cityofpaloalto.org.
Chair Baltay introduced the item at 420 Acacia and asked for Boardmember disclosures.
Boardmember Hirsch commented no. Chair Baltay reaffirmed no disclosures.
Vice Chair Rosenberg stated she visited the site.
Chair Baltay stated he visited the site.
Boardmember Chen stated she visited the site.
Boardmember Adcock stated she visited the site.
Chair Baltay requested staff’s presentation.
Senior Planner Claire Raybould provided staff’s presentation for 420 Acacia [23PLN-00058] and stated it
is the City’s first Streamlined housing development review project. The project is located in the North
Ventura Coordinated Area Plan (NVCAP) future planning area. The land use is fairly unique as there is split
zoning and split land use on the site. The majority of the site is zoned RM 30 for multifamily residential
and a small portion at the rear of the parcel is zoned R-1 single family residential. The land use aligns with
those. The RM 30 zoned area also has a multifamily land use designation and the R-1 portion has a land
use designation of single family residential. The project proposes to construct sixteen unit multifamily
with two units affordable to medium income on a .8 acre parcel that has surrounding uses of single family
along Olive Avenue at the rear and nonresidential uses such as office and gym on Acacia across the Acacia,
and an approved 129 unit multifamily affordable housing project adjacent the site along El Camino and
Acacia. Additionally, the existing Cannery building 200-404 Portage sits to the east of the site at the end
Page 15 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
of Acacia. The project is proposing to utilize State Density Bonus. They are eligible for one concession
which they are planning to use for the landscaping for the rooftop open space, as well as unlimited waivers
which are proposed to be used for height, floor area, lot coverage, front setback, private street width,
finished floor height, and for the daylight plane for the fixtures on the rooftop open space. This exact
details are included in the staff report. Key consideration includes the project is a housing development
project in accordance with the Housing Accountability Act, it is also subject to SB 330, they submitted a
compliant SB 330 pre-application in January 2023, which freezes the development standards. This was
after the Objective Standards were adopted, so the project is complying with the Objective Standards. It
is subject to the Street and Light Housing development review. The code in the Streamline Housing
Development review states that the ARB should be looking at the project and looking at opportunities for
minor improvements for better consistency with the Objective Standards. To address that, staff indicated
some areas where they believe there could be some improvements for better consistency of those
standards. Staff is open to hearing the ARBs thoughts on that. Staff is asking the ARB to conduct a study
session to provide feedback on whether minor adjustments to the application would result in better
adherence to the contextual design criteria or objective design standards contained in Chapter 18.24,
consistent with the streamlined review pursuant to the new code section 18.77.073 for housing
development projects. Ms. Raybould noted that in terms of next steps, following the ARB’s review, staff
would look for hopefully some revisions to the plans to address some of the concerns raised by the ARB
and then issue a decision on the project, following that the applicant also has a vesting tentative map on
file since these are ‘for sale’ units. That vesting tentative map would follow and go before the Planning
Commission and City Council for review and decision. Staff recommended the ARB to hear from the
applicant as well.
Chair Baltay asked if anyone on the Board has questions for staff.
Boardmember Hirsch commented that they were at one point working on standards for townhomes, and
requested why the project is not being reviewed relative to townhome standards.
Ms. Raybould explained staff are looking at potential changes to the code, however, they are not able to
apply things that are in the code at this time.
Boardmember Hirsch confirmed they applied the general objective standards that were in place prior to
looking at town homes and asked if they would be inserting townhomes once they became official.
Ms. Gerhardt explained that at the time they approved the ODS, they had already heard the townhouse
question and had the consulting architect look at the design standards to see if a townhouse project could
fit within those standards and the answer was yes, it could. Staff feels like the current standards can be
applicable to townhouses, but they could also be refined.
Boardmember Hirsch noted within the detail of this project conflicts can been seen, as staff pointed out,
and the ARB was hoping they could see how the ODS would apply and revise them as they see they no
longer work or are not appropriate.
Ms. Raybould answered staff began looking at the things they may want to revise in the code, and this is
the very first project since the ODS was completed, so staff was hoping that through this process they
could highlight things in the code they feel may need to be changed or refined to be a possible alternative
Page 16 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
to townhomes, or in just generally applying to project. To date, they have to apply the standards that
were in the code as of January 4, 2023.
Boardmember Chen requested clarification on the required setback, or the buildable area for the project,
referencing Sheet 8.6, there are red dashed lines and black dashed lines, a line called the R-1, a line for
the RM-30 designation boundary and asked what the limitation is to the buildable area.
Ms. Raybould stated that this project is unique in that it has the land use split with the multiple land use
designations, specifically in the R1 land use designation, they are only allowed to do single family
residential. They’ve designed the project to stay outside of the R1 area and stay within the multifamily
RM 30 boundaries. That produced a greater setback than what is otherwise required, but it aligned
because it also had to maintain a daylight plane. In doing so, they also aligned with the R1 daylight plan
requirement.
Boardmember Adcock thanked Ms. Raybould for the presentation and referred to Page 54 of the
document regarding the landscaping concession being requested and asked if the required document was
provided by the developer that supports the cost reduction that’s achieved through the concession.
Ms. Raybould answered that was provided and requested some time to locate it if the ARB wanted to
move on.
Boardmember Hirsch asked if there was any possibility within the zoning to do spot zoning revisions, as it
would simplify the project considerably.
Ms. Raybould explained that if they site is rezoned, the developer would no longer be eligible for the
Streamlined process that they have proposed, thus choosing not to rezone. State Density Bonus and SB
330 cannot be used if property is being rezoned.
Boardmember Adcock referred to Page 63 of the report and inquired about the highlight Section XII,
treatment of buried archeological and asked if that was intentional.
Ms. Raybould apologized and stated she should have noted that there an At Places Memorandum for the
project, as there was an accidental draft version of the conditions of approval that she had been working
from that had other standard conditions that were not relevant. The At Places Memo is in the packet,
however staff has also updated the conditions of approval for the project.
Chair Baltay referenced Packet page 76, checklist item B-1 and inquired why the treatment of corner
buildings less than forty feet in height and the end unit of townhouses didn’t apply to the end unit of the
townhomes.
Ms. Raybould answered because it’s not on a corner.
Chair Baltay recalled in doing those standards that it was either the corners of the buildings forty feet in
height, or the end units of townhouses. It’s very unlikely you would put the end unit of a townhouse on a
corner.
Ms. Raybould replied it’s under treatment of building corners, on corner lots.
Page 17 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Chair Baltay reiterated that the intention was for that to apply to end units whether they were on a corner
or not. That being the case, he asked if those would need to apply.
Ms. Raybould requested that he repeat his question.
Chair Baltay stated that if it is the case that it be applied to end units, those units would need to have the
design standards and the height to width standard is the one that jumps out at him. It’s potentially a
conflict on units that are required to be low at the same time. Chair Baltay brought that to his colleagues
attention the project and suggested there is a potential issue with the standards.
Vice Chair Rosenberg referenced Packet page 76, the first item under 18.24.040, B1 “Treatment of corner
buildings” and said it’s not a corner lot, it’s ‘a corner building that is less than forty feet in height, and end
units of townhomes or other attachment housing projects that face the street shall include all of the
following features on their secondary building frontage’. Vice Chair Rosenberg asked staff if the items in
the applicant’s justification are items the applicants write in and staff prints it or are the reviewed by staff?
Ms. Raybould answered that those were written in the document by herself.
Vice Chair Rosenberg noted that earlier the report stated that the applicant states that this requirement
is not objective, but subjective, and expressed frustration because the City has Objective Standards and
found it interesting that the applicant was fighting as to if an item on the Objective Standards is actually
objective. That’s a determination made by the City, Staff, and the Board. They should adhere or not
adhere.
Ms. Gerhardt reinforced that those comments were the reason they were before the Board and stated
that the check list in the code language is an abbreviated version.
Vice Chair Rosenberg inquired the height of the buildings.
Ms. Raybould answered they are maximum forty-four feet, and she had misinterpreted the code thinking
it only applied to buildings on street corners and acknowledged Vice Chair Rosenberg’s point that the code
also be applied to this project.
Chair Baltay mentioned that not all the buildings are over forty feet and the one in question is three
stories, twenty something feet.
Ms. Gerhardt stated there are two different code sections based on height. If buildings are over forty feet
tall, it is not clear if the code applies to the end of townhouses.
(crosstalk)
Chair Baltay stated this was a question session and asked if the ARB had any further questions of staff and
inquired if they had found the answer to Boardmember Adcock’s earlier question.
Vice Chair Rosenberg wanted to further note the zoning issue on the project that with Building B it’s unit
#5 and with Building C, those units have to be shorter because they about the residential zoned strip on
the back side of the property and questioned if the daylight plane was being imposed.
Chair Baltay commented there are several regulations requiring those units to be lower.
Page 18 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Ms. Raybould confirmed there is a daylight plane on the R-1 shown on the drawing.
Vice Chair Rosenberg questioned the intent with the code for Building B because the end unit is under
forty feet in height and the rest of the building is over forty feet in height.
Ms. Gerhardt responded by reading the specific code text and clarified that the building does not face a
street, therefore it is not applicable in this case.
Chair Baltay expressed concern that this will become an issue for future projects because the intention is
to make the buildings have the appearance of being vertical, rather than seeing conflict such as two-story
townhouses that require parking; also noting this ties into Boardmember Hirsch’s previous comment that
the Objective Standards were not designed with townhomes in mind, it’s an area that needs refining to
mitigate applicant confusion.
Ms. Raybould reported as to Boardmember Adcock’s previous question, the cost estimate is $4,250 per
home or $68,000 for the project as a whole; there were concerns with respect to long-term maintenance
of the common area because these units are for sale, causing it to be unclear if the Homeowner’s
Association or the resident’s would assume the maintenance of a drip system.
Boardmember Adcock commented that in reference to the appearance of a loophole in the code, has staff
considered that the applicant is getting the additional height and the building orientation and setbacks
waiver?
Ms. Raybould responded that if it doesn’t apply, it doesn’t apply. It’s not a waiver they are requesting if
the building is over forty feet, however she understood her point.
Boardmember Hirsch requested clarification on which drawings as the site plan on A-6 show no
connection to the entry street for access to the garage. There is a drawing on C-3 that shows the proposed
condition to access the garage, which would have impact on the public street being used.
Ms. Raybould stated that the street is not public, it is a private shared easement between the two property
owners. On A-6 there is a very light dashed line around the easement location and references it as “Access
easement for adjoining property”, and it shows the existing condition on that site, however Council
recently approved that project so several of the drawings are showing what staff expects will be that
shared access point.
Chair Baltay invited the applicant to make a presentation.
Mr. Josh Vrotsos, with Dividend Homes, thanked Ms. Raybould’s diligence in getting the project before
the ARB as quickly as she has and introduced Ritu Raj Sharma of the Dahlin Group, the architect for the
project.
Mr. Ritu Raj Sharma, architect, first addressed the Board’s concerns with applicant’s approach to objective
standards, explaining that sometimes objective standards set the path forward, and pose limits on what
can be done. This was an interesting split site with many different zones around it. It is a small site with
distinct edges, and they had to consider the edges in order to determine what their options were for the
project. They stayed out of the residential R1 zone which they felt helped to create a buffer against the
neighborhood, which also allowed them to have two story units on that edge. They limited the open space
Page 19 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
for the two story units by not having open space in the units which helped facilitate more ground level
open space and helped with privacy concerns from the R-1 zone. The Units fronting Acacia are side turned
with the two single story end units being the residential view versus a three story building and complies
with daylight plane requirements for R-1 zones. The access easement was worked out collaboratively with
the Sobrato project. The street side units have the paseo’s and porches on the street side which mitigates
any concerns of there being a residential project crammed into a small space between large buildings.
There is a mix of two and three story units with five different unit types, two units are provided for below
market rate (BMR), a mix of tandem and two car garages and the units are a mix of two and three
bedrooms, ranging from 1400 square feet (SF) to 2100 SF. They’ve incorporated step backs, roof decks,
clean materials, articulation through massing and changes in material to create a contextual look that
suits the current and future environment. Mr. Sharma continued with slides of material information, views
of the different varying elevations from the neighbors, and invited the ARB to ask questions and thanked
the staff for their work.
Chair Baltay opened the hearing to Public Comments and was met with they were interested in hearing
the questions from the Board to the applicant.
Boardmember Adcock posed a question about the screen material being used between the units and it
was not included on the material board.
Mr. Sharma stated they had not yet determined what that would be, the intent is for the owner to decide
if they want a privacy screen built into the roof decks on the upper levels.
Boardmember Adcock inquired if that was going to be left up to the owner, one of the requirements of
townhomes is nothing is built between the property between one home and the next.
Mr. Sharma responded they had not decided if there would be a screen or not.
Boardmember Adcock referenced between Building A and B on Sheet A-13, also show as the end unit
elevation on Sheet A-8, and inquired about the change from the darker siding to the stucco below and it
being higher than the rest of the units and what the applicants intent was and if it was a result of the
additional height waiver, and if so, how did they plan to join the two materials; additionally, there is a
vertical while line which is unclear to her on both buildings, but best seen on Building B on Sheet A-8 on
the south elevation there appears to be a gap between two units .
Ron Cariaga commented there is no gap between the two units, other than a covered air gap. The
additional height on the soffit of the end unit is a higher plate height on the first floor of the two story
unit of ten feet. It’s 9 feet over 10 feet on the two story units and 9 feet for each level on the three story
units.
Boardmember Adcock referenced Sheet A-31 the left section with the similar soffit and inquired what the
material is on the soffit; additionally, there is a wood trim on the upper left Detail 9 that was not listed
on the renderings, inquiring which one is correct.
Mr. Sharma stated the material for the soffit would be shiplap, and they will revise the detail of the wood
trim, it’s supposed to be a metal trim.
Page 20 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Boardmember Adcock commented that the rending looks cleaner than the detail.
Boardmember Hirsch asked for a description of the garage door locations of the opposing units in
Buildings C and D and the width of the driveway. He believed he saw twenty-two feet.
Mr. Sharma answered twenty-two feet is the drivable surface. There’s a four foot difference on either side
so he thought it was either twenty or twenty-one feet.
Boardmember Chen stated it’s on the C-3 sheet. There’s a twenty two foot driveway plus four feet aprons
on either side.
Boardmember Hirsch thought planning had concerns with the street width itself.
Ms. Raybould clarified the door to door is slightly different than what they would consider to be the street
width, which also for the purpose of calculating the total floor area because staff does reduce the street
width, but that doesn’t include the aprons.
Boardmember Hirsch referenced Building A, South elevation along the paseo, the canopy detailing
appears to be incomplete and inquired if the canopy extends from the building and wraps around the
corner on the two story unit. Generally, canopies turn corners when they are on one.
Ron Cariaga stated on Page A-13, it wraps around the corner, but the extend out is shorter by about six
inches.
Boardmember Hirsch commented there needs to be coordination if the intent is to cut it off at the end
of the building, and inquired about the projections above the roofline and some being white while others
are dark, listed Building A, south elevation on A-7.
Mr. Sharma explained those are stair towers and the intent was to breakup everything being white.
Boardmember Hirsch inquired about the daylight plan issues surrounding the stair towers.
Ms. Raybould stated the applicant is requesting a waiver under the rooftop open space requirement for
a 45 degree angle from the edge of the bottom of the rooftop open space moving inward. The applicant
is requesting a waiver for the guardrail, parapet, and a couple of stair towers which encroach the 45-
degree angle. They did centralize the other stairwells.
Boardmember Hirsch questioned the design intent on some of the elevations with the smaller buildings
not aligning with the larger buildings, referencing Building B on Sheet A-8, there’s a window on one side
and there isn’t a roofline on the adjacent lower material.
Mr. Sharma explained that was intentional to break up the mass on the front of the building.
Boardmember Hirsch stated on the smaller building the canopy doesn’t extend out beyond the line of
the face of the lower brown section. Additionally, he didn’t understand the east elevation of Building D.
Ron Cariaga explained those were accent panels.
Mr. Sharma stated those also were to break the massing and add additional color.
Boardmember Chen inquired how the applicant intended on solving the guest parking for the project.
Page 21 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Mr. Sharma stated the city does not have a guest ratio for multifamily units.
Boardmember Chen asked if they gave it any thought?
Mr. Sharma answered there is on-street parking on Acacia in comparison about 5 units down from the
building.
Boardmember Chen referenced Sheet A-34, the pedestrian circulation sheet, and inquired how Building
A residents would access the trash enclosure.
Mr. Sharma stated the last unit could go through their backyard. The other residents would go through
the alley side of the building. They assume the residents will have cans that will come out of the garages,
but that hadn’t yet finalized that detail. The safer route would be they could use the paseo’s too.
Boardmember Chen clarified that the rest of the building would go down the driveway between Building
A and B.
Mr. Sharma replied that residents could do what she suggested, or they could use the paseo.
Boardmember Chen referenced the walkway behind Building C and inquired if that was intended for the
residents of Building C only.
Mr. Sharma explained there are meter closets on the outside of the two story building, so the utility folks
would also be using it, but staff expressed concerns about other people mistaking it for a shared walkway
while the car next door was backing out, which is why the pedestrian route was routed through the top
end of the project, and it’s just for the end unit.
Boardmember Chen questioned the applicants design intent with the trash enclosure roof slope as it is
the only sloped roof in the project.
Mr. Sharma answered that it had to do with ventilation for fire safety for potential combustion. It’s low
and on the backside of the property they did not feel it would be an issue.
Ms. Raybould noted there is also a daylight plane requirement for accessory structures, there has to be
a certain height of the structure, but it also has to meet a daylight plane.
Boardmember Hirsch requested clarification of the finished floor height under the Density bonus waiver,
two feet versus two-feet-eight.
Mr. Sharma stated that as per the Objective Standards there is a floating scale as to how far the building
is from a sidewalk variant on how raised the building is from grade, and based on step requirements, how
many steps are required leading down to the sidewalk and into the garages.
Chair Baltay opened the hearing to public comments.
PUBLIC COMMENT
Page 22 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Ms. Dao stated there was one speaker care from Yugen Lockhart
Mr. Yugen Lockhart provided comments as an Olive Avenue resident stated he has spoken to the
applicants, and he supports the project, however expressed concerns with the trash enclosure being in
one of the resident’s backyard and requested that if it stayed there, their request would be for rubber
gaskets and soft closed hinges on all the metal doors, to mitigate banging and clashing and creating an
audible nuisance. They appreciate that Building C is stepped down however there is a big grey wall created
by the façade of the second level going up to the third and expressed an interest in there being some type
of wood feature as part of that story’s massing to break those edges. He appreciates the non-standard
situation of Acacia being very industrial and trying to match the Charities building and the Sobrato project.
The Square look is appealing on the Acacia side of the street. A more residential feeling on the back side
overlooking the R-1 zone would also be appreciated. He likes the idea of the rooftop area and offered the
suggestion of building some horizontal trellises to break up the sun beating down on the residents during
the hot part of the days. Please make sure there is adequate draining as that property is prone to flooding,
and with the slope tends to run off in the residential area.
Chair Baltay closed the hearing to Public comment and brought it back to the Board for discussion.
Boardmember Adcock requested clarification as the applicant responded there were trash bins in the
garages that would come out, however a trash enclosure had also been mentioned.
Ms. Raybould answered there would not be individual trash service with bins in their garages, there is a
community trash area in an enclosure. In previous iterations of the project, it was determined there would
be too many bins along the frontage of the property that they wouldn’t be able to fit individual trash
service along the frontage. Staff required the trash enclosure and for clarification, the property would be
responsible, by means of an HOA or maintenance, for taking the three bins of trash from the enclosure to
the street for pickup service.
Chair Baltay stated there will be more questions regarding the trash when Boardmember Adcock finishes
her comments.
Boardmember Adcock commented that the path between Building C and the residential R-1 neighborhood
has an alley feel to the area and feels it should be a discussion. There is a 3 foot difference between the
first floor planned width and the second floor planned width on Building A. It goes from twenty eight feet
to twenty five feet which creates a three foot ledge that could be a waterproofing concern. The units with
outdoor space on the first floor are not consistent in showing which units have gates. Privacy is a concern
for townhouses as they are units that are individually sold, consideration should be given towards
substantial height of the roof decks and barriers between the units.
Boardmember Chen thanked the applicant for the presentation and commented she agreed with
Boardmember Adcock’s comments regarding the trash circulation for the enclosure and suggested the
applicant work to resolve some of those issues. In regard to the resident pathways, Boardmember Chen
asked staff if using different pavers to designate residents paths is allowed, she recalled it being used in
Alma Village.
Page 23 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Ms. Raybould stated that it is allowed, but it is not required, and she didn’t know that there would be
space to provide a separate pedestrian pathway, nor would it necessarily safe to paint a pedestrian
pathway that goes across everyone’s garages.
Boardmember Chen inquired about Building C, with the boundaries between the R-1 and RM 30, and what
the zoning requirements are for the rear yard daylight plan starting from the setback or the property line.
Ms. Raybould explained for the R-1 zoning is being treated based on the RM 30 zoning because the areas
within the RM 30 zone are subject to the RM 30 zone and that district standard is to measure ten feet up
at the property line and a 45 degree angle in.
Boardmember Chen is concerned about the alley that’s created behind Building C that abuts the R-1
neighborhood. If it is only going to be used by one unit, consideration should be given to treating it as
described on Building A and the unit that accesses the trash from their patio. That would also allow a
private yard in back. The elevation materials need more defined details of treatment, and Boardmember
Chen suggested raising the plate height of the windowsill to five plus feet for the two story end unit facing
R-1, in Sheet A-17 Building A west elevation. This well prevent them from being able to look into the R-1
neighbor’s back yard.
Chair Baltay and Ms. Raybould both stated those are all shown as opaque windows.
Ms. Raybould apologized and stated she thought it was in the actual printed plans.
Chair Baltay suggested it be translucent glazing, which is not opaque.
Ms. Gerhardt rephrased it to obscured, and added they were asking for frosting, it didn’t have to be black
out windows, it just needed to be frosted.
Vice Chair Rosenberg appreciated the applicants presentation and the public speaker and commented
that the overall stepped heights and the fact that they are townhouses are pretty respectful to the
location. It’s a nice transition from the property on El Camino and the residential. The zoning was handled
in a clever manner. The R-1 strip was a great way to add a buffer to the residential area. She agrees the
pathways are hit and miss, the path for Building A going to the trash doesn’t exist and that works well.
The one from unit 15 is the one unit that needs a pathway. Landscaping could be used to create privacy
along that path. More details about the rear fence material, length, and height would be helpful in
reviewing appropriate light screening. Clarity on the number of patios would be helpful. She’s concerned
about the trash enclosure and maybe a solution could be having two driveways with two trash enclosures.
The mailboxes could be split as well. Particularly since it’s already a concern for staff. Soft joints for the
trash enclosures are a great idea to minimize noise. The roof terraces are in a good location however she
sees no way a three foot tall parapet can be acceptable between the units. It’s a safety hazard and there
needs to be privacy and should be a permanent fixture, not optional by the residents. Additionally, that
material would need to be added to the material board. Vice Chair Rosenberg suggested they consider
having a sloped roof on units four and five of the building that abuts the residential neighborhood. It
would give that side a more single family appearance and would complement the trash enclosure. A way
to get the water back into the water table from the patio could be to make the patio permeable pavers.
Page 24 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
It's a quick and easy solution. The pathway that goes from the front units of Building B stops at unit 5
would benefit from a connection that continued around to the trash enclosure.
Chair Baltay commented that he agreed with much of what Vice Chair Rosenberg said and finds overall
that it is excellent site planning. They did a great job in building something that transitions into such a
varying space. It’s compatible, there are a good number of units, and it will be a great addition to the
community. They did a great job respecting the neighbors and at a high level the project works well. He
believes there’s a greater grade change on the site that what staff indicated on the drawings. The back of
the property that abuts the houses on olive has a large berm with plants, and behind the berm the grade
is significantly lower than the grade of the site itself, by at least two feet, possibly three. The importance
of that detail is that’s where the daylight plane measurements should actually start. It begins at the
existing grade of the back property line. The drawings indicate the daylight plane begins at the grade of
the project. That could potentially impact the rear neighbors significantly. They had a great surveyor
involved; however, the elevations are missing from the drawings. There are plus or minus details on the
drainage plan but that’s all that’s listed. Staff will need to follow up with receiving that information. Chair
Baltay is concerned about two of the roof decks that abut the Olive Avenue side. There will be privacy
impacts to those neighbors. The back units on both Buildings A and C have roof decks that can potentially
see into those yards and there should be some type of buffer to include landscaping, planters or high
walls. The Objective Standards don’t seem to have any requirements surrounding that topic and his
recollection was there had been considerable discussion on the topic of balconies and how close they
could be to the edge, their overlooking views.
Ms. Raybould apologized and stated that it seemed like there was something missing from the list.
However, it still wouldn’t have applied to this project because those standards require privacy elements
for decks within 40-feet of other windows and in both scenarios, there were no decks within that area.
Staff will revisit the Objective Standards check list and fix the missing item.
Chair Baltay stated it is important to make sure that’s documented. Additionally, he recalled there being
a list of materials created by the Director of Planning considered high quality pre-approved materials that
would be updated by the ARB. This project is requesting fiber cement panels, and he doesn’t recall that
being directly allowed.
Ms. Gerhardt stated there is a list of approved materials, she believes the one this projects falls under is
‘fiber enforced cement siding and panels’ is allowed for 100% of the façade area.
Chair Baltay thought they had any other information on texture detailing was allowed. He echoed Vice
Chair Rosenberg regarding the pitched roof on the back of Buildings C and on the lower units of Buildings
A and B. It would provide a roof eave which would likely save the project money and is a better view for
the residential neighborhood. He believes the trash collection circulation doesn’t work. Vice Chair
Rosenberg suggestion of creating two driveways and splitting the trash location into two mad a lot of
sense. Again, something else he saw that wasn’t mentioned in the objective standards and it’s an issue
that comes up often.
Ms. Raybould commented that she asked the applicant to indicate the distance, everything was 200 feet
or less, which is suggested was appropriate in general discussion. With that in mind, she didn’t comment
on the trash any further. She agreed they could ask the applicant to consider the trash circulation more,
Page 25 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
however, she was not clear on where there would be ample space to add another trash enclosure without
conflicting with storm water drainage, easements, transformers, or bike parking. Trash enclosures are
required because individual trash service requires each unit to have a bin for trash, compost, and
recycling. When they lined all the bins, they exceeded the length of the frontage because all the bins
would have to be pulled to Acacia for pickup. Zero Waste were the folks who said they needed to have a
trash enclosure.
Chair Baltay stated that he felt this was a conflict with what is allowed in the City. Most townhomes don’t
try to do this.
Boardmember Hirsch stated they did some research on this and what comes to mind is Arbor Real, their
trash is brought out to the street and there are thirty or more bins that are lined up on each side of the
street on garbage day. Some of those people have to then drag their bins back to their residence within
the property. There are better ways to handle trash than that. However, he believes that the Board is
reaching a consensus that there is an issue of garbage on this particular site.
Chair Baltay asked Boardmember Chen if she discovered anything enlightening from the ad hoc
committee related to trash circulation.
Boardmember Chen commented they noticed the problem but really didn’t find any solutions, but
noticed some communities such as Mountainview, pushed their bins in front of their garage. In that case
she’s not sure what the minimum requirement would be from garage to garage.
Ms. Raybould stated that historically that was happening but more and more the trash companies weren’t
willing to take on the liabilities of navigating through the tight properties to pick up at each garage. The
noise of backing out of dead end aisles is also a concern and they won’t pick those up either.
Chair Baltay questioned how the trash in the trash enclosures would be picked up.
Ms. Raybould stated she envisioned putting a requirement into the vesting tentative map that the CCNRs
require a maintenance person to bring the trash out unless they assign someone in the HOA to handle
that.
Chair Baltay stated there aren’t any regulations and their hands are tied, this is a chance for them to solve
the problem because everything they’ve discussed is not satisfactory. One trash bin for all isn’t going to
work well and he had doubts that an HOA was going to want to have the expense of an ongoing
maintenance person. He encouraged the applicant to resolve the problem.
Boardmember Hirsch commented that he agreed it’s not sufficient for there to be only one trash bin and
it’s horrible for one unit to take their trash 200 feet through the property. He suggested shifting Building
C at the far end, to gain the space to add an additional enclosure. He believes there needs to be fencing
on the rear of the property overlooking the residential area and the ARB is going to need to collectively
review the material used for any privacy element. In general, he hoped the project would return to the
ARB.
Ms. Raybould confirmed that the project would not be reviewed again by the ARB.
Page 26 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Boardmember Hirsch finds the elevations interesting. The mail has a similar issue to the trash in terms of
being accessible. Putting it at the drive in is a legitimate suggestion to solve that. The center paseo is a
shift in the circulation in front of unit 6 of Building B and everyone who uses the paseo will be walking
right in front of their door and window. It’s a privacy issue for that unit. The furniture in this area is a
mistake. That’s used for larger buildings. The seating should be contained to the common areas where
they cook out or gather. There are ways to create courtyards in such a manner that still maintains privacy
for the residents abutting the common areas. He encouraged them to work on that area to make it
cohesive both socially and functionally. He agreed with continuing the pathway around the corner to the
trash area, however, that wouldn’t be necessary if they added a second trash enclosure. The detailing of
the façades is very good, and they did a good job with the elevations. He liked they way they work and
the materials that they used; the varying materials is nice to see versus each unit looking different. The
site plan has been very will done along with the planning of the apartments. It’s exciting to see the
residents have choices regarding floor plans and window treatments. He appreciated the Board comments
regarding the alignments of the finishes and the privacy fencing. He disagrees with the comments about
sloping roofs, this isn’t a sloping roofs project and is rectangular in all aspect. If he were to get another
presentation, he would love to hear the details of how the materials meet the other materials on the
façades. He believes it’s going to be a great project and he’s looking forward to seeing it completed.
Boardmember Adcock added she believes there is room for improvement with the trash circulation and
on the pathways leading towards the trash area(s) should they add another one particularly the two units
in Building C.
Boardmember Chen explained she sketched out an alternate site plan in which she separated building B
or eliminating it and adding the units split between Building C and D, they could have the buildings in a
loops style format in which the garbage service would be able to pick up trash at the individual garages.
In doing so they could use the trash enclosure space as a common patio space.
Chair Baltay inquired if staff were looking for a motion.
Ms. Raybould answered they were not looking for a motion. The ARB can make comments, however a lot
of what she was hearing was not related to Objective Standards. The only one she noted was the request
for staff to review closely and ensure the correct elevations were being used to determine the daylight
plane. With regard to the privacy screen, staff were not aware that it might not be added, and it doesn’t
seem like it’s a detail that is shown on the plan, and relevant to the design and what had been reviewed.
While there is no requirement for the screening, it was proposed on the plan therefore staff would expect
that to be constructed.
Boardmember Adcock stated that Vice Chair Rosenberg had mentioned not having the screening could be
a security concern and Chair Baltay added that safety is definitely objective.
Boardmember Adcock asked if it would be appropriate to add a condition of approval for the concession
that was being requested and recommended that every unit have a hose bib in each terrace so that if the
residents choose to do their own planting, they have some way to water the plants, even if landscaping is
not provided per the concession that they are requesting.
Page 27 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Chair Baltay commented that was a great suggestion and asked staff if they could recommend that as a
condition of approval.
Ms. Raybould stated it is a good suggestion, however, they have no requirements related to that. It is
something staff could suggest to the applicant. They have stated they were agreeable to putting in
removable planters or something of that nature on the rooftop.
Mr. Josh Vrotsos, with Dividend Homes, explained they had a lot of concerns regarding adding hose bibs
on the rooftop decks because if someone leaves it on, it becomes a huge water intrusion issue. Particularly
with construction litigation for condominiums. It opens the developer up to a lot of liability. He loves the
idea of landscaping both for privacy and aesthetics. He believed potted plants would be a better way to
go.
Chair Baltay moved on to the next item on the agenda.
Approval of Minutes
5. Draft Architectural Review Board Meeting Minutes for August 17, 2023.
Chair Baltay asked for comments or a motion.
MOTION: Vice Chair Rosenberg, seconded by Boardmember Hirsch, to approve the meeting minutes for
August 17, 2023 as written.
VOTE: 4-0-1 (ABSTAIN by Adcock)
6. Draft Architectural Review Board Meeting Minutes for September 7, 2023.
Chair Baltay asked for comments or a motion.
MOTION: Vice Chair Rosenberg, seconded by Boardmember Chen, to approve the meeting minutes for
September 7, 2023 as noted.
FRIENDLY AMENDMENT
Boardmember Adcock noted when she read the minutes that “lead” was used in the minutes when she
felt they were referencing LEED.
Vice Chair Rosenberg and Boardmember Chen accepted the friendly amendment.
VOTE: 4-0-1 (ABSTAIN by Adcock)
Boardmember Questions, Comments or Announcements
Page 28 of 28
Architectural Review Board Meeting
Draft Summary Minutes: 10/05/23
Chair Baltay stated Boardmember Hirsch has a statement to make.
Boardmember Hirsch commented the information that was provided in Staff’s Presentation was
impressive. He had been thinking about the housing issue and he feels like they are lacking urban design.
In that he means the pieces that go beyond planning. He said that in imagining the new construction on
parking lots in the downtown area, there are issues about how that’s done that don’t necessarily apply to
what planning requires. Diagrams can be utilized to really get a sense of how things would look. That
requires an architectural point of view. Site access, parking scheme alternatives, commercial requirement
locations, community open space consideration, related neighborhood impacts, special zoning
considerations for unique sites, public utility requirements and costs, affordable housing considerations,
these are all mentioned in the Housing Element in more of mathematical way and then need conceptual
planning in urban design. Other City’s have separate organizations that deal with those and the
development, so they get something like a high line in New York, which is dealt with as a completely
different structure within the City. It strikes him that every time they do something in planning, they are
missing an opportunity and that was demonstrated in the Hamilton Avenue project. It’s something that
could be looked at from a design standpoint in creating something unique. Something like insisting on
daylight in garages. Those types of aspects of urban design needs to be addressed, as it will have an affect
on the city as a whole. Additionally, the financial considerations and possibilities need to be considered
so that if a building is built on a parking lot that is owned by the City and leased to the developer, what is
the return? Could there be a significantly higher number of affordable housing units, and should that be
considered? Instead, the City asked affordable housing developers to consider the sites downtown and
didn’t say, what happens if we find a private developer and negotiate a deal with a long term lease, for a
higher number of affordable units.
Adjournment
Chair Baltay adjourned the meeting at 12:18 p.m.