HomeMy WebLinkAbout2020-10-19 City Council Agendas (2)
City of Palo Alto (ID # 11652)
City Council Staff Report
Report Type: Consent Calendar Meeting Date: 10/19/2020
City of Palo Alto Page 1
Summary Title: Amendment to Utility Pole Replacement Contract with TW
Powerline
Title: Approval and Authorization for the City Manager to Execute
Amendment Number 1 to the Electric Enterprise Fund Contract Number
C20177717 With Wire Wrangler, LLC, dba TW Power Line Construction, for
the Caltrain Facility Relocation Project (EL-17007) and Wood Pole
Replacement Project (EL-19004), to Increase the Authorization to Negotiate
and Execute Related Change Orders by $110,000 to Cover COVID-19
Expenditures, for a Total Not-to-Exceed Amount of $2,207,049
From: City Manager
Lead Department: Utilities
RECOMMENDATION
Staff recommends that Council:
1. Approve and authorize the City Manager or designee to execute Amendment Number 1
(Attachment A) to contract C20177717 with Wire Wrangler, LLC, dba TW Power Line
Construction (Linked Contract), to increase the contingency authorization by $110,000
for a new total amount not to exceed $2,207,049 for the Caltrain Facility Relocation
Project (EL-17007) and the Wood Pole Replacement Project for 2020 (EL-19004).
2. Staff recommends that Council delegate authority to the City Manager or his designee
to approve and execute change orders to the contract with Wire Wrangler, LLC, dba TW
Power Line Construction, for additional related, but unforeseen work, which may
develop during the project, including adjustments for COVID-19; the total of which shall
not exceed $300,641.
The amended total not to exceed authorized amount is $2,207,049, which includes a contract
amount of $1,906,408 and a contingency of $300,641.
DISCUSSION
The Wood Pole Replacement 2020 project includes 84 utility poles (out of a total of 6,000 poles
in the system), which need replacement. Many of these poles are in difficult locations such as
Q
CITY OF
PALO
ALTO
City of Palo Alto Page 2
residential backyards. The original least-cost process for pole replacement required large
numbers of residential outages for up to 12 hours per outage (in one instance affecting about
200 residential properties).
In the past few weeks, COVID-19 work from home orders and online school attendance have
been exacerbated by a combination of extreme hot weather and bad air quality from wildfires,
making residential power outages very difficult for customers to work around. To reduce the
impact, work shutdowns have been ordered on extreme heat event days, and alternative
(higher cost) pole replacement techniques were employed to reduce the duration of outages
and number of customers affected.
An estimated $110,000 of the original authorized contingency of $190,461 has been used to
cover the change orders generated from these COVID-19 adjustments. There are still five (5)
poles requiring replacement, the work on nine (9) remaining Caltrain crossings, and just
$10,000 left for further contingencies. The $110,000 requested increase will cover
contingencies and change orders for the remaining work, including further COVID-19
adjustments.
RESOURCE IMPACT
The estimated $110,000 for the COVID-19 adjustments to date is broken down into these three
components:
• Investigation to perform special procedure to minimize outages: 21K
• Alternative work as the result of the investigation above: 45k
• Cancellation of four pole replacements on Sep 15: 44k
STAKEHOLDER ENGAGEMENT
Residents have contacted Utilities staff and the City Manager to explain the difficulties they are
facing from extended power outages in the current situation. The COVID-19 adjustments have
been made to address and mitigate customer concerns.
ENVIRONMENTAL REVIEW
This project is categorically exempt from California Environmental Quality Act (CEQA), under
CEQA Guidelines Sec. 15301 (repair or maintenance of existing facilities), and Sec. 15302
(replacement or reconstruction of existing structures and facilities).
Attachments:
• Attachment B - Amendment No. 1 to C20177717
Vers.: Aug. 5, 2019
Page 1 of 3
AMENDMENT NO. 1 TO CONTRACT NO. C20177717
BETWEEN THE CITY OF PALO ALTO AND
WIRE WRANGLER, LLC, DBA TW POWER LINE CONSTRUCTION
This Amendment No. 1 (this “Amendment”) to Contract No. C20177717 (the “Contract” as
defined below) is entered into as of October 19, 2020, by and between the CITY OF PALO ALTO, a
California chartered municipal corporation (“CITY”), and WIRE WRANGLER, LLC dba TW Power Line
Construction, a limited liability company, located at 1677 Eureka Road, Roseville, CA 95661
(“CONTRACTOR”). CITY and CONTRACTOR are referred to collectively as the “Parties” in this
Amendment.
R E C I T A L S
A. The Contract (as defined below) was entered into by and between the Parties
hereto for the provision of Pole Replacement & Caltrain Facility Relocation Services, at various
locations in Palo Alto, as detailed therein.
B. The Parties now wish to amend the Contract in order to increase the City’s
authorization to negotiate and execute change orders in the amount of $300,641, for a total not-
to-exceed amount of $2,207,049.
NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions of
this Amendment, the Parties agree:
SECTION 1. Definitions. The following definitions shall apply to this Amendment:
a. Contract. The term “Contract” shall mean Contract No. C20177717
between CONSULTANT and CITY, dated June 22,2020.
b. Other Terms. Capitalized terms used and not defined in this Amendment
shall have the meanings assigned to such terms in the Contract.
SECTION 2. Section 7.1 of the Contract is hereby amended to read as follows:
7.1 Contract Sum.
Contractor shall be compensated for satisfactory completion of the Work in compliance with the
Contract Documents the Contract Sum of Two Million Two Hundred and Seven Thousand Forty
Nine Dollars ($2,207,049).
[This amount includes the bid items 1 to 95.]
DocuSign Envelope ID: B2157CBA-D7BE-4DEF-897A-86EF5D9DB734
Vers.: Aug. 5, 2019
Page 2 of 3
SECTION 3. Legal Effect. Except as modified by this Amendment, all other provisions of the
Contract, including any exhibits thereto, shall remain in full force and effect.
SECTION 6. Incorporation of Recitals. The recitals set forth above are terms of this
Amendment and are fully incorporated herein by this reference.
(SIGNATURE BLOCK FOLLOWS ON THE NEXT PAGE.)
DocuSign Envelope ID: B2157CBA-D7BE-4DEF-897A-86EF5D9DB734
Vers.: Aug. 5, 2019
Page 3 of 3
SIGNATURES OF THE PARTIES
IN WITNESS WHEREOF, the Parties have by their duly authorized representatives executed
this Amendment effective as of the date first above written.
CITY OF PALO ALTO
City Manager
APPROVED AS TO FORM:
City Attorney or designee
WIRE WRANGLER, LLC, DBA TW
POWER LINE CONSTRUCTION
Officer 1
By:
Name:
Title:
Officer 2
By:
Name:
Title:
DocuSign Envelope ID: B2157CBA-D7BE-4DEF-897A-86EF5D9DB734
Vice President & GC
Brian Corrigan
Blake Edwards
Project Manager
r-:: DocuSigned by:
~~c~~~[s
Certificate Of Completion
Envelope Id: B2157CBAD7BE4DEF897A86EF5D9DB734 Status: Completed
Subject: Please DocuSign: Amendment 1- Wire Wrangler.pdf
Source Envelope:
Document Pages: 3 Signatures: 2 Envelope Originator:
Certificate Pages: 2 Initials: 0 Terry Loo
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Terry.Loo@CityofPaloAlto.org
IP Address: 199.33.32.254
Record Tracking
Status: Original
9/30/2020 2:10:43 PM
Holder: Terry Loo
Terry.Loo@CityofPaloAlto.org
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign
Signer Events Signature Timestamp
Brian Corrigan
brian@twpowerline.com
Vice President & GC
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 192.92.1.249
Sent: 9/30/2020 2:15:45 PM
Viewed: 9/30/2020 2:16:17 PM
Signed: 9/30/2020 2:23:37 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Blake Edwards
blake@twpowerline.com
Project Manager
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 67.169.17.105
Signed using mobile
Sent: 9/30/2020 2:23:39 PM
Viewed: 9/30/2020 2:24:22 PM
Signed: 9/30/2020 2:40:48 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Tabatha Boatwright
tabatha.boatwright@cityofpaloalto.org
Administrative Associate III
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Sent: 9/30/2020 2:40:51 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Docu~
■ SfCi.lltJll
~
DocuSigned by:
bvi~ {6vvi~
B74358CF230F459
COPIED
Carbon Copy Events Status Timestamp
Henry Nguyen
Huynh.Nguyen@CityofPaloAlto.org
Senior Electric Engineer
Security Level: Email, Account Authentication
(None)
Sent: 9/30/2020 2:40:52 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 9/30/2020 2:40:52 PM
Certified Delivered Security Checked 9/30/2020 2:40:52 PM
Signing Complete Security Checked 9/30/2020 2:40:52 PM
Completed Security Checked 9/30/2020 2:40:52 PM
Payment Events Status Timestamps
COPIED