Loading...
HomeMy WebLinkAbout2020-11-09 City Council Agendas (4) City of Palo Alto (ID # 11567) City Council Staff Report Report Type: Consent Calendar Meeting Date: 11/9/2020 City of Palo Alto Page 1 Summary Title: Gas Main Replacement Project 23 Title: Approval of Contract Number C21179815 With Daleo, Inc., in the Amount of $6,417,876 for Gas Main Replacement Project 23 (GS-13001) in the Evergreen, Ventura, College Terrace, Research Park, Greer Tract, Midtown, and Charleston Terrace Neighborhoods; and Authorization for the City Manager to Negotiate and Execute Related Change Orders Not-to-Exceed $641,788, for a Total Not-to-Exceed Amount of $7,059,644 From: City Manager Lead Department: Utilities Recommendation Staff recommends that the Council: 1. Approve and authorize the City Manager or designee to execute contract C21179815 with Daleo, Inc. an amount not–to-exceed $6,417,876 for the Gas Main Replacement Project 23 (GMR Project 23) Capital Improvement Program (GS-13001); and 2. Approve and authorize the City Manager or designee to negotiate and execute one or more change orders to the contract with Daleo, Inc., for related additional, but unforeseen, work which may develop during the project, the total value of which shall not exceed $641,788 or 10% of the contract amount, for a total not-to-exceed amount of $7,059,664. Background This project is part of the Council-approved Capital Improvement Program (CIP) designed to ensure reliable gas services for the City of Palo Alto residents and customers. The project targets replacement of Polyvinyl Chloride (PVC) mains and services that are nearing their operational life expectancy and have become embrittled over time. These natural gas pipelines are susceptible to cracking during earth movement and could result in leaking gas mains and services. The project also targets replacement of steel mains and services that are identified to be severely corroded due to the lack of cathodic protection (electrical current on steel pipelines) resulting from previously installed isolation fittings on the pipeline. Over time, these Q CITY OF PALO ALTO City of Palo Alto Page 2 mains and services have developed leaks and are usually discovered during the City’s mobile and walking leak survey. Repairs to these pipelines require specialized tooling and are very time consuming and difficult. Gas service is temporarily interrupted when the pipe is damaged by construction activities or a leak on a distribution main is found. The damaged section is cut out and a new section of pipeline is installed; but when a leak on a service is located, the service is typically replaced in its entirety. Accelerated replacement of PVC and severely corroded steel mains and services is required to remain on track with the City of Palo Alto (City)’s planned CIP schedule and minimize the impact on resources due to the maintenance and replacement of sections of main and services. The sections of PVC and steel pipelines identified for replacement on this project have contributed to 59 individual leak responses from 2006 to 2019. PVC and severely corroded steel material failures will continue to contribute to increasing gas maintenance expenses resulting from gas leaks. As part of the planning and design process, staff coordinated this project with other City departments to minimize interference with other contractors and their schedules. Work on sections of Ash Street and sections of Embarcadero Road will be followed by a Public Works’ street paving project. Discussion Project Description The work to be performed under the contract C21179815 (Linked Document) is for installation of approximately 22,300 linear feet of polyethylene (PE) gas main, 142 new PE gas service pipelines, and to reconnect 64 existing PE gas services to the new gas main within the City of Palo Alto (project locations are shown in Attachment C). Replacing the gas distribution system with PE will enhance the reliability of the gas distribution system, make the system more resilient against corrosion and earth movements, eliminate potential leaks, reduce maintenance costs, and extend the useful life of the gas system. In addition, unlike PVC gas main and services, the new PE pipelines will be installed with a metallic tracer wire, which dramatically increases the accuracy of pipeline locating and reduces construction dig-ins. Construction dig-ins are the City’s 2nd through 6th highest ranking risk scores on the Distribution Integrity Management Plan (DIMP) due to the potential of homeowners, Contractors, and City Staff damaging a mismarked pipeline. Bid Process On August 20, 2020, the City posted a notice inviting formal bids (IFB) for the GMR 23 Project on the City’s electronic procurement system, PlanetBids. The bidding period was 30 calendar days. Two (2) contractors submitted bids on September 18, 2020 as listed on the attached Bid Summary (Attachment B). City of Palo Alto Page 3 Bid Name/Number Gas Main Replacement Project 23 (GS-13001), IFB Number 179815 Proposed Length of Project 265 working days Number of Vendors notified through PlanetBids 955 Number of Builder’s Exchanges notified through PlanetBids 3 Number of Bid Packages Downloaded by Vendors 31 Total Days to Respond to Bid 30 Pre-Bid Meeting? Yes (Mandatory) Number of Vendors at Pre-Bid Meeting 8 Number of Bids Received: 2 Bid Price Range $6,417,876 to $6,923,782 Staff has reviewed all bids submitted and recommends that Daleo, Inc., be declared the lowest responsible and responsive bidder. Daleo’s bid is approximately 3.7 percent below the Project Engineer's estimate of $6,667,165. The contingency amount of $641,788, which equals 10 percent of the total contract, is requested for additional unforeseen work that may develop during the project. Additional work is common with construction projects because during construction there may be previously unknown obstructions and ground conditions that require changes in how construction will proceed, leading to change orders that may create additional costs. A contingency fund is necessary to prevent significant delays in the project to handle these unforeseen conditions, which could otherwise result in longer road closures and disruptions. Any unspent contingency funds are returned to reserves at the end of the project. Staff confirmed with the Contractor's State License Board that Daleo, Inc., has an active license on file. Staff checked references supplied by the contractor for previous work performed and found no significant complaints. Staff also confirmed that Daleo, Inc., is registered and in good standing with the Department of Industrial Relations (DIR). Resource Impact The total not-to-exceed amount is $7,059,664, which includes the contract amount of $6,417,876 and a 10% contingency of $641,788. Funding for the contract amount ($6,417,876) and 10% contingency ($641,788) are available in the FY 2021 Adopted Capital Budget for project number GS-13001, Gas Main Replacement Project 23. This project includes funding transfers of $92,384 to the General Fund as an estimate for Street Cut Fees. City of Palo Alto Page 4 Summary of Project Costs for GMR Project 23 (GS-13001) Pre-Design/Design Costs $183,355 Construction Costs $6,417,876 10% Contingency $641,788 Staff Time (Includes Engineering, Operations, & Inspection) $485,800 Trench Cut Fees $92,384 TOTAL $7,821,203 The size of this project significantly exceeds the City’s in-house construction resources, making it necessary to contract out the work. Policy Implications The approval of this contract and implementation of this project is consistent with existing City goals, policies, programs, and plans including: Utilities Strategic Plan The recommendation conforms with the 2018 Utilities Strategic Plan Priority 4 Strategy 1: “Establish a proactive infrastructure replacement program, based on planned replacement before failure to support reliability and resiliency.” Distribution Integrity Management Plan (DIMP) This project is consistent with the City’s 2019 DIMP plan which is compliant with the Department of Transportation (DOT) 49 CFR Part 192, Subpart P, “Gas Distribution Pipeline Integrity Management” requirements. This contract is on the City’s construction contract template, which permits the City to terminate without cause/for convenience by providing written notice to the contractor. In the event the City finds itself facing a challenging budget situation, and it is determined that City resources need to be refocused elsewhere, the City can terminate for convenience. Other options include termination due to non-appropriation of funds or amending the contract to reduce the cost, for example, by reducing the scope of work. Stakeholder Engagement Utilities infrastructure work has been and will continue to be coordinated with street paving activities. Project coordination within the City’s administration is enhanced by using the City’s Geographical Information System Project Coordinator Program to determine potential project conflicts. The City’s Gas Distribution Integrity Management Plan (DIMP) has identified PVC pipelines as the current highest risk material in the gas distribution system. Staff’s GMR Project 23 communications will include project notifications mailed to all residents and businesses along the project alignment at least 30 days prior to the commencement of work. Daleo, Inc., will distribute project notifications to each property, work will take place, a minimum of 15 day City of Palo Alto Page 5 and again 24 hours’ notice prior to beginning work. A link to the City website for the GMR Project 23 will be included in the mailed project notifications. The construction is expected to commence in February 2021. Environmental Review The project is categorically exempt from California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15302(c), replacement or reconstruction of existing utility systems or facilities. Attachments: • Attachment B: Bid Summary • Attachment C: Project Maps ATTACHMENT B Gas Main Replacement Project 23 Bid Due Date 9/18/20 GS-13001 179815 Item No.Qty. Unit Description Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price 1 7,441 LF Install 2" Gas MDPE pipe by horizontal directional drilling 120.00$ 892,920.00$ 128.35$ 955,052.35$ 222.00$ 1,651,902.00$ 2 709 LF Install 2" Gas MDPE pipe by open trench excavation 240.00$ 170,160.00$ 296.90$ 210,502.10$ 330.00$ 233,970.00$ 3 4,154 LF Install 4" Gas MDPE pipe by horizontal directional drilling 160.00$ 664,640.00$ 170.65$ 708,880.10$ 235.00$ 976,190.00$ 4 165 LF Install 4" Gas MDPE pipe by open trench excavation.350.00$ 57,750.00$ 467.30$ 77,104.50$ 435.00$ 71,775.00$ 5 672 LF Install 6" Gas MDPE pipe by horizontal directional drilling 200.00$ 134,400.00$ 228.00$ 153,216.00$ 240.00$ 161,280.00$ 6 50 LF Install 6" Gas MDPE pipe by open trench excavation.400.00$ 20,000.00$ 524.60$ 26,230.00$ 440.00$ 22,000.00$ 7 4,181 LF Install 8" Gas MDPE pipe by horizontal directional drilling 260.00$ 1,087,060.00$ 211.20$ 883,027.20$ 310.00$ 1,296,110.00$ 8 67 LF Install 8" Gas MDPE pipe by open trench excavation.450.00$ 30,150.00$ 401.35$ 26,890.45$ 495.00$ 33,165.00$ 9 2,385 LF Install 8" Gas HDPE pipe by horizontal directional drilling 260.00$ 620,100.00$ 211.20$ 503,712.00$ 310.00$ 739,350.00$ 10 60 LF Install 8" Gas HDPE pipe by open trench excavation.450.00$ 27,000.00$ 401.35$ 24,081.00$ 495.00$ 29,700.00$ 11 10 EA Install Anode Box 750.00$ 7,500.00$ 150.00$ 1,500.00$ 250.00$ 2,500.00$ 12 83 EA Install 1" PE Gas Service Line Including EFV and 1" Riser with OR without a bypass at the existing gas meter location by horizontal directional drilling OR open trench excavattion 6,500.00$ 539,500.00$ 7,500.00$ 622,500.00$ 4,000.00$ 332,000.00$ 13 43 EA Install 1" PE Gas Service Stub and EFV for the City to reconnect the existing 1" PE gas service to new main by horiziontal directional drilling OR open trench excavation 4,500.00$ 193,500.00$ 2,500.00$ 107,500.00$ 2,500.00$ 107,500.00$ 14 1 EA Install 2" PE Gas Service Line Including 2" PE ball valve and 2" Riser with a 1-1/4" bypass at existing gas meter location by horizotnal directional drilling OR open trench excavation 7,500.00$ 7,500.00$ 9,500.00$ 9,500.00$ 4,500.00$ 4,500.00$ 15 11 EA Install 2" PE Gas Service Stub with 2" PE ball valve for the City to reconnect the existing 2" PE gas service to new main by horizontal directional drilling OR open trench excavation 6,000.00$ 66,000.00$ 3,500.00$ 38,500.00$ 3,000.00$ 33,000.00$ 16 1 EA Install a 2" residential steel pipe bollards filled with concrete at existing gas meter location per Standard Detail WGW-05A 1,000.00$ 1,000.00$ 500.00$ 500.00$ 200.00$ 200.00$ 17 2 EA Install a 2" commercial steel pipe bollard filled with concrete at existing gas meter location per Standard Detail WGW-05B 1,500.00$ 3,000.00$ 750.00$ 1,500.00$ 200.00$ 400.00$ 18 38 EA Excavate Tie-in/Abandonment Pits for Gas Main(s) (≤5-ft in depth, up to 50 SF)10,000.00$ 380,000.00$ 6,500.00$ 247,000.00$ 3,500.00$ 133,000.00$ 19 33 EA Excavate Tie-in/Abandonment Pits for Gas Main(s) (>5-ft in depth, up to 50 SF)15,000.00$ 495,000.00$ 10,800.00$ 356,400.00$ 3,500.00$ 115,500.00$ 20 11 EA Replace existing gas meter box and lid with Armorcast Polymere Concrete Utility Box (24" x 36" x 18") with extensions and two- piece cover 4,500.00$ 49,500.00$ 3,200.00$ 35,200.00$ 1,000.00$ 11,000.00$ 21 1 EA Replace existing gas meter box and lid with Armorcast Polymere Concrete Utility Box (30" x 60" x 36") with extensions and two- piece cover 5,500.00$ 5,500.00$ 4,750.00$ 4,750.00$ 1,000.00$ 1,000.00$ 22 40 LF Fence Removal and Replacement 250.00$ 10,000.00$ 75.00$ 3,000.00$ 50.00$ 2,000.00$ 23 2 EA Casing Vent Pipe Installation 3,500.00$ 7,000.00$ 1,500.00$ 3,000.00$ 2,500.00$ 5,000.00$ 24 1 EA Perform GPS survey 100,000.00$ 100,000.00$ 62,500.00$ 62,500.00$ 20,000.00$ 20,000.00$ Total 5,569,180.00$ 5,062,045.70$ 5,983,042.00$ Item No.Qty. Unit Description Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price 25 1 LS Material Storage and Laydown Yard 70,000.00$ 70,000.00$ 100,000.00$ 100,000.00$ 30,000.00$ 30,000.00$ 26 5 EA Install 1" PE service including 3/4" riser at NEW gas meter location by horizontal directional drilling OR open trench excavation 5,000.00$ 25,000.00$ 7,500.00$ 37,500.00$ 4,000.00$ 20,000.00$ 27 95 LF Modification of 12-inch steel casing, removal of 6-inch BWP, and insertion of 6-inch MDPE through 12-inch casing -$ -$ -$ 28 3 EA Abandon existing anode box / valve 1,500.00$ 4,500.00$ 750.00$ 2,250.00$ 50.00$ 150.00$ 29 10 EA Install sanitary sewer cleanout 3,000.00$ 30,000.00$ 3,500.00$ 35,000.00$ 100.00$ 1,000.00$ 30 1 CY Recycle asphalt containing petro mat 15.00$ 15.00$ 75.00$ 75.00$ 80.00$ 80.00$ 31 1,500 SF Install additional concrete pavement (Up to 10” thick)15.00$ 22,500.00$ 32.00$ 48,000.00$ 5.00$ 7,500.00$ 32 3,000 SF Install additional asphalt concrete pavement 15.00$ 45,000.00$ 14.00$ 42,000.00$ 3.00$ 9,000.00$ 33 500 LF Install additional curb 25.00$ 12,500.00$ 35.00$ 17,500.00$ 10.00$ 5,000.00$ 34 500 LF Install additional gutter 25.00$ 12,500.00$ 35.00$ 17,500.00$ 10.00$ 5,000.00$ 35 500 SF Install additional sidewalk 15.00$ 7,500.00$ 25.00$ 12,500.00$ 5.00$ 2,500.00$ 36 20,000 Inch/SF Install additional pavement (Concrete thickness)0.60$ 12,000.00$ 3.00$ 60,000.00$ 0.20$ 4,000.00$ 37 20,000 Inch/SF Install additional pavement (AC thickness)1.00$ 20,000.00$ 3.00$ 60,000.00$ 0.20$ 4,000.00$ 38 20,000 Inch/SF Install additional pavement thickness (Base thickness)0.35$ 7,000.00$ 3.00$ 60,000.00$ 0.05$ 1,000.00$ 39 10,000 Inch/LF Sawcut additional pavement (thickness)0.25$ 2,500.00$ 0.75$ 7,500.00$ 0.05$ 500.00$ 40 500 LF Perform additional sawcutting 2.00$ 1,000.00$ 4.50$ 2,250.00$ 1.00$ 500.00$ 41 1 EA Remove unused meter box 75.00$ 75.00$ 300.00$ 300.00$ 50.00$ 50.00$ 42 10 Ton Disposal of excavated soils at Class 1 landfill 300.00$ 3,000.00$ 500.00$ 5,000.00$ 350.00$ 3,500.00$ 43 10 Ton Disposal of excavated soils at Class 2 landfill 200.00$ 2,000.00$ 400.00$ 4,000.00$ 300.00$ 3,000.00$ 44 20 EA Additional pothole due to USA mismark 1,200.00$ 24,000.00$ 750.00$ 15,000.00$ 250.00$ 5,000.00$ 45 1 EA Investigation and removal/relocation of Sewer Lateral Obstructions by Open-Trench Excavation in Paved Area 1,200.00$ 1,200.00$ 6,500.00$ 6,500.00$ 5,000.00$ 5,000.00$ 46 1 EA Investigation and removal/relocation of Sewer Lateral Obstructions by Open-Trench Excavation in Paved Area 1,200.00$ 1,200.00$ 5,700.00$ 5,700.00$ 5,000.00$ 5,000.00$ 47 1,000 LF Install sheeting, shoring and bracing.25.00$ 25,000.00$ 2.00$ 2,000.00$ 1.00$ 1,000.00$ Total 328,490.00$ 540,575.00$ 112,780.00$ Ranger Pipelines Ranger Pipelines Project Title CIP No. Section A - GMR 23 - Base Bid Engineer's Estimate Daleo Inc. Section B - GMR 23 - Additive Alternate Engineer's Estimate Daleo Inc. PR No. 1 of 2 ATTACHMENT B Item No.Qty. Unit Description Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price 48 1,556 LF Install 2" Gas MDPE pipe by horizontal directional drilling $ 120.00 186,720.00$ 128.35$ 199,712.60$ 230.00$ 357,880.00$ 49 58 LF Install 2" Gas MDPE pipe by open trench excavation $ 240.00 13,920.00$ 296.90$ 17,220.20$ 330.00$ 19,140.00$ 50 39 EA Install 1" PE Gas Service Line Including EFV and 1" Riser with OR without a bypass at the existing gas meter location by horizontal directional drilling OR open trench excavattion $ 6,500.00 253,500.00$ 7,500.00$ 292,500.00$ 4,000.00$ 156,000.00$ 51 8 EA Install 1" PE Gas Service Stub and EFV for the City to reconnect the existing 1" PE gas service to new main by horiziontal directional drilling OR open trench excavation $ 4,500.00 36,000.00$ 2,500.00$ 20,000.00$ 2,500.00$ 20,000.00$ 52 10 EA Install a 2" residential steel pipe bollards filled with concrete at existing gas meter location per Standard Detail WGW-05A $ 275.00 2,750.00$ 500.00$ 5,000.00$ 200.00$ 2,000.00$ 53 4 EA Excavate Tie-in/Abandonment Pits for Gas Main(s) (≤5-ft in depth, up to 50 SF) $ 6,250.00 25,000.00$ 6,500.00$ 26,000.00$ 3,500.00$ 14,000.00$ 54 1 EA Perform GPS Survey $ 30,000.00 20,000.00$ 10,000.00$ 10,000.00$ 2,000.00$ 2,000.00$ Total 537,890.00$ 570,432.80$ 571,020.00$ Item No.Qty. Unit Description Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price 55 805 LF Install 2" Gas MDPE pipe by horizontal directional drilling 120.00$ 96,600.00$ 128.35$ 103,321.75$ 220.00$ 177,100.00$ 56 32 LF Install 2" Gas MDPE pipe by open trench excavation 240.00$ 7,680.00$ 296.90$ 9,500.80$ 320.00$ 10,240.00$ 57 14 EA Install 1" PE Gas Service Line Including EFV and 1" Riser with OR without a bypass at the existing gas meter location by horizontal directional drilling OR open trench excavattion 6,500.00$ 91,000.00$ 7,500.00$ 105,000.00$ 4,000.00$ 56,000.00$ 58 2 EA Install 1" PE Gas Service Stub and EFV for the City to reconnect the existing 1" PE gas service to new main by horiziontal directional drilling OR open trench excavation 4,500.00$ 9,000.00$ 2,500.00$ 5,000.00$ 2,500.00$ 5,000.00$ 59 3 EA Install a 2" residential steel pipe bollards filled with concrete at existing gas meter location per Standard Detail WGW-05A 275.00$ 825.00$ 500.00$ 1,500.00$ 200.00$ 600.00$ 60 2 EA Excavate Tie-in/Abandonment Pits for Gas Main(s) (≤5-ft in depth, up to 50 SF)6,250.00$ 12,500.00$ 6,500.00$ 13,000.00$ 3,500.00$ 7,000.00$ 61 1 EA Perform GPS Survey 20,000.00$ 14,000.00$ 7,500.00$ 7,500.00$ 1,000.00$ 1,000.00$ Total 231,605.00$ 244,822.55$ 256,940.00$ Engineer's Estimate Daleo Inc.Ranger Pipelines 5,569,180.00$ 5,062,045.70$ 5,983,042.00$ 328,490.00$ 540,575.00$ 112,780.00$ 537,890.00$ 570,432.80$ 571,020.00$ 231,605.00$ 244,822.55$ 256,940.00$ 6,667,165.00$ 6,417,876.05$ 6,923,782.00$ GRAND TOTAL Section D - GMR 23 - Industrial - Additive Alternate Engineer's Estimate Daleo Inc. B.2 - Add Alternate (Items 25 through 47) C.1 - Add Alternative(Items 48 through 54) D.1 - Add Alternative(Items 55 through 61) B.1 - Base Bid (Items 1 through 24) Section B: Gas Main Replacement Ranger Pipelines Section C - GMR 23 - Dennis, Celia, Burnham, and Agnes - Additive Alternate Engineer's Estimate Daleo Inc.Ranger Pipelines 2 of 2 GAS MAIN REPLACEMENT 23 Rev. 200825 LOCATIONS ID NUMBER STREET 2020-1 PARK BLVD, GRANT AVE, AND ASH ST 2020-2 EL CAMINO REAL, AND ENCINA AVE 2020-3 PAGE MILL RD, AND ASH ST 2020-4 PORTAGE AVE, AND PORTAGE ALLEY 2020-5 CALIFORNIA AVE, HARVARD AVE, AND CORNELL ST 2020-6 PAGE MILL RD, AND FOOTHILL EXPWY 2020-7 AGNES WY, BURNHAM WY, DENNIS DR, AND CELIA DR 2020-8 INDUSTRIAL AVE Attachment C O R E G O N E X P W Y GR A N T A V E PE R A L L N SH E R M A N A V E JA C A R A N D A L N CA L I F O R N I A A V E PARK BLVD SH E R I D A N A V E ASH ST BIRCH ST GR A N T A V E PROJECT LOCATION MAP 2020-1 GMR 23 PARK BVLD, GRANT AVE, AND ASH ST NOT TO SCALE EM B A R C A D E R O R D EL CAMI N O R E A L WEL L S A V E ENC I N A A V E SOUTHERN PACIFIC RAILRD U R B A N L N HIGH ST ALMA STFO R E S T A V E HO M E R A V E TO W N & C O U N T R Y A L L E Y GA L V E Z S T CH A N N I N G A V E EL CAMI N O R E A L GMR 23 EL CAMINO REAL, AND ENCINA AVE NOT TO SCALE PROJECT LOCATION MAP 2020-2 i---------> '~ ( r O R E G O N E X P W Y GR A N T A V E EL CAMINO REAL SH E R I D A N A V E GR A N T A V E OL I V E A V E PE P P E R A V E ASH ST PA G E M I L L R D PA G E M I L L R D PROJECT LOCATION MAP 2020-3 GMR 23 PAGE MILL RD, AND ASH ST NOT TO SCALE = ==========~~ ~~ EL C A M I N O R E A L LAMBERT AVE AS H S T HANSEN WAY ACACIA AVE PORTAGE AVE PR O J E C T L O C A T I O N M A P 20 2 0 - 4 GM R 2 3 PO R T A G E A V E , A N D P O R T A G E A L L E Y NO T T O S C A L E CA L I F O R N I A A V E OBERLIN ST HARVARD ST HANOVER ST CO L L E G E A V E CA L I F O R N I A A V E YALE ST CA M B R I D G E A V E WELLESLEY ST ST A N F O R D A V E CORNELL ST PRINCETON ST WILLIAMS ST CO L L E G E A V E PROJECT LOCATION MAP 2020-5 GMR 23 CALIFORNIA AVE, HARVARD AVE AND CORNELL ST NOT TO SCALE HI L L V I E W A V E PO R T E R D R PORTER DR MIRAN D A A V E FOOTH I L L E X P W Y PA G E M I L L R D C O YOTE HILL R D F O OTH ILL EXPRESS WAY M I R A ND A AVENUE CA T H C A R T W A Y AL L A R D I C E W A Y FOOTHILL EXPWY PA G E M I L L R D HI L L V I E W A V E PA G E M I L L R D PROJECT LOCATION MAP 2020-6 GMR 23 PAGE MILL RD, AND FOOTHILL EXPWY NOT TO SCALE BLAIR CT OR E G O N E X P W Y DE N N I S D R CE L I A D R COLONIAL LN BURNHAM WAY GREER RD MO R E N O A V E LOUIS RD AGNES WAY PROJECT LOCATION MAP 2020-7 GMR 23 AGNES WY, BURNHAM WY, DENNIS DR, AND CELIA DR NOT TO SCALE CHA R L E S T O N R D S A N A N T O N I O A V E C O M M E R C I A L S T I N D U S T R I A L A V E TRANS P O R T R D T R A N S P O R T R D PROJECT LOCATION MAP 2020-8 GMR 23 INDUSTRIAL AVE NOT TO SCALE