HomeMy WebLinkAbout2022-06-13 Architectural Review Board Summary MinutesArchitectural Review Board
Staff Report (ID # 14564)
Report Type: Approval of Minutes Meeting Date: 7/21/2022
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442
Summary Title: Minutes of June 13, 2022
Title: Draft Architectural Review Board Meeting Minutes for June 13,
2022
From: Jonathan Lait
Recommendation
Staff recommends the Architectural Review Board (ARB) adopt the attached meeting minutes.
Background
Draft minutes from the June 13, 2022 Architectural Review Board (ARB) are available in
Attachment A.
Draft and Approved Minutes are made available on the ARB webpage at bit.ly/paloaltoARB
Attachments:
• Attachment A: Minutes of June 13, 2022 (DOCX)
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 1
Call to Order/Roll Call
The Architectural Review Board (ARB) of the City of Palo Alto met on this date in Council Chamber and
virtual teleconference at 8:30 a.m.
Present: Chair Osma Thompson, Vice Chair David Hirsch, Boardmember Peter Baltay, Boardmember
Kendra Rosenberg, Boardmember Yingxi Chen
Absent: none
Chair Thompson noted that there would not be oral communications at this meeting since it was the Board
Retreat meeting.
Retreat Agenda
1.Discuss ARB Award Winners and Ceremony
Chair Thompson initiated discussion of the ARB Award Winners and Ceremony. The last a ction taken was
to pick the winners. The next step was to send notices and assign specific addresses to Boardmembers to
create a description and work with the architect team to obtain professional photos for the project. Then ,
a timeline could be discussed and choice of a date for the ceremony.
Jodie Gerhardt, Manager of Current Planning, shared the notes taken from the previous hearings on some
of the award winners, including why it was felt they were award-winning. For the Middlefield project, the
high-quality materials and landscaping, et cetera, were mentioned. She said it might be good to assign
projects to individuals to put together a write-up including some detail as to why the project is award-
winning.
Boardmember Baltay thought they had already made assignments. It was thought it might have been with
previous Boardmembers. Ms. Gerhardt thought this was the case, so they needed to make new assignments
with the new members. Another project, Forest Avenue, had be en added as well.
Boardmember Rosenberg’s understanding was that the awards happen every five years. Boardmember
Rosenberg responded that this is correct, although they are somewhat off-track because of the pandemic.
Boardmember Rosenberg asked if anyone on the Board had written up a review like this before. Two former
Boardmembers had. Ms. Gerhardt advised that the By-laws are not very specific in regard to this, so it is
fairly free-form as far as how to do it.
Boardmember Chen wondered if the write-up would be more like the architect describing the design
concepts and the Board commenting on why they are the winner. Ms. Gerhardt thought it was both, with
the Board agreeing on why the award was being given, at least on a high level. They would also work with
Architectural Review Board Retreat Meeting
Minutes: 6/13/22
Council Chamber & Virtual Meeting
8:30 AM
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 2
the project architect to obtain the project description and perhaps share their design process or other
details.
Boardmember Baltay commented that he had just joined the Board the last time this occurred, in 2015.
One of the first things they did was a public presentation of the awards. He felt the public presentation was
embarrassing. There was almost no one there, just five Boardmembers standing around trying to talk about
the projects without much substance or presentation. He felt it would be even less represented this time,
given the pandemic they had just gone through. He proposed an alternate idea to a public ceremony,
consisting of a display in the lobby, and asking the City to put it on the main City website for a month, with
a banner, and a flyer from the Architectural Review Board, focusing on a quality presentation. Boardmember
Baltay felt this would be more effective.
Vice Chair Hirsch added that they could run a digital presentation that floats across the big screen in the
hallway. Ms. Gerhardt thought both ideas were great. The screen would be temporary, but the web page
display could live on for a longer period of time.
Boardmember Rosenberg advocated having something more permanent on the website. She questioned
whether anyone does models of their project. If the architectural firm has models, it would be an interesting
thing to display. Chair Thompson noted they have models for select projects, but thought it was a good
idea and wondered about talking to the architects to find out what kind of materials they already have and
then reconvene to decide. Boardmember Rosenberg suggested having even a sample materials board
where people could see and touch what was used, something more physical. She loved the digital
presentation idea but felt that also having the physicality would be interesting, if it was available.
Chair Thompson mentioned the Uplift local emails and how they define destinations or events that are
happening. She thought perhaps they could have an awards ceremony to kick off the installation in the
lobby for the Architecture Review Board winners. She thought they might be able to do better advertising.
Boardmember Chen asked if the winner gets a certificate or something to display in their office. Vice Chair
Hirsch indicated that they do. Ms. Gerhardt added that it is up to the Board. Boardmember Rosenberg liked
the idea of them being on the website as well, which lives on in perpetuity, because the winners could then
link back to it on their own websites.
Chair Thompson said they needed to establish the action items – whether they want to create a plaque,
who would create it, whether there would be an installation, et cetera. Ms. G erhardt said they would take
care of securing a plaque, if the Board wanted to design it. Boardmember Rosenberg wondered if there
was a budget for such an item, or what the financial obligation might be. Ms. Gerhardt thought the awards
done for ARB members were not very costly. Boardmember Baltay thought just a paper certificate would
be adequate, something that an office can put on their wall or on their website. Getting the Mayor to sign
it, on official paper, with the seal would make it meaningful. The Boardmembers agreed with this.
Ms. Gerhardt noted that they could do a Council hearing as well, as another possibility. Chair Thompson
thought that would be great, and Boardmember Baltay thought that could constitute the public ceremony.
Chair Thompson wondered about something nicer than a City Council meeting. Ms. Gerhardt recalled that
what has been done before is a pre-meeting with appetizers, et cetera, gathering in the lobbying, followed
by the Council meeting where the award winners receive their certificate and handshake, et cetera.
Boardmember Chen asked if the certificate would go to the architect or the building owner. Ms. Gerhardt
said it was the architect. Boardmember Chen wondered about having a logo or sign in the building, the
project site, for people to recognize that it is an ARB-award-winning project. Something like the LEED logo.
Ms. Gerhardt said for them to install it on their building would probably be something that the architect
would pay for, but there is no reason why they couldn’t do something like that.
Boardmember Baltay didn’t think it was a big enough deal for them to care that much about. He reiterated
that it would be embarrassing if once again only a few people came to a ceremony and just a few of the
winners showed up, or if no one comes by to collect their award because it’s five o’clock. Chair Thompson
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 3
thought if there was enough advertising it could be a bigger deal. Ms. Gerhardt said it was up to the
Boardmembers. When they are calling one or two of the architects, it would be their job to get them
personally jazzed up about it.
Vice Chair Hirsch noted that some architects are from out of town.
Boardmember Baltay advocated the award be digitally presentable on the website and/or in the lobby and
felt that would be more successful. Chair Thompson felt this seemed like a bare minimum.
Ms. Gerhardt recapped the ideas – having the lobby TV spot in the short term, doing the website longer
term, a paper certificate, and talking to Council about handing them out , with the mayor’s signature, on
some sort of official documentation, seal, et cetera. Boardmember Baltay felt a certificate with the offic ial
seal from the City would be meaningful. Vice Chair Hirsch added the architects could then digitally produce
it for their own brochure and advertising.
Chair Thompson suggested revisiting the concept of the lobby installation after chatting with the architects
regarding what kind of materials they would have. Boardmember Rosenberg thought the Junior Museum
and Zoo might have a model, which might even be on display now, and they could borrow it for a month.
She thought the residential one probably would not. It would be necessary to find out what they have and
what is available. Chair Thompson pointed out there isn’t that much space in the lobby for all of them to
have a model anyway.
Boardmember Baltay said one way to get more buy-in might be to have each firm make their own award
presentation. Each could have an easel or display within a designated space. There is enough space in the
lobby to put up eight. Everything including the website, the Council meeting, would focus on driving people
to come to the lobby to see the award-winning displays. The architects might feel a desire not to be
embarrassed by having the least desirable presentation and therefore be motivated to produce a high-
quality presentation. Boardmember Rosenberg agreed that the architects would likely want to maintain
their branding and certain level of aesthetic in their presentation.
Boardmember Baltay thought they might want to establish the parameters for the presentation. The
boardmember supervising each winner would be responsible to make sure they get it done. He remarked
that the risk of having their name associated with a blank board in City Hall for a month would be an
impetus for the architects to come down and do something. Once they have an easel there, they might
show up for a ceremony/reception.
Chair Thompson wondered if they would provide a size, like a 24 x 36 portrait. Boardmember Baltay thought
they would have to come up with something standardized in terms of square feet of floor area, or a display
easel. Boardmember Rosenberg thought the 24 x 36 easel would be a natural size to use, mounted on
foam core. Chair Thompson said if they have a model, then that could be a bonus, but everyone needs a
24 x 36.
Chair Thompson asked how much time they should allow for boardmembers to do this. There was
discussion of a month. The question was asked whether permission was needed to use the space. Ms.
Gerhardt assumed they could get the space, but she would need to have it approved. Boardmember Baltay
suggested aiming to launch it in September. Vice Chair Hirsch agreed with this, after the summer.
Boardmember Baltay thought that firms would need a month or two to create their display. Ms. Gerhardt
said Council will not be back until August, and agendas will be packed in early August.
Chair Thompson wondered about having the event on a Council day, or if people would be free on an
evening. Vice Chair Hirsch questioned presentation of the award in the Council Chambers, because there
are eight of them. Chair Thompson agreed they do not want to encroach on the Council meeting.
Boardmember Baltay suggested Council could pass a resolution where they read the names of the winners
into the record and the mayor makes the proclamation, as opposed to having all eight of them file in front
of the Council. Perhaps a five-minute proclamation. Chair Thompson said they could invite Councilmembers
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 4
to come to the event the opening night of the installation. Ms. Gerhardt wondered about it being an extra
trip for Council to come down to the Chambers. Chair Thompson commented that Monday is not the most
convenient evening for people. Ms. Gerhardt said the event usually occurs about half an hour before the
meeting or so.
Boardmember Baltay commented again that it is not worth having a reception, but they should just have
the Council make a proclamation the same day the installation is formally unveiled and be done. Chair
Thompson felt it would be fun to have something, perhaps on a Thursday night, pointing out that this is
celebrated only once every five years, or seven years in this case. A Thursday or Friday night was suggested
by Boardmember Baltay. The Council would be invited, highly encouraged to attend for photo opportunities.
Ms. Gerhardt suggested they could call the rep from Palo Alto Online.
Boardmember Rosenberg thought a cocktail lasting an hour to hour-and-a-half would be sufficient.
Boardmember Baltay inquired whether the City can provide wine. Ms. Gerhardt was not sure on this.
Boardmember Rosenberg suggested appetizers and finger foods.
Boardmember Baltay suggested the Chair appointed a committee to oversee the social event. Chair
Thompson said they will talk about it as a Board and then maybe appoint a committee if they choose to.
Each boardmember will have responsibility for a certain architect or project. Boardmember Chen asked
how this would be communicated, and to whom. The sentiment was to do a better job with media exposure
and communication than the last time. Chair Thompson said with two or three months there would be
ample time to build interest in the event. Ms. Gerhardt said this is where the Uplift local email could come
in. Vice Chair Hirsch asked how Uplift is distributed. Ms. Gerhardt said the Uplift subscription is not
automatic, but citizens can sign up for it.
The month of September was generally agreed upon, pending staff organizing what would work for a
Council date and reservation of the lobby. Chair Thompson mentioned possibilities of the 8th and 15th, as
well as the possibility of organizing the event as part of the regular ARB meeting. Boardmember Baltay
thought it needed to be an evening social event to get people to attend. Ms. Gerhardt said September 1st
and 15th would be the regular ARB meeting dates. She thought an off day would make more sense.
Chair Thompson asked for thoughts on September 8th, 6:00 to 7:30, with arrival and refreshments/cocktails
until 6:30, then the presentation, followed by another half hour for socializing. Chair Thompson thought
dressing up a bit would make it feel special. Boardmember Rosenberg stressed that it is a special event.
The Board discussed who would be the contact person for which project. Ms. Gerhardt stated that she and
Ms. Klicheva would get the certificate with a logo and the mayor’s signature and consult the Chair for
approval of it after it is designed. Assignments of the projects were made as follows:
1. 1451 Middlefield Road – Junior Museum and Zoo – Vice Chair Hirsch
2. 799 Embarcadero Road - Fire Station #3 Replacement Project – Boardmember Baltay
3. 3223 Hanover Street – Office/R&D project – Chair Thompson
4. 4175 Manuela Avenue – Religious Assembly – Boardmember Rosenberg
5. 375 University Avenue – Retail façade renovation – Boardmember Chen
6. 611 Cowper Street – New construction – Vice Chair Hirsch
7. 701 Welch Road – (Honorable Mention) Children’s Hospital – Chair Thompson
8. 430 Forest Ave – (Honorable Mention) Residential – Boardmember Baltay
Chair Thompson and Ms. Gerhardt will work together on notices to award winners. Honorable mentions will
be recognized, and all will be the same level of award. The notice will include instructions, requirements,
and timing, including preparation of a 24 x 36 board that will be displayed in the lobby, models if they have
any, and the contact person’s information.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 5
The Board discussed the timeline. Ms. Gerhardt suggested early September, with due date for information
in late August. Boardmembers should copy Ms. Gerhardt on all emails. Chair Thompson will send the email
template to the boardmembers, who will communicate with the architects. Boardmember Baltay said he
may also make a personal phone call. Ms. Gerhardt will try to find names and contact information for the
architects.
Vice Chair Hirsch asked about what date they should call the architects, either this week or next, a week
after she sends the template. Notices will go out no later than the 27th. Ms. Gerhardt thought the personal
phone call is warranted, followed up with an email with all the details.
Ms. Gerhardt thought 24 x 36 displays is good but using the lobby TV’s is good as well. Architects hopefully
have high-quality images or renderings to share. Chair Thompson thought they would need to know the
pixel count. Vice Chair Hirsch thought there was a person in charge of designing the whole display. Ms.
Gerhardt will check into this.
Boardmember Chen asked if the display should be horizontal or vertical. Chair Thompson thought vertical.
Boardmember Rosenberg agreed, stating the TVs are horizontal. Landscape was agreed upon.
Presentations should be sent in to the Board by mid-August.
Vice Chair Hirsch advocated letting the architects choose how to present their projects. Boardmember
Baltay agreed and suggested for the physical part giving them a two-square-foot space with a vertical stand
for people to look at while standing. Chair Thompson summarized the points for the physical presentation:
A 24 x 36, landscape, one board per architect and one model, if available. Vice Chair Hirsch advocated
leaving the presentation up to the creativity of the architects and explain that it will be on display in the
lobby for the month of September.
The Board discussed availability of easels. The City probably has easels to use. Ms. Gerhardt and Ms.
Klicheva will come up with these. Chair Thompson wondered about the Arts Commission, since it is an
installation, and thought they might have supplies.
Chair Thompson wanted to make sure they don’t already have an installation planned for September in the
lobby of City Hall. Ms. Gerhardt will check on these things and will contact Public Arts Commission this
week.
Boardmember Chen asked if the photos/images should focus on more the exterior of the project, since this
is what the Board reviews. Vice Chair Hirsch thought they should choose their own best images that explain
their project the best they can. Exteriors are important and the main focus, but if they had a major space
on the inside it could be included – the Junior Museum, for example, where the lobby aspect is important
as well as the exterior landscape, with courtyards, animals, cages.
Regarding the digital presentation, Boardmember Baltay suggested the architects provide jpeg files so that
they could be placed into a PowerPoint with the Board’s own graphics and format for consistency. He
recommended a maximum of 10 images, minimum 3. They should pick their “money shot” that best
captures the whole thing. This could be played at the Council meeting, with every 10 ten seconds a new
image flashing by.
Vice Chair Hirsch thought the architects could coordinate something with a site plan as a background, but
it should be left up to them and their creativity to present their project. He thought they needed
coordination with a graphics person for the big board, who understands the best way to present a series
of building shots. Ms. Gerhardt didn’t know if there is any special expertise, except the person that controls
the TVs. Boardmember Baltay thought one of the Board members should put together the PowerPoint
presentation.
Boardmember Rosenberg took back her suggestion of portrait versus landscape. With the digital
PowerPoint, the presentation would be separate and distinct, based on the jpegs. The “money shot” could
be the one on the board. Chair Thompson suggested giving an option between landscape and portrait
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 6
based on the project, for the 24 x 36 board. Different projects may present better on different formats.
Boardmember Baltay suggested encouraging use of a board and something physical representing their
project. Ms. Gerhardt said staff will check into a table or pedestal for a model.
Ms. Gerhardt noted that, for the web page, someone needs to design the presentation. Boardmember
Baltay recommended producing a PowerPoint with all the images, within consistent graphics , scrolling
through the images and the graphics. For the website, the same thing with only one image for each project,
scrolling through the eight projects.
Boardmember Rosenberg suggested when they do their 24 x 36, they send in the image, which will be the
image for the website. The architects can control which one. Boardmember Baltay suggested when
someone clicks the tab on the website, it scrolls the eight images. Then the larger PowerPoint with 3 to 10
images can be shown in City Hall, where you can do more images.
Boardmember Rosenberg said she would want control over what is displayed in her name for perpetuity.
She felt they should allow architect to have control over the image used on the website , designed exactly
how they want it, understanding it will include a frame or logo for City of Palo Alto Architectural Review
Board.
Ms. Gerhardt said she can program this but needs the ideas of how it should look and the verbiage to go
with it, et cetera. There are staff who work on the website who can do this. It will be connected with a tab
on the ARB page on the City website, with a banner on the City homepage initially. Boardmember Baltay
said they want the architects to have incentive to do this, as it is great publicity.
Vice Chair Hirsch said the first step is to get contact information as priority so they can start. Ms. Gerhardt
and Chair Thompson will get an email template out and contact information. Regarding Brown Act
considerations, Ms. Gerhardt thought Boardmembers emailing each other on this proje ct, an awards
ceremony, is fine since no decisions are being made. She will double check with Attorney’s office, but the
subject is a party, not approving a building.
2. Discuss the Architectural Review Board’s (ARB) By-Laws and Council’s Handbook. Discuss the
ARB’s Annual Report and any By-law/Procedural Changes that might be needed.
Ms. Gerhardt gave some background on this and the need to talk about term dates (packet page 7).
Number one, term start dates and limits should match the Handbook. Council said what is not fully
described in the Handbook is that the ARB can serve a maximum of three terms, equal ing nine years, total.
Chair Thompson thought some terms were extended, potentially. Ms. Gerhardt acknowledged that
Boardmember Rosenberg is serving the rest of Grace Lee’s term so that’s why hers is two years. Vice Chair
Hirsch asked if she gets two full terms after that if re-appointed. Ms. Gerhardt said yes, if she gets re-
appointed.
Boardmember Baltay commented on the need to be careful because the handbook referenced is out of
date (November 2020). The one on the website is incorrect. Council revisited it in June of 2021 and passed
new guidance pertaining to how long ARB members can serve. There’s never been a clear explanation of
what that is. Ms. Gerhardt said there is no new Handbook but there was a vote. Boardmember Baltay said
when he asked about it, he was told the Clerk’s Office was too busy to deal with it. Now it’s been a year-
and-a-half. For him, when he was re-appointed for a third term, initially it had said two terms, max, and
then they said they would make it two terms, plus one more if in a window of time before a new rule was
in effect. Now, it says three terms for ARB members.
Ms. Gerhardt said the Council’s motion was for ARB and HRB to be three terms. Boardmember Baltay said
they were concerned that it’s harder to get real architects on the Board , and they wanted to keep them
there. He was frustrated that the change has never been made clear publicly in the record. He didn’t
remember if it was two terms for anybody and three if already in the pipeline. Ms. Gerhardt said the motion
was for three terms for anyone. However, at this time there is not a corrected Handbook. Boardmember
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 7
Rosenberg asked if they could incorporate the three-term policy into the cleaned-up Handbook. Ms.
Gerhardt responded that only Council has control over the Handbook. The Board has control over the
bylaws and procedures.
Boardmember Baltay noted they are trying to sync bylaws with a handbook that is not yet published. Ms.
Gerhardt agreed but suggested taking into consideration the motion. Chair Thompson clarified that this is
just for discussion. Ms. Gerhardt agreed and said they will have to agendize any formal changes.
Chair Thompson noted this also includes timing of Chair and Vice Chair elections. Ms. Gerhardt said in the
bylaws, terms for members have changed two or three times , and they want to sync this up. Everyone’s
terms currently end on December 15th. Also, under the current bylaws, they were supposed to vote for
Chair and Vice Chair before new people came on. However, in their last discussion it was suggested that
was not the best approach, and they might want to vote for a Chair after the new people came on.
Boardmember Rosenberg questioned if the reasoning for that was that voting for the Chair before new
people came on helped ensure that the Chair is someone who has experience. Ms. Gerhardt agreed.
Boardmember Rosenberg said she wouldn’t object to that.
Boardmember Baltay noted the political background regarding this issue. There was a real fight with the
Council on this. He waded into it when the ARB didn’t have enough members. A strong minority of Council
felt that a new board should appoint their own Chair. There was quite a debate about putting old board
members into the future and putting their thumbprint onto the scale. He said that the Board should be
aware that the Council at the time had a strong minority of people pushing hard not to do it that way. The
idea was that an active board should appoint their officers at the beginning of each term.
Vice Chair Hirsch thought they should decide on the process on their own. It seemed to him the best way
is to get all of the Board to be involved in that and accepting of it. Although two of the members have less
experience, he felt they should be included in the decision-making process no matter the Council’s thinking.
It’s a democratic process that all are involved in.
Boardmember Baltay said he was putting this out there in deference to Tom Dubois, who felt strongly
about it. He had gotten to know him well over the years, and this is basically his opinion. Boardmember
Baltay’s opinion was that having the Board, at the end of the year, choose the next year’s Chair and Vice
Chair is sensible. It gives a very good sense of who’s going forward. A person who just came on is hard-
pressed to make a good decision. When he first joined, he basically did what everybody else was doing,
but that’s not really a good way.
Boardmember Rosenberg commented it’s like a forced concept that someone with experience gets put into
place, an appearance that they have a choice, but if she had to vote for a Chair on her first day, she would
probably look to who’s been there before and vote for whoever they vote for, so it’s sort of an illusion of
democracy to some extent. She had no strong opinion either way, and said she is still honestly debating it.
Boardmember Baltay thought it is not a bad thing for the outgoing Board to put their thumb on the scale
a little bit going forward to ensure continuity. Boardmember Rosenberg supported this, saying when you
have someone with experience, it’s not necessarily tipping the scale . The “thumb on the scale” term seems
like influencing, and this is not necessarily the case. They are just providing experience and continuity.
Boardmember Baltay responded that is exactly the point. Council is a political body. This was a political
decision for them. For the Board, he would like to think their decisions are based on experience, expertise,
and design acumen. It’s not relevant whether you’re likely to approve a development or be pro -growth or
anti-growth. Boardmember Rosenberg agreed that providing continuity for applicants is beneficial. If
suddenly there’s a whole new Board and everything is totally different every two to three years, applicants
will go crazy. Projects can take five years sometimes, and if going through three different Architectural
Review Boards in a six-year span, it’s hard for applicants to know the rules if they are constantly changing.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 8
Boardmember Baltay advocated for having a very strong protocol, so when choosing the Chair, the public
can expect how it will go and have a way to have experienced Board members part of making that decision.
Vice Chair Hirsch said this puts them in an in-between position.
Ms. Gerhardt said the terms currently end December 15th. If the Board wants the prior board to be making
the Chair and Vice Chair decisions, as currently written in bylaws, it makes sense, and it is a matter of
moving it from October to early December so that the Chair can have the whole year, starting with new
Chair and new board all at the same time, after December 15th.
Chair Thompson said in their case they were supposed to have changed Chairs and Vice Chair in January.
Ms. Gerhardt said that was true for this year. They should have changed in early December if doing it this
way, but there was the pandemic and extra turmoil of only having three Boardmembers.
Vice Chair Hirsch wondered how will it work if boardmembers are not in the same three-year sequence
together? Ms. Gerhardt said that terms end in December, but they are in different terms, which is part of
what keeps the continuity. The Chair and Vice Chair are voted on every year. The end date of the term
doesn’t affect that.
Boardmember Baltay noted that recently they have done year-and-a-half stints because of changes in the
board’s membership. Chair Thompson noted that they need to have elections soon, because they’re late
on this. The question is would it be redone in December or keep the officers for a year-and-a-half again?
Boardmember Baltay said when the Handbook was put together there was talk that they were going to
stipulate boards and commissions to choose Chairs in June. The rationale was that Council doesn’t always
get around to appointing new Board members at the end of the year. This is what happened with Chair
Thompson and Ms. Lee. That got pushed into February, which is when he objected because it is bad for
the ARB Board to have a Chair who has not even been re-appointed. The idea was to put the Chair elections
halfway in the cycle so if Council takes a long time it doesn’t matter.
Boardmember Baltay said he is not sure how much you can anticipate all of this, but they flexed just fine
with it. Ms. Gerhardt said if you get voted Chair and then don’t get re-appointed – which seems rare – they
would just have to have another election for Chair.
Boardmember Baltay affirmed Boardmember Rosenberg’s point, stating the more you can make it
transparent and predictable for applicants the more the Board is seen as being impartial, apolitical, and
serving the public. He felt strongly that they want that reputation, to not be seen as pawns of political
machinations going on with Council, where, for example, the person they’re going to re-appoint will affect
whether Castilleja gest approved. He said they don’t want to go there. Boardmember Rosenberg agreed
that it should remain apolitical.
Chair Thompson asked if they would be doing elections that Thursday. Ms. Gerhardt said she put that in
because of noticing two weeks ahead. But it is ultimately up to Board to decide if they want to carry on
with that item or how they want to do it. She thought they should do something, since Chair Thompson
has been Chair for a year-and-a-half, finishing out Ms. Lee’s Vice Chair term.
Ms. Gerhardt explained that normally elections are yearly, but the Board can re-appoint the same Chair
repeatedly. Boardmember Baltay said it’s very rare that that happens. Ms. Gerhardt said where there have
been other situations where they have re-appointed people. Boardmember Baltay’s opinion was that you
shouldn’t serve as Chair until you’ve been re-appointed to the Board and earned the confidence of the
Council to get appointed twice. They can’t question you if they just re-appointed you.
Boardmember Baltay reiterated the idea that the Board needs to be seen as being impartial, apolitical,
experienced, stable. The more they can do to get that kind of internal protocol the better. Not that it would
be put in the bylaws, but he has felt it is a good policy.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 9
Boardmember Baltay suggested that the end of the year is when they should have the outgoing annual
report that the ARB presents to Council, so the outgoing Chair takes responsibility for getting that report
together, and then they make the presentation at the end of their term. At the last meeting of the year,
they have an election for the new Chair who then takes over at the first meeting of the next year. That
year runs, and they run the report to the Council again at the end of the year. He noted that they now
also have this annual work packet which kind of duplicates that.
Vice Chair Hirsch thought if the person who was Chair is Chair for a year-and-a-half it would be a reasonable
time for them to put a report together. Boardmember Baltay said it was his second thought – that a year
is maybe not a long enough term. Boardmember Rosenberg asked if re-appointing is allowed. For example,
can they reappoint Chair Thompson, or would it come down to one of the two experienced ones, because
they must change? Boardmember Baltay replied that they can do anything they like. The bylaws only
stipulate that they must choose a Chair and a Vice Chair. He didn’t think the bylaws should tie their hands.
He advocated for policies that make for a strong body. Chair Thompson noted that a term of three years
is long, and someone who has been on the Board for less than three years could be Vice Chair, since it is
like a learning place.
Boardmember Baltay commented that one of the jobs of a Chair is to bring on the next Chair, just as one
of the jobs of a parent is to bring your kid up right. That’s what you do if you want to ensure continuity.
That’s why Vice Chair Hirsch has been Vice Chair for a while. Vice Chair Hirsch added that, at the time,
there were only three on the Board, and they had no choice. Ms. Gerhardt said it does get passed around.
Everyone has an opportunity. Chair Thompson thought technically in a five-year period, there would be
five Chairs. When you have it every year, everyone has a chance, which is important.
Chair Thompson said if they went with concept that a Chair has to be around for three years, even after
two years is a long time if you’ve been Vice Chair. It depends on how the person feels and the Board feels.
Boardmember Baltay acknowledged there are many changing circumstances. People come and go.
Vice Chair Hirsch suggested either electing a new Chair or keeping Chair Thompson in the role until the
beginning of the year. Ms. Gerhardt noted that the bylaws right now talk about annual elections. They are
a little off because of pandemic and not having enough people. She felt they should have some sort of
election, but re-appointing the same people is up to them. Vice Chair Hirsch added that situation of Ms.
Lee leaving, and Mr. Lew terming out added to the complexity. Ms. Gerhardt replied there are many good
reasons to keep the same people to have some stability for a little longer, while bringing on two new
members.
Chair Thompson wanted to talk about who is interested in being Chair or Vice Chair. Vice Chair Hirsch said
he honestly, to some degree, wasn’t sure about his own capabilities, but thinks it is a challenge he would
like to try, although for not more than one term.
Boardmember Baltay suggested instead of thinking of this in terms of today, trying to think what they are
establishing into the future. What will the process be – to present a Chair at the end of the year, or in June,
the middle of the year? Then they can figure out how to get there.
Ms. Gerhardt said December, January or June would be the three likely choices. Vice Chair Hirsch thought
December and January were fairly equal. Boardmember Rosenberg noted that one is before when the old
members are in place, the other would include the new people. Ms. Gerhardt said since the new people
are likely to vote with the older members many times, really the choice is essentially December or June.
Boardmember Baltay said Council’s elections are in November, and new members are seated the first
meeting in January. This makes it more political and was what caused the controversy last time, an election
with new people coming onboard with a different perspective . They wanted to get appointments made
before there was a change on Council.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 10
Boardmember Rosenberg observed that if they elected the Chair and Vice Chair in June, there would be a
continuous City Council. If in December, there might be a new City Council. Ms. Gerhardt noted that Council
is December 31st. ARB is December 15th.
Vice Chair Hirsch remarked that Council itself has elected a new Mayor from a new member who had been
Mayor twice before, who was extremely experienced, but it was a new term.
Boardmember Baltay noted that if Council reappoints in December to take effect in January there’s an
obvious logical continuity to that which makes sense. It is in sync with City Council having a change of
leadership. However, does leave it more vulnerable to being political in the event of a sea change of Council
and Council desire. They can change who they reappoint, which might affect the makeup of the ARB, and
they would not be insulated as much.
Vice Chair Hirsch did not feel it was an issue-by-issue thing.
Chair Thompson wondered why would Council would want to influence who ARB votes as Chair.
Boardmember Baltay said they can influence who is on the Board. Last time, a different faction of Council
members was elected, not taking effect until later in the year. The ones currently seated wanted to vote
for things like board members. They pushed the vote through and had the vote; whereas, if it had been
the new Council members it might have been a different selection of people appointed. What the public
sees is that it is a political choice, and who they put on the ARB might affect whether controversial projects
get approved or not approved.
Chair Thompson recalled in her situation she had been Vice Chair, with her term ending. If her term would
have been renewed, she would have liked to have been considered for Chair. At that time, different
members had been Chair, and she had been on for a while. As a Board, they decided to push the election
until after the appointments. If she was getting reappointed, they could vote, and she could have a turn
as Chair.
Boardmember Baltay recalled that the City Council didn’t appoint her in the fall like they were supposed to.
They pushed back appointments because some of them wanted to see more applicants. He said they treat
this more politically than the boardmembers do. Leaving appointments at end of the year makes the Board
more vulnerable to the politics. Chair Thompson remembered that it is why they pushed it until after the
end date, in case she was elected as Chair but was then not re-appointed.
Boardmember Baltay remarked that such a scenario would be doing institutional damage to the Board.
Chair Thompson thought this was an argument for having the election in June so that it’s not during a
campaign season. Boardmember Baltay remarked that the Federal Reserve Chairman is appointed in years
that are not presidential election years. He advocated being on a cycle of June to June, although there are
arguments both ways, and the major political storm is rare.
Boardmember Rosenberg reiterated the importance that this body stay non-political. Everything they can
do to insulate against that is valid and worth pursuing. Boardmember Baltay agreed but said they need to
make sure they all agree. Vice Chair Hirsch advocated keeping it away from the Council relationship.
The Board agreed upon June for the election of Chair via a straw poll. Ms. Gerhardt will do official report
and noticed hearing, et cetera. The Board can verbalize hearing the proposal on the 16th and do a true
agendized item soon after that.
Regarding annual reports – Council’s work plan versus the ARB annual report – Ms. Gerhardt agreed that
the outgoing Chair, wrapping up their year as Chair can do the annual report, but it’s off-cycle with Council’s
work plan. The question was how to weave them together, or not.
Boardmember Baltay backtracked briefly to the election discussion and noted that Council takes a break in
summer. He asked, would it make sense to have a new Chair start in the fall, September 1st? Vice Chair
Hirsch advocated first discussing the annual report/work plan situation. Writing up a report could involve
the Chair and Vice Chair working together and reminding each other of things. He felt it would be good if
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 11
that relationship was responsible for the report. He remembered Wynne Furth working on her report,
coming into planning and writing it up. He stressed that it is a difficult thing to put together and write up.
Although it is a summary sheet, it involves a lot of work, so perhaps two people could be responsible for
it.
Chair Thompson felt the bigger question was if the work plan duplicates the annual report. Is there a need
to do the annual report if the work plan already has everything in it? The only possible difference could be
specific things noticed in applications that might be of interest, not in the work plan, but in the annual
report, such as proposals for parking that was close to trees or other considerations.
Vice Chair Hirsch asked if they felt an annual report was duplication. Ms. Gerhardt said they didn’t have the
Council’s work plan in past years. This is only the second year for the Council’s work plans. In previous
years the annual report was a communication tool from the ARB to Council saying what work was done
over the year and where they might be seeing issues.
Chair Thompson added that, in thinking more about it, the annual report is different. They might be
recapping things they’ve noticed over the last year – projects approved, projects denied, issues that came
up that were difficult to solve. Ms. Gerhardt pointed out a few such items that were included in their annual
report.
Vice Chair Hirsch noted that going forward there will be issues with state regulations that will affect them,
such as the housing element report coming up. Boardmember Baltay added that there are two or three big
issues coming up that the Council could use some education from the ARB on. Th e annual report is
opportunity to push that. They don’t have an official Council Liaison, so there is very little real way to get
their attention aside from constantly politicking with them informally. He referenced the opportunity to do
a design study of the Downtown, a grant that Council has been offered and are hesitating accepting. It is
a free grant to study putting housing downtown. The ARB should chime in on that subject , and this is the
format they have to do that.
Ms. Gerhardt thought they need to be careful. The ARB is a design review board, whereas PTC is more
about reviewing policy. Vice Chair Hirsch questioned, what if they don’t do it?
Boardmember Baltay said the question on the table is whether to do a work plan and, additionally, a report
to Council, or if they are the same thing. Looking at the one they did last , compared to the work plan,
they’re different in his opinion, but it is a lot of work putting it together. He felt it is an important job of the
Chair.
Chair Thompson mentioned if they’re doing elections in June, the annual report would be in June as well,
so she wondered if the outgoing Chair would do it. Ms. Gerhardt said that would be one way. Otherwise,
they would have just done the work plan for Council, so would they want to combine those things? Both
are communication tools to Council. The good thing about the work plan is they did have hearings related
to that where Board Chairs could actually speak to Council. The annual report itself doesn’t include that
opportunity. Boardmember Baltay said on the last one, he insisted that they read it with Council. Ms.
Gerhardt agreed they can do that, but as part of the work plan, the Council is expecting more back-and-
forth.
Vice Chair Hirsch thought the timing works better if synced with the new Council. Ms. Gerhardt said Council
elections are in December. With ARB elections in June, then March/April is three-quarters into a Chair’s
year. Chair Thompson commented if it’s the Chair’s obligation to have to do it as part of their duties, it
makes sense they should do it before they leave. It involves starting a draft, getting a lot of input, sending
out drafts, et cetera. Boardmember Baltay said last time it was discussed at a meeting and the topics
agreed upon going into it. He drafted up a paragraph and asked everyone to help with it. Then he put it
all together in one format.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 12
Chair Thompson thought the outgoing Chair should do the annual report it in June because the person
elected as Chair doesn’t want to be responsible for things happening between July and November. It will
be the next Chair’s job.
Boardmember Baltay thought maybe end of summer would be a better time to change than beginning of
summer, since this is essentially when everyone is ready to stop thinking about City business. One strength
of the Chair is having more access to City Council if speaking to them as the Chair. They learn who you
are, and there’s more interaction.
Ms. Gerhardt suggested it might be good to have a new Chair to ease into the position.
Boardmember Baltay responded that June is probably just fine. He asked, could they put it in the bylaws
that the Chair shall take the lead on presenting the annual report? When he first came on, nobody was
aware the annual report existed. Not until a member of the Planning Commission came to him and said
they needed to do this report. He brought it to the Chair at the time, who said they don’t do it anymore.
Ms. Gerhardt said that is why she brought up the meeting with Council, because there used to be a joint
meeting with the ARB and the Council. That was a tradition that got lost. Now the work plan and hearing
has brought it back somewhat. It is at least the Chair going before Council. Boardmember Baltay wondered
about putting in the bylaws that there will be an annual report and the Chair shall present it to the Council
to formalize it a little bit more. Vice Chair Hirsch asked if this would be when Council’s new session begins.
Boardmember Baltay felt the more face time with City Council, the more they are taken seriously, the more
they can advise Council on trends and issues going on. Putting put this in the bylaws as something they
must do makes it more likely it will last beyond any one of them.
Ms. Gerhardt asked if he was saying the Chair is responsible for the annual report and for presenting it to
Council? Boardmember Baltay said yes, for both.
Vice Chair Hirsch remembered that at the Council meeting last time they were sitting in Council Chambers,
split up. Each of them talked to them about particular part of it. Boardmember Baltay agreed and recalled
that everybody had a piece, and it was planned out.
Ms. Gerhardt said the annual report is the ARB giving a professional opinion to Council as far as what
they’ve worked on and how things might be improved, which are many times things that only Council can
do.
Chair Thompson thought focusing on things Council can do might be a good idea . They wouldn’t want to
present something to them and there’s nothing to be done about it.
Vice Chair Hirsch said it could be items that are prioritized for Palo Alto.
Boardmember Baltay asked if this could be put in the bylaws or regulations/procedures. Vice Chair Hirsch
supported this, but Chair Thompson said she was on fence and not fully convinced. Boardmember Baltay
said it would make it ongoing, so it doesn’t get lost and forgotten.
Ms. Gerhardt suggested if they want an annual report, to put some level of detail into the bylaws as
appropriate. Vice Chair Hirsch wondered if the Article referring to the Architecture Review Board might be
the place to reference the report.
Boardmember Baltay commented on the Boards and Commissions Handbook regarding description of the
use of ad hoc and temporary committees. On the third bullet point, 2nd paragraph of page 27, “Ad hoc or
temporary Committees” defines what an ad hoc committee does and is not how it is treated. It says an ad
hoc committee comes back to the Board for a final decision. Ms. Gerhardt said what it is doing is pre-
determining what the conclusion is. There are very limited items that the subcommittee is looking at.
Vice Chair Hirsch thought it should reflect what they do. Chair Thompson said they only do it if they feel
they really need to.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 13
Boardmember Rosenberg suggested maybe changing the wording to, “may return to the full Board.” Ms.
Gerhardt responded that the Handbook is the City Council’s, and the boards have no control over it.
Boardmember Baltay said they need to be sure when appointing something to a subcommittee to be very
clear that the Board is delegating the authority to make a final decision.
Chair Thompson added also the authority to decide if it is enough that they should come back to the Board.
In past if an applicant comes back with something, and the subcommittee feels it a big enough change
that it needs to come back, they do that.
Boardmember Baltay said their bylaws should be very clear how they use ad hoc committees so that they
are always in sync with the Handbook.
Boardmember Baltay noted that, under Article 6 of the bylaws (packet page 42) regular meetings of the
ARB shall be held not less than twice a month. The Palo Alto Municipal Code says it shall be held monthly.
Ms. Gerhardt thought this was okay, because it says, “at least monthly.”
Boardmember Rosenberg asked about situations when a meeting is cancelled because there are no items
to discuss. Is there a problem then? Ms. Gerhardt thought the bylaws should change. Boardmember Baltay
agreed that the bylaws should copy the language of the Code.
Boardmember Baltay suggested striking the language, “Chair shall establish the dates of the meetings.
Meetings shall be held on Thursday at 8:30,” et cetera, and replace with “the Secretary, with advice and
consent of the Chairperson, shall establish dates and places of meetings,” the secretary, meaning the staff.
Chair Thompson suggested just saying “staff.” Boardmember Baltay responded that the secretary is the
official appointment of staff, but the point is, don’t put the meeting time in the bylaws, just establish who
decides the dates and places of the meetings.
Chair Thompson noted that “special meetings only need 48-hour notice,” and noted that was different than
this special meeting. Ms. Gerhardt remarked that there are the rules and then there’s some good common
sense.
Boardmember Baltay commented regarding procedural rules on the back of page 49, talking about quasi -
judicial hearings and how much time people get to speak. “Applicant gets 10 minutes to speak and then
10 minutes to rebut public testimony.” He thought they could change that to “Applicant gets up to 10
minutes, but not longer than the total length of public comment.” Boardmember Baltay said it seems unfair
that the moment anybody comments on anything, the applicant gets another 10 minutes.
Chair Thompson felt the applicant should be allowed, because they might need it to rebut. If public
comment ended up being three hours, the applicant could get only 10 minutes to respond. Boardmember
Baltay clarified they would get 10 minutes if there’s at least 10 minutes of public comment. But if there is
only one minute of public comment, why should applicant get 10 minutes more? Vice Chair Hirsch added
that there is also Board comment, and the applicant gets 10 minutes to answer. Ms. Gerhardt clarified that
when an applicant is answering questions there is no time limit.
Boardmember Baltay suggested this could be at the discretion of the Chair. He reiterated his point about
always being seen as very fair and even-handed with everybody. On Castilleja project it was a big deal to
take time to listen to everybody even though it took a long time. Many times, he has felt, when an applicant
gets, effectively, 20 minutes to speak, and there is one person who feels strongly, and they get only three
minutes at most, that’s not fair.
Chair Thompson said it’s very rare that it happens, and it may not be worth changing the rules for a very
rare occurrence. Vice Chair Hirsch added that if there are three or five of them, they can combine their
times. If the sentiment is out there, they can find others who agree as a group and will have a longer
period to speak. Chair Thompson pointed out that often the applicant doesn’t even take the time to rebut.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 14
Ms. Gerhardt was concerned from an implementation standpoint that it is difficult to remember what the
rule is.
Boardmember Baltay commented on packet page 56, Change of Vote, item 5. “Board members may change
votes before the next item on the agenda is called ,” He said it may sound silly, but someone may want to
change their vote before the next agenda item at the next meeting is called.
Boardmember Rosenberg said maybe it should say, “…before the next item on the agenda is called, or the
end of the meeting.” Ms. Gerhardt thought, “…or adjournment.”
Boardmember Baltay commented on item 10, packet page 57, when recusing yourself you have to say
why. He wasn’t aware that was the case, having to disclose the nature of the conflict. It was probably a
legal detail, but he would like to be able to recuse himself without having to explain.
Ms. Gerhardt responded that usually people just say they live too close, know the applicant, et cetera , and
it’s usually generic. She said she would have to talk to attorneys about that one.
Boardmember Baltay commented on page 58, item 3, policy number A., the fourth line, “Usually, quasi-
judicial hearings involve a single parcel of land.” He said that is not true. Ms. Gerhardt replied that it is
usually either a single parcel or contiguous parcels. Chair Thompson added that it doesn’t say “always.”
Boardmember Baltay wondered why they even need to say it. Ms. Gerhardt said a quasi-judicial project is
on a specific piece of property, whereas policies are across the entire city, and she assumed this is to say
something to that effect.
Boardmember Baltay commented on page 59, item 5, “Members will disclose any contacts which have
significantly influenced their preliminary views or opinions about the item.” His understanding was you
disclose anything that’s not in the public record that you’ve learned. It doesn’t have to significantly influence
you just to be something you have to disclose. Vice Chair Hirsch thought this was different than saying,
“Yes, I went to the site.” Boardmember Baltay thought they were trying to find a polite way to make
everybody say they’ve been to the site. Chair Thompson thought it was more to pressure people to visit
the site. Vice Chair Hirsch wondered if you can simply declare that you’ve been to the site, because
“disclosure” means something else to him.
Boardmember Baltay said he had discussion with Wynne Furth about it. She was the former land use
attorney. She said you need to disclose what’s not in the public record. If you’re a judge you can only take
evidence under certain circumstances that everybody sees you taking, so when you go to the site it’s giving
you input of some kind that’s not in the record, or when you speak to a neighbor, have a meeting with
somebody, look at the material board. What we should disclose is not whether it influences you, but rather
whether or not it's in the record. Chair Thompson responded that it would be good to disclose, however, if
something did influence somebody.
Boardmember Baltay remarked that it is hard for him to say whether it influences him until he has heard
everything. Vice Chair Hirsch thought they should be asking, “Have you visited this site or spoken to anyone
party to this project?” Ms. Gerhardt thought “disclosures” was just a generic way of saying that.
Boardmember Baltay felt uncomfortable on a couple occasions when do ing his own technical research on
something. For example, when researching cell phone towers on one occasion to verify an applicant’s
statement, he did not disclose that he had done this research, because the information is out there, but he
was the only one finding it. Ms. Gerhardt said the main reason for a disclosure of that sort of information
is that you’ve done some extra homework, and everyone should have the benefit of it. The same goes for
a site visit, which is a version of homework.
Chair Thompson noted that presumably the research greatly influenced him. Boardmember Baltay
responded, what if it didn’t? Suppose it just confirmed what the applicant was saying? Isn’t that still
important? Chair Thompson agreed.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 15
Boardmember Baltay advocated removing the notion of “influencing you” and rather refer simply to being
in the public record. Chair Thompson was not sure she agreed with that. Ms. Gerhardt noted that all of this
would have to be taken to the Attorney.
Vice Chair Hirsch talked about putting something about the timing of the annual report in the Articles. Ms.
Gerhardt thought she has enough information on that and will draft something so they can make sure it’s
correct.
Vice Chair Hirsch commented under “Role of Council Liaison” on packet page 26. He said there is a Council
meeting every Monday, all digitally recorded. The handbook says the discussion should be officially
transmitted to Board as to what the Council has determined. The liaison should, “provide a wide range of
info to the advisory board” info about Council discussions, policies and actions.” Therefore, the Board would
have a choice. They could ask Ms. Gerhardt to report on it, or take responsibility for listening to the meetings
themselves, which is tedious. He wondered to get those pieces of information. It is often important to listen
in to those Council discussions, especially when there are projects the Board has opined on.
Ms. Gerhardt responded that she thinks she does provide such information, albeit on a hit-or-miss basis,
and does answer questions, although she has not done a formal report. Chair Thompson noted that they
sometimes get information in the in the staff report on what the Council has discussed , such as objective
standards.
Ms. Gerhardt said if the project comes back to the Board, it would be in the in the staff report. But there
are times that they do not come back to the Board. For example, the Bayshore project. ARB recommended
denial. Boardmember Baltay asked if the Director had made a decision. Because the question was asked,
she reported that, no, the Director did not make a decision, but floated it up to Council. This is what she
has done when members have asked questions.
Vice Chair Hirsch wondered again how to get that information. Boardmember Baltay said there’s no easy
answer because Council decided they don’t want to have an ARB liaison on Council. There is no formal
person on Council responsible for communicating to the Board. Pushing to get staff to do it is a big ask and
a lot of work. Chair Thompson added that it is also not their job.
Boardmember Baltay agreed that the ARB needs to know what the Council is doing and what staff is doing
with their decisions and recommendations, but he didn’t know how to formalize that. Vice Chair Hirsch
suggested each Board could listen to the Council hearing on issues that affect them. The timing of items is
usually not exact, but close, within 15 or 20 minutes that they may have to wait for the item to come up.
Chair Thompson thought that that is too much to mandate. Vice Chair Hirsch understood this, but stated
they need some of that information discussed. For example, information on the Castilleja project.
Chair Thompson thought they should ask Council for a liaison, maybe as part of the annual report.
Boardmember Rosenberg inquired if this was asking for a Councilmember to come to the ARB. Vice Chair
Hirsch explained no, it is just someone to summarize Council s opinions on things pertinent to the ARB and
to present it to the ARB.
Ms. Gerhardt expected that it would probably fall on staff. Vice Chair Hirsch said it’s impossible for Ms.
Gerhardt to be able to do this, or for any Boardmember to do so. Chair Osma said they need to find a
solution that makes sense.
Ms. Gerhardt explained that there are Council action minutes and then there are also Council summary
minutes. The action minutes come out quickly. The minutes could be copied into the packets. Then, if there
were questions, it would be easy enough for staff to answer them. Reading the minutes would provide a
reminder for Boardmembers to be aware of what was discussed and whether Boardmembers have
questions.
Boardmember Rosenberg asked if it would be the condensed version with items most pertinent to the ARB.
Ms. Gerhardt thought it could be, depending on how quickly they want it. Action minutes come out more
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 16
quickly, literally just stating “approve” or “deny”, et cetera. The summary minutes are detailed, like the
ARB’s regular minutes.
Chair Thompson wondered if there is an existing table, like Excel, that has the project and then the status
that it’s currently in, and maybe an export of projects they’ve review ed, and the status as to whether
approved and awaiting Council. Ms. Gerhardt thought that was a good idea, but it would be a new
spreadsheet to create.
Boardmember Rosenberg thought they could review the high-level minutes, with the action taken, and
then if they have further questions, they can request more information. Ms. Gerhardt agreed that it would
be a trigger for everyone. They will see what Council did, so things don’t slip by.
Vice Chair Hirsch commented on packet page 27, “The Chairperson shall appoint a special committee as
they are desired.” He thought they haven’t used that process. Ms. Gerhardt replied that they have more
recently. They usually have ad hoc committees for specific projects, such as the Parklet Committee and the
Cal Ave Committee.
Boardmember Baltay said they just started following the bylaws, where the Chair appoints the ad hoc
committee members, and they do it in public at the time that it’s being discussed. It used to be that the
staff would just ask whether you want to be on that committee. In private, the Chair would pick two people,
or staff would pick two people. He thought it much better for the applicant to see who that person will be
in public, which is what they’ve been doing.
Vice Chair Hirsch noted that the Chair could have a study group on some particular aspect, and they should
consider that more as a possibility. Ms. Gerhardt explained that the Chair can appoint any committee as
long as people are willing to be on it and do the work.
Vice Chair Hirsch noted on page 44 that on a tie vote, if somebody abstains from voting and there’s a
potential for tie votes, a project can be reconsidered or continued at another meeting. He thought this was
something they should know about. Chair Thompson agreed and noted that “a tie vote constitutes a denial
of the item.” Boardmember Baltay further explained that if an item is a tie and therefore denied, a majority
of the people on the Board can still push it to the next meeting for reconsideration. Therefore, the way it
is worded, it takes a majority to decide to reconsider the item, which struck him as odd.
Ms. Gerhardt said this would only happen if somebody was absent. If there were only four voting that day,
and it is a tie, that constitutes a denial unless three of the Boardmembers present decide to continue the
item. Essentially, if there is a tie, three people would need to say, “Let’s vote again,” or “Let’s t alk about
this when the fifth member is here.” To continue the item would require a motion, a second, and then a
majority vote. Ms. Gerhardt said this is the same as any other motion. If it ends in a tie, someone can make
another motion. As long as three people agree, then it goes to the next meeting.
[the Board took a five-minute break]
Vice Chair Hirsch shared a general thought about the state law which limits the number of times they can
look at a project coming through. This creates an issue because if they put it off to another meeting
sometimes they won’t ever get to see a project again. He wondered what to do in that situation. He
wondered if they could come up with a procedure that allows them to do enough preliminary review on
projects and allows them to communicate with each other, as a possible way out of the issue.
Chair Thompson noted this is what the next item addresses.
Vice Chair Hirsch brought up issue of when there’s an ad hoc decision, what happens with that information.
Ms. Gerhardt explained that for ad hoc committees, there is a formal ARB hearing, a motion is made, the
Board decides that whatever the item is, it’s small enough that it can go to an ad hoc. Two people on the
ad hoc committee are then delegated to make a decision. An example was 160 Waverly. It was a handful
of housing units with a large roof deck. The normal things happened. It went to the ad hoc committee. Ms.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 17
Gerhardt explained that staff until recently sent out a tentative approval letter that said, “You s hall go to
ad hoc committee,” and then after ad hoc , there was a separate letter that said, “You’ve gone to ad hoc;
you’re done.” This is how they used to do it. Because of the laws changing, with objective standards, et
cetera, they are no longer sending out that approval letter. The process is different now because of changes
in the state laws within the last month or two.
Chair Thompson noted that before, it used to be that they would approve the project. Ms. Gerhardt said
the ARB part has not changed. The staff part has changed, and the time when they send out the approval
letter. With 160 Waverly, what happened is that there was a motion. It went to ad hoc committee, but also
there was an extra wrinkle in that there was a daylight plane that staff didn’t realize applied to the property.
It was a misread of the Code. Instead of them being able to go straight up with the roof deck, they had to
adhere to a daylight plane, meaning the roof deck got smaller. Ms. Gerhardt said she did not bring this
back to the Board because the roof deck was getting smaller. But then the building lengthened and that’s
why she was emailing members of the ad hoc committee , asking whether the lengthening needed more
review. They felt like it was minor change, so they ran with it.
Vice Chair Hirsch saw it differently because the shape of the roof changed with the idea of a peaked roof
instead of a flat roof. They had had some general concerns about aesthetics of a flat roof in the general
meeting. If changed to a peaked roof, it was quite a substantial change in design. He thought it was
wonderful, but that was his opinion. The question is, was this a situation in which it should come back to
the Board?
Ms. Gerhardt said there are always minor changes that happen in a project, things that staff has to take
responsibility for. This is one of them. This was probably a little bit bigger than they like to handle by
themselves, especially because the ARB was involved early on, so they like them to be involved the whole
way. There are other projects that are small from the beginning, and staff handles them themselves. In
this case, the project had gone down a path, not knowing that the daylight plane was required. She had
felt it was a small enough change that staff could handle it, and they owed it to the applicant to send them
through a more streamlined process.
Vice Chair Hirsch said by then they had spent a lot of time on a little three - or four-unit project, and that
entered into his thinking as well. He made a judgment on it and couldn’t talk to Alex, the other member of
the ad hoc, because he was no longer with them. He was a little bothered, but he thought they should
forward the drawings to the two other members of the Board at that time.
Ms. Gerhardt said she could not do that, because of Brown Act problems.
Chair Thompson said she thinks when they assign an ad hoc committee to review something after it’s
approved, they trust the members of the ad hoc committee to make the best decision, and if they felt like
it didn’t need to come back, they have to trust them. The ad hoc also has the power to say it needs to
come back to the Board. The Board trusts them to make that choice. So, if he made that choice, they trust
them, and she didn’t think it needed to come back.
Vice Chair Hirsch felt the Board needed to know it was changed in case they went back to the project a
year from now and under construction and say “This isn’t what we approved. What happened?” Chair
Thompson felt that it was Vice Chair Hirsch’s prerogative to approve it.
Boardmember Baltay was bothered hearing that there is only one member of the ad hoc committee who
made that decision. His feeling was the ad hoc has a very focused task, a very clear issue that they’ve been
discussing. Anything beyond that is not within their purview. They’re not empowered to act on his behalf
on something they couldn’t agree on, and in his opinion changing the shape of the roof of a building is a
big deal. Ms. Gerhardt interjected that the changing of the shape of the roof had to happen because of the
Code.
Boardmember Baltay understood but said it doesn’t change the basic design impact of the decision, and to
have that not come back to the Board, the ad hoc committee should say, “This is beyond our purview. You
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 18
have to send it back to the Board.” He felt it was a mistake, especially if there is only one person on the
ad hoc. An ad hoc needs to have two members, so if there was only one member then that was a mistake
administratively. The Chair should have appointed a second member. Chair Thompson said she wasn’t
aware that they needed another member.
Ms. Gerhardt said sometimes there are projects that staff is on the fence about, whether they should come
to ARB or not, so in those cases there have been a number of times where they would talk to the Chair
and discuss it. In this instance thought she had an ad hoc committee member that had the most recent
experience with the project, and that is why she was asking the Vice Chair.
Boardmember Baltay reinforced the importance of being very careful when creating an ad hoc, what that
committee is supposed to do. It comes back to the Boards and Commissions Handbook. According to that,
it must come back to the Board anyway. If empowering a subcommittee to act on Board’s behalf, they
must be focused on what they are doing.
Chair Thompson stated that they usually are. Ms. Gerhardt reiterated that this was a staff decision.
Vice Chair Hirsch stated that he went along with the staff decision and made a judgment for everybody.
Boardmember Baltay said he was empowered to do that. Vice Chair Hirsch expressed that it was supposed
to be two people. Chair Thompson agreed that it could have been brought to their attention so that they
could find someone to fill the vacancy, but once a project is approved, it is approved, and t he subcommittee
is basically the babysitter for the rest of the things they were hoping to look at afterwards
Vice Chair Hirsch said he raised the issue because they don’t want this kind of thing to happen again. Chair
Thompson agreed and said they now know that if an ad hoc committee finds something that is out of their
purview, it should be brought back to the Board. Ms. Gerhardt hoped it’s a situation that doesn’t happen
again.
Boardmember Baltay felt the situation needs to be put in the Board meeting minutes so that everybody
knows what happened. They have struggled in the past because the minutes need to reflect ad hoc
committee hearings as well. They do now, but he didn’t recall this one.
Ms. Gerhardt said that’s what the ad hoc approval letter used to do. It was some sort of minutes, but now
they’re not doing the approval letter. Boardmember Baltay responded that it makes him cautious about
appointing an ad hoc committee.
Chair Thompson noted that it is a good thing to reiterate what the job is for the ad hoc committee.
Boardmember Baltay supported the concept that the Chair would be allowed to advise staff on whether
something must come to the Board or whether it needs to go back again. He said you trust the Chair,
because that’s who you elected.
Vice Chair Hirsch commented that the first part of that, the ad hoc decision, should come back to the Chair
in some way, but because of regulations it cannot. Chair Thompson agreed and said it must come back to
the whole Board, or not at all.
Ms. Gerhardt said she, as staff, was ready to approve this, but just was realizing that it had gone through
the whole ARB process, so she didn’t’ want to leave the whole Board out of it.
Vice Chair Hirsch felt the chances were about 100 to 1 that the group would have approved it if they had
looked at it.
Chair Thompson assured Vice Chair Hirsch that they trust him. People who get assigned to ad hoc
committees are trusted to take care of it, and if he didn’t know it was outside of their purview but now
knows, it’s okay.
Vice Chair Hirsch he felt comfortable doing that, but on the other hand wondered if it could have come
back a couple weeks later the way the Council takes items that really aren’t part of the general public
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 19
interest anymore and makes quick decisions. Ms. Gerhardt said that would be like a consent item for the
Council.
Boardmember Baltay thought they tried to do that at one point, and someone, possibly a lawyer, said they
can’t do consent items. Ms. Gerhardt felt that even if they could it would rarely be used and that this case
was really a one-off.
Boardmember Baltay said he would rather have a consent calendar than have an ad hoc committee for
exactly this kind of thing. A consent calendar would go to the entire Board, and it would take two members
of the Board to pull it from consent to get discussed. Until it crosses that threshold, it’s very simple for the
applicant, but it doesn’t leave it entirely up to two members making a decision. Architecturally, sometimes
they want to have that give-and-take with an applicant that can be done with an ad hoc committee. He
shared a recent situation in which this was the case. There was debate about how a railing was built. It
was discussed until eventually an understanding was achieved. Such situations would be cumbersome to
handle through a consent calendar. Ms. Gerhardt agreed and said there usually is no discussion with
consent items.
Boardmember Baltay said the situation being discussed would have been perfect for a consent calendar.
Vice Chair Hirsch agreed and thought the Board would have been happy with the change.
Chair Thompson felt that if it is a design change, it does require discussion as opposed to just being on a
consent calendar, although she wasn’t really sure how consent calendars work.
Ms. Gerhardt explained that consent calendar items are normally contracts or second readings, where
Council is just saying yes and don’t need to talk about it. It is for “easy” things. Vice Chair Hirsch added
sometimes staff brings items that simply need approval for payment, which often go on a consent calendar.
Vice Chair Hirsch thought if it was legally possible to do a consent calendar, it would have avoided the
problem they ran into. Chair Thompson didn’t necessarily agree. Ms. Gerhardt did not agree. She said they
were trying to resolve that situation quickly, and putting it on ARB agenda is not quickly, and can only be
put on an agenda twice a month.
Boardmember Baltay thought it would be great if they could do a consent calendar but reiterated that he
remembers being told that they can’t, although they could ask about it again.
Chair Thompson said if this happens again, either somebody on the subcommittee should say it needs to
go back to the Board and have it as another agenda item, or they approve it.
3. Discuss How the ARB’s Expertise Could Best Be Used in the Early Portions of a Planning Project.
Ms. Gerhardt gave an overview of the item. The existing process is laid out on packet page 63. It is highly
recommended that new buildings go through a preliminary ARB process. That is, one hearing with the A RB.
This is supposed to be at an earlier stage in the design, so that things are still moldable. There is a checklist
of things applicants are asked to provide to the ARB to facilitate informed comments. Packet page 65 lists
the formal process, and page 66 is the checklist for the process.
The formal process begins when an application is submitted. Staff reviews it for at least 30 days. It is run
through all the different departments – Transportation, Watershed Protection, all of those, with comments
collected back from them. During this time staff is making sure that the project adheres to the Code. Have
they met setbacks? Do they have enough parking, et cetera? Also, as much as possible, they try to predict
what the ARB is going say. The ARB would like benches. The ARB would like below grade parking, things
of that nature, requirements for meeting the ARB findings. Staff is talking through these things with the
applicant during this time. Once they feel like it is a decent project and meets Code, they bring it to the
ARB.
For most applications the ARB has up to three hearings. The applicant should be making changes in
between. Also, sometimes if the applicant is agreeable and working with staff, they will continue on. If not,
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 20
staff may bring it to the Board earlier on. Or, if they think environmental review is going to take a long
time and they want to give the architect some early info they will come to a first hearing and have ARB
weigh in and then wait until they have all the CEQA before going to a second hearing.
At the second hearing the ARB could recommend approval if it is a good enough project. Page 72 is the
actual Code section with the legal language that talks about the process. A preliminary hearing is only a
recommendation, not a requirement. There is a section explaining how to appeal, et cetera. Ms. Gerhardt
inquired whether the Board wants to weigh into more when the applicant comes in for first hearing, or
even when they come for a second hearing if the Board made comments in a first hearing and want to look
at it and see if they have addressed the concerns before coming to a second hearing. Ms. Gerhardt said
there is a limitation on hearings, and they want to make sure they don’t burn through them a nd not get
the project fixed.
Boardmember Rosenberg asked about packet page 65, the statement “major architectural review new
construction of buildings or additions of 5,000 square feet or greater,” whether this applies to residential.
Ms. Gerhardt replied that this applies to all architecture review. Boardmember Rosenberg asked whether
residential has to go through IRB and ARB. Ms. Gerhardt responded no; the IRB process is for two-story
homes. The architecture review process would be more for multi-family.
Boardmember Rosenberg said she questioned that, because she can totally imagine having a 6,000-square-
foot house and wondered if it would get reviewed here. Ms. Gerhardt said no, that is not the process. Chair
Thompson pointed out that the second bullet point refers to residential requirements. Ms. Gerhardt pointed
out number three, which is three or more adjacent single-family residences, which is the only time the
Board would see single-family, and they did see that with Zuckerberg’s property. Also, there have been
some church properties where they sell off the parking lot and do three houses. They have reviewed those,
but not one house by itself.
Vice Chair Hirsch said the issue is the five meetings and that’s it. You max out. Suppose the ARB gets two
and the Council gets their preliminary meeting. They have a very preliminary meeting where they say a
project does or does not have the potential to make it. Ms. Gerhardt said she will have to double check
with the attorneys, but thinks the preliminary meeting has a separate file number and is a separate process
so she didn’t think they have to count that meeting. Also, housing projects could skip that piece if t hey
chose to. She thought it was mostly the formal process that has the five-hearing limit.
Vice Chair Hirsch was concerned they are going to be limited because of because of state requirements
and how to deal with that. He felt what Ms. Gerhardt described as the first submission that the ARB gets
is often very extensive, including landscaping, and things the applicant must do. For example, they must
do the full survey, get into some of the mechanical issues. If raising site levels, they must deal with all of
that. Perimeter walls, et cetera. He said it seems that the Chair could ask for a committee of some sort to
look over a project in an earlier, very preliminary stage. Particularly, for housing projects that are
complicated they could have a lot of input into that. They could have a preliminary meeting that had some
input into the opportunities for a developer to develop alternatives. He felt this could be useful in complex
projects. He asked for the Board’s opinion on this. Could the Chair and Vice Chair meet at the initial filing
of the schematic concept, preliminary zoning application and site plan , and advise the Board to say “Hey,
we’re going to get a housing project down the line, so let’s look at this kind of a housing project around
town,” and inform the Board that they should go out and do some research into it ? They wouldn’t have
any official application put through the process yet, so maybe that’s as far as can go at that point, but he
felt it would be a useful item for the Board to do this prior to the fully developed drawings.
Chair Thompson said there is, on packet page 63, a preliminary ARB checklist, and she wondered how is
what they would submit to the ARB different than what is on that? That have sometimes seen this as a
Board before. For example, they saw the Bayshore project as a preliminary.
Vice Chair Hirsch responded that the preliminary for Bayshore was very close to the final submission, with
hardly any changes. Chair Thompson wondered if he was suggesting a “pre-preliminary,” and if so, if it
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 21
would count towards a hearing. Vice Chair Hirsch said this was his suggestion and he didn’t think it would
have to count as a hearing, but rather the Chair or a committee looking at a project as it comes into
planning.
Ms. Gerhardt said she would check with the attorneys on that. She said they already have a preliminary
review process, but it is not required. They could possibly change the requirement part. The prelim would
be the best, because that is in the very early stages. She wondered if during the first 30 days when they
are routing the application to various departments, if the ARB would want to be considered a department.
It would have to be maybe one or two people, but at that point you’re reviewing a raw formal project. No
staff report or any of that to go with it.
Vice Chair Hirsch said from that point on zoning will become more significant, mechanical issues more
significant, elevations. The intent would be they would be looking at block drawings of some sort. Ms.
Gerhardt said that is part of the prelim process, the schematic sketches. Architects can bring anything they
want to a prelim meeting. When they get to a formal application, they have to have everything. Vice Chair
Hirsch said if they could review just a schematic idea then the ARB could have some voice in that. Ms.
Gerhardt said this is what the ARB prelim is, though. Vice Chair Hirsch responded that it wasn’t on Bayshore.
Boardmember Chen wondered if they should treat housing projects differently, because it most likely they
have a 90-day limit and also the five -meeting max. Ms. Gerhardt said yes, but the Bayshore project was
an SB 330, so it has the five hearings. They still have some discretion, whereas in the near future, once
objective standards are in place, then housing development projects that are mostly housing can just have
the one hearing, and its advisory. The current discussion is talking about discretionary, five-hearing types
of projects for the most part.
Vice Chair Hirsch thought they will probably be housing projects.
Boardmember Baltay thought the issue was that on some projects they feel they are looking at the projects
when it’s too late to make some of the changes the ARB thinks would make sense to change. By the time
the applicant has put forth the whole package and chosen not to do a preliminary hearing – sometimes
even when they do on a complex project – they’ve already made some fundamental site planning issues,
decisions of how to approach trees or views or things, that he sometimes feels he would have approached
it differently or at least would like to have seen it done differently. He said he didn’t know what mechanism
could be used to get a seat at the table earlier , because you can’t get all five of ARB without getting that
info in this process. The preliminary hearing works pretty well for that, but it still is a formal sort of process
to make an application and public hearing, and it has been agendized. In the past five to seven years, for
every ARB meeting there’s a pre-meeting held between staff and the Chair and Vice Chair. Nominally the
purpose of the meeting is to review what’s going to happen at the meeting to make sure no administrative
things to understand, how they want the meeting to go, make sure there’s a materials board, et cetera.
Ms. Gerhardt and the Chair and Vice Chair can ask questions that they will later answer at the hearing.
Boardmember Baltay said he has advocated for and thinks it would be a good adjustment to take that pre-
meeting – just the Chair or Vice Chair to avoid the Brown Act issues, only two people – to look at projects
in the pipeline, not just projects coming up at the next meeting. They should be looking at just the basic
design approach. Secondly, the presentation, the thoroughness of what they see. Many times, they get an
application where they think the way the project relates to the building to the left is critical, but the applicant
doesn’t even provide an image of that. If he was sitting in such a meeting he would say, “Be sure to bring
that image. We need to see the relationship to the adjacent buildings.” Many times, staff planners are not
architects and don’t see it the same way the ARB does. Really, they’re just helping with that kind of input.
It short circuits a loop in the process by having that input of what information will help make the application
complete. He said while staff is waiting for applicants to provide a complete package, they talk to people
as they prepare applications, and that’s where staff could bring into the pipeline projects to the pre-
meetings as well. “This is something that’s going to be coming up. Here’s what it’s looking like,” even
offering the applicant a chance to be at the meeting as well. The Chair and Vice Chair could then say, “This
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 22
is something that you really should bring for a preliminary meeting,” and encourage the applicant to put it
in front of the whole Board. Or they might say, “We think the Board is going to go for this.” Boardmember
Baltay saw this kind of pre-meeting as a mechanism to use to pre-screen projects for design compatibility
and presentation of content.
Vice Chair Hirsch agreed but thought it might be a problem having the applicant at that meeting. It might
be something to avoid. Maybe an applicant wants to be there, but it doesn’t necessarily represent the Board
decision. He agreed that the relationship between buildings and separation and open space and all that
was described. In looking over packages, he is bothered by only getting straight-on elevations. They are
great for architects to see how to put things together but not for seeing what buildings really look like from
the ground level. It is often a problem for them, so they should have perspective drawings from an eye-
level view that they insert into packages in some way. Ms. Gerhardt that’s where the checklist comes into
play. Chair Thompson those things are already in there. Ms. Gerhardt added that if there is something that
the Board always wants from an applicant it needs to be on the checklist.
Chair Thompson said her issue with having this as part of the pre -meeting is that they already consume all
of the time in the pre-meeting to talk about what’s going to happen on Thursday. To do this thing for an
applicant before they even submit a preliminary meeting takes a site visit, takes time to study the site,
takes way more time than just to talk about things like is whether there is a material board for Thursday.
The prep for a meeting like that is much more than they would otherwise do, and to put that on the Chair
and Vice Chair would make no one ever want to be the Chair or Vice Chair, unless they’re retired and have
all kinds of time. She wanted to encourage anybody in all situations the opportunity to contribute. She was
open to a process where if something comes in the pipeline perhaps staff could ask the Chair about it and
a subcommittee is formed in advance, separate from the pre-meeting. Also, she didn’t know what applicant
would go through this trouble to do it.
Chair Thompson said she has seen in past meetings, when they had preliminary meetings with open-
minded applicants, the applicants that really listen at the meeting usually come out with a great product at
the first hearing. If applicant does not want to do this, they’ll attend a preliminary meeting and then change
nothing. It’s just their attitude, and there’s nothing the ARB can do about that. There is only so much power
they have as a review board. It’s really up to the applicant to take the initiative if they want. She said she
doesn’t know that creating a whole new process is actually going to change anything and is skeptical based
off of projects seen in the past, but she is open to trying it.
On the other hand, she said she has seen that preliminary meetings do wonders. She remembered seeing
Wilton, who had a preliminary meeting. It was a nightmare, lots of issues they pulled out, but it came out
amazing on the first day. When the applicant is open-eared and open-minded that’s when the process
really works. She didn’t know that it’s all on them to make something work with the City. The applicant has
to be a co-partner to do that. The preliminary process makes sense and fulfills what he is asking to do. To
have a pre-pre-meeting, she was skeptical that it would make a difference.
Boardmember Chen thought a pre-meeting is good and useful but for the design process for the architect
it’s the basic process they do for the site analysis first, so it depends on what deliverables you’re asking
for, so if they wanted to ask them about lot coverage, setback, heights, etc. it’s basically the first thing
they need to solve when they design a project, so she thought it would work for them. It is not some extra
burden for the applicant. She agreed it’s not necessary that it be the Chair and Vice Chair because
everybody will be afraid of that position. But if it is just very preliminary info, maybe they could ask the
applicant to prepare like a simple packet and email it to everybody on the Board so all have a chance to
quickly know what’s there. If somebody has a strong opinion on certain things, they can let the
subcommittee know of their concerns instead of relying on just those two board members.
Boardmember Rosenberg said she was on the fence. She said there’s part of her that fully agrees. In her
own practice she deals mostly with residential, so she has had incidents with Palo Alto where she has to
dive in headfirst and get structural, get civil, get all the stuff done and present it , and then one little thing
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 23
doesn’t actually allow for it, so you have to start all over, and all of that time and money and effort is
wasted. It’s extremely frustrating. The fact that they already have a preliminary meeting process that the
applicant can use or is required to use, whether or not they utilize it the way Wilton did, she thinks it’s up
to them. She was curious what the additional meeting would really accomplish that the other meeting could
not. She agreed that the more information you get the better, the more stamps of approval you get along
the way, the more you feel you’re going in the right direction, and effort is not wasted, time is not wasted,
nobody is getting frustrated. But, if that can be accomplished through current processes, why not simply
better utilize what they already have? Why is there need for an additional meeting, or this extra stipulation
in the process?
Chair Thompson said it was a good point. That’s the struggle. Why isn’t their existing process good enough?
Would it make sense to modify this preliminary process in some way , if they could find out what it is that
it’s not doing?
Boardmember Rosenberg agreed and thought it would be better to find a way to streamline to make the
current process more efficient, and make sure the preliminary meeting is more useful and provides better
outcomes for everyone, versus adding another stipulation and another thing to do.
Chair Thompson added if it is public, like it is, then the concept sheet of getting all the Boardmembers
feedback at one go, it would accomplish that as well.
Boardmember Baltay expressed that what Boardmember Chen said is the most commonsense thing that
they’re just not allowed to do. They can’t just circulate that email. He said he is on a design review board,
has house in the mountains, and is the Chair of that design review board. It’s crazy how somebody submits
an application and all of a sudden there’s an email, there’s a five-member board and everybody, just by
emailing, discusses this before anybody has looked at it. It’s a grossly unfair process to the applicant and
everybody. He said they can’t do that. They have to follow this process, and he believes that is the right
thing to do. He felt that they should not create a new process but reuse the process they have – the
preliminary meeting with Chair and Vice Chair. His feeling is that the pre-meeting for the meetings
themselves is generally a waste of time, going through to see if the material board is right, requiring each
staff member to come into the room and spend an hour of their day to present to what is already in the
record is not really that useful.
Boardmember Baltay suggested that a much better use of time would be , earlier in the process, to have
the staff just informally bring whatever is coming down the pike. “Hey, I’ve got the two of your sitting here
for an hour. Give me 15 minutes of feedback on what I see here.” He might look at it and say, “Wow, they
really should consider bringing the drive on the other side,” or “This tree is going to be critical. If they don’t
back away from that tree, it’s just not going to work” Boardmember Baltay shared that Stanford Shopping
Center had a building right next to a line of old oak trees, it was a huge issue going through the process.
If they had just heard from Boardmembers at the beginning that it was an issue and to do something about
it, it would have been very helpful.
Boardmember Baltay advocated re-structuring the process they already have, the meeting with the Chair
and the Vice Chair, and encouraging staff to think of them as an additional help to the Planning Department
and to think of the ARB as a staff architect who will give additional feedback to Ms. Gerhardt’s staff early
enough in the process where it makes a difference. Secondly, they can look at the project and advise the
applicant of what is going to be really important in the presentation, and make sure they think about this,
or present this angle or view, or advise them that the site plans they’re looking at are illegible and they
need to do something about it. Many times, they get drawings that are just not a good package, and it’s
much hard to make sense of it. The ability to give informal feedback early enough that an applicant can
look at it, would be more valuable. It would be better use of the Chair and Vice Chair’s time during those
meetings, and better use of staff’s time than just going through by rote what’s going to be coming up on
Thursday.
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 24
Chair Thompson asked how to do that thoughtfully, because it’s not just 15 minutes of the Chair and Vice
Chair’s time. They would need to do a site visit and much more study. She asked how they would know a
tree is important without going there to see it, because you can’t know that from a site plan, and you can’t
know every tree’s location even if noted on a site plan. The site plan could be inc orrect, and the tree is
much bigger in person.
Boardmember Baltay shared that when he is in the office he will go around to staff and sometimes just sit
down and look at what they’re doing and casually direct, point, push. This is more what he was talking
about, getting staff to think of it not as a task they have to do but as a resource available to them.
Ms. Gerhardt thought if this was a second or third hearing there wouldn’t be that issue as much, because
they would have already had a first hearing and would know about the project. Then the Chair and Vice
Chair could just be asking if it is ready to come back.
Vice Chair Hirsch thought what was described is a much later issue. When a first submission comes into
the whole Board it’s going to be much more complete but this preliminary discussion like Boardmember
Chen described as a process is appropriate. The only thing that was missing from it is the legal issue of
distributing the comments to everybody, and they legally can’t do that.
Chair Thompson noted that the legal way around it is to have a public meeting where they are all together
in public. Vice Chair Hirsch responded that would be one public meeting out of the limited number of them.
He said what they are missing is that very early commitment to getting alternatives that might work better.
Ms. Gerhardt was thinking more about when they have a formal application, they need to be careful that
they are not burning all of their hearings. So, they could use the pre-meeting for that, to make sure they’re
not getting to the last hearing and realizing that the project needed a lot of changes. Also, they have to be
careful that if a project comes in as townhomes, none of them have the authority to change it into condos.
They can suggest and make recommendations, but it’s not a requirement.
Boardmember Baltay said that many times when an applicant hears something from the ARB, they will take
it seriously. Ms. Gerhardt agreed but pointed out there are some developers that are like only townhouse
developers.
Boardmember Baltay said Chair Thompson’s point is well-taken that if the applicant isn’t interested in
working with them it’s just going to be a tough process.
Chair Thompson said that is why she has a hard time finding a point in this process. This process appears
to work for applicants that are willing to use it. To create an extra “gate ,” she didn’t know if it would
necessarily improve the process. She said she knew the discussion was coming from a project that the
Board recommended denial on, but she didn’t know that that would happen every time.
Boardmember Baltay has been advocating for four or five years the idea that pre-meetings should really
be looking ahead in the pipeline, not at what’s coming down next Thursday. He said it has been his big
push. It is an opportunity to re-focus their time and staff’s time way ahead of time, six months downstream,
on what’s coming to them. He said they can do it informally. When someone makes an application, they’re
working with a planner. They’re going back and forth on the phone all the time, asking “What do you think
about this?” “What’s the ARB going to say to that?” Planning staff is making aesthetic and subjective
judgements and going back and forth. That’s their job, but it is where the ARB or architects involved would
be helpful. Also, ARB members could say, “You really should consider bringing this to a proper preliminary
hearing.” When they hear it from the ARB they might take it differently. He’s been pushing hard to
restructure pre-meetings to be more focused earlier and not just administrative or bureaucratic.
Boardmember Rosenberg wondered how they could better utilize staff’s time and effort to begin with. If
they are simply going over materials boards, that is something they can do in the meeting, during the
public hearing. She acknowledged that she hasn’t sat in on a meeting, so she was talking from inexperience.
She advocated utilizing existing processes they have, making better use of the Chair and Vice Chair’s time,
City of Palo Alto
Planning & Development Services
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2442 Page 25
focusing on things that will actually be beneficial to the ARB, to the client, the applicant. She thought they
should save their time for identifying things that are useful and potentially important changes that could
happen early.
Vice Chair Hirsch noted that they are part of the process that the public in general says “Oh, you’ve got to
go through Palo Alto. Good luck to you.” Chair Thompson acknowledged that Palo Alto does have a bad
reputation in that way.
Vice Chair Hirsch stated that there is a possibility they could shorten the timeframe here as well if they can
be of help in directing an early, early process in conjunction with staff and just focusing on things which
are big planning issues. He commented that the PTC doesn’t do it. They looked at the project and said,
“We need housing,” and that’s all that they said. Ms. Gerhardt said that the PTC’s purview in that project
is only over the subdivision map.
Ms. Gerhardt said she they have project webpages that they load plans to. They try to do that when a
project is first on file. Also have a list of projects that are going to the ARB and ha ve to keep that list for
the Director. She could show that list to the Chair and Vice Chair, and if they see an interesting address
and want to go look at the webpage for the plans, they could do that at any point that it is formally on file.
Chair Thompson announced that they were out of time and needed to stop. S he felt they had had a good
discussion. They may not have solved anything but can consider what has been discussed and revisit it
again in a month or so. Ms. Gerhardt asked if she should agendize it for a month from now. Chair Thompson
thought she should. She adjourned the meeting thanking everyone for the robust discussion.