Loading...
HomeMy WebLinkAbout2020-09-15 Public Art Commission Agendas IS POSTED IN ACCORDANCE WITH GOVERNMENT CODE SECTION 54954.2(a) OR SECTION 54956 PUBLIC ART COMMISSION Ben Miyaji, Chair Ian Klaus, Member Loren Gordon, Vice-Chair Hsinya Shen, Member Nia Taylor, Member City Council Liaison: Liz Kniss Kristen O’Kane: Director, CSD Elise DeMarzo: Public Art Program Director Nadya Chuprina: Public Art Program Coordinator Denise Laxen di Zazzo: Public Art and CASP Communications http://www.cityofpaloalto.org/publicart https://zoom.us/join Meeting ID: 99190492086 Phone: +1 669 900 6833 Saturday, September 15, 2020 Virtual Conference 2:00 p.m. – 6:00 p.m. RETREAT AGENDA ROLL CALL AGENDA CHANGES, REQUESTS, DELETIONS ORAL COMMUNICATIONS 1.Ice Breaker 2.Special Presentation and discussion on current trends in the field of public art in response to Post- COVID recovery 3.Setting the Context for the formulation of a work plan -Existing projects / PAMP status - Images and Timeline -Budget Overview 4.Break 5.Prioritization of projects for two-year work plan 6.Racial and Cultural Equity Discussion with consultant Elizabeth D. Foggie 7. Process Questions/ Wrap up/ Next Steps ANNOUNCEMENTS Art in Public Places - CIP 80471001-31070 WBS AC-86017-080 FY 2020 (through June 30, 2020) Posted July 16, 2020 Total CarryForward from prior years 144,931.00$ FY 20 CIP Adopted Budget 50,000.00$ Total FY 20 CIP Budget 194,931.00$ Actual Costs Labyrinth by Paz de la Calzada (Prototype)King Plaza 1,900.00$ Labyrinth by Paz de la Calzada (Fab+Install)King Plaza 5,440.00$ Artists Stipends Code:ART2 3,012.00$ Pavilion by FreelandBuck King Plaza 12,000.00$ Pavilion baseplate + install supplies for FB King Plaza 2,185.06$ Arbor by Adam Marcus King Plaza 4,000.00$ Artwork Design for Cal Ave Construction Fence Phillip Hua 4,000.00$ Artwork Design for Cal Ave Construction Fence Allison Kunath 4,000.00$ Artwork Design for Cal Ave Construction Fence Samuel Price 4,000.00$ Artwork Design for Cal Ave Construction Fence Oree Originol 4,000.00$ Blue Trees Pressure washing King Plaza 8,000.00$ Code:ART2 Event Coordinator Giant Creative 2,000.00$ Code:ART2 Urban Interventions Code:ART2 10,000.00$ BLACK LIVES MATTER Mural Hamilton Ave 12,771.38$ Subtotal Actual Costs 77,308.44$ Commitments (Under Contract) Urban Interventions Code:ART2 26,000.00$ Code:ART2 Event Coordinator Giant Creative 9,500.00$ Structual Engineering Consultant for Temp Public Art Hohbach-Lewin, Inc. 50,000.00$ Pavilion by FreelandBuck King Plaza 4,000.00$ Arbor by Adam Marcus King Plaza 16,000.00$ Labyrinth by Paz de la Calzada (Fab+Install)King Plaza 9,560.00$ Total Commitments 115,060.00$ Available Total Budget before PAC-approved future projects 2,562.56$ Upcoming Projects to be approved by PAC: Temporary Public Art Pilot 8 locations 32,000.00$ Open Galleries Collaboration with Art Center 10,000.00$ Subtotal Approved Future Projects 42,000.00$ Total CIP Available Budget (39,437.44)$ Municipal CIP Budget 80471001-31990 FY 2020 (through June 30, 2020) Posted July 16, 2020 FY19 CarryForward Budget 1,181,659.10$ FY20 Adopted Budget 207,072.00$ Total FY 20 Muni CIP Budget 1,388,731.10$ Actual Costs Cal Ave PAMP Consultant Barbara Goldstein 6,000.00$ Paleoalto by Marpi Code:ART2 24,390.00$ Cal Ave Construction Fence Temp Art: Fab + Install Martin Sign Co 33,886.00$ Public Safety Building (Fab + Delivery)Peter Wegner 562,390.00$ Public Art Consultant Joe Saxe 4,809.00$ Junior Museum and Zoo (Fab + Install)Charles Sowers 78,930.00$ 101 Bike Bridge Mary Lucking 60,000.00$ coUrbanize for Cal Ave PAMP 1,911.00$ Subtotal Actual Costs 772,316.00$ Commitments (Under Contract) Cal Ave PAMP Consultant Barbara Goldstein 9,000.00$ Paleoalto by Marpi Code:ART2 16,260.00$ Public Safety Building (Fab + Delivery)Peter Wegner 153,610.00$ Junior Museum and Zoo (Fab + Install)Charles Sowers 54,000.00$ Downtown Parking Garage (Design Dev)Amy Landesberg 5,700.00$ Public Art Consultant Joe Saxe 9,296.00$ Charleston-Arastradero Transit Corridor Susan Zoccola 55,000.00$ 101 Bike Bridge Mary Lucking 20,000.00$ Subtotal Commitments 322,866.00$ Avalable Total CIP Muni Funds after Actual Costs and Commitments 293,549.10$ PAC Approved Future Projects (Contract Pending) Downtown Parking Garage (Fab + Install)Amy Landesberg 161,500.00$ Subtotal PAC Approved Future Projects 161,500.00$ Total CIP Muni Budget Available 132,049.10$