Loading...
HomeMy WebLinkAbout2013-12-19 Architectural Review Board Agenda Packet City of Palo Alto Page 1 =================MEETINGS ARE CABLECAST LIVE ON GOVERNMENT ACCESS CHANNEL 26====================== Thursday, December 19, 2013 REGULAR MEETING - 8:30 AM City Council Chambers, Civic Center, 1st Floor 250 Hamilton Avenue Palo Alto, CA 94301 ROLL CALL: Board members: Staff Liaison: Lee Lippert (Chair) Russ Reich, Senior Planner Randy Popp (Vice Chair) Alexander Lew Staff: Clare Malone Prichard Diana Tamale, Administrative Associate Robert Gooyer Amy French, Chief Planning Official Jodie Gerhardt, Senior Planner Clare Campbell, Planner Margaret Netto, Contract Planner PROCEDURES FOR PUBLIC HEARINGS Please be advised the normal order of public hearings of agenda items is as follows:  Announce agenda item  Open public hearing  Staff recommendation  Applicant presentation – Ten (10) minutes limitation or at the discretion of the Board.  Public comment – Five (5) minutes limitation per speaker or limitation to three (3) minutes depending on large number of speakers per item.  Architectural Review Board questions of the applicant/staff, and comments  Applicant closing comments - Three (3) minutes  Close public hearing  Motions/recommendations by the Board  Final vote ORAL COMMUNICATIONS. Members of the public may speak to any item not on the agenda with a limitation of three (3) minutes per speaker. Those who desire to speak must complete a speaker request card available from the secretary of the Board. The Architectural Review Board reserves the right to limit the oral communications period to 15 minutes. APPROVAL OF MINUTES. None. ARCHITECTURAL REVIEW BOARD AGENDA City of Palo Alto Page 2 AGENDA CHANGES, ADDITIONS AND DELETIONS. The agenda may have additional items added to it up until 72 hours prior to meeting time. CONTINUED BUSINESS: Major Review: 1. 2209-2215 El Camino Real [13PLN-00396]: Request by Karen Kim on behalf Tai Ning Trading & Innovations Co. for Major Architectural Review of a new 8,560 sq. ft. three story, mixed use development on a 5,392 square foot lot to replace 3,803 sq. ft. of floor area in restaurant and retail use. Zone District: CC(2). Environmental Assessment: Exempt from the provisions of the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15332. The plans for this project have been modified to the extent that this description is no longer accurate. A new notice will be published for an ARB hearing in January 2014. NEW BUSINESS: Minor Reviews: 2. 103 El Camino Real (El Camino Park) [13PLN-00434]: Request by City of Palo Alto Public Works Engineering for Architectural Review of El Camino Park improvements that include a synthetic soccer/lacrosse play field, natural turf softball/lacrosse play field, new restrooms, and an enlarged parking lot. Zone District: Public Facility. Environmental Assessment: An Environmental Impact Report was adopted March 5, 2007 in accordance with the California Environmental Quality Act (CEQA). 3. 4180 El Camino Real [13PLN-00422]: Request by David McVey of Tesla Motors on behalf of Peter Mullen for Architectural Review of and Sign Exception for one freestanding sign and one wall sign. Zone District: CS. Environmental Assessment: Exempt from CEQA. Preliminary Reviews 4. 3877 El Camino Real [13PLN-00439]: Request by EID Architects on behalf of Zijin, Inc. for Preliminary Architectural Review of a new three story, mixed use building with 4,365 sq. ft. of commercial office/retail area and 21,663 sq. ft. of area for 17 housing units over one level of semi depressed podium parking replacing the existing 6,000 sq. ft. single-story restaurant building and surface parking lot. Zone district: Service Commercial (CS) and RM-30. 5. 636 Middlefield Road [13PLN-00410]: Request by Steve Smith for Preliminary Architectural Review of the construction of three detached residential units, demolition of two existing residential units, and retention of an existing structure occupied continuously by legal non- conforming office use. Zone District: RM-15. STUDY SESSION: 6. 1213 Newell Road [Main Library]: Request by City of Palo Alto Pubic Works Engineering for Study Session review of an exterior signage program for the Main Library facility. Zone District: Public Facility. City of Palo Alto Page 3 BOARD MEMBER BUSINESS AND ANNOUNCEMENTS. Discussion of Retreat Topics and Date REPORTS FROM OFFICIALS. Subcommittee Members: Alex Lew and Randy Popp SUBCOMMITTEE: 7. 611 Cowper Street [13PLN-00259]: Request by The Hayes Group for sub-committee review of the rear stair tower redesign, associated with conditions of approval for a previously approved mixed, use project (a 34,703 square foot, four-story building comprised of three floors commercial area and one floor for a residential unit with below grade parking facilities). Zone District: CD- C(P). 8. 4190 El Camino Real [13PLN-00338]: Request by Kevin Stong for sub-committee review of rear wall/fencing, colors and materials, photometric study, landscaping details, parking calculations, and removal of any extraneous trailers, associated with conditions of approval for a previously approved project (a 3,024 sq. ft. service building for McLaren/Volvo). Zone District: Service Commercial Auto Dealership ((CS)(AD)). STAFF ARCHITECTURAL REVIEW: Project Description: Removal and replacement of two of the existing six panel antennas and installation Applicant: Jerome Wade Address: 2425 Embarcadero Way [13PLN-00420] Approval Date: 12/2/13 Request for hearing deadline: 12/16/13 Project Description: New illuminated wall sign to identify the building Applicant: Plican Signs Address: 250 Cambridge Avenue [13PLN-00432] Approval Date: 12/3/13 Request for hearing deadline: 12/16/13 Project Description: Installation of two roof-top mounted “donor” antennas in the Research Park Applicant: Charnel James Address: 3412 Hillview Avenue [13PLN-00405] Approval Date: 12/3/13 Request for hearing deadline: 12/16/13 Project Description: Two (2) square foot illuminated sign Applicant: Carol Sedensky Address: 180 El Camino Real (Flemings) [13PLN-00504] Approval Date: 12/4/13 Request for hearing deadline: 12/17/13 City of Palo Alto Page 4 Project Description: Two small additions to the existing community room for the relocation of the resident mailboxes Applicant: Debbie Hill Address: 650 San Antonio Road [13PLN-00379] Approval Date: 12/11/13 Request for hearing deadline: 12/24/13 ADA. The City of Palo Alto does not discriminate against individuals with disabilities. To request accommodations to access City facilities, services or programs, to participate at public meetings, or to learn more about the City’s compliance with the Americans with Disabilities Act of 1990 (ADA), please contact the City’s ADA Coordinator at 650.329.2550 (voice) or by e-mailing ada@cityofpaloalto.org. Posting of agenda. This agenda is posted in accordance with government code section 54954.2(a) or section 54956.Recordings. A videotape of the proceedings can be obtained/reviewed by contacting the City Clerk’s Office at (650) 329-2571. Materials related to an item on this agenda submitted to the Architectural Review Board after distribution of the agenda packet are available for public inspection in the Planning and Community Environment Department at 250 Hamilton Avenue, 5th floor, Palo Alto, CA. 94301 during normal business hours. CITY OF ALO AL 0 Agenda Date: To: From: Subject: December 19,2013 Architectural Review Board Clare Campbell, Planner Architectural Review Board Staff Report Department: Planning and Community Environment 103 EI Camino Real (EI Camino Park) [13PLN-00434]: Request by City of Palo Alto Public Works Engineering for Architectural Review of park improvements for El Camino Park that include a synthetic soccer/lacrosse play field, natural turf softball/lacrosse play field, new restrooms, enlarged parking lot, and other improvements in the Public Facility zone district. Environmental Assessment: An Environmental Impact Report was adopted March 5, 2007 in accordance with the California Environmental Quality Act (CEQA). RECOMMENDATION Staff recommends that the Architectural Review Board (ARB) recommend the Director of Planning and Community Environment approve the proposed project, based upon the required findings (Attachments A) and subject to the conditions of approval (Attachment B). BACKGROUND Background The proposed project is the second phase of the El Camino Park Reservoir and Pump Station project. This project is part of the larger Palo Alto Emergency Water Supply project that included the rehabilitation of existing city water wells, construction of new wells, and upgrading of the. existing Mayfield pump station. The proposed proj ect is located within El Camino Park, which is bordered by El Camino Real to the west, Alma Street/Caltrain tracks to the east, Palo Alto Avenue to the north, and the University Avenue Caltrain bus transfer station to the south. The existing condition, as explained in this report, is based upon the park layout of2011; the park had one full-sized grass soccer field on the north side and one lighted softball diamond on the south side with bleachers, cage and fencing. Located in the easternmost comer of the park is the newly constructed Lytton pump station; the new underground water reservoir has also been installed below the softball field. These two elements, the pump station and reservoir, were part .of the first phase of the project 13PLN-00434 Page 1 of5 approved by the ARB in March 2011; construction began in October 2011. The ARB review and recommendation of site improvements unrelated to the actual pump station and reservoir are now requested. The City's Utilities Department has a project website that provides additional background information, photos, and live webcam of the site: http://www.cityofpaloalto.org/gov/depts/utl/eng/water/wells/pumpstation.asp . Proj ect Description The proposed project will complete the renovations of El Camino Park. The construction of the first phase of the project is at or near completion with the installation of the replacement water pump station and new underground water reservoir. The second phase of the project will provide upgrad~d recreational amenities, as detailed below. South Field (see Sheet ARB 5.0 of Attachment E): 1. Installation of a natural turf softball field above the new water reservoir; 2. ,Installation of permanent eight foot tall chain-link. fencing along the perimeter of theJeft and right outfields; 3. Installation of two dugouts and softball backstop; 4. Installation of a removable four foot tall mesh fence system in the outfield; 5. Relocation of the existing alunlinum portable bleachers; 6. Replacement of two 70 foot tall pole-mounted sports field lights and upgrading the four existing 70 foot tall pole-mounted light fixture heads; and 7. Construction of the scorekeeper and storage building behind the backstop. North Field (see Sheet ARB 5.1 of Attachment E): 1. Installation of a synthetic turf field striped for soccer and lacrosse games; 2. Installation of player seating on both sides of the mid-field; 3. Installation of soccer ball protection fencing around the majority of the field perimeter (14 foot tall chain-link fence with 12 feet of additional netting); 4. Installation of four 70 foot tall pole-mounted sports field lights; 5. Installation of a multi-purpose lawn area at the north end of the park; and 6. Addition of three new picnic areas with tables around the multi-purpose lawn. General Improvements: 1. Expansion of the asphalt parking lot from 46 spaces to 68 spaces; 2. Construction of replacement restrooms; 3. Installation of a 'no parking loading/unloading' zone next to the new restroom facility; 4. Installation of porous pavement for a portion of the parking lot to facilitate water infiltration to the nearby existing trees; 5. Construction of a new trash enclosure; 6. Installation of two 42 inch tall fold-down bollards to secure the maintenance vehicle route; 7. Relocation of the emergency phone close to the new restroonl building; 8. Installation of decomposed granite pathways around the entire park; 9. Installation of security lighting throughout the park with 14 foot tall pole-mounted lights; 10. Installation of nine bike racks (three near the restroom and six by the soccer field); 13PLN-00434 Page 2 0[5 11. Installation of new landscaping throughout the park that includes trees of various SIzes, shrubs, grasses, vines, and ground cover. The new structures (restroom, scorekeeper & storage, trash enclosure) have been designed in a style consistent with the already constructed pump station building. Similar materials and colors have been selected for the new structures so as to maintain a complementary and cohesive style for the park. The basic materials proposed are concrete block (CMU) with the color to match the pump station and a dark grey standing-seam metal roof. Please refer to the applicant's project description and plans for additional project details (Attachments C and E). DISCUSSION Architectural Review The Architectural Review Board is tasked with reviewing the aesthetics of significant development projects within the City and focuses its discussion and comments on .the design and. architecture; land use policy and enforcement of zoning requirements do not fall within the ARB's purview. For all projects subject to Architectural Review, there are required findings (ARB Findings) that must be considered and complied with in order to support approval of a project. These findings are not based on quantitative standards, such as a maximum height allowance or defined setback requirement, but rather on more qualitative criteria (e.g. design appropriate to the function of the project, plant material suitable to the site, and design appropriate with the immediate environnlent of the site). Within this qualitative realm, the Council-appointed ARB members, who are experienced design professionals, provide their expertise in evaluating the ARB Findings to support a project. Attachment A includes the project's ARB Findings and discusses the project's compliance with each. Zoning and Comprehensive Plan Compliance The proposed project upgrades the existing playfields and amenities and increases the on-site parking with 22 additional spaces. The project design is in compliance with the Public Facility (PF) zoning requirenlents and is in general conformance with the Comprehensive Plan. It is supported by several policies that direct new construction, including public infrastructure, to be compatible with the neighborhood character, to have high quality, creative design and site planning, and to promote the use of community facilities as gathering places, as follows: • Policy L-4: Maintain Palo Alto's varied residential neighborhoods while sustaining the vitality of its commercial areas and public facilities. Use the Zoning Ordinance as a tool to enhance Palo Alto's desirable qualities. • Policy L-15: Preserve and enhance the public gathering spaces within walking distance of residential neighborhoods. Ensure that each residential neighborhood has such spaces. • Policy L-48: Promote high quality, creative design and site planning that is compatible with surrounding development and public spaces. 13PLN~00434 Page 3 of5 • Policy L-61: Promote the use of community and cultural centers, libraries, local schools, parks, and other community facilities as gathering places. Ensure that they are inviting and safe places that can deliver a variety of conlmunity services during both daytime and evening hours. • Policy L-76: Require trees and other landscaping within parking lots. • Policy C-22: Design and construct new community facilities to have flexible functions to ensure adaptability to the changing needs of the community. • Policy C~24: Reinvest in aging facilities to improve their usefulness and appearance. Avoid deferred maintenance of City infrastructure. • Policy C-26: Maintain and enhance existing park facilities. • Policy C-32: Provide fully accessible public facilities to all residents and visitors. ENVIRONMENTAL REVIEW The proposed project is subject to environmental review under provisions of the California Environmental Quality Act (CEQA). An Environmental Impact Report (EIR) was adopted March 5, 2007 for the City of Palo Alto Emergency Water Supply and Storage Project, which included t~e re~abilitation of existing city water wells, construction of new wells, construction of a new water· storage reservoir with associated well and pump station, and upgrading the existing Mayfield pump station. The proposed project was included in the scope of the EIR and is associated with the new water reservoir and pump station component of the overall larger project. An Addendum (Attachment D) has been prepared to provide project clarifications to this one component of the larger proj ect, which shall become public record as an attachment to the adopted 2007 EIR. The project clarifications, which were not known at the time the EIR was prepared, are considered minor and staff determined that the project would not create any environmental impacts beyond those already identified in the 2007 EIR. The significant and unavoidable impacts identified in the 2007 EIR were related to noise levels exceeding the Code allowances during construction activities and the potential short term loss of parking spaces related to temporary parking demand for construction workers and construction vehicles as the crew moves along the pipeline installation alignment, and would reduce parking supply at proposed well and storage reservoir locations. Pursuant to CEQA Guidelines Section 15162, recirculation is not required as the project changes do not create new significant environmental impacts or a substantial increase in the severity of previously identified effects. ATTACHMENTS Attachment A: Draft ARB Findings Attachment B: Draft Conditions of Approval Attachment C: Project Description* Attachment D: CEQA Addendum (to be provided at places) Attachment E: Development Plans (Board Members Only)* * Prepared by Applicant; all other attachments prepared by Staff COITRTESY COPIES Hung Nguyen, Hung.N guyen@CityofPaloAlto.org Daren Anderson, Daren.Anderson@CityofPaloAlto.org 13PLN-00434 Page 4 of5 Prepared By: Clare Campbell, Pla,w;:-:Q Manager Review: Amy French, Chief Planning Official t$1-- 13PLN-00434 Page 5 of5 ATTACHMENT A FINDINGS FOR APPROVAL ARCHITECTURAL REVIEW BOARD STANDARDS FOR REVIEW 103 EI Camino Real/File No. 13PLN-00434 The design and architecture of the proposed project, as conditioned, complies with the Findings for Architectural Review as required in PAMC Chapter 18.76. (l) The design is consistent and compatible with applicable elements of the Palo Alto Comprehensive Plan. This finding can be made in the affirmative in that the project incorporates quality design that conforms with policies that direct new construction (including public infrastructure) to be compatible with the neighborhood character; to have high quality, creative design and site planning; and to promote the use of community facilities as gathering places (2) The design is compatible with the immediate environment of the site. This finding can be made in the affirmative in that the proposed park improvements are designed to complement the architectural elements of the recently upgraded pump station and are compatible with the adjacent transit center. (3) The design is appropriate to the function of the project. This finding can be made in the affirmative in that the design of the inlprovements are consistent with typical park and active sport field facilities; the design of the new structures are simple with a modem aesthetic that is inline with their utilitarian function. (4) In areas considered by the board as having a unified design character or historical character, the design is compatible with such character. This finding is not applicable to this proj ect in that this area does not have a unified design or historic character. (5) The design promotes harmonious transitions in scale and character in areas between different designated land uses. This finding is not applicable in that this project is not situated in a transition area between different designated land uses. ( 6) The design is compatible with approved improvements both on and off the site. This finding can be made in the affirmative in that the renovated playing fields and amenities are compatible with the existing established park use and the adjacent transit station. (7) The planning and siting of the various functions and buildings on the site create an internal sense of order and provide a desirable environment for occupants, visitors and the general community. This finding can be nlade in the affirmative in that the siting of the playing fields, new restrooms, picnic area, pathways, etc. provide desirable and functional spaces and amenities for users of the park. (8) The amount and arrangement of open space are appropriate to the design and the function of the structures. This finding can be made in the affirmative in that the project is a park facility and provides significant open space. ATTACHMENT A (9) Sufficient ancillary functions are provided to support the main functions of the project and the same are compatible with the project's design concept. This finding can be made in the affirmative with the inclusion of restrooms, refuse area, pathways, etc. that support the prin1ary active sports field functions. (10) Access to the property and circulation thereon are safe and convenient for pedestrians, cyclists and vehicles. This finding can be made in the affirmative in that the added pathways and expanded parking lot provide safe and convenient access for users. (11) Natural features are appropriately preserved and integrated with the project. This finding can be made in the affirmative in that three non-protected trees are proposed for removal and all remaining trees will be fully protected and preserved. The parking lot will use pervious concrete for a portion of the area that is near existing root zones to facilitate preservation of mature trees. (12) The materials, textures, colors and details of construction and plant material are appropriate expression to the design and function. This finding can be made in the . affirmative in that the proposed project incorporates finishing materials and .. colors .that, match the existing CMU pump station building, which uses earth-tone neutral colors. (13) The landscape design concept for the site, as shown by the relationship of plant masses, open space, scale, plant forms and foliage textures and colors create a desirable and functional environment. This finding can be made in the affirmative in that the project incorporates landscape materials that provide screening and enhance the aesthetics of the park. (14) Plant material is suitable and adaptable to the site, capable of being properly maintained on the site, and is of a variety which would tend to be drought-resistant to reduce consumption of water in its installation and maintenance. This finding can be made in the affirmative in that the proposed landscape materials were specifically selected to be low maintenance as well as an enhancement to the site. (15) The project exhibits green building and sustainable design that is energy efficient, water conserving, durable and nontoxic, with high-quality spaces and high recycled content materials. This finding can be made in the affirmative in that the project includes the use of a cool roof, materials with substantial recycled content, and low VOC emitting materials. The proposed project is also subject to the City's Green Building Regulations for nonresidential development. (16) The design is consistent and compatible with the purpose of architectural review as set forth in subsection 18.76. 020(a). This finding can be made in the affirmative in that the project design promotes visual environments that are of high aesthetic quality and variety. ATTACHMENTB DRAFT CONDITIONS OF APPROV AL 103 El Camino Real/File No. 13PLN-00434 PLANNING & COMMUNITY ENVIRONMENT On December 19, 2013 the Architectural Review Board (ARB) recomm'ended approval of the application referenced above, and the Director of Planning and Community Environment (Director) approved the project on date. Project Planner: Clare Campbell Planning Division _______________________ ___ 1. The project shall be in substantial conformance with the approved plans and related documentsreceived -D'ecelhber 10, 2013, except as'modified to "il1corpotate' these ' conditions of approval. 2. The Conditions of Approval document shall be printed on all plans submitted for building permits related to this project. ACCESS IMPROVEMENTS: Nunlbered comnlents refer to attached annotated site plan. 1. Consider adding an additional DG path to connect the crosswalk at Quarry RoadiEI Camino to the parks perimeter DG path. 2. Refine the connection between the new bike path and the existing AC path to ensure proper curvature, sight lines, stirping and smooth joint. 3. Should the crosswalk improvements be implemented realign the existing El Camino Real AC sidewalk to merge with the new bike path. 4. Provide proper bollard placement and striping that conforms with the HDMIMUTCD. Use city standard bollards. 5. Provide an accessible path of travel from the public right of way to the playing field buildings. 6. Add new trail crosswalk across parking lot driveway with potential median refuge. Work with CPA transportation 'division to determine signage and striping. 7. Relocate existing AC path on north side of parking lot driveway to align with proposed crosswalk and trail adjacent to the softball field. 8. Resurface approximately 100' of existing cracked pathway between El Camino/Palo Alto Ave curb ramp and the proposed limits of the new path. Include in plans submitted for a building permit: Page 10f6 .' .,t' •• " "'.i ATTACHMENT B 1. GRADING & DRAINAGE PLAN: The plan set nlust include a grading & drainage plan prepared by a licensed professional that includes existing and proposed spot elevations and drainage flow arrows to demonstrate proper drainage of the site. Adj acent grades must slope away from the house a minimum of 2%. Downspouts and splashblocks should be shown on this plan, as well as any site drainage features such as swales. Grading will not be allowed that increases drainage onto, or blocks existing drainage from, neighboring properties. Public Works generally does not allow rainwater to be collected and discharged into the street gutter, but encourages the developer to keep rainwater onsite as much as feasible by directing runoff to landscaped and other pervious areas of the site. See the Grading & Drainage Plan Guidelines for Residential Developments on our website: http://www.cityofpaloalto.org/civicax/filebank!documents/2717 2. GRADING & EXCAVATION PERMIT: An application for a grading & excavation permit must be submitted to Public Works when applying for a building permit. The site plan must include a table providing the cubic yardage of dirt being cut and filled outside of the building footprint. The application and guidelines are available atthe Development Center and on our website. Instructions: http://www.cityofpaloalto.org!civicax/filebank/documents/11697 Application: http://www.cityofpaloalto.org!civicax/filebank!documents/11695 3. GRADING PERMIT: The site plan must include a table providing the cubic yardage of dirt being cut and filled outside of the building footprint. If the total is more than 100 cubic yards, a grading permit will be required. An application and plans for a grading permit are subnlitted to Public Works separately from the building permit plan set. The application and guidelines are available at the Development Center and on our website. . 4. STORM WATER POLLUTION PREVENTION: The City's full-sized Pollution Prevention -It's Part of the Plan sheet must be included in the plan set. Copies are available from Public Works at the Development Center or on our website: http://www.cityofpaloalto .org! civicaxlfile bank! documents/273 2 5. SWPPP: The proposed development will disturb more than one acre of land. Accordingly, the applicant will be required to comply with the State of California's General Permit for Storm Water Discharges Associated with Construction Activity. This entails filing a Notice of Intent to Comply (NOI), paying a filing fee, and preparing and implementing a site specific storm water pollution prevention plan (SWPPP) that addresses both construction-stage and post-construction BMP's for storm water quality protection. The applicant is required to submit two copies of the NOI and the draft SWPPP to the Public Works Department for review and approval prior to issuance of the building permit. Also, include the City's standard "Pollution Prevention -It's Part of the Plan" sheet in the building permit plan set. Copies are available from Public Works at the Development Center. Page 20f6 ATTACHMENT B 6. STREET TREES: Show all existing street trees in the public right-of-way. Any removal, relocation or planting of street trees; or excavation, trenching or pavement within 10 feet of street trees must be approved by Public Works' arborist (phone: 650-496-5953). This approval shall appear on the plans. Show construction protection of the trees per City requirements. 7. WORK IN THE RIGHT -OF-WAY: The plans must clearly indicate any work that is proposed in the public right-of-way, such as sidewalk replacement, driveway approach, or utility laterals. The plans must include notes that the work must be done per City standards and that the contractor performing this work must first obtain a Street Work Permit from Public Works at the Development Center. If a new driveway is in a different location than the existing driveway, then the sidewalk associated with the new driveway must be replaced with a thickened (6" thick instead of the standard 4" thick) section. Additionally, curb cuts and driveway approaches for abandoned driveways must be replaced with new curb, gutter and planter strip. K IMPERVIOUS SURFACE AREA: The project will be creating or replacing 500- square feet or more of impervious surface. Accordingly, the applicant shall provide calculations of the existing and proposed impervious surface areas with the building permit application. The Impervious Area Worksheet/or Land Developments form and instructions are available at the Development Center or on our website': http://www.cityofpaloalto.org/civicax/filebank/documents/2718 9. STORM WATER TREATMENT: This project shall comply with the storm water regulations contained in provision C.3 of the NPDES municipal stoml water discharge permit issued by the San Francisco Bay Regional Water Quality Control Board (and incorporated into Palo Alto Municipal Code Chapter 16.11). These regulations apply to land development projects that create or replace 10,000 square feet or more of impervious surface. In order to address the potential permanent impacts of the project on storm water quality, the applicant shall incorporate into the project a set of permanent site design measures, source controls, and treatment controls that serve to protect storm water quality, subject to the approval of the Public Works Department. The applicant shall identify, size, design and incorporate permanent storm water pollution prevention measures (preferably landscape-based treatment controls such as bioswales, filter strips, and permeable pavement rather than mechanical devices that require long-term maintenance) to treat the runoff from a "water quality storm" specified in P AMC Chapter 16.11 prior to discharge to the municipal storm drain system. Effective February 10,2011, regulated projects, must contract with a qualified third­ party reviewer during the building permit review process to certify that the proposed permanent storm water pollution prevention measures comply with the requirements of Palo Alto Municipal Code Chapter 16.11. The certification form, 2 copies of approved storm water treatment plan, and a description of Maintenance Task and Schedule must be received by the City from the third-party reviewer prior to approval of the building permit by the Public Page 3 of6 ATTACHMENTB Works department. Within 45 days of the installation of the required storm water treatment measures and prior to the issuance of an occupancy permit for the building, third-party reviewer shall also submit to the City a certification for approval that the project's permanent measures were constructed and installed in accordance to the approved permit drawings. 10. STORMW ATER MAINTENANCE AGREEMENT: The applicant shall designate a party to maintain the control measures for the life of the improvements and must enter into a maintenance agreement with the City to guarantee the ongoing maintenance of the permanent C.3 storm water discharge . compliance measures. The maintenance agreement shall be executed prior to the first building occupancy sign-off. The City will inspect the treatment measures yearly and charge an inspection fee. There is currently a $350 C.3 plan check fee that will be collected upon submittal for a grading or building permit. EkctricEn~n~ringD~~fun _____________________ _ 1. The applicant shall comply with all the Electric Utility Engineering Department service requirements noted during plan review. 2. The applicant shall be responsible for identification and location of all utilities, both public and private, within the work area. Prior to any excavation work at the site, the applicant shall contact Underground Service Alert (USA) at 1-800-227-2600, at least 48 hours prior to beginning work. 3. The applicant shall submit a request to disconnect all existing utility services and/or meters including a signed affidavit of vacancy, on the form provided by the Building Inspection Division. Utilities will be disconnected or removed within 10 working days after receipt of request. The demolition permit will be issued after all utility services and/or meters have been disconnected and removed. THE FOLLOWING SHALL BE INCORPORATED IN SUBMITTALS FOR ELECTRIC SERVICE 1. A completed Electric Load Sheet and a full set of plans must be included with all applications involving electrical work. The load sheet must be included with the preliminary submittal. 2. Industrial and large commercial customers must allow sufficient lead-time for Electric Utility Engineering and Operations (typically 8-12 weeks after advance engineering fees have been paid) to design and construct the electric service requested. 3. Only one electric service lateral is permitted per parcel. Utilities Rule & Regulation #18. 4. This project requires a padmount transformer; the location of the transformer shall be shown on the site plan and approved by the Utilities Department and the Architectural Review Board. Utilities Rule & Regulations #3 & #16 (see detail comments below). Page 4 of6 ATTACHMENTB 5. The developer/owner shall provide space for installing padmount equipment (Le. transformers, switches, and interrupters) and associated substructure as required by the City. 6. The customer shall install all electrical substructures (conduits, boxes and pads) required from the service point to the customer's switchgear. The design and installation shall be according to the City standards a1)d shown on plans. Utilities Rule & Regulations # 16 & #18. 7. Location of the electric paneVswitchboard shall be shown on the site plan and approved by the Architectural Review Board and Utilities Department. 8. All utility meters, lines, transformers, backflow preventers, and any other required equipment shall be shown on the landscape and irrigation plans and shall show that no conflict will occur between the utilities and landscape materials. In addition, all aboveground equipment shall be screened in a manner that is consistent with the building design and setback requirements. 9. For services larger than 1600 amps, the customer will be required to provide a transition cabinet as the interconnection point between the utility's padmount transformer and the customer's main switchgear. The cabinet design drawings must be submitted to the Electric Utility Engineering Department for review and approval. 10. For underground services, no more than four (4) 750 MCM conductors per phase can be connected to the transformer secondary terminals; otherwise, bus duct must be used for connections to padmount transformers. If customer installs a bus duct directly between the transformer secondary terminals and the main switchgear, the installation of a transition cabinet will not be required. 11. The customer is responsible for sizing the service conductors and other required equipment according to the National Electric Code requirements and the City standards. Utilities Rule & Regulation #18. 12. If the customer's total load exceeds 2500 kVA, service shall be provided at the primary voltage of 12,470 volts and the customer shall provide the high voltage switchgear and transformers. . 13. For primary services, the standard service protection is a padmount fault interrupter owned an maintained by the City, installed at the customer's expense. The customer must provide and install the pad and associated substructure required for the fault interrupter. 14. Any additional facilities and services requested by the Applicant that are beyond what the utility deems standard facilities will be subject to Special Facilities charges. The Special Facilities charges include the cost of installing the additional facilities as well as the cost of ownership. Utilities Rule & Regulation #20. 15. Projects that require the extension of high voltage primary distribution lines or reinforcement of offsite electric facilities will be at the customer's expense and must be coordinated with the Electric Utility. Page 5 of6 ATTACHMENT B DURING CONSTRUCTION 1. Contractors and developers shall obtain permit from the Department of Public Works before digging in the street right-of-way. This includes sidewalks, driveways and planter strips. 2. At least 48 hours prior to starting any excavation, the customer must call Underground Service Alert (USA) at 1-800-227-2600 to have existing underground utilities located and marked. The areas to be check by USA shall be delineated with white paint. All USA markings shall be removed by the customer or contractor when construction is complete. 3. The customer is responsible for installing all on-site substructures (conduits, boxes and pads) required for the electric service. No more than 270 degrees of bends are allowed in a secondary conduit run. All conduits must be sized according to National Electric Code requirements and no 1/2 -inch size conduits are permitted. All off-site substructure work will be constructed by the City at the customer's expense. Where mutually agreed upon by the City and the Applicant, all or part of the off-site substructure work may be constructed by the Applicant. 4. All primary electric conduits shall be concrete encased with the top of the encasement at the depth of30 inches. No more than 180 degrees of bends are allowed in a primary conduit run. Conduit runs over 500 feet in length require additional pull boxes. 5. All new underground conduits and substructures shall be installed per City standards and shall be inspected by the Electrical Underground Inspector before backfilling. 6. The customer is responsible for installing all underground electric service conductors, bus duct, transition cabinets, and other required equipment. The installation shall meet the National Electric Code and the City Standards. 7. Meter and switchboard requirements shall be in accordance with Electric Utility Service Equipment Requirements Committee (EUSERC) drawings accepted by Utility and CPA standards for meter installations. 8. Shop/factory drawings for switchboards (400A and greater) and associated hardware must be submitted for review and approval prior to installing the switchgear to: Gopal Jagannath, P .E. Supervising Electric Project Engineer Utilities Engineering (Electrical) 1007 Elwell Court Palo Alto, CA 94303 9. Catalog cut sheets may not be substituted for factory drawing submittal. All new underground electric services shall be inspected and approved by both the Building Inspection Division and the Electrical Underground Inspector before energizing. Page 6of6 I •. -ATTACHMENT C •• SIEGFRIEQ RECEIVED To: From: Date: Re: EI Camino Park Restoration OCT 17 2013 Package #2 City of Palo Alto, Planning Department Architectural Review Board Paul J. Schneider October 11, 2013 Department of Planning & Community Environment Palo Alto Emergency Water Supply Project -EI Camino Park Reservoir and Pump Station -Park Restoration Package #2 -ARB Approval Submittal . General Overview of Project Need and Team: Since 1962, the primary source of potable water supply for the City of Palo Alto (City) has been from' the San Francisco' Public Utilities Commission (SFPUC) Hetch Hetchy' aqueduct" . system. There are five (5) connections to the aqueduct system at various locations in the City. In addition, the City's water supply in an emergency can be supplemented by five (5) existing water wells and five (5) storage reservoirs. In 1997, the Department of Health Services (DHS, now the California Department of Public Health (CDPH» recommended that, as a minimum, the City should have sufficient stand-alone emergency water supply and storage capacity to deliver eight. (8) hours of maximum day water demand, while maintaining additional reserves and pumping capacity for four (4) hours of fire demand, in the event that water supply from the Hetch Hetchy aqueduct system is interrupted for any reason. In 1999, a comprehensive study was made of the City's water distribution system. The results of the study were reported in "Water Wells, Regional Storage, and Distribution Study" (1999 Study). The 1999 Study recommended the following improvements to the City's water distribution system: • rehabilitation of all five (5) existing City water wells, • construction of three (3) new water wells, • construction of a new water storage reservoir and associated new well and pump station, and • upgrading of an existing pump station. In 2007, an Environmental Impact Report (EIR) of the "City of Palo Alto Emergency Supply and Storage Project" was certified for compliance with the California Environmental Quality Act (CEQA) for construction of-the recommended water distribution system improvements. The purpose of this presentation is to address the construction of the underground reservoir, one new emergency use well, and pump station replacement with improvements at EI Camino Park. The Utilities Division of the City has chosen the "Design-Bid-Build" method of project delivery and has hired CMM-Smith of Walnut Creek with the assistance of Siegfried of Stockton as the design team. The improvements at the site will be performed as two (2) separate design and bidding packages. Package #1 which has been approved and is nearly complete involves the construction of the underground reservoir, the underground F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\EI Camino ARB Project Description 10-11- 2013.doc •. - •• SIEGFRIEI) piping, the pump station, and the hardscape improvements adjacent to the pump station. Package #2 involves the re-construction of the sports fields on the north and south sides of the park, the landscaping and irrigation, reconstruction and expansion of the parking lot, a new restroom, and a combined scorekeeper's booth/storage building. The purpose of this submittal is to seek ARB approval of the project documents for the Work associated with Package #2-Park Restoration. The ARB reviewed and approved the Package #1 Reservoir and Pump Station Improvement Plans on March 17, 2011. Existing Site Conditions: The project site is . located within EI Camino Park located along EI Camino Real at Alma Street. The park is bound on the east by the Caltrain tracks, Alma Street to the north, Stanford Shopping Mall and EI Camino Real to the west, and the Caltrain bus transfer station to the south. The cover s~eet, ARB 1.0, displays the project site. The park currently has a small parking lot, natural grass full soccer field, grass play area, , and· natural ,grass softball ,field with crushed brick. infield.· In the southeast comerot thesite. there is an existing pump station facility with a paved and fenced access yard with access from both the park and the Caltrain transfer station driveway. The existing site conditions are documented with site photos on ARB 2.0 and renderings of the nearly complete Phase 1 improvements can be found on ARB 3.0. As one can see from the site pictures the existing and proposed facilities are tucked back in the far corner of the park and nestled up against the Caltrain tracks, the Caltrain bus transfer station, and is nicely surrounded by tall mature oaks and redwoods that obscure its visibility from EI Camino Real and the Stanford Mall. As illustrated in ARB 4.0 the City has purchased a permanent easement within which the plan shows the Package #1 im provements with the new reservoir, emergency groundwater well, pump station, and overflow pipeline. There are numerous other utility easements that contain underground and overhead electrical mains, water supply and feed lines to and from the City system, and SFPUC main feed. Site Design: Parking Lot The project is split into two sport fields by the parking lot. As shown in ARB 6.0 and ARB 7.0 the parking lot will be rebuilt and expanded more or less in place and additional parking will be added expanding the to the towards the north. The paving will be asphalt and areas that occur under the canopy of the existing trees will have porous pavers, porous concrete or porous asphalt installed to maintain infiltration into the root zone of the trees. The stall~ will meet City standards and parking lot tree islands will be added as well. The new deSign will be adding valuable and much needed parking spaces. A 22'x8' City standard CMU trash enclosure will be installed at the end of the parking lot as well as a centrally located restroom facility with drinking fountains. Both structures will match in materials, color and style to that of the pump station installed during Package #1. Materials, details, and renderings can be found on ARB 15.0. F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\EI Camino ARB Project Description 10-11- 2013.doc ·.-•• SIEGFRIEI) South Field The south field is where the softball field is located. The pr<~posed design (see ARB 6.0) locates the new field in the same location and fence distances as the existing conditions. The field will be a natural turf field with a crushed brick infield material. The facility features the use of the eXisting arched backstop cage. Both foul lines will have new 8' high chain link fencing and dugout enclosure areas. The outfield fence will be a 4' high removable fencing system which will allow for other sporting functions such as lacrosse and soccer to be striped and played. Just beyond the right-center field fence a planter island will be located with understory planting and screen trees to help buffer the views from EI Camino. Updated and more efficient sports field lighting will be installed to meet current field lighting requirements and will be installed with cut-off shields to confine the light to the fields. See ARB 10.0 and 10.1 for photometric and cut sheets. Electrical conduit only will be installed for future opportunities to wire a scoreboard in the outfield. The walkways and area behind the field fences will have new concrete installed. The existing bleachers will be used and ph~ced per plan. A small scorekeeper's building will be combined with a storage building and placed at the softball backstop per ARB 6.0. The structure is displayed on ARB 15.0. In .. addition a new· restroom}NilI. be .. c.oostructedvi a . a20 13CI P.programand is located; at . the,l. end of the new parking lot. The restroom is displayed on ARB 14.0. These structures will match in materials, colors and style to that of the pump station installed during Package #1" .. North Field The north field is where the soccer and lacrosse fields will be located. The proposed deSign (see ARB 7.0) locates the new synthetic field within the location of the existing field and is located to minimize impact to the surrounding trees. The field will be' striped at 65 yards by 110 yards and have moveable goal posts which can be secured in their location on the field. There is an additional synthetic turf perimeter of 10' on the sidelines and 15' on the end lines. The entire perimeter of synthetic turf is contained by a flush 12" Wide concrete band. Concrete player gathering areas are located at midfield on both sides of the field and access walkways are provided from the field to the parking lot, bike path and restroom. The north end of the park, beyond the field will be a multi-purpose lawn area with natural turf. Concrete pads and picnic tables will be located on the perimeter and walkers will have the ability to walk the perimeter of the north park on a meandering decomposed granite fines path with stabilizer. The portion of the bike path adjacent to EI Camino will be rebuilt in-place with porous concrete. All areas in the park beyond fields and pavement will be covered with recycled mulch. One of the priorities for this site is the preservation of the existing trees and the protection of the root zones. The design team is in the process of working with a consulting Arborist to determine the allowable impact of construction under the tree canopies and within the drip lines of the trees. Prior to final submittal of Improvement plans to ARB, the design team will meet with the City Arborist to determine and approve any deSigns and construction within the tree drip lines. New path lighting will be installed to ensure safety along the walking paths and the picnic areas to the north of the soccer field. Photo metrics are displayed on ARB 10.0. A 25 foot high chain link fence will be installed along portions of the field on the EI Camino and F:\12cad\12288 EI Camino Park Phase 2\Win-Oocs'ARB Forms and Checklist\EI Camino ARB Project Description 10-11- 2013.doc • ill- •• SIEGFRIEI) parking lot sides. This fencing will add safety and limit the ability of errant soccer balls from entering EI Camino Real and the parking lot. Proposed Building Context: The general geographic area has more than one distinctive architectural style, and our goal is to make the restroom facilities less dominant but cohesive with all aspects of its surroundings. The varying styles in the local area are evident by looking across the street to the Stanford Mall, the very contemporary style of the Caltrain Facility, and then having Such elements as the old Stanford Barn and the University Architecture just down the street. Given so much visual feedback in such close proximity to the building site, the design team has chosen to pursue a style that more closely follows the contemporary style set by the Stanford Mall and the Caltrain Facility. The proposed buildings are displayed in Exhibits ARB 14 and ARB 15. In general, the design team has attempted to produce an architectural '" ,;rl,productwhichmanifests\the.following ,design, principles. " 1. Draws on local architectural styles for context. 2. Sense of permanence. ' 3. Presence of function and structural clarity and order. 4. ,Reflect inventive/ original edge. When selecting the architectural style, the following were considered: 1. Contextualize the Building: Drawing inspiration for materiality and form from the surrounding vicinity, the pump station is contextualized in an attempt to make it less prominent. The following building materials are proposed in this submittal: Standing Seam Metal Roofing: The proposed standing seam metal roof provides a long-term, simple, and durable solution to enclosing the building's envelope. The subtle pencil rib texture prevents and disguises the oil-canning distortion often inherent in metal roofing systems, and helps to insure a more uniformly 'finished appearance after installation. The neutral color selected offers a subtlety which is strongly preferred by the City (as opposed to the use of a more vibrant color), and provides a IICool Roof' classification helping to reduce the heat island effect (see Green Building Code se~ion below). Insulated/Impact Resistant. Translucent Fiberglass Panels: Kalwall is an inSulating, diffuse light-transmitting, structural composite sandwich panel with an impact resistant face panel at the exterior. By incorporating this system into our deSign, we have introduced natural light into the space and have added a level of aesthetic variation in materials which enhances the overall texture of the building envelope. Ground Face Concrete Masonry Units (Calstone's 12 x 8 x 16 - a gesture to the CMU used in the Stanford Shopping Center at PF Chang's): The ground-face texture of the masonry unit offers a more refined texture from the park-user's F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\E1 Camino ARB Project Description 10-11-/ 2013.doc •. -II. SIEGFRIEI;) .~ perspective (as compared to typical CMU), and the use of a warm gold color helps soften the appearance by making the structure appear less institutional. Green Building Code: The City of Palo Alto requires that all non-residential, new construction projects, greater than or equal to 1,000 square feet shall comply with the California Green Building Code effective January of 2011. The sustainable aspects described in the list of materials below exceed the minimum code requirements already incorporated into the construction documents for the pump station building: Standing Seam Metal Roofing -Cool Roof: . AEP Span -24 gauge "Span-Lok hp -Pencil Ribbed", Color: Cool Old Town Gray: Solar Reflectance Index = 41 LEED: The minimum reflectivity is 29 percent as prescribed by LEED for Steep > Sloped roofs (greater than 2: 12) for a minimum of 75% of the roof surface (the ,.d?rppg~e~roofing qualifiesfqr~EEp's.,SS ~re,Q.it7.(2) ,'. ,'. EPA: The minimum reflectivity is 25 percent as prescribed by the Federal Environmental Protection Agency (the proposed roofing qualifies for the EPA's Energy Star program for Steep Slope Roofs) Insulated/Impact Resistant. Translucent Fiberglass Panels Clearstory windows and skylights: Kalwall"Hi-lmpact" Panels, 12" x 24" shoji pattern, Color: "Crystal" exterior and "White" interior Energy Efficiency: Provides winter and summer energy efficiency by transmitting diffuse daylight, and reducing the need for artificial task lighting. Recycled Content: The specified system contains ± 20% post-consumer/pre­ consumer recycled content, primarily in the aluminum extrusions used in fabricating the panels and installation system. The skylights have an even greater recycled content, up to 40% or more, due to the aluminum box beam structure inherent to the system. ' Ground Face Concrete Masonry Units CMU: Calstone Ground face finish, color: #2152WC Regional Materials: Calstone Company manufactures the CMU specified for the pump station building in their Sunnyvale facility. In addition, all raw materials (except for pigments, which make up less than 1 % of the product) are extracted or manufactured within the 500-mile radius of the manufacturing facility. Acoustic Performance: CMU walls help dissipate and isolate noise. Mold Prevention: CMU does not provide a food source (like drywall or wood) for mold growth. Low Emitting Material: CMU walls provide a surface that does not require painting, thus reducing Volatile Organic Compounds (VOCs). F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\E1 Camino ARB Project Description 10-11- 2013.doc CITY OF ALO AL 0 Agenda Date: To: From: Subject: December 19,2013 Architectural Review Board Clare Campbell, Planner Architectural Review Board Staff Report Department: Planning and Community Environment 103 EI Camino Real (EI Camino Park) [13PLN-00434]: Request by City of Palo Alto Public Works Engineering for Architectural Review of park improvements for El Camino Park that include a synthetic soccer/lacrosse play field, natural turf softball/lacrosse play field, new restrooms, enlarged parking lot, and other improvements in the Public Facility zone district. Environmental Assessment: An Environmental Impact Report was adopted March 5, 2007 in accordance with the California Environmental Quality Act (CEQA). RECOMMENDATION Staff recommends that the Architectural Review Board (ARB) recommend the Director of Planning and Community Environment approve the proposed project, based upon the required findings (Attachments A) and subject to the conditions of approval (Attachment B). BACKGROUND Background The proposed project is the second phase of the El Camino Park Reservoir and Pump Station project. This project is part of the larger Palo Alto Emergency Water Supply project that included the rehabilitation of existing city water wells, construction of new wells, and upgrading of the. existing Mayfield pump station. The proposed proj ect is located within El Camino Park, which is bordered by El Camino Real to the west, Alma Street/Caltrain tracks to the east, Palo Alto Avenue to the north, and the University Avenue Caltrain bus transfer station to the south. The existing condition, as explained in this report, is based upon the park layout of2011; the park had one full-sized grass soccer field on the north side and one lighted softball diamond on the south side with bleachers, cage and fencing. Located in the easternmost comer of the park is the newly constructed Lytton pump station; the new underground water reservoir has also been installed below the softball field. These two elements, the pump station and reservoir, were part .of the first phase of the project 13PLN-00434 Page 1 of5 approved by the ARB in March 2011; construction began in October 2011. The ARB review and recommendation of site improvements unrelated to the actual pump station and reservoir are now requested. The City's Utilities Department has a project website that provides additional background information, photos, and live webcam of the site: http://www.cityofpaloalto.org/gov/depts/utl/eng/water/wells/pumpstation.asp . Proj ect Description The proposed project will complete the renovations of El Camino Park. The construction of the first phase of the project is at or near completion with the installation of the replacement water pump station and new underground water reservoir. The second phase of the project will provide upgrad~d recreational amenities, as detailed below. South Field (see Sheet ARB 5.0 of Attachment E): 1. Installation of a natural turf softball field above the new water reservoir; 2. ,Installation of permanent eight foot tall chain-link. fencing along the perimeter of theJeft and right outfields; 3. Installation of two dugouts and softball backstop; 4. Installation of a removable four foot tall mesh fence system in the outfield; 5. Relocation of the existing alunlinum portable bleachers; 6. Replacement of two 70 foot tall pole-mounted sports field lights and upgrading the four existing 70 foot tall pole-mounted light fixture heads; and 7. Construction of the scorekeeper and storage building behind the backstop. North Field (see Sheet ARB 5.1 of Attachment E): 1. Installation of a synthetic turf field striped for soccer and lacrosse games; 2. Installation of player seating on both sides of the mid-field; 3. Installation of soccer ball protection fencing around the majority of the field perimeter (14 foot tall chain-link fence with 12 feet of additional netting); 4. Installation of four 70 foot tall pole-mounted sports field lights; 5. Installation of a multi-purpose lawn area at the north end of the park; and 6. Addition of three new picnic areas with tables around the multi-purpose lawn. General Improvements: 1. Expansion of the asphalt parking lot from 46 spaces to 68 spaces; 2. Construction of replacement restrooms; 3. Installation of a 'no parking loading/unloading' zone next to the new restroom facility; 4. Installation of porous pavement for a portion of the parking lot to facilitate water infiltration to the nearby existing trees; 5. Construction of a new trash enclosure; 6. Installation of two 42 inch tall fold-down bollards to secure the maintenance vehicle route; 7. Relocation of the emergency phone close to the new restroonl building; 8. Installation of decomposed granite pathways around the entire park; 9. Installation of security lighting throughout the park with 14 foot tall pole-mounted lights; 10. Installation of nine bike racks (three near the restroom and six by the soccer field); 13PLN-00434 Page 2 0[5 11. Installation of new landscaping throughout the park that includes trees of various SIzes, shrubs, grasses, vines, and ground cover. The new structures (restroom, scorekeeper & storage, trash enclosure) have been designed in a style consistent with the already constructed pump station building. Similar materials and colors have been selected for the new structures so as to maintain a complementary and cohesive style for the park. The basic materials proposed are concrete block (CMU) with the color to match the pump station and a dark grey standing-seam metal roof. Please refer to the applicant's project description and plans for additional project details (Attachments C and E). DISCUSSION Architectural Review The Architectural Review Board is tasked with reviewing the aesthetics of significant development projects within the City and focuses its discussion and comments on .the design and. architecture; land use policy and enforcement of zoning requirements do not fall within the ARB's purview. For all projects subject to Architectural Review, there are required findings (ARB Findings) that must be considered and complied with in order to support approval of a project. These findings are not based on quantitative standards, such as a maximum height allowance or defined setback requirement, but rather on more qualitative criteria (e.g. design appropriate to the function of the project, plant material suitable to the site, and design appropriate with the immediate environnlent of the site). Within this qualitative realm, the Council-appointed ARB members, who are experienced design professionals, provide their expertise in evaluating the ARB Findings to support a project. Attachment A includes the project's ARB Findings and discusses the project's compliance with each. Zoning and Comprehensive Plan Compliance The proposed project upgrades the existing playfields and amenities and increases the on-site parking with 22 additional spaces. The project design is in compliance with the Public Facility (PF) zoning requirenlents and is in general conformance with the Comprehensive Plan. It is supported by several policies that direct new construction, including public infrastructure, to be compatible with the neighborhood character, to have high quality, creative design and site planning, and to promote the use of community facilities as gathering places, as follows: • Policy L-4: Maintain Palo Alto's varied residential neighborhoods while sustaining the vitality of its commercial areas and public facilities. Use the Zoning Ordinance as a tool to enhance Palo Alto's desirable qualities. • Policy L-15: Preserve and enhance the public gathering spaces within walking distance of residential neighborhoods. Ensure that each residential neighborhood has such spaces. • Policy L-48: Promote high quality, creative design and site planning that is compatible with surrounding development and public spaces. 13PLN~00434 Page 3 of5 • Policy L-61: Promote the use of community and cultural centers, libraries, local schools, parks, and other community facilities as gathering places. Ensure that they are inviting and safe places that can deliver a variety of conlmunity services during both daytime and evening hours. • Policy L-76: Require trees and other landscaping within parking lots. • Policy C-22: Design and construct new community facilities to have flexible functions to ensure adaptability to the changing needs of the community. • Policy C~24: Reinvest in aging facilities to improve their usefulness and appearance. Avoid deferred maintenance of City infrastructure. • Policy C-26: Maintain and enhance existing park facilities. • Policy C-32: Provide fully accessible public facilities to all residents and visitors. ENVIRONMENTAL REVIEW The proposed project is subject to environmental review under provisions of the California Environmental Quality Act (CEQA). An Environmental Impact Report (EIR) was adopted March 5, 2007 for the City of Palo Alto Emergency Water Supply and Storage Project, which included t~e re~abilitation of existing city water wells, construction of new wells, construction of a new water· storage reservoir with associated well and pump station, and upgrading the existing Mayfield pump station. The proposed project was included in the scope of the EIR and is associated with the new water reservoir and pump station component of the overall larger project. An Addendum (Attachment D) has been prepared to provide project clarifications to this one component of the larger proj ect, which shall become public record as an attachment to the adopted 2007 EIR. The project clarifications, which were not known at the time the EIR was prepared, are considered minor and staff determined that the project would not create any environmental impacts beyond those already identified in the 2007 EIR. The significant and unavoidable impacts identified in the 2007 EIR were related to noise levels exceeding the Code allowances during construction activities and the potential short term loss of parking spaces related to temporary parking demand for construction workers and construction vehicles as the crew moves along the pipeline installation alignment, and would reduce parking supply at proposed well and storage reservoir locations. Pursuant to CEQA Guidelines Section 15162, recirculation is not required as the project changes do not create new significant environmental impacts or a substantial increase in the severity of previously identified effects. ATTACHMENTS Attachment A: Draft ARB Findings Attachment B: Draft Conditions of Approval Attachment C: Project Description* Attachment D: CEQA Addendum (to be provided at places) Attachment E: Development Plans (Board Members Only)* * Prepared by Applicant; all other attachments prepared by Staff COITRTESY COPIES Hung Nguyen, Hung.N guyen@CityofPaloAlto.org Daren Anderson, Daren.Anderson@CityofPaloAlto.org 13PLN-00434 Page 4 of5 Prepared By: Clare Campbell, Pla,w;:-:Q Manager Review: Amy French, Chief Planning Official t$1-- 13PLN-00434 Page 5 of5 ATTACHMENT A FINDINGS FOR APPROVAL ARCHITECTURAL REVIEW BOARD STANDARDS FOR REVIEW 103 EI Camino Real/File No. 13PLN-00434 The design and architecture of the proposed project, as conditioned, complies with the Findings for Architectural Review as required in PAMC Chapter 18.76. (l) The design is consistent and compatible with applicable elements of the Palo Alto Comprehensive Plan. This finding can be made in the affirmative in that the project incorporates quality design that conforms with policies that direct new construction (including public infrastructure) to be compatible with the neighborhood character; to have high quality, creative design and site planning; and to promote the use of community facilities as gathering places (2) The design is compatible with the immediate environment of the site. This finding can be made in the affirmative in that the proposed park improvements are designed to complement the architectural elements of the recently upgraded pump station and are compatible with the adjacent transit center. (3) The design is appropriate to the function of the project. This finding can be made in the affirmative in that the design of the inlprovements are consistent with typical park and active sport field facilities; the design of the new structures are simple with a modem aesthetic that is inline with their utilitarian function. (4) In areas considered by the board as having a unified design character or historical character, the design is compatible with such character. This finding is not applicable to this proj ect in that this area does not have a unified design or historic character. (5) The design promotes harmonious transitions in scale and character in areas between different designated land uses. This finding is not applicable in that this project is not situated in a transition area between different designated land uses. ( 6) The design is compatible with approved improvements both on and off the site. This finding can be made in the affirmative in that the renovated playing fields and amenities are compatible with the existing established park use and the adjacent transit station. (7) The planning and siting of the various functions and buildings on the site create an internal sense of order and provide a desirable environment for occupants, visitors and the general community. This finding can be nlade in the affirmative in that the siting of the playing fields, new restrooms, picnic area, pathways, etc. provide desirable and functional spaces and amenities for users of the park. (8) The amount and arrangement of open space are appropriate to the design and the function of the structures. This finding can be made in the affirmative in that the project is a park facility and provides significant open space. ATTACHMENT A (9) Sufficient ancillary functions are provided to support the main functions of the project and the same are compatible with the project's design concept. This finding can be made in the affirmative with the inclusion of restrooms, refuse area, pathways, etc. that support the prin1ary active sports field functions. (10) Access to the property and circulation thereon are safe and convenient for pedestrians, cyclists and vehicles. This finding can be made in the affirmative in that the added pathways and expanded parking lot provide safe and convenient access for users. (11) Natural features are appropriately preserved and integrated with the project. This finding can be made in the affirmative in that three non-protected trees are proposed for removal and all remaining trees will be fully protected and preserved. The parking lot will use pervious concrete for a portion of the area that is near existing root zones to facilitate preservation of mature trees. (12) The materials, textures, colors and details of construction and plant material are appropriate expression to the design and function. This finding can be made in the . affirmative in that the proposed project incorporates finishing materials and .. colors .that, match the existing CMU pump station building, which uses earth-tone neutral colors. (13) The landscape design concept for the site, as shown by the relationship of plant masses, open space, scale, plant forms and foliage textures and colors create a desirable and functional environment. This finding can be made in the affirmative in that the project incorporates landscape materials that provide screening and enhance the aesthetics of the park. (14) Plant material is suitable and adaptable to the site, capable of being properly maintained on the site, and is of a variety which would tend to be drought-resistant to reduce consumption of water in its installation and maintenance. This finding can be made in the affirmative in that the proposed landscape materials were specifically selected to be low maintenance as well as an enhancement to the site. (15) The project exhibits green building and sustainable design that is energy efficient, water conserving, durable and nontoxic, with high-quality spaces and high recycled content materials. This finding can be made in the affirmative in that the project includes the use of a cool roof, materials with substantial recycled content, and low VOC emitting materials. The proposed project is also subject to the City's Green Building Regulations for nonresidential development. (16) The design is consistent and compatible with the purpose of architectural review as set forth in subsection 18.76. 020(a). This finding can be made in the affirmative in that the project design promotes visual environments that are of high aesthetic quality and variety. ATTACHMENTB DRAFT CONDITIONS OF APPROV AL 103 El Camino Real/File No. 13PLN-00434 PLANNING & COMMUNITY ENVIRONMENT On December 19, 2013 the Architectural Review Board (ARB) recomm'ended approval of the application referenced above, and the Director of Planning and Community Environment (Director) approved the project on date. Project Planner: Clare Campbell Planning Division _______________________ ___ 1. The project shall be in substantial conformance with the approved plans and related documentsreceived -D'ecelhber 10, 2013, except as'modified to "il1corpotate' these ' conditions of approval. 2. The Conditions of Approval document shall be printed on all plans submitted for building permits related to this project. ACCESS IMPROVEMENTS: Nunlbered comnlents refer to attached annotated site plan. 1. Consider adding an additional DG path to connect the crosswalk at Quarry RoadiEI Camino to the parks perimeter DG path. 2. Refine the connection between the new bike path and the existing AC path to ensure proper curvature, sight lines, stirping and smooth joint. 3. Should the crosswalk improvements be implemented realign the existing El Camino Real AC sidewalk to merge with the new bike path. 4. Provide proper bollard placement and striping that conforms with the HDMIMUTCD. Use city standard bollards. 5. Provide an accessible path of travel from the public right of way to the playing field buildings. 6. Add new trail crosswalk across parking lot driveway with potential median refuge. Work with CPA transportation 'division to determine signage and striping. 7. Relocate existing AC path on north side of parking lot driveway to align with proposed crosswalk and trail adjacent to the softball field. 8. Resurface approximately 100' of existing cracked pathway between El Camino/Palo Alto Ave curb ramp and the proposed limits of the new path. Include in plans submitted for a building permit: Page 10f6 .' .,t' •• " "'.i ATTACHMENT B 1. GRADING & DRAINAGE PLAN: The plan set nlust include a grading & drainage plan prepared by a licensed professional that includes existing and proposed spot elevations and drainage flow arrows to demonstrate proper drainage of the site. Adj acent grades must slope away from the house a minimum of 2%. Downspouts and splashblocks should be shown on this plan, as well as any site drainage features such as swales. Grading will not be allowed that increases drainage onto, or blocks existing drainage from, neighboring properties. Public Works generally does not allow rainwater to be collected and discharged into the street gutter, but encourages the developer to keep rainwater onsite as much as feasible by directing runoff to landscaped and other pervious areas of the site. See the Grading & Drainage Plan Guidelines for Residential Developments on our website: http://www.cityofpaloalto.org/civicax/filebank!documents/2717 2. GRADING & EXCAVATION PERMIT: An application for a grading & excavation permit must be submitted to Public Works when applying for a building permit. The site plan must include a table providing the cubic yardage of dirt being cut and filled outside of the building footprint. The application and guidelines are available atthe Development Center and on our website. Instructions: http://www.cityofpaloalto.org!civicax/filebank/documents/11697 Application: http://www.cityofpaloalto.org!civicax/filebank!documents/11695 3. GRADING PERMIT: The site plan must include a table providing the cubic yardage of dirt being cut and filled outside of the building footprint. If the total is more than 100 cubic yards, a grading permit will be required. An application and plans for a grading permit are subnlitted to Public Works separately from the building permit plan set. The application and guidelines are available at the Development Center and on our website. . 4. STORM WATER POLLUTION PREVENTION: The City's full-sized Pollution Prevention -It's Part of the Plan sheet must be included in the plan set. Copies are available from Public Works at the Development Center or on our website: http://www.cityofpaloalto .org! civicaxlfile bank! documents/273 2 5. SWPPP: The proposed development will disturb more than one acre of land. Accordingly, the applicant will be required to comply with the State of California's General Permit for Storm Water Discharges Associated with Construction Activity. This entails filing a Notice of Intent to Comply (NOI), paying a filing fee, and preparing and implementing a site specific storm water pollution prevention plan (SWPPP) that addresses both construction-stage and post-construction BMP's for storm water quality protection. The applicant is required to submit two copies of the NOI and the draft SWPPP to the Public Works Department for review and approval prior to issuance of the building permit. Also, include the City's standard "Pollution Prevention -It's Part of the Plan" sheet in the building permit plan set. Copies are available from Public Works at the Development Center. Page 20f6 ATTACHMENT B 6. STREET TREES: Show all existing street trees in the public right-of-way. Any removal, relocation or planting of street trees; or excavation, trenching or pavement within 10 feet of street trees must be approved by Public Works' arborist (phone: 650-496-5953). This approval shall appear on the plans. Show construction protection of the trees per City requirements. 7. WORK IN THE RIGHT -OF-WAY: The plans must clearly indicate any work that is proposed in the public right-of-way, such as sidewalk replacement, driveway approach, or utility laterals. The plans must include notes that the work must be done per City standards and that the contractor performing this work must first obtain a Street Work Permit from Public Works at the Development Center. If a new driveway is in a different location than the existing driveway, then the sidewalk associated with the new driveway must be replaced with a thickened (6" thick instead of the standard 4" thick) section. Additionally, curb cuts and driveway approaches for abandoned driveways must be replaced with new curb, gutter and planter strip. K IMPERVIOUS SURFACE AREA: The project will be creating or replacing 500- square feet or more of impervious surface. Accordingly, the applicant shall provide calculations of the existing and proposed impervious surface areas with the building permit application. The Impervious Area Worksheet/or Land Developments form and instructions are available at the Development Center or on our website': http://www.cityofpaloalto.org/civicax/filebank/documents/2718 9. STORM WATER TREATMENT: This project shall comply with the storm water regulations contained in provision C.3 of the NPDES municipal stoml water discharge permit issued by the San Francisco Bay Regional Water Quality Control Board (and incorporated into Palo Alto Municipal Code Chapter 16.11). These regulations apply to land development projects that create or replace 10,000 square feet or more of impervious surface. In order to address the potential permanent impacts of the project on storm water quality, the applicant shall incorporate into the project a set of permanent site design measures, source controls, and treatment controls that serve to protect storm water quality, subject to the approval of the Public Works Department. The applicant shall identify, size, design and incorporate permanent storm water pollution prevention measures (preferably landscape-based treatment controls such as bioswales, filter strips, and permeable pavement rather than mechanical devices that require long-term maintenance) to treat the runoff from a "water quality storm" specified in P AMC Chapter 16.11 prior to discharge to the municipal storm drain system. Effective February 10,2011, regulated projects, must contract with a qualified third­ party reviewer during the building permit review process to certify that the proposed permanent storm water pollution prevention measures comply with the requirements of Palo Alto Municipal Code Chapter 16.11. The certification form, 2 copies of approved storm water treatment plan, and a description of Maintenance Task and Schedule must be received by the City from the third-party reviewer prior to approval of the building permit by the Public Page 3 of6 ATTACHMENTB Works department. Within 45 days of the installation of the required storm water treatment measures and prior to the issuance of an occupancy permit for the building, third-party reviewer shall also submit to the City a certification for approval that the project's permanent measures were constructed and installed in accordance to the approved permit drawings. 10. STORMW ATER MAINTENANCE AGREEMENT: The applicant shall designate a party to maintain the control measures for the life of the improvements and must enter into a maintenance agreement with the City to guarantee the ongoing maintenance of the permanent C.3 storm water discharge . compliance measures. The maintenance agreement shall be executed prior to the first building occupancy sign-off. The City will inspect the treatment measures yearly and charge an inspection fee. There is currently a $350 C.3 plan check fee that will be collected upon submittal for a grading or building permit. EkctricEn~n~ringD~~fun _____________________ _ 1. The applicant shall comply with all the Electric Utility Engineering Department service requirements noted during plan review. 2. The applicant shall be responsible for identification and location of all utilities, both public and private, within the work area. Prior to any excavation work at the site, the applicant shall contact Underground Service Alert (USA) at 1-800-227-2600, at least 48 hours prior to beginning work. 3. The applicant shall submit a request to disconnect all existing utility services and/or meters including a signed affidavit of vacancy, on the form provided by the Building Inspection Division. Utilities will be disconnected or removed within 10 working days after receipt of request. The demolition permit will be issued after all utility services and/or meters have been disconnected and removed. THE FOLLOWING SHALL BE INCORPORATED IN SUBMITTALS FOR ELECTRIC SERVICE 1. A completed Electric Load Sheet and a full set of plans must be included with all applications involving electrical work. The load sheet must be included with the preliminary submittal. 2. Industrial and large commercial customers must allow sufficient lead-time for Electric Utility Engineering and Operations (typically 8-12 weeks after advance engineering fees have been paid) to design and construct the electric service requested. 3. Only one electric service lateral is permitted per parcel. Utilities Rule & Regulation #18. 4. This project requires a padmount transformer; the location of the transformer shall be shown on the site plan and approved by the Utilities Department and the Architectural Review Board. Utilities Rule & Regulations #3 & #16 (see detail comments below). Page 4 of6 ATTACHMENTB 5. The developer/owner shall provide space for installing padmount equipment (Le. transformers, switches, and interrupters) and associated substructure as required by the City. 6. The customer shall install all electrical substructures (conduits, boxes and pads) required from the service point to the customer's switchgear. The design and installation shall be according to the City standards a1)d shown on plans. Utilities Rule & Regulations # 16 & #18. 7. Location of the electric paneVswitchboard shall be shown on the site plan and approved by the Architectural Review Board and Utilities Department. 8. All utility meters, lines, transformers, backflow preventers, and any other required equipment shall be shown on the landscape and irrigation plans and shall show that no conflict will occur between the utilities and landscape materials. In addition, all aboveground equipment shall be screened in a manner that is consistent with the building design and setback requirements. 9. For services larger than 1600 amps, the customer will be required to provide a transition cabinet as the interconnection point between the utility's padmount transformer and the customer's main switchgear. The cabinet design drawings must be submitted to the Electric Utility Engineering Department for review and approval. 10. For underground services, no more than four (4) 750 MCM conductors per phase can be connected to the transformer secondary terminals; otherwise, bus duct must be used for connections to padmount transformers. If customer installs a bus duct directly between the transformer secondary terminals and the main switchgear, the installation of a transition cabinet will not be required. 11. The customer is responsible for sizing the service conductors and other required equipment according to the National Electric Code requirements and the City standards. Utilities Rule & Regulation #18. 12. If the customer's total load exceeds 2500 kVA, service shall be provided at the primary voltage of 12,470 volts and the customer shall provide the high voltage switchgear and transformers. . 13. For primary services, the standard service protection is a padmount fault interrupter owned an maintained by the City, installed at the customer's expense. The customer must provide and install the pad and associated substructure required for the fault interrupter. 14. Any additional facilities and services requested by the Applicant that are beyond what the utility deems standard facilities will be subject to Special Facilities charges. The Special Facilities charges include the cost of installing the additional facilities as well as the cost of ownership. Utilities Rule & Regulation #20. 15. Projects that require the extension of high voltage primary distribution lines or reinforcement of offsite electric facilities will be at the customer's expense and must be coordinated with the Electric Utility. Page 5 of6 ATTACHMENT B DURING CONSTRUCTION 1. Contractors and developers shall obtain permit from the Department of Public Works before digging in the street right-of-way. This includes sidewalks, driveways and planter strips. 2. At least 48 hours prior to starting any excavation, the customer must call Underground Service Alert (USA) at 1-800-227-2600 to have existing underground utilities located and marked. The areas to be check by USA shall be delineated with white paint. All USA markings shall be removed by the customer or contractor when construction is complete. 3. The customer is responsible for installing all on-site substructures (conduits, boxes and pads) required for the electric service. No more than 270 degrees of bends are allowed in a secondary conduit run. All conduits must be sized according to National Electric Code requirements and no 1/2 -inch size conduits are permitted. All off-site substructure work will be constructed by the City at the customer's expense. Where mutually agreed upon by the City and the Applicant, all or part of the off-site substructure work may be constructed by the Applicant. 4. All primary electric conduits shall be concrete encased with the top of the encasement at the depth of30 inches. No more than 180 degrees of bends are allowed in a primary conduit run. Conduit runs over 500 feet in length require additional pull boxes. 5. All new underground conduits and substructures shall be installed per City standards and shall be inspected by the Electrical Underground Inspector before backfilling. 6. The customer is responsible for installing all underground electric service conductors, bus duct, transition cabinets, and other required equipment. The installation shall meet the National Electric Code and the City Standards. 7. Meter and switchboard requirements shall be in accordance with Electric Utility Service Equipment Requirements Committee (EUSERC) drawings accepted by Utility and CPA standards for meter installations. 8. Shop/factory drawings for switchboards (400A and greater) and associated hardware must be submitted for review and approval prior to installing the switchgear to: Gopal Jagannath, P .E. Supervising Electric Project Engineer Utilities Engineering (Electrical) 1007 Elwell Court Palo Alto, CA 94303 9. Catalog cut sheets may not be substituted for factory drawing submittal. All new underground electric services shall be inspected and approved by both the Building Inspection Division and the Electrical Underground Inspector before energizing. Page 6of6 I •. -ATTACHMENT C •• SIEGFRIEQ RECEIVED To: From: Date: Re: EI Camino Park Restoration OCT 17 2013 Package #2 City of Palo Alto, Planning Department Architectural Review Board Paul J. Schneider October 11, 2013 Department of Planning & Community Environment Palo Alto Emergency Water Supply Project -EI Camino Park Reservoir and Pump Station -Park Restoration Package #2 -ARB Approval Submittal . General Overview of Project Need and Team: Since 1962, the primary source of potable water supply for the City of Palo Alto (City) has been from' the San Francisco' Public Utilities Commission (SFPUC) Hetch Hetchy' aqueduct" . system. There are five (5) connections to the aqueduct system at various locations in the City. In addition, the City's water supply in an emergency can be supplemented by five (5) existing water wells and five (5) storage reservoirs. In 1997, the Department of Health Services (DHS, now the California Department of Public Health (CDPH» recommended that, as a minimum, the City should have sufficient stand-alone emergency water supply and storage capacity to deliver eight. (8) hours of maximum day water demand, while maintaining additional reserves and pumping capacity for four (4) hours of fire demand, in the event that water supply from the Hetch Hetchy aqueduct system is interrupted for any reason. In 1999, a comprehensive study was made of the City's water distribution system. The results of the study were reported in "Water Wells, Regional Storage, and Distribution Study" (1999 Study). The 1999 Study recommended the following improvements to the City's water distribution system: • rehabilitation of all five (5) existing City water wells, • construction of three (3) new water wells, • construction of a new water storage reservoir and associated new well and pump station, and • upgrading of an existing pump station. In 2007, an Environmental Impact Report (EIR) of the "City of Palo Alto Emergency Supply and Storage Project" was certified for compliance with the California Environmental Quality Act (CEQA) for construction of-the recommended water distribution system improvements. The purpose of this presentation is to address the construction of the underground reservoir, one new emergency use well, and pump station replacement with improvements at EI Camino Park. The Utilities Division of the City has chosen the "Design-Bid-Build" method of project delivery and has hired CMM-Smith of Walnut Creek with the assistance of Siegfried of Stockton as the design team. The improvements at the site will be performed as two (2) separate design and bidding packages. Package #1 which has been approved and is nearly complete involves the construction of the underground reservoir, the underground F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\EI Camino ARB Project Description 10-11- 2013.doc •. - •• SIEGFRIEI) piping, the pump station, and the hardscape improvements adjacent to the pump station. Package #2 involves the re-construction of the sports fields on the north and south sides of the park, the landscaping and irrigation, reconstruction and expansion of the parking lot, a new restroom, and a combined scorekeeper's booth/storage building. The purpose of this submittal is to seek ARB approval of the project documents for the Work associated with Package #2-Park Restoration. The ARB reviewed and approved the Package #1 Reservoir and Pump Station Improvement Plans on March 17, 2011. Existing Site Conditions: The project site is . located within EI Camino Park located along EI Camino Real at Alma Street. The park is bound on the east by the Caltrain tracks, Alma Street to the north, Stanford Shopping Mall and EI Camino Real to the west, and the Caltrain bus transfer station to the south. The cover s~eet, ARB 1.0, displays the project site. The park currently has a small parking lot, natural grass full soccer field, grass play area, , and· natural ,grass softball ,field with crushed brick. infield.· In the southeast comerot thesite. there is an existing pump station facility with a paved and fenced access yard with access from both the park and the Caltrain transfer station driveway. The existing site conditions are documented with site photos on ARB 2.0 and renderings of the nearly complete Phase 1 improvements can be found on ARB 3.0. As one can see from the site pictures the existing and proposed facilities are tucked back in the far corner of the park and nestled up against the Caltrain tracks, the Caltrain bus transfer station, and is nicely surrounded by tall mature oaks and redwoods that obscure its visibility from EI Camino Real and the Stanford Mall. As illustrated in ARB 4.0 the City has purchased a permanent easement within which the plan shows the Package #1 im provements with the new reservoir, emergency groundwater well, pump station, and overflow pipeline. There are numerous other utility easements that contain underground and overhead electrical mains, water supply and feed lines to and from the City system, and SFPUC main feed. Site Design: Parking Lot The project is split into two sport fields by the parking lot. As shown in ARB 6.0 and ARB 7.0 the parking lot will be rebuilt and expanded more or less in place and additional parking will be added expanding the to the towards the north. The paving will be asphalt and areas that occur under the canopy of the existing trees will have porous pavers, porous concrete or porous asphalt installed to maintain infiltration into the root zone of the trees. The stall~ will meet City standards and parking lot tree islands will be added as well. The new deSign will be adding valuable and much needed parking spaces. A 22'x8' City standard CMU trash enclosure will be installed at the end of the parking lot as well as a centrally located restroom facility with drinking fountains. Both structures will match in materials, color and style to that of the pump station installed during Package #1. Materials, details, and renderings can be found on ARB 15.0. F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\EI Camino ARB Project Description 10-11- 2013.doc ·.-•• SIEGFRIEI) South Field The south field is where the softball field is located. The pr<~posed design (see ARB 6.0) locates the new field in the same location and fence distances as the existing conditions. The field will be a natural turf field with a crushed brick infield material. The facility features the use of the eXisting arched backstop cage. Both foul lines will have new 8' high chain link fencing and dugout enclosure areas. The outfield fence will be a 4' high removable fencing system which will allow for other sporting functions such as lacrosse and soccer to be striped and played. Just beyond the right-center field fence a planter island will be located with understory planting and screen trees to help buffer the views from EI Camino. Updated and more efficient sports field lighting will be installed to meet current field lighting requirements and will be installed with cut-off shields to confine the light to the fields. See ARB 10.0 and 10.1 for photometric and cut sheets. Electrical conduit only will be installed for future opportunities to wire a scoreboard in the outfield. The walkways and area behind the field fences will have new concrete installed. The existing bleachers will be used and ph~ced per plan. A small scorekeeper's building will be combined with a storage building and placed at the softball backstop per ARB 6.0. The structure is displayed on ARB 15.0. In .. addition a new· restroom}NilI. be .. c.oostructedvi a . a20 13CI P.programand is located; at . the,l. end of the new parking lot. The restroom is displayed on ARB 14.0. These structures will match in materials, colors and style to that of the pump station installed during Package #1" .. North Field The north field is where the soccer and lacrosse fields will be located. The proposed deSign (see ARB 7.0) locates the new synthetic field within the location of the existing field and is located to minimize impact to the surrounding trees. The field will be' striped at 65 yards by 110 yards and have moveable goal posts which can be secured in their location on the field. There is an additional synthetic turf perimeter of 10' on the sidelines and 15' on the end lines. The entire perimeter of synthetic turf is contained by a flush 12" Wide concrete band. Concrete player gathering areas are located at midfield on both sides of the field and access walkways are provided from the field to the parking lot, bike path and restroom. The north end of the park, beyond the field will be a multi-purpose lawn area with natural turf. Concrete pads and picnic tables will be located on the perimeter and walkers will have the ability to walk the perimeter of the north park on a meandering decomposed granite fines path with stabilizer. The portion of the bike path adjacent to EI Camino will be rebuilt in-place with porous concrete. All areas in the park beyond fields and pavement will be covered with recycled mulch. One of the priorities for this site is the preservation of the existing trees and the protection of the root zones. The design team is in the process of working with a consulting Arborist to determine the allowable impact of construction under the tree canopies and within the drip lines of the trees. Prior to final submittal of Improvement plans to ARB, the design team will meet with the City Arborist to determine and approve any deSigns and construction within the tree drip lines. New path lighting will be installed to ensure safety along the walking paths and the picnic areas to the north of the soccer field. Photo metrics are displayed on ARB 10.0. A 25 foot high chain link fence will be installed along portions of the field on the EI Camino and F:\12cad\12288 EI Camino Park Phase 2\Win-Oocs'ARB Forms and Checklist\EI Camino ARB Project Description 10-11- 2013.doc • ill- •• SIEGFRIEI) parking lot sides. This fencing will add safety and limit the ability of errant soccer balls from entering EI Camino Real and the parking lot. Proposed Building Context: The general geographic area has more than one distinctive architectural style, and our goal is to make the restroom facilities less dominant but cohesive with all aspects of its surroundings. The varying styles in the local area are evident by looking across the street to the Stanford Mall, the very contemporary style of the Caltrain Facility, and then having Such elements as the old Stanford Barn and the University Architecture just down the street. Given so much visual feedback in such close proximity to the building site, the design team has chosen to pursue a style that more closely follows the contemporary style set by the Stanford Mall and the Caltrain Facility. The proposed buildings are displayed in Exhibits ARB 14 and ARB 15. In general, the design team has attempted to produce an architectural '" ,;rl,productwhichmanifests\the.following ,design, principles. " 1. Draws on local architectural styles for context. 2. Sense of permanence. ' 3. Presence of function and structural clarity and order. 4. ,Reflect inventive/ original edge. When selecting the architectural style, the following were considered: 1. Contextualize the Building: Drawing inspiration for materiality and form from the surrounding vicinity, the pump station is contextualized in an attempt to make it less prominent. The following building materials are proposed in this submittal: Standing Seam Metal Roofing: The proposed standing seam metal roof provides a long-term, simple, and durable solution to enclosing the building's envelope. The subtle pencil rib texture prevents and disguises the oil-canning distortion often inherent in metal roofing systems, and helps to insure a more uniformly 'finished appearance after installation. The neutral color selected offers a subtlety which is strongly preferred by the City (as opposed to the use of a more vibrant color), and provides a IICool Roof' classification helping to reduce the heat island effect (see Green Building Code se~ion below). Insulated/Impact Resistant. Translucent Fiberglass Panels: Kalwall is an inSulating, diffuse light-transmitting, structural composite sandwich panel with an impact resistant face panel at the exterior. By incorporating this system into our deSign, we have introduced natural light into the space and have added a level of aesthetic variation in materials which enhances the overall texture of the building envelope. Ground Face Concrete Masonry Units (Calstone's 12 x 8 x 16 - a gesture to the CMU used in the Stanford Shopping Center at PF Chang's): The ground-face texture of the masonry unit offers a more refined texture from the park-user's F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\E1 Camino ARB Project Description 10-11-/ 2013.doc •. -II. SIEGFRIEI;) .~ perspective (as compared to typical CMU), and the use of a warm gold color helps soften the appearance by making the structure appear less institutional. Green Building Code: The City of Palo Alto requires that all non-residential, new construction projects, greater than or equal to 1,000 square feet shall comply with the California Green Building Code effective January of 2011. The sustainable aspects described in the list of materials below exceed the minimum code requirements already incorporated into the construction documents for the pump station building: Standing Seam Metal Roofing -Cool Roof: . AEP Span -24 gauge "Span-Lok hp -Pencil Ribbed", Color: Cool Old Town Gray: Solar Reflectance Index = 41 LEED: The minimum reflectivity is 29 percent as prescribed by LEED for Steep > Sloped roofs (greater than 2: 12) for a minimum of 75% of the roof surface (the ,.d?rppg~e~roofing qualifiesfqr~EEp's.,SS ~re,Q.it7.(2) ,'. ,'. EPA: The minimum reflectivity is 25 percent as prescribed by the Federal Environmental Protection Agency (the proposed roofing qualifies for the EPA's Energy Star program for Steep Slope Roofs) Insulated/Impact Resistant. Translucent Fiberglass Panels Clearstory windows and skylights: Kalwall"Hi-lmpact" Panels, 12" x 24" shoji pattern, Color: "Crystal" exterior and "White" interior Energy Efficiency: Provides winter and summer energy efficiency by transmitting diffuse daylight, and reducing the need for artificial task lighting. Recycled Content: The specified system contains ± 20% post-consumer/pre­ consumer recycled content, primarily in the aluminum extrusions used in fabricating the panels and installation system. The skylights have an even greater recycled content, up to 40% or more, due to the aluminum box beam structure inherent to the system. ' Ground Face Concrete Masonry Units CMU: Calstone Ground face finish, color: #2152WC Regional Materials: Calstone Company manufactures the CMU specified for the pump station building in their Sunnyvale facility. In addition, all raw materials (except for pigments, which make up less than 1 % of the product) are extracted or manufactured within the 500-mile radius of the manufacturing facility. Acoustic Performance: CMU walls help dissipate and isolate noise. Mold Prevention: CMU does not provide a food source (like drywall or wood) for mold growth. Low Emitting Material: CMU walls provide a surface that does not require painting, thus reducing Volatile Organic Compounds (VOCs). F:\12cad\12288 EI Camino Park Phase 2\Win-Docs\ARB Forms and Checklist\E1 Camino ARB Project Description 10-11- 2013.doc @ w C IT Y OF PAL ALTO Agenda Date: To: From: Subject: December 19, 2013 Architectural Review Board Jodie Gerhardt, Senior Planner 3 Architectural Review Board Staff Report Department: Planning and Community Environment 4180 EI Camino Real [13PLN-00422]: Request by David McVey, Tesla Motors on behalf of Peter Mullen for Architectural Review of a sign exception to allow one additional wall sign and one freestanding sign along the El Camino Real elevation of the new Tesla Motors Automobile Dealership in the CS(AD) zoning district. RECOMMENDATION Staff recommends that the Architectural Review Board (ARB) recommend the Director of Planning and Community Environment approve the proposed project, based upon the draft Architectural Review and Sign Exception findings (Attachment A) and subject to the conditions of approval (Attachment B). BACKGROUND Existing Site Conditions The new Tesla Motors automobile dealership is located at the southern side ofEl Camino Real, between Maybell Avenue and Arastradero Road, on a site of approximately 1.41 acres. Another dealership, Carlsen Volvo, is located on the adjacent property to the south of the site, with Walgreens located to the north. Directly to the rear is an electrical substation, with single family residences in the Barron Park neighborhood beyond. Across the street are additional retail businesses and the Camino Place residential development. The site is currently developed for an automobile dealership with associated service areas, parking spaces, and landscaping. The site has a Comprehensive Plan land use designation of Service Commercial. The Service Commercial land use designation allows facilities providing citywide and regional services and relying on customers arriving by car. Typical uses include auto services and dealerships, motels, lumberyards, appliance stores, and restaurants. Page 1 of 5 The subject property has a zoning designation of Service Commercial with an Auto Dealership overlay (CS(AD)), the zone allows for a wide variety of commercial uses including retail sales. The Automobile Dealership (AD) combining district is intended to create and maintain areas that will accommodate dealerships which generally require special parking, access, and outdoor display provisions for customer convenience, servicing of vehicles or equipment, loading or unloading, or parking of commercial service vehicles. Proj ect Description The Applicant's project description is provided as Attachment C. The project includes the location and construction of two new signs as follows: 1. Installation of (1) new Tesla Motors Wall Sign. This red aluminum wall sign would have a one (1) inch white push thru acrylic logo. The logo would be internally illuminated with energy-efficient white LEDs. The logo would be approximately 5 foot 8 inches by 5 foot 8 inches in size, while the red aluminum background would wrap around the wall and have a height of 15 feet 10 inches and a width of 7 foot 4 inches and be mounted to the existing building fayade. The overall sign is 116 square feet. 2. Installation of (1) new Tesla Motors freestanding sign. The proposed sign would be built on an existing concrete slab location within the front setback of the property. The alunlinum framed sign would be "neon red", 8 foot 6inches in height and 4 foot wide with an overall area of 40.63 square feet. The sign would have both the "Tesla" lettering and logo constructed of one inch thick white acrylic and would be internally illuminated with energy-efficient LEDs. The sign itself would be 11 feet tall from grade and would have a total area of70 square feet. Project Review Applications for the location and construction of signs are typically classified as minor architectural review projects. Minor projects are usually reviewed at a staff level without a public hearing, although any member of the public may request a hearing once a tentative decision has been made and prior to thedecision effective date (Palo Alto Municipal Code (PAMC) 18.77.070(b)). However, requests for Sign Exceptions are required to be reviewed by the ARB, per PAMC Section 16.20.040. The proposed project requires a sign exception because, according to Palo Alto Municipal Code (PAMC) 16.20.170; "In each place of business or occupancy there shall be permitted the following combinations of signs: a) Where there is a freestanding sign, anyone of the following: a flat wall sign, a proj ecting wall sign, or an awning sign; b) Where there is no freestanding sign, any combination of two of the following; a flat wall sign, a projecting wall sign, an awning sign; c) On comer lots, each frontage shall be treated separately for the purposes of subsections ( a) and (b) above; d) Notwithstanding any other provision of this chapter, pursuant to architectural review, PAMC 18.76, one type of sign may be disapproved where a combination of tow or more types is pernlitted." Page 2 of 5 DISCUSSION On October 3, 2013, approval was granted for the installation of two (2) exterior wall signs on the upper walls of the existing showroom building (App# 13PLN-00353) for the Tesla Motors automobile dealership. The two currently proposed signs could not be approved at that time as they would have exceeded the Sign Code limitation of two wall signs (Section 16.20.170). Staff advised the applicant to apply for this sign exception for consideration by the ARB. Comprehensive Plan Consistency ARB finding # 1 requires that the design be consistent and compatible with applicable elements of the Palo Alto Comprehensive Plan. The Comprehensive Plan designation for the property is Service Commercial (CS), which allows automobile dealership uses, as described above. The project design is in conformance with the Comprehensive Plan and is supported by Policy L-50, which encourages high quality signage that is attractive, appropriate for the location, and balances visibility needs with aesthetic needs. El Camino Real Design Guidelines The 2002 South El Camino Real Design Guidelines (Guidelines) recommended by the ARB designate this area as part of the Triangle Area Pedestrian-Oriented Node. The Guidelines call for the area to become a well-designed, compact, vital multi-neighborhood center with diverse uses and a mix of one-, two-and three-story buildings, and a network of pedestrian oriented streets an ways. New development and improvements to existing properties should support this vision. The Guidelines state that signage should be an integral part of the building, shall not extend beyond the top level of the building wall, and shall have individually formed letters. The 1979 Council-adopted El Canlino Real Design Guidelines provide direction for sign design. These guidelines encourage: the limitation of sign sizes along El Camino Real to Y2 to 2/3 the maximum size permitted by the Sign Ordinance; limitation of height of freestanding signs to ten feet if placed at the property line; external illumination; and prohibition of flashing or moving signs. Conformance with these Guidelines is discussed in Sign Ordinance section below. Conlpliance with Palo Alto's Sign Ordinance Proposed Freestanding Sign The standards for a freestanding sign, as specified in Palo Alto Municipal Code Section 16.20.120, are listed below along with the proposed project's compliance. (1) Area and Height. The maximum area and height of such signs is set forth in Table 2*. The total site signage shall not exceed the total allowed for the site. Complies; the proposed sign would be 40.63 square feet (60 percent of allowance) in conformance with the maximum allowed sign area of 67 square feet, and in conformance with the 66 percent guideline for freestanding signage along EI Camino Real. The height of the sign would be 8 foot six inches in conformance with the allowed maximum of 25 feet and within the guideline of 1 0 feet. Page 3 of 5 (2) Location. Every sign shall be wholly on the owner's property. In no case shall the sign size exceed fifty square feet. Complies; the sign would be located within the front landscaped portion of the project site on an existing concrete slab and would be less than 50 square feet in size. (3) Number. Per Section 16.20.170, there may be one such sign for each frontage. The size of any additional sign shall be determined from Table 2*. Complies; one sign is freestanding proposed. (4) Construction. In addition to Section 16.20.190, every such sign shall be constructed wholly of metal, incombustible plastic or other approved fire-resistant material. Complies; the sign would be constructed of aluminum and acrylic. Proposed Wall Sign The standards for a wall sign, as specified in Palo Alto Municipal Code Section 16.20.130, are listed below along with the proposed project's compliance. (a) Area. The maximum wall sign area for each building face shall be as indicated on Table 3*. Does not comply; the proposed signs would be 116 square feet in size, which is over the allowed 100 square feet for the entire wall area. With inclusion of the previously approved wall sign the total sign area on this wall would be 141 square feet or 141 percent of the allowed sign area. However, the given the unique building design the tenant is not proposing signage along the front fa9ade facing EI Camino Real which is allowed to have 80 square feet of signage. (b) Height. No part of any wall sign shall extend above the top level of the wall upon or in front of which it is situated. Any such sign which is suspended or projects over any public or private walkway or walk area shall have an overhead clearance of at least seven feet. Complies; the height of the proposed sign would be 15 feet 10 inches, less than the top level of the wall which is 20 foot 8 inches. No portion of the sign would extend over a walkway. (c) Thickness or Projection. No such sign, including any light box or other structural part, shall exceed a thickness of ten inches. In any sign consisting of cutout or raised characters, said characters shall project no more than six inches from the mounting surface, except that when the average area of the individual characters exceeds six square feet, the projection may be increased by one-half inch for each additional square foot of average area over six feet, in no case to exceed fifteen inches. Complies; the proposed sign would be three inches thick with an additional one inch for the push through logo. (d) Number. Subject to the provisions of Section 16.20.170, there may be any number of such signs for each building face, but in no case shall the total wall sign area for each face exceed that shown in Table 3*. No building shall be deemed to have more than four building faces. Does not comply; as described in (aJ the two signs on this wall would exceed the allowed 100 square foot sign area as indicated in Table 3 of the Sign Code. Page 4 of 5 Sign Exception Findings While the proposed signs meet many of the Sign Code requirements, as noted they are not in conformance with two regulations: 1) the allowed area for wall signs, and 2) the allowed combination of signs. The proposed project therefore requires approval of a sign exception. In order for the ARB to recommend approval of the sign exception the following findings must be made, per PAMC 16.20.040. The draft sign exception fmdings are further described in Attachment B. (1) There are exceptional or extraordinary circumstances or conditions applicable to the property involved that do not apply generally to property in the same district; (2) T~e granting of the application is necessary for the preservation and enjoyment of a substantial property right of the applicant and to prevent unreasonable property loss or unnecessary hardships; and (3) The granting of the application will not be detrimental or injurious to property or improvements in the vicinity and will not be detrimental to the public health, safety, general welfare or convenience. While the proposed wall sign is well over the allowed sign area at 141 percent, nluch of the square footage is a simple red aluminum structure which provides architectural interest to the building and provides a background for the 32 square foot Tesla logo. The subject site is also not taking advantage of a front wall sign where 80 square feet of sign area would be allowed. The proposed combination of signs includes two approval wall signs located on the upper wall of the building. Given the height of these signs, they would be best seen by automobile occupants, whereas the additional proposed wall sign and freestanding sign are lower to the ground and would be better seen by pedestrians and bicycle travelers. F or the above reasons, staff would ask the ARB to recommend approval of the proposed sign exception. ENVIRONMENTAL REVIEW The project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) per Section 15303 (New Construction or Conversion of Small Structures) of the CEQA Guidelines. ATTACHMENTS A. Draft ARB Findings B. Sign Exception Findings C. Draft ARB Conditions of Approval D. Applicant's Project Description E. Development Plans (Board Members Only) COURTESY COPIES David McVey, Tesla Motors, dm.cvey(iilteslan10tors.com Prepared By: Jodie Gerhardt, Senior Planner @ Manager Review: Amy French, Chief Planning Officit:t!7-- Page 5 of 5 ATTACHMENT A DRAFT FINDINGS FOR APPROVAL ARCHITECTURAL REVIEW BOARD ST ANDARDSFOR REVIEW 4180 EI Camino Real [13PLN-00422] The design and architecture of the proposed project, as conditioned, complies with the Findings for Architectural Review as required in PAMC Chapter 18.76. (1) The design is consistent and compatible with applicable elements of the Palo Alto Comprehensive Plan. This finding can be nlade in the affirmative in that the project incorporates quality design that conforms to Comprehensive Plan policies that encourage high quality signage that is attractive, appropriate for the location and balances visibility needs with aesthetic needs. (2) The design is compatible with the immediate environment of the site. This finding can be made in the affirmative in that the proposed sign designs are appropriate for the automobile dealership setting near a busy intersection on a major thoroughfare. The project is generally consistent with the 1979 EI Camino Real Design Guidelines and the 2002 South EI Camino Real Design Guidelines, which address development of sites on el Camino Real. (3) The design is appropriate to the function of the project. This finding can be made in the affirmative in that the signs are not excessive for the intended use. (4) In areas considered by the board as having a unified design character or historical character, the design is compatible with such character. This finding is not applicable to this project. (5) The design promotes harmonious transitions in scale and character in areas between different designated land uses. This finding is not applicable to this project. (6) The design is compatible with approved improvements both on and off the site. This finding can be made in the affirmative in that the project, with its scale and design, is compatible with the existing building and the built environment on surrounding commercial sites. . (7) The planning and siting of the various functions and buildings on the site create an internal sense of order and provide a desirable environment for occupants, visitors and the general community. This finding is not applicable to this project. (8) The amount and arrangement of open space are appropriate to the design and the function of the structures. This finding is not applicable to this project. (9) Sufficient ancillary functions are provided to support the main functions of the project and the same are compatible with the project's design concept. This finding is not applicable to this proj ect. Page 1 of2 ATTACHMENT A (10) Access to the property and circulation thereon are safe and convenient for pedestrians, cyclists and vehicles. The proposed signage will ensure visibility of the business which will service to provide safe and convenient circulation for employees and customers. (11) Natural features are appropriately preserved and integrated with the project. This finding is not applicable to this project. (12) The materials, textures, colors and details of construction and plant material are appropriate expression to the design and function. This finding can be made in the affirmative, see Findings 2, 3, and 4 above. (13) The landscape design concept for the site, as shown by the relationship of plant masses, open space, scale, plant forms and foliage textures and colors create a desirable and functional environment. This finding is not applicable to this proj ect. (14) Plant material is suitable and adaptable to the site, capable of being properly maintained on the site, and is of a variety which would tend to be drought-resistant to reduce consumption of water in its installation and maintenance. This finding is not applicable to this project. (15) The project exhibits green building and sustainable design that is energy efficient, water conserving, durable and nontoxic, with high-quality spaces and high recycled content materials. This finding is not applicable to this project. The scope of the project is small and there is limited opportunity to incorporate green building design into the sign installations: (16) The design is consistent and compatible with the purpose of architectural review as set forth in subsection 18.76. 020(a). This finding can be made in the affirmative in that the project design promotes visual environments that are of 'high aesthetic quality and variety. Page 2 of2 DRAFT FINDINGS FOR APPROVAL SIGN CODE EXCEPTION 4180 El Camino Real [13PLN-00422] ATTACHMENT B The following findings have been made to support the sign exception request for one additional wall sign and one freestanding sign for the new Tesla Motors Automobile , Dealership, as modified by the ARB approval conditions. The specific exceptions that have been requested are for the following standards: Wall Sign: • Allow sign area in excess of allowed 100 square feet • Allow the combination of three walls signs and one freestanding sign (1) There are exceptional or extraordinary circumstances or conditions applicable to the property involved that do not apply generally to property in the same district in that the building is lo<;ated directly adjacent to the public sidewalk along a busy roadway. The proposed signage will provide additional appropriately scaled and designed signage for a large site and allow customers to easily identify the entry along this busy roadway. (2) The granting of the application is necessary for the preservation and enjoyment of a substantial property right of the applicant and to prevent unreasonable property loss or unnecessary hardships in that the visibility of signage is important for a retail business to be easily identifiable and to attract customers. Because the building is located directly adjacent to the public sidewalk, along a very busy roadway, there is limited visibility for typical signs. The proposed signs have been carefully designed for compatibility with the buildings and were reviewed and found consistent with the Architectural Review findings as required by the Municipal Code. (3) The granting of the application will not be detrimental or injurious to property or improvements in the vicinity and will not be detrimental to the public health, safety, general welfare or convenience in that the placement and appearance of the proposed signs do not pose safety hazards nor do they detract from the subj ect building or surrounding properties. The signs will not be detrimental to public health, safety, general welfare or convenience. They will be securely placed in a location that will not result in conflicts with pedestrians, drivers, occupants, visitors or employees. ATTACHMENT C DRAFT CONDITIONS OF APPROV AL 4180 EI Camino Real [13 PLN -004 22] PLANNING & COMMUNITY ENVIRONMENT On December 19, 2013 the Architectural Review Board (ARB) recommended approval of the application referenced above, and the Director of Planning and Community Environment (Director) approved the project on date. Project Planner: Jodie Gerhardt, AICP Planning Division 1. The project shall be in substantial conformance with the approved plans and related documents received October 10, 2013, except as modified to incorporate these conditions of approvaL 2. The Conditions of Approval document shall be printed on all plans submitted for building permits related to this project. 3. The wall sign shall have a maximum height of 15 feet 10 inches and a width of 7 foot 4 inches, be mounted to the existing building fa9ade, and have a maximum overall sign area of 116 square feet. 4. The freestanding sign shall be a maximum of 8 foot 6inches in height and 4 foot wide with an overall square footage of 40.63 square feet. 5. Both signs shall be internally illuminated with energy-efficient LEDs. 6. For any future changes to the sign content, an Architectural Review application must be filed for review and approvaL 7. The project approval shall be valid for a period of one year from the original date of approvaL In the event a building permit(s), if applicable, is not secured for the project within the time limit specified above, the ARB approval shall expire and be of no further force or effect. Application for extension of this entitlement may be made prior to the one year expiration. Page 1 of 1 T October 10,2013 City of Palo Alto Department of Planning & Community Environment 250 Hamilton Avenue Palo Alto, CA 94301 Re: Application for Sign Exception SL n Attachment D Tesla Motors is requesting a Sign Exception for its electric automobile dealership located at 4180 EI Camino Real. On October 3, 2013, approval was granted for the installation of (2) exterior wall signs on the existing upper wall of the building (Sign Application 13PLN-00353). Per Section 16.20.170 of the City of Palo Alto Sign Code, this is the maximum number of exterior signs allowed for a combination of (2) wall signs. This request is for the addition of (1) wall sign and (1) freestanding sign, and for this wall sign being larger than allowed per Table 3 of the Sign Code. In support of the granting of the Sign Exception, the findings listed in Section 16.20.040 are met: (1) There are exceptional or extraordinary circumstances or conditions applicable to the property involved that do not apply generally to property in the same district The building presents a unique shape -four facades are visible from EI Camino Real. The (2) approved wall signs on the upper wall will be on opposite sides of the building, each separately visible from EI Camino Real in opposite directions. The additional wall sign will compliment the approved upper wall sign on the south side of the building while the freestanding sign will compliment the approved upper wall sign on the north side of the building. (2) The granting of the application is necessary for the preservation and enjoyment of a substantial property right of the applicant arid to prevent unreasonable property loss or unnecessary hardships As an electric automobile dealership, the presence of each of these (4) signs is a key element for the business in order to promote the brand. The shape of the building allows only certain signs to be visible in certain directions without bringing an overwhelming view from any given approach. Two unique views are possible -from the south, only (2) wall signs are visible while from the north, only the freestanding sign and the other (1) wall sign are visible. (3) The granting of the application will not be detrimental or injurious to property or improvements in the vicinity and will not be detrimental to the public health, safety, general welfare or convenience The addition of these two signs will help beautify the property and surrounding area as well as bring a more enjoyable customer experience while positively influencing the public health, safety, general welfare, and convenience. The granting of this Sign Exception to allow for a combination of (3) exterior wall signs and (1) freestanding sign with (1) wall sign being larger than allowed per code will allow Tesla to bring a positive presence to the community. This exposure will encourage the use of electric vehicles that are not only fun to drive, but also environmentally responsible. ' Thank you Angela Wisco I Tesla Motors I Retail Development TESLA MOTORS, INC C I TY OF PALO ALTO Agenda Date: To: From: Subject: December 19, 2013 Architectural Review Board Russ Reich, Senior Planner 4 Architectural Review Board Staff Report Department: Planning and Community Environment 3877 El Camino Real [13PLN-00439]: A Request by EID Architects on behalf of Zijin, Inc. for Preliminary Architectural Review ofa neW-three story mixed use building with 4,365 'sq. ft. of commercial office/retail area and 21,663 sq. ft. of area for 17 housing units over one level of semi depressed podium parking replacing the existing 6,000 sq. ft. single-story restaurant building and surface parking lot. Zone district: Service Commercial (CS) and RM-30. RECOMMENDATION Staff recommends the Architectural Review Board (ARB) conduct a Prelim~Ilary Reyi-~wof the conceptual plans for the project and provide comments on the design to staffand the applicant. No formal action may be taken at a Preliminary Review and comments made are not binding on the City or the applicant. Staff has summarized key issues to provide a framework for comments. BACKGROUND Site Information . The site is located mid-block on the north east side of El Camino Real between Curtner and Ventura A venues. The site is a unique "L" shaped parcel that also has street frontage on Curtner Avenue. The 0.75 acre site includes a one-story, approximately 6,000-square-foot, restaurant building on the El Camino Real frontage, and a surface parking lot that covers the rest of the site with vehicular access only from Curtner Avenue. The Compadres restaurant ' closed and the building has been vacant for about five years. Landscaping and trees exist around the perimeter of the parking lot. Adjacent uses primarily consist of one and two story multifamily structures, with the exception of commercial uses on either side of the parcel at the El Camino Real frontage. The commercial use to north (left side) is an automotive service facility that does oil chapges and to the south (right side) is a Starbucks Coffee retail business with drive through window service. Across El Camino Real to the west are two liquor stores, a small market, a florist and nursery business, and fast food retailers. The site has two separate Land Use Designations. The Comprehensive Plan land · use map indicates that the portion of the lot that faces El Camino Real has a Service Conunercial 13PLN-00445 Page 1 of5 designation and the rear portion that goes back and continues to the Curtner Avenue frontage has a Multifamily Residential designation. Project Description The proposed project is the demolition of the existing restaurant building and construction of a new mixed-use building. The project description provided by the applicant is included as Attachment A. The concept plans indicate two floors of office/retail space at the El Camino Real frontage consisting of approximately 4,365 square feet. Behind the commercial portion would be 17, two-story, attached residential townhome units over a semi-depressed parking podium, providing 55 parking spaces. The residential units would total approximately 21,663 square feet in floor area. The proposed building height is approximately 32 feet with snlaller elements that reach a height of 35 feet. The vehicular ingress and egress for the project would occur on Curtner Avenue, at the same location as the existing parking lot for the former restaurant. The building's primary pedestrian entrance for the commercial portion of the project would be located at the sidewalk on EI Camino Real with an additional entrance behind the commercial space from the semi depressed parking garage. The pedestrian access for the residential units would .be provided off of Curtner Avenue. The proposed landscaping would include various ground covers, 'shrubs and trees. The new trees would be strategically placed along the perimeter property boundary to enhance privacy and provide a landscape buffer between the project and the adjacent multifamily residential uses. DISCUSSION Comprehensive Plan Conformance , The proposed commercial and residential uses are consistent with the, site's Service Commercial and Multifamily Residential land use designations. The proposed project is the replacement of an existing single-story restaurant building with a new approximately thIee-story mixed use building containing 17 residential units. The proposal is consistent with the following Comprehensive plan policies, as indicated: .! Policy L-4-The proj ect would maintain and reinforce the residential neighborhood, replacing a restaurant parking lot with new multifamily housing in a multifamily zone district while also maintaining the commercial vitality by replacing a use that has been vacant for five years with new office/retail/residential uses. Policy L-6-The project would be consistent with the scale of the neighborhood with a two story commercial component on El Camino Real and three level multifamily residential uses located between other one, two, and three story multifamily residential buildings. Policy L-9-The project enhances mixed use areas by adding residential units and new commercial uses to an area zoned for mixed use development. Policy L-12-The project enhances the existing multifamily residential neighborhood by replacing a commercial parking lot with multifamily residential units. Policy L-13-The project increases the housing density, adding residential units to a location that previously had none. Policy L-31-The proj ect site lies between California Avenue and V entura Avenue and provides mixed use in a location where mixed use and increased housing density is encouraged. 13PLN-00445 Page 2 of5 Policy L-35-The project proposal limits the building heights to two and three stories, as encouraged by this policy. Policy L-36-The proposal includes office/retail spaces as encouraged by the policy while maintaining a separation between the new commercial uses and the existing residential uses as stated in the Policy. Policy L-48-The project incorporates a well-designed building that is compatible with surrounding development. Policy L-49-The new buildings would include human scale details and massing. Policy L-67-The proposal does not include vehicular access from El Camino Real to enhance vehicle and pedestrian safety at the El Camino Real frontage, preventing faster moving cars from needing to slow down quickly to enter at an El Camino Real driveway. All vehicular access would be from Curtner Avenue, where the traffic speeds are slower and the project access point is close to a signalized intersection. Policy L-75-The proposal places the parking behind and beneath the building, hiding it from view. Policy L-77-The project's semi depressed parking beneath the new building provides an alternative to surface parking lots as encouraged by the Policy. Parking and Traffic The project would include one level of semi depressed parking. Due to the, narrow width of the property along El Camino Real, the Curtner Avenue frontage would provide the vehicular access to the parking garage. Avoiding a vehicular access point on Camino Real improves pedestrian safety along the street. El Camino Real traffic is fast moving and a quick turn into a narrow driveway would not be ideal. Curtner A venue is a side street with a slower traffic speed making it more ideal as a vehicle entry point. Having the access on Curtner A venue also provides the added benefit of a signalized intersection, allowing both right and left turns onto El Camino Real from Curtner Avenue. The garage would provide 55 vehicle parking spaces and 10 bicycle spaces. The proj ect concept would meet the parking requirement set forth in the Palo Alto Municipal Code. A traffic analysis will be conducted for the formal project submittal, which would study the projects potential impact on traffic and parking in the area. Trees and Landscaping There are currently numerous trees along the perimeter of the property that buffer the site from the adjacent multifamily properties. The formal application submittal will need to clarify which of these trees are to be removed and precisely where new trees will be planted in order t6 maintain an adequate landscape/privacy buffer between the properties. While the landscape concept is not fully developed, staff would encourage the applicant to consider a reverse approach to the "plaza" areas shown on the plans. As currently proposed, there are open spaces surrounding elevated planted areas. A reverse strategy, having elevated planting areas that surround the open spaces would be more desirable from a user's standpoint. Having the open spaces encapsulated and surrounded by the landscape areas affords the opportunity for the open spaces to be more useful and feel more comfortable, rather than just being a pathway around a large planter box. 13PLN-00445 Page 3 of5 Context-Based Design Considerations and Findings In addition to Zoning Compliance and Architectural Review approval findings, Context-Based Design Considerations and Findings found in P AMC Chapter 18.18 would be applicable to the project. Many of the South EI Camino Real Design Guidelines were adopted in the Context Based Design Guidelines and Findings. The following findings that appear relevant to this project are listed for discussion purposes: 1. Pedestrian and Bicycle Environment: The design of new projects shall p:romote pedestrian walkability, a bicycle friendly environment, and connectivity through design elements. The proposal appears to be bike friendly in that it would provide bike parking within the parking area of the garage. Bike racks at the buildings entries would also be required. The design includes pedestrian friendly design elements such as awnings, large expanses of storefront glass, and balconies. 2. Street Building Facades: Street facades shall be designed to provide a strong relationship with the sidewalk and the street( s), to create an environment that supports and encourages pedestrian activity through design elements. The proposal includes a two-story retail/office building that holds the EI Camino Real street frontage. It is set back four feet to provide a 12 foot wide sidewalk. The initial proposal had a vehicle access point on EI Camino Real but the plan has been revised to only have a pedestrian entry point, relocating the vehicle entry point to Curtner A venue to enhance the pedestrian experience at EI Camino Real. 3. Massing and Setbacks: Buildings shall be designed to minimize massing and conform to proper setbacks. The building will meet the required setback to provide the 12 foot sidewalk at EI Camino Real. The two and three story heights are appropriate for the context of the project. 4. Low Density Residential Transitions: Where new projects are built abutting existing lower-scale residential development, care shall be taken to respect the scale and privacy of neighboring properties. The proposed building would be set back from the property line relative to the adjacent residential neighbors and would be further away where neighboring residential buildings come closer to the property line. I • 5. Project Open Space: Private and public open space shall be provided so that it is us~ble for the residents, visitors, and/or employees of a site. The proposal appears to include adequate open spaces but further design development is needed to ensure that the spaces are more functional. 6. Parking Design: Parking needs shall be acconunodated but shall not be allowed to overwhelm the character of the project or detract from the pedestrian envirOlunent. Page 4 of5 Consistent with the Guidelines, the parking for the project has been located below grade. The entry to the garage has been located on Curtner A venue to avoid a new curb cut on EI Camino Real. 8. Sustainability and Green Building Design: Project design and materials to achieve sustainability and green building design should be incorporated into the project. Green building design considers the environment during design and construction. The project will incorporate a multitude of Green building design elements such as solar electric power, high efficiency HVAC equipment, energy efficient lighting systems, structurally insulated roofs, low-e windows, solar window shading, low VOC finishes, tankless or electric heat pump water heaters, structured plumbing with recirculating pumps, foam wrapped building envelope, tightducting, energy star appliances, water saving fixtures, whole house vacuums, and indoor air exchangers. ENVIRONMENTAL REVIEW No environmental review is required for a Prelinlinary Review as it is not considered aproject under the California Environmental Quality Act (CEQA). An initial study would be prepared in accordance with CEQ A for a formal project on this site, and as noted, a traffic analysis would be required in addition to other studies. ATTACHMENTS Attachment A: Attachment B: Attachment C: Project Description* Site Location Map Development Plans (Board Members Only)* * Prepared by Applicant; all other attachments prepared by Staff COURTESY COPIES Applicant: EID Architects Owner: Zijin, Inc. Prepared By: Russ Reich, Senior Planner N Manager Review: Amy French, Chief Planning Official!lO' 13PLN-00445 Page 5 of5 ======== Attachment A ENVIRONMENTAL INNOVATIONS 3877 EI Camino & 393 Curtner Avenue Palo Alto, California 94306 A Vibrant & Sustainable Mixed Use Community Proposed Project Design The proposed design will create a vibrant and sustainable mixed-use community at the southeast corner of EI Camino Real and Curtner Avenue - a portion of the EI Camino Real that will be revitalized and tnake the Palo Alto community proud. The project will include a mix of commercial and townhome style condotniniums, and ample podium parking below. Our team is collaborating with the City of Palo Alto Community Development staff to thoughtfully synthesize a highly sustainable community for the proposed site plan and architectural design. The project will complement and support the existing urban fabric, and will be harmonious with the new developments underway in close proximity to our site. COMMERCIAL SPACE -APPROX. 4,600SF The commercial spaces will contribute significandy to the revitalization of EI Camino Real, and will be located on two floors along this business corridor. Designed for pedestrians, the commercial spaces are Open, inviting, and convenient for local residents. . CONDOMINIUM RESIDENCES -16 UNITS Flexibly designed two bedroom with office or three bedroom condominiums are planned to maximize energy efficiency and provide healthy living envirorunents for residents. The inclusion of 15% affordable housing will provide for a diverse range of income levels. SUSTAINABLE DESIGN A unifying theme throughout the project will be the use of sustainable materials and energy efficiency technologies. Green building has become more and more main stream in recent years, thus homeowners and businesses increasingly seek the high level of quality, natural beauty, economic and health benefits that sustainable design and construction entail. Our green design approach is particularly suitable for a community that includes a 15% affordable housing component. While all residents of this sustainable community will enjoy lower utility bills (utility bills ~re reduced by as much as 95% in "zero energy" homes), this significant monthly savings will be particularly meaningful to low and moderate income residents. The health benefits of sustainable design, such as better indoor air quality resulting from use of no-or low-VOC paints and adhesives, are another advantage for sensitive populations. Green design will support a thriving commercial community, as employers will benefit from reduced utility bills and customers will be happy to visit pleasant, daylight-filled spaces. II The commercial component of the project will include cutting-edge commercial applications of energy efficient and recycled building materials. Some of the features envisioned for this component include solar electric power systems, high-efficiency heating and cooling systems, energy-efficient lighting systems, structurally insulated roofs, low-e windows, passive solar design, solar window shading, thermally advanced building envelopes, low- VOC finishes. : , , The residences will include all of our standard Enviro-Home features including sqlar electric power, tankless or elec:tric heat pump water heaters, structured plumbing with recirculating pumps, high-efficiency furnaces with energy star thermostats, low-e windows, increased insulatio~, foam wrapped builqing envelope, advancedHV AC 1080 Commercial Street, San Carlos, California 94070 2013-10-243877 El Camino Project Description . (650) 226-8770 Fax (650) 412-2356 Page 1 of2 ENVIRONMENT AL INNOVATIONS design, tight ducting, Energy Star appliances, water saving fixtures, high efficiency lighting and ceiling fan outlets. Additional features are planned to include eco-cabinets constructed with wheatboard frames, recycled flooring options, bamboo and cork flooring, whole house vacuums, indoor air exchangers, front-loading laundry equipment and low-VOC paints. . Landscape elements throughout the entire project will include a variety of drought-tolerant native California plants, satellite-controlled irrigation systems (where feasible), porous paving and local materials. We will recycle eighty-five percent (850/0) of onsite construction waste via local de-construction teams, who specialize in onsite/offsite methods to convert scrap lumber, drywall and brick/block into mulch, erosion control material, soil amendment and aggregate base. 1080 Commercial Street, San Carlos, California 94070 2013-10-24 3877 El Camino Project Description (650) 226-8770 Fax (650) 412-2356 I Page 2 of2 3877 EI Camino Real The City of Palo Alto Attachment B ThIs map is a product of tt City of Palo Alto GIS -. 0' 14; C I TY OF PALO ALTO Agenda Date: To: . From: Subject: December 19, 2013 Architectural Review Board , Clare Campbell, Planner Architectural Review Board Staff Report Department: Planning and Community Environment 636 Middlefield Road [13PLN-00410]: Request by Steve Smith for Preliminary Architectural Review for the construction of three detached residential units, demolishing the existing two units, and retaining the existing legal non-conforming office use in an existing structure, In conjunction with a lot merger in the RM-15 zone district. RECOMMENDATION Staff recommends that the Architectural Review Board (ARB) conduct a Preliminary Review of the conceptual plans for the project and provide comments on the design to staff and the applicant. No fom1al action may be taken at a Preliminary Review and comments made are not binding on the City or the applicant. Staff has summarized key issues to provide a framework for comments. BACKGROUND Site Information The project site is currently comprised of two separate 7,500 sq. ft. interior lots, 640 and 636 Middlefield Road. On 636 Middlefield, there are two existing structures; the 1,476 sq. ft. front structure was constructed as a single-family residence and later converted to office use (legal non­ conforming use) and the rear 300 sq. ft. structure is a small residential unit. On 640 Middlefield, there is an existing 2,431 sq. ft. single-family home and that is used as such. Within the 636 site, there are three protected Coast Live Oaks, and within the 640 site, there is one protected Coast Live Oak and one mature Canary Island Date Palm that is to be preserved. The subject property and surrounding properties on the same side of Middlefield Road are zoned RM-15, Low Density Multi-Family Residential, and directly across the street the parcels are ~onedR-1, Single Family Residential. The project site is surrounded primarily by low density residential uses with an office use to the left at 660 Middlefield Road. The applicant has submitted for a Certificate of Compliance to merge the two RM-15 lots to make one 15,000 sq. ft. parcel, which is under review by the City. 13PLN-0041O Page 1 of3 Project Description The proposed project concept would include three new detached residential units and the retention of the legal non-conforming office use in the primary structure on 636 Middlefield. The preliminary concept plan includes the demolition of the existing single-family home on 640 Middlefield and demolition of the residential unit at the rear of 636 Middlefield. The existing structure at the front of 636 Middlefield that is used for office would be maintained for continued office use. The concept plans also show the new landscaping designs for the project site. The concept plan shows two proposed units (A and B) with a shared 491 sq. ft. detached garage on the 640 site. Unit A, facing the street, is 2,227 sq. ft. with two bedrooms; unit B, at the rear, is 1,736 sq. ft. with three bedrooms. On the 636 site, the new residential unit (C), is 1,902 sq. ft. with a 273 sq. ft. attached garage. The office, unit D, will remain as 1,476 sq. ft. Please refer to the applicant's project description and plans for additional clarification (Attachments A and C). ,," DISCUSSION Zoning Compliance A summary indicating the project's conformance with the Development Standards of the RM -15 Low Density Multiple-Family zone district is provided as Attachment B. Floor Area: The project appears to be in general conformance with the allowable floor area ratio (FAR) for this site. For the RM-15 zone, a FAR credit is given for up to 230 sq. ft. for each covered parking space; any area above this 230 sq. ft. would count towards the total FAR for the site. Lot Coverage: All structures on the site, including the garage and carport, count towards the lot coverage; the project appears to exceed the allowable coverage. Daylight Plane: Unit A appears to encroach into the side daylight plane. Parking: Each residential unit requires two parking spaces, one of which must be covered. The project provides the required parking with garages and open spaces. The retained legal non­ conforming office use requires six parking spaces (one space/250 sq. ft.). The proposed plan shows one accessible parking space located within the front setback, four spaces within a carport structure (that uses two parking lifts) and possible two uncovered spaces behind the carport. Transportation will need to review and approve the parking, with special approval needed for the two uncovered spaces behind the carport. The existing site conditions provide for 6-8 parking spaces at the rear of the site, based on aerial images. Setback Encroachment: The front setback is a Special Setback of24' and the project has specified one accessible parking space and a loading zone to be located within this area; parking in the front setback of residential zones is not permitted. 13PLN·0041O Page 2 of3 Accessory Structures: The two detached covered parking structures must comply with the accessory structure development standards; not enough information has been provided to fully evaluate compliance. Grandfathered Use: In the RM-15 zone district, professional and medical office uses existing on July 20, 1978 and which, prior to that date, were lawful conforming permitted uses or conditional uses operating subject to a conditional use permit may remain as grandfathered uses. Based on the information that has been provided, the existing office is allowed to continue. Staff will continue to analyze this further when the formal application is submitted. ENVIRONMENTAL REVIEW For a Preliminary Review, where ,no action is taken on a project, no environmental review is required under the California Environmental Quality Act (CEQA) as it is not considered a project. When the formal application is submitted for action by the City, an environmental analysis will be completed at that time. ATTACHMENTS Attachnlent A: Project Description* Attachment B: Zoning Compliance Table Attachment C: Development Plans (Board Members Only)* * Prepared by Applicant; all other attachnlents prepared by Staff COURTESY COPIES Steve Smith, sdedk@aol.com Prepared By: Clare Campbell, Pl~ Manager Review: Amy French, Chief Planning Offici~ 13PLN-0041O Page 3 of3 ATTACHMENT A 636 + 638 + 640 MIDDLEFIELD ROAD Steve & Debra Smith I 640 Middlefield Road I Palo Alto, CA 904301 I 650.387.6721 "maHto: SDEDK@aol.com" SDEDK@aol.com" There are currently 3 structures, at the 3 addresses noted above. They sit on 2 parcels, each rectangular in shape and equally sized, ISO' deep by 50' wide (7,500 sq. ft. each 15,000 sq. ft. total). There is a single family home at 640 in which the current owners have lived for 22 years. The structure at 636 is currently grandfathered commercial and was utilized by Robert Trent Jones (golf course architect) until about 12 years ago when it was bought and occupied by Rick Stem Mortgage until May of this year. It currently houses the psychotherapy office for Steve Smith, PhD, MFT. 638 Middlefield has a 300 sq. ft. structure that had been utilized as commercial space as well. SCOPE OF PROJECT The scope of this project includes eliminating the house at 640 Middlefield and the rear structure at 638 Middlefield and replacing them with 3 homes at the appropriate FAR. The structure at 636 remains unchanged. The current structures will be dismantled as "green" as we can and includes recycling as much as possible in partnership with Whole House Supply in Burlingame (formerly of East Palo Alto). EXISTING AND PROPOSED USE The existing use is residential at 640 and grandfathered commercial at 636 and 638. There will be a net positive of2 new homes and 1 less commercial building. The new homes will clearly be residential and 636 remains unchanged ("legal non-conforming office use"). DESIGN Think ZEN. Or at least we do. Three family Oasis's. Accentuating side and rear yard spaces away from Middlefield Road. A stone's throw and a short stroll to downtown Palo Alto. We live in an Ecoregion that, although Mediterranean, borders on more desert from Monterrey Bay and South according to the World Wide Fund for Nature and the Environmental Protection Agency. The three new structures will be have stucco exteriors finished in complimentary earth tones with window, entry way, patio door, and overhang features that add aesthetic color. The roofs will be flat in appearance and would allow for unseen solar panels. Page 2 of2 There will be no natural lawn or other landscaping that requires excessive watering. With the exception of minimal granite/stone covered walkways and rock patio slabs of autumn slate, the entire project will consist of permeable ground surfaces utilizing the current natural beauty of the site. Present trees will be complemented with Japanese maples of various colors, types, and sizes. Landscaping will be water friendly. Each home will include self-contained water fountains, raised urban bed-gardens for growing herbs and produce, and each unit will have a Zen raking garden. A common driveway of crushed rock will appropriately protect tree roots and maximize the overall beauty of the property while increasing permeable surface drainage efficiency. Interlocking pavers will characterize the area outside of each garage and make up the area provided for sufficient vehicle parking. RELATIONSHIP TO EXISTING SITE "CONDITIONS The current home at 640 will be replaced and the second and third homes will be at the rear. The third home will sit behind the current structure at 636 Middlefield. MATERIALS COLORS AND CONSTRUCTION METHODS As noted above. Slab foundations. Stucco exteriors. The color of 636 Middlefield remains unchanged and is called Mississippi Mud. Butternut Wood, Harvest Brown, and Chocolate Cupcake are the colors for each of the other homes. All are earth tone, brownish in various hues. Grounds will be mixed landscaping, rock, pebble, crushed rock, interlocking pavers. The street-facing chimney at 640 will be constructed of a rock veneer called "Ranchers". The roofwill be made of foam (Armstrong) or the like and will be capped with a sinlple aluminum flashing. Entry doors will be wood and glass. Garage doors will be automatic opening wood carriage or wood over head doors. Patio doors and windows are intended to be duo-pane and energy efficient Jen-Weld aluminum clad (exterior) wood (interior). The construction method is wood 2x6 exterior walls and 2x4 wood interior walls covered in sheetrock. Thank you, Sincerely, Steve & Debra Smith DEVELOPMENT STANDARDS Lot Size Minimum Building Setback Front (Middlefield Rd) I Rear Interior Side Maximum Site Coverage (building footprint) Floor Area Ratio (FAR) Maximum Height Daylight Plane ce ... ... Usable Open Space Common Open Space (100 sf/unit) . Private Open Space Parking Requirement (within the Downtown Parking Assessment District) Frking ZONING COMPLIANCE TABLE Study Session 636 Middlefield Road / File No. 13PLN-00410 RM-15 ZONE STANDARD PROPOSED PROJECT 17,000 sf Special Setback: 24' 22' -8" 10' 10' -6" 10' Varied 5,250 sf(35%) ~ 5,467 sf 7,500 sf(0.5:1) ~ 7,418 sf 30' 22' -6" 10' up @ PL/ 45° 5,250 sf (35%) 200 sf/unit 300 sf 50 sf/unit 12 spaces 6 res. spaces 1 space/250 sf commercial area 5-7 comm. spaces 2 spaces/2+bdnn unit 1 space Short Term: 4 1 space/commercial 2,500 sf ATTACHMENT B CONFORMS Yes, existing grandfathered building encroaches Yes Yes* No Yes Yes No Yes Yes Not well defined Yes Needs further study Yes *Interior Setback: The exis~ing grandfathered building encroaches into the right side yard +/-4'- 6" and the new units' setback range from the 10' -12' -6". The detached garage encroaches into the left side yard 8', which is permitted for accessory structures. Open Space Defined: (1) Required Minimum Site Open Space. Each site shall, at a minimum, have a portion of the site, developed into permanently maintained open space Site open space includes all Page 1 of2 ATTACHMENT B usable open space plus landscape or other uncovered areas not used for driveways, parking, or walkways. (2) Usable Open Space (Private and Common). Each project shall, at a minimum, have a portion of the site, developed into permanently maintained usable open space, including private and common usable open· space areas. Usable open space shall be located protected from the activities of commercial areas and adjacent public streets and shall provide noise buffering from surrounding uses where feasible. Parking, driveways and required parking lot landscaping shall not be counted as usable open space. (A) Private Usable Open Space. Each dwelling unit shall have at least one private usable open space area contiguous to the unit that allows the occupants of the unit the personal use of the outdoor space. The minimum size of such areas shall be as follows: (i) Balconies (above ground level): 50 square feet, the least dimension of which shall is 6 feet. (ii) Patios or yards in the RM-15 and RM-30 districts: 100 square feet, the least dilllension:·'of which is8 feet for at lea.st 75% of the area. . ;,' (iii) Patios or yards in the RM -40 district: 80 square feet, the least dimension of which is 6 feet for at least 75% of the area. (B) Common Usable Open Space. The minimum designated comnion open space area on the site shall be 10 feet wide and each such designated area shall comprise a minimum of 200 square feet. In the RM-30 and RM-40 districts, part or all of the required private usable open space areas may be added to the required common usable open space in a development, for purposes of inlproved design, privacy, protection and increased play area for children, upon a recommendation of the Architectural Review Board and approval of the Director. Page 2 of2