HomeMy WebLinkAbout2024-06-03 Utilities Advisory Commission Agenda PacketUTILITIES ADVISORY COMMISSION
Special Meeting
Monday, June 03, 2024
Community Meeting Room & Hybrid
6:00 PM
Utilities Advisory Commission meetings will be held as “hybrid” meetings with the option to
attend by teleconference/video conference or in person. To maximize public safety while still
maintaining transparency and public access, members of the public can choose to participate
from home or attend in person. Information on how the public may observe and participate in the
meeting is located at the end of the agenda. Masks are strongly encouraged if attending in
person. T h e m e e t i n g w i l l b e b r o a d c a s t o n C a b l e T V C h a n n e l 2 6 , l i v e o n
YouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen Media
Center https://midpenmedia.org.
VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/96691297246)
Meeting ID: 966 9129 7246 Phone: 1(669)900‐6833
PUBLIC COMMENTS
Public comments will be accepted both in person and via Zoom for up to three minutes or an
amount of time determined by the Chair. All requests to speak will be taken until 5 minutes
after the staff’s presentation. Written public comments can be submitted in advance to
UACPublicMeetings@CityofPaloAlto.org and will be provided to the Council and available for
inspection on the City’s website. Please clearly indicate which agenda item you are referencing
in your subject line.
PowerPoints, videos, or other media to be presented during public comment are accepted only
by email to UACPublicMeetings@CityofPaloAlto.org at least 24 hours prior to the meeting. Once
received, the Clerk will have them shared at public comment for the specified item. To uphold
strong cybersecurity management practices, USB’s or other physical electronic storage devices
are not accepted.
Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks,
posts, poles or similar/other type of handle objects are strictly prohibited; (2) the items do not
create a facility, fire, or safety hazard; and (3) persons with such items remain seated when
displaying them and must not raise the items above shoulder level, obstruct the view or
passage of other attendees, or otherwise disturb the business of the meeting.
TIME ESTIMATES
Listed times are estimates only and are subject to change at any time, including while the
meeting is in progress. The Commission reserves the right to use more or less time on any item,
to change the order of items and/or to continue items to another meeting. Particular items may
be heard before or after the time estimated on the agenda. This may occur in order to best
manage the time at a meeting to adapt to the participation of the public, or for any other reason
intended to facilitate the meeting.
CALL TO ORDER 6:00 pm – 6:05 pm
AGENDA CHANGES, ADDITIONS AND DELETIONS 6:05 pm – 6:10 pm
The Chair or Board majority may modify the agenda order to improve meeting management.
PUBLIC COMMENT 6:10 pm – 6:25 pm
Members of the public may speak to any item NOT on the agenda.
APPROVAL OF MINUTES 6:25 pm – 6:30 pm
1.Approval of the Minutes of the Utilities Advisory Commission Meeting Held on May 1,
2024
UTILITIES DIRECTOR REPORT 6:30 pm – 6:45 pm
NEW BUSINESS (a 10 minute break will be imposed during this section)
2.City of Palo Alto Utilities Wildfire Mitigation Plan (WMP) Annual Update (ACTION 6:45
PM – 7:15 PM) Staff: Tomm Marshall
3.Staff Recommends that the Utilities Advisory Commission Recommend the City Council
Adopt the 2024 Annual Water Shortage Assessment Report (ACTION 7:15 PM – 7:35
PM) Staff: Lisa Bilir
4.City of Palo Alto One Water Plan: Presentation of Initial Results (DISCUSSION 7:35 PM –
8:30 PM) Staff: Lisa Bilir
COMMISSIONER COMMENTS AND REPORTS FROM MEETINGS/EVENTS
FUTURE TOPICS FOR UPCOMMING MEETING July 3, 2024
ADJOURNMENT
SUPPLEMENTAL INFORMATION
The materials below are provided for informational purposes, not for action or discussion during UAC Meetings (Govt. Code
Section 54954.2(a)(3)).
INFORMATIONAL REPORTS
12‐Month Rolling Calendar
Public Letter(s) to the UAC
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email,
teleconference, or by phone.
1. W r i t t e n p u b l i c c o m m e n t s m a y b e s u b m i t t e d b y e m a i l t o
UACPublicMeetings@cityofpaloalto.org.
2. Spoken public comments using a computer will be accepted through the
teleconference meeting. To address the Council, click on the link below to access a Zoom‐
based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using
your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 ,
Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in
older browsers including Internet Explorer.
You may be asked to enter an email address and name. We request that you
identify yourself by name as this will be visible online and will be used to notify you
that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will
activate and unmute speakers in turn. Speakers will be notified shortly before they
are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be
shown on the computer to help keep track of your comments.
3. Spoken public comments using a smart phone will be accepted through the
teleconference meeting. To address the Council, download the Zoom application onto
your phone from the Apple App Store or Google Play Store and enter the Meeting ID
below. Please follow the instructions B‐E above.
4. Spoken public comments using a phone use the telephone number listed below. When
you wish to speak on an agenda item hit *9 on your phone so we know that you wish to
speak. You will be asked to provide your first and last name before addressing the
Council. You will be advised how long you have to speak. When called please limit your
remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 966 9129 7246 Phone:1‐669‐900‐6833
Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public
programs, services and meetings in a manner that is readily accessible to all. Persons with
disabilities who require materials in an appropriate alternative format or who require auxiliary
aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at
(650) 329‐2550 (voice) or by emailing ada@cityofpaloalto.org. Requests for assistance or
accommodations must be submitted at least 24 hours in advance of the meeting, program, or
service.
1 Regular Meeting June 03, 2024
Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet are
available for public inspection at www.CityofPaloAlto.org.
UTILITIES ADVISORY COMMISSIONSpecial MeetingMonday, June 03, 2024Community Meeting Room & Hybrid6:00 PMUtilities Advisory Commission meetings will be held as “hybrid” meetings with the option toattend by teleconference/video conference or in person. To maximize public safety while stillmaintaining transparency and public access, members of the public can choose to participatefrom home or attend in person. Information on how the public may observe and participate in themeeting is located at the end of the agenda. Masks are strongly encouraged if attending inperson. T h e m e e t i n g w i l l b e b r o a d c a s t o n C a b l e T V C h a n n e l 2 6 , l i v e o nYouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen MediaCenter https://midpenmedia.org.VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/96691297246)Meeting ID: 966 9129 7246 Phone: 1(669)900‐6833PUBLIC COMMENTSPublic comments will be accepted both in person and via Zoom for up to three minutes or anamount of time determined by the Chair. All requests to speak will be taken until 5 minutesafter the staff’s presentation. Written public comments can be submitted in advance toUACPublicMeetings@CityofPaloAlto.org and will be provided to the Council and available forinspection on the City’s website. Please clearly indicate which agenda item you are referencingin your subject line.PowerPoints, videos, or other media to be presented during public comment are accepted onlyby email to UACPublicMeetings@CityofPaloAlto.org at least 24 hours prior to the meeting. Oncereceived, the Clerk will have them shared at public comment for the specified item. To upholdstrong cybersecurity management practices, USB’s or other physical electronic storage devicesare not accepted.Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks,posts, poles or similar/other type of handle objects are strictly prohibited; (2) the items do notcreate a facility, fire, or safety hazard; and (3) persons with such items remain seated whendisplaying them and must not raise the items above shoulder level, obstruct the view orpassage of other attendees, or otherwise disturb the business of the meeting.TIME ESTIMATESListed times are estimates only and are subject to change at any time, including while the
meeting is in progress. The Commission reserves the right to use more or less time on any item,
to change the order of items and/or to continue items to another meeting. Particular items may
be heard before or after the time estimated on the agenda. This may occur in order to best
manage the time at a meeting to adapt to the participation of the public, or for any other reason
intended to facilitate the meeting.
CALL TO ORDER 6:00 pm – 6:05 pm
AGENDA CHANGES, ADDITIONS AND DELETIONS 6:05 pm – 6:10 pm
The Chair or Board majority may modify the agenda order to improve meeting management.
PUBLIC COMMENT 6:10 pm – 6:25 pm
Members of the public may speak to any item NOT on the agenda.
APPROVAL OF MINUTES 6:25 pm – 6:30 pm
1.Approval of the Minutes of the Utilities Advisory Commission Meeting Held on May 1,
2024
UTILITIES DIRECTOR REPORT 6:30 pm – 6:45 pm
NEW BUSINESS (a 10 minute break will be imposed during this section)
2.City of Palo Alto Utilities Wildfire Mitigation Plan (WMP) Annual Update (ACTION 6:45
PM – 7:15 PM) Staff: Tomm Marshall
3.Staff Recommends that the Utilities Advisory Commission Recommend the City Council
Adopt the 2024 Annual Water Shortage Assessment Report (ACTION 7:15 PM – 7:35
PM) Staff: Lisa Bilir
4.City of Palo Alto One Water Plan: Presentation of Initial Results (DISCUSSION 7:35 PM –
8:30 PM) Staff: Lisa Bilir
COMMISSIONER COMMENTS AND REPORTS FROM MEETINGS/EVENTS
FUTURE TOPICS FOR UPCOMMING MEETING July 3, 2024
ADJOURNMENT
SUPPLEMENTAL INFORMATION
The materials below are provided for informational purposes, not for action or discussion during UAC Meetings (Govt. Code
Section 54954.2(a)(3)).
INFORMATIONAL REPORTS
12‐Month Rolling Calendar
Public Letter(s) to the UAC
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email,
teleconference, or by phone.
1. W r i t t e n p u b l i c c o m m e n t s m a y b e s u b m i t t e d b y e m a i l t o
UACPublicMeetings@cityofpaloalto.org.
2. Spoken public comments using a computer will be accepted through the
teleconference meeting. To address the Council, click on the link below to access a Zoom‐
based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using
your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 ,
Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in
older browsers including Internet Explorer.
You may be asked to enter an email address and name. We request that you
identify yourself by name as this will be visible online and will be used to notify you
that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will
activate and unmute speakers in turn. Speakers will be notified shortly before they
are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be
shown on the computer to help keep track of your comments.
3. Spoken public comments using a smart phone will be accepted through the
teleconference meeting. To address the Council, download the Zoom application onto
your phone from the Apple App Store or Google Play Store and enter the Meeting ID
below. Please follow the instructions B‐E above.
4. Spoken public comments using a phone use the telephone number listed below. When
you wish to speak on an agenda item hit *9 on your phone so we know that you wish to
speak. You will be asked to provide your first and last name before addressing the
Council. You will be advised how long you have to speak. When called please limit your
remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 966 9129 7246 Phone:1‐669‐900‐6833
Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public
programs, services and meetings in a manner that is readily accessible to all. Persons with
disabilities who require materials in an appropriate alternative format or who require auxiliary
aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at
(650) 329‐2550 (voice) or by emailing ada@cityofpaloalto.org. Requests for assistance or
accommodations must be submitted at least 24 hours in advance of the meeting, program, or
service.
2 Regular Meeting June 03, 2024
Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet are
available for public inspection at www.CityofPaloAlto.org.
UTILITIES ADVISORY COMMISSIONSpecial MeetingMonday, June 03, 2024Community Meeting Room & Hybrid6:00 PMUtilities Advisory Commission meetings will be held as “hybrid” meetings with the option toattend by teleconference/video conference or in person. To maximize public safety while stillmaintaining transparency and public access, members of the public can choose to participatefrom home or attend in person. Information on how the public may observe and participate in themeeting is located at the end of the agenda. Masks are strongly encouraged if attending inperson. T h e m e e t i n g w i l l b e b r o a d c a s t o n C a b l e T V C h a n n e l 2 6 , l i v e o nYouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen MediaCenter https://midpenmedia.org.VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/96691297246)Meeting ID: 966 9129 7246 Phone: 1(669)900‐6833PUBLIC COMMENTSPublic comments will be accepted both in person and via Zoom for up to three minutes or anamount of time determined by the Chair. All requests to speak will be taken until 5 minutesafter the staff’s presentation. Written public comments can be submitted in advance toUACPublicMeetings@CityofPaloAlto.org and will be provided to the Council and available forinspection on the City’s website. Please clearly indicate which agenda item you are referencingin your subject line.PowerPoints, videos, or other media to be presented during public comment are accepted onlyby email to UACPublicMeetings@CityofPaloAlto.org at least 24 hours prior to the meeting. Oncereceived, the Clerk will have them shared at public comment for the specified item. To upholdstrong cybersecurity management practices, USB’s or other physical electronic storage devicesare not accepted.Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks,posts, poles or similar/other type of handle objects are strictly prohibited; (2) the items do notcreate a facility, fire, or safety hazard; and (3) persons with such items remain seated whendisplaying them and must not raise the items above shoulder level, obstruct the view orpassage of other attendees, or otherwise disturb the business of the meeting.TIME ESTIMATESListed times are estimates only and are subject to change at any time, including while themeeting is in progress. The Commission reserves the right to use more or less time on any item,to change the order of items and/or to continue items to another meeting. Particular items maybe heard before or after the time estimated on the agenda. This may occur in order to bestmanage the time at a meeting to adapt to the participation of the public, or for any other reasonintended to facilitate the meeting.CALL TO ORDER 6:00 pm – 6:05 pmAGENDA CHANGES, ADDITIONS AND DELETIONS 6:05 pm – 6:10 pmThe Chair or Board majority may modify the agenda order to improve meeting management.PUBLIC COMMENT 6:10 pm – 6:25 pm Members of the public may speak to any item NOT on the agenda.APPROVAL OF MINUTES 6:25 pm – 6:30 pm1.Approval of the Minutes of the Utilities Advisory Commission Meeting Held on May 1,2024 UTILITIES DIRECTOR REPORT 6:30 pm – 6:45 pm NEW BUSINESS (a 10 minute break will be imposed during this section)2.City of Palo Alto Utilities Wildfire Mitigation Plan (WMP) Annual Update (ACTION 6:45PM – 7:15 PM) Staff: Tomm Marshall3.Staff Recommends that the Utilities Advisory Commission Recommend the City CouncilAdopt the 2024 Annual Water Shortage Assessment Report (ACTION 7:15 PM – 7:35PM) Staff: Lisa Bilir4.City of Palo Alto One Water Plan: Presentation of Initial Results (DISCUSSION 7:35 PM –8:30 PM) Staff: Lisa BilirCOMMISSIONER COMMENTS AND REPORTS FROM MEETINGS/EVENTSFUTURE TOPICS FOR UPCOMMING MEETING July 3, 2024ADJOURNMENTSUPPLEMENTAL INFORMATIONThe materials below are provided for informational purposes, not for action or discussion during UAC Meetings (Govt. CodeSection 54954.2(a)(3)).
INFORMATIONAL REPORTS
12‐Month Rolling Calendar
Public Letter(s) to the UAC
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email,
teleconference, or by phone.
1. W r i t t e n p u b l i c c o m m e n t s m a y b e s u b m i t t e d b y e m a i l t o
UACPublicMeetings@cityofpaloalto.org.
2. Spoken public comments using a computer will be accepted through the
teleconference meeting. To address the Council, click on the link below to access a Zoom‐
based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using
your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 ,
Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in
older browsers including Internet Explorer.
You may be asked to enter an email address and name. We request that you
identify yourself by name as this will be visible online and will be used to notify you
that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will
activate and unmute speakers in turn. Speakers will be notified shortly before they
are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be
shown on the computer to help keep track of your comments.
3. Spoken public comments using a smart phone will be accepted through the
teleconference meeting. To address the Council, download the Zoom application onto
your phone from the Apple App Store or Google Play Store and enter the Meeting ID
below. Please follow the instructions B‐E above.
4. Spoken public comments using a phone use the telephone number listed below. When
you wish to speak on an agenda item hit *9 on your phone so we know that you wish to
speak. You will be asked to provide your first and last name before addressing the
Council. You will be advised how long you have to speak. When called please limit your
remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 966 9129 7246 Phone:1‐669‐900‐6833
Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public
programs, services and meetings in a manner that is readily accessible to all. Persons with
disabilities who require materials in an appropriate alternative format or who require auxiliary
aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at
(650) 329‐2550 (voice) or by emailing ada@cityofpaloalto.org. Requests for assistance or
accommodations must be submitted at least 24 hours in advance of the meeting, program, or
service.
3 Regular Meeting June 03, 2024
Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet are
available for public inspection at www.CityofPaloAlto.org.
Item No. 1. Page 1 of 1
Utilities Advisory Commission
Staff Report
From: Dean Batchelor, Director Utilities
Lead Department: Utilities
Meeting Date: June 3, 2024
Staff Report: 2405-3026
TITLE
Approval of the Minutes of the Utilities Advisory Commission Meeting Held on May 1, 2024
RECOMMENDATION
Staff recommends that the UAC consider the following motion:
Commissioner ______ moved to approve the draft minutes of the May 1, 2024 meeting as
submitted/amended.
Commissioner ______ seconded the motion.
ATTACHMENTS
Attachment A: 05-01-2024 DRAFT UAC Minutes
AUTHOR/TITLE:
Jenelle Kamian, Program Assistant I
Item #1
Packet Pg. 4
Utilities Advisory Commission Minutes Approved on: Page 1 of 9
UTILITIES ADVISORY COMMISSION MEETING
MINUTES OF MAY 1, 2024 REGULAR MEETING
CALL TO ORDER
Chair Scharff called the meeting of the Utilities Advisory Commission (UAC) to order at 6:00 p.m.
Present: Chair Scharff, Vice Chair Mauter, Commissioners Croft, Forssell (joined at 6:05 p.m.),
Metz and Phillips
Absent: Commissioner Segal
AGENDA CHANGES, ADDITIONS AND DELETIONS
None
PUBLIC COMMENT
None
APPROVAL OF MINUTES
ITEM 1: ACTION: Approval of the Minutes of the Utilities Advisory Commission Meeting Held on April 3,
2024
Chair Scharff asked for a motion to approve the April 3, 2024 UAC draft meeting minutes.
ACTION: Commissioner Metz moved to approve the draft minutes of the April 3, 2024 meeting as
submitted.
Commissioner Mauter seconded the motion.
The motion carried 4-0 with Chair Scharff, Vice Chair Mauter, Commissioners Metz and Phillips voting
yes.
Commissioner Croft abstained.
Commissioner Forssell absent.
UTILITIES DIRECTOR REPORT
Utilities Director Dean Batchelor delivered the Director's Report.
Water Supply Update: SFPUC, Palo Alto’s water supplier, confirmed water supply is in a solid position
this year. SFPUC increased rates by 8.8% to $5.67. This change resulted in a proposed CPAU water rate
Item #1
Packet Pg. 5
Utilities Advisory Commission Minutes Approved on: Page 2 of 9
increase of 11%. Last week, staff met with Finance regarding the proposed rates. Finance recommended
lowering the CPAU water rate increase to 9.5%; therefore, staff will use funds from the Rate Stabilization
Account. The proposed rate increase will be in the Financial Plan presented to Council in June and in the
Proposition 218 notices.
Heat Pump Water Heater (HPWH) Program Update: As of March 7, the State’s TECH Clean HPWH
incentives were fully reserved. On April 15, City Council adopted the HPWH program budget with new
pricing. A new 65-gallon HPWH installed through the full-service program is $2300. The City will provide
a credit up to $1000 for site preparation work such as plumbing for the condensate line. There is a City
rebate up to $3500 for customers who use their own contractor for HPWH installation. As of April 25,
237 HPWHs were installed through the full-service program and 70 HPWHs were installed through the
rebate program. Staff is in the process of selecting one or more vendors to implement an Emergency
Water Heater Replacement Pilot Program.
Facilities Managers Meeting: Last Tuesday, the Commercial team hosted a Facilities Managers Meeting
at the Cabana Crown Plaza Hotel. There were 20 participants. Staff presented a case study on the HPWH
installation at City Hall, electrification incentives, landscape rebates and AMI. The meeting culminated
with a tour of the heat pump HVAC system installed at the hotel.
Earth Day Event at Hewlett Packard: The City’s Sustainability and Key Account Program Managers
participated in a tabling event for HP’s Earth Day Event to share information about the City’s energy
efficiency and electrification programs along with available rebates. City staff and HP’s facility and
sustainability staff explored potential partnerships and ways the City can support HP’s sustainability
initiatives and educational endeavors.
Commercial Energy Efficiency Webinar: Last Thursday, staff hosted its first Commercial Energy
Efficiency Webinar. The discussion led by industry experts and engineers discussed strategies for making
commercial buildings more energy-efficient, particularly through HVAC and lighting advancements. After
the webinar, one attendee signed up for the Business Energy Advisor program and was interested in
pursuing energy efficiency projects. With close to 60 RSVPs for this session and the success of this
workshop, staff plans to put together other webinar opportunities for our commercial customers.
EV Charger Program: The EV Charger Program has 15 sites in the permitting or installation phase. Most
of these projects will be completed by the end of the year. More than 30 additional properties are in
earlier project phases, including site assessment, bidding and vendor selection.
EV Technical Assistance Program (EVTAP): The three-year extension with CLEAResult began April 16 to
provide technical assistance to sites in the pipeline. The extension guarantees a minimum of 19
additional sites going live within the life of the contract. It takes at least two years on average to
complete an EV charger project.
Events: The Commercial team attended an Earth Month Celebration at Stanford Research Park and a
Sustainability Fair at Hewlett Packard. Staff tabled at the Downtown Palo Alto Farmers Market to
promote the HPWH Program. On April 13, staff hosted an in-person workshop entitled “Tips & Tricks for
Successful Turf Conversion” attracting over 60 people. On April 21, staff from Utilities, Public Works,
Community Services and the Office of Transportation hosted the City’s Earth Day Festival at Rinconada
Library and had over 700 attendees. On April 23, Utilities staff participated in the Palo Alto High School
Item #1
Packet Pg. 6
Utilities Advisory Commission Minutes Approved on: Page 3 of 9
Earth Day event. More than 30 students came to the Utilities table to play an interactive game and learn
about heat pump water heaters, EVs and PV systems.
The UAC will have tables at the park for the May Fete Parade this weekend. The yearly MSC open house
is on July 27 from 10 to 2. Jenelle Kamian sent an email to the UAC about rescheduling the next UAC
meeting to Monday, June 3 in the Community Room. Commissioners will receive a poll regarding not
having a UAC meeting this August.
NEW BUSINESS
ITEM 2: ACTION: Recommendation to Retain the Current WAPA Hydroelectricity Base Resource Contract
Allocation From 2025-2030
Sr. Resource Planner Lena Perkins, PhD, delivered a slide presentation on the WAPA contract
background, history and recommendation. Dr. Perkins addressed commissioners’ questions. The
Valuation Estimate for WAPA Base Resource chart shows annual net value decreasing over time due to
decreasing power market prices and increasing cost projections. The 20-year contract expires December
31, 2024 with five-year off-ramps. Western does not produce energy in the middle of the day when
there is a surplus of solar and is paid for doing so.
ACTION: Vice Chair Mauter moved to approve Staff’s recommendation that the UAC recommend that
the City Council keep the City of Palo Alto’s full share of its allocated hydroelectric resource under the
current hydroelectricity supply contract, the 2025 Base Resource Contract from Sierra Nevada Region of
the Western Area Power Administration (2025 WAPA Contract), as approved by Council in February of
2021 (Staff Report #11679).
Commissioner Phillips seconded the motion.
The motion carried 6-0 with Chair Scharff, Vice Chair Mauter, Commissioners Croft, Forssell, Metz and
Phillips voting yes.
Commissioner Segal absent.
The UAC took a break at 6:38 p.m. and resumed at 6:43 p.m.
ITEM 3: DISCUSSION: Discussion of the Northern California Power Agency Issuing Bonds to Prepay for
the Energy Received Under the 2025-2037 Geysers Power Purchase Agreement
Sr. Resource Planner Shiva Swaminathan addressed the UAC. In early 2023, the UAC recommended and
the Council approved Palo Alto’s participation in the 12-year PPA for Geysers Power Company. Staff
anticipated receiving 5% of Palo Alto’s energy from this geothermal PPA starting in January 2025 and up
to 10% of our needs by 2027 at an annual cost of approximately $7M ($6M for energy products and $1M
for capacity products). The energy component is prepaid and was expected to yield 5% to 8% of energy
cost savings at prevailing interest rate spreads, yielding a savings equivalent for Palo Alto of about
$300,000 to $400,000 per year over 12 years. Staff seeks the UAC’s input on this deal structure. Staff will
seek the Finance Committee’s input in June. If the consensus among NCPA member governing bodies is
to proceed with the prepayment, staff will return to the UAC for formal approval to participate.
Item #1
Packet Pg. 7
Utilities Advisory Commission Minutes Approved on: Page 4 of 9
PFM Financial Advisors Managing Director Michael Berwanger explained the energy prepayment
structure. Northern California Power Agency (NCPA) CFO Monty Hanks stated the PPA participants were
Palo Alto 10%, Santa Clara 70%, Lodi 10% and five other entities totaled the remaining 10%.
Mr. Hanks stated that staff would seek input from the Finance Committee at their June 4 meeting.
Approximately August 2024, NCPA will provide an informational update to the UAC, including the status
of the CEC discussions, the result of Anaheim Electric’s prepay transaction, the status of bond financing
documents, an estimated savings update, market conditions and review of the schedule. Higher interest
rates generate greater savings. In fall or winter 2024, Geysers PPA participants will seek their respective
City Council approvals and NCPA will seek approval from their commission to issue bonds.
Mr. Swaminathan addressed commissioners’ questions. As the community expressed concerns with past
structures and this is Palo Alto’s first prepay, staff was seeking the UAC’s input today. In August, staff
will ask the UAC to act. There is minimal or no financial risk. There is a regulatory risk. An interest rate
risk does not exist after the deal is done.
Mr. Berwanger stated a custodian bank would bundle the separate payments and send one check to
Geysers. Geysers is not prepaid for energy. Mr. Hanks remarked that Geysers would receive a check of
$2.5M per month paid from funds in a custodian account funded by a combination of the participants
paying a premium with the discount and the prepaid counterparty paying the difference.
Mr. Berwanger explained the worst-case scenario was if the transaction terminates and participants no
longer received expected savings; otherwise, this nonrecourse transaction does not financially harm
participants. NCPA’s obligation is take and pay. The debt does not come back to NCPA or any of the
project participants.
There are contract provisions allowing the remarketing of energy to other municipal entities if there is
too much energy coming off the project or if a project participant fails to pay or cannot take the energy.
The first step is to look to the other participants within the project or other NCPA members to see if they
can take the energy.
As this is a nonrecourse transaction, there is no obligation on NCPA to repay the debt. It is a take-and-
pay obligation, meaning that as you take energy you need to pay for it.
Commissioner Phillips expressed his concern with the Bucket 1 risk from the CEC; however, he would
recommend Council approval if Anaheim’s prepay transaction was successful and Palo Alto does not
have any risk.
Utilities Director Dean Batchelor commented that staff previously evaluated this option when interest
rates were low but did not proceed because there was not much savings. In August, depending on
interest rates, staff will evaluate the risks and savings.
ACTION: None
ITEM 4: ACTION: Utilities Advisory Commission Recommendation to Adopt a Resolution Amending the
Gas Utility Long-term Plan (GULP) Objectives, Strategies and Implementation Plan; Amending the Gas
Utility Reserves Management Practices, Amending the FY 2025 Gas Fund Budget, and Amending Rate
Schedules G-1 (Residential Gas Service), G-2 (Residential Master-Metered and Commercial Gas Service),
Item #1
Packet Pg. 8
Utilities Advisory Commission Minutes Approved on: Page 5 of 9
G-3 (Large Commercial Gas Service), and G-10 (Compressed Natural Gas Service). CEQA status: Not a
project under Public Resources Code 15378(b)(5) and exempt under Public Resources Code 15273(a).
Resource Management Acting Assistant Director Karla Dailey and Resource Planner Jason Huang
delivered a slide presentation and proposed a strategy for mitigating a short-term natural gas price
spike.
Mr. Huang stated that Council approved a capped-price winter gas purchasing strategy for winter 2023-
2024 and a $0.15/therm maximum gas commodity charge impact to purchase the price caps. Staff
purchased $2/therm price caps for half of Palo Alto’s expected load for December 2023, January 2024
and February 2024 at a total cost of about $1.5M. A $0.055/therm adder was included in the gas
commodity charge from November 2023 through October 2024, representing an increase of about
$1.80/month on a typical residential bill or a 2.8% increase, not including the underlying commodity
price which is still based on the market index. Gas prices remained below $2/therm during December
2023, January 2024 and February 2024, so the City did not use the price caps it purchased. Council
directed staff to evaluate alternatives.
Staff recommended purchasing gas based on the monthly market price in addition to funding a reserve
to offset future short-term price spikes. To fund the Gas Rate Stabilization Reserve, staff recommended
an adder of $0.103/therm to the gas commodity charge, representing an estimated 5.2% increase on the
median monthly residential customer bill. Staff estimated $2.8M would accrue each year up to a total of
$11.3M by November 2028. The reserve would have funds to maintain the gas commodity charge at
$2/therm for one month even if there were a price spike up to $5/therm for that month. Staff proposed
reducing the maximum commodity charge to $3.50/therm in Fiscal Year 2026-2027, $2.75/therm after
three years, and $2/therm after four years.
Ms. Dailey stated that staff would address the Finance Committee on June 4 and the Council in August.
Implementation of the strategy would start in October 2024 for gas year November 2024-October 2025.
The Commission discussed alternatives as well as the importance of transitioning from gas to electricity,
assisting low-income customers, an information campaign, and the possibility of using the Outage
Management System to provide immediate notifications to customers of price spikes.
Ms. Dailey addressed commissioners’ questions about neighboring communities. Long Beach and
Vernon have gas utilities. PG&E passes the market price through every month. The CPUC requires PG&E
to have storage, which in a normal year costs more money because storage is expensive. Usually, PG&E
is around 6% higher than CPAU, although PG&E was lower than CPAU in January 2023 for an unknown
reason but staff believed PG&E had some hedging in place.
Ms. Dailey reminded the UAC it could not build a reserve for low-income customers because of
Proposition 26; however, the General Fund could help. ProjectPLEDGE allows customers to donate
money into a fund that provides one time bill payment assistance.
Chair Scharff recommended that staff calculate the cost to protect low-income consumers who are
unable to pay a one to three-month spike. Vice Chair Mauter wondered if CPAU saw a large increase in
unpaid bills during the price spike. Utilities Strategic Manager Dave Yuan responded that there have
been many unpaid bills accumulating since COVID but staff could do some research if the UAC wanted
Item #1
Packet Pg. 9
Utilities Advisory Commission Minutes Approved on: Page 6 of 9
an answer. Mr. Yuan pointed out that CPAU’s Rate Assistance Program had about 500 participants in gas
and 700 in electric. Staff can use the Rate Assistance Program to identify low-income customers.
The Commission’s consensus was to assist low-income customers but not protect the broad populace
against volatility in gas market prices over which Palo Alto has no control. Discussion ensued on the
wording of the motion.
ACTION: Vice Chair Mauter moved to recommend the City Council advise Staff to investigate options to
protect low-income customers and provide additional price spike informational campaigns and to
consider the following:
1. Maintain the maximum gas commodity charge of $4 per therm with the $0.06 adder for 3 years,
and for Staff to return for review in two years, or
2. Raise the maximum of the gas commodity charge to $5 per therm with no adder.
Commissioner Forssell seconded the motion.
The motion carried 6-0 with Chair Scharff, Vice Chair Mauter, Commissioners Croft, Forssell, Metz and
Phillips voting yes.
Commissioner Segal absent.
ITEM 5: ACTION: Staff Recommends That the Utilities Advisory Commission Recommend the City Council
Adopt the Proposed Operating and Capital Budgets for the Utilities Department for the Fiscal Year 2025
Sr. Business Analyst Anna Vuong delivered a presentation. Next week, staff will seek the Finance
Committee’s recommendations. In June, staff will seek Council approval.
Projected FY 2025 rate increases in residential median bills: Electric Utility 9% increase, Gas Utility 9%
increase, Wastewater 15% increase and Water Utility 9.5% increase for a total increase of about $33 in
the median monthly bill.
Ms. Vuong displayed slides on FY 2024 Department accomplishments, FY 2024 staffing report and
Electric FY 2024 accomplishments. Electric FY 2025 initiatives included electrification-related business
processes, efficiency programs and TOU rates; rebalance the electric supply portfolio; design and
identify pilot area for residential whole-home electrification and gas decommissioning; enhance and
accelerate HPWH installations.
The Commission provided feedback on the presentation slides. Accomplishments do not need to be
included in budgeting unless it is an ongoing project. Have a more detailed discussion on initiatives.
When making budgeting decisions, what were the first two or three things below the line and why did
staff decide not to include them? If you had an additional $5M, what would you do? Utilities Director
Dean Batchelor responded that there was nothing below the line for Electric. When discussing the other
funds, staff will mention any unbudgeted items.
Commissioner Metz asked when the UAC would have more details on grid modernization, which was
about 80% of the total budget. Utilities Strategic Business Manager Dave Yuan replied that the City was
using existing vendors for the pilot project. After the pilot, the City will issue an IFP (invitation for bid)
for the construction project and would have a list of all line items and costs from vendors or suppliers.
Item #1
Packet Pg. 10
Utilities Advisory Commission Minutes Approved on: Page 7 of 9
Mr. Batchelor remarked that components of the large dollar amounts included building the hardware;
costs for poles, wires, transformers and labor. Almost all the secondary needed replacement. Some of
the feeder had to be replaced coming out of the substations. The substations needed upgrades. Oil
breakers have to be replaced to harden the system.
In response to Commissioner Croft’s question, Mr. Yuan explained why expenses exceeded revenues.
The electric fund did not fully budget the bond financing. After the IFB and cost estimate, staff will
perform a midyear (or later) revenue adjustment to account for the remaining bond finance.
Ms. Vuong outlined the preliminary plan for the FY 2024-2030 grid modernization project. Purchase
equipment and construction to upgrade all overhead areas in Years 1 through 4. Purchase equipment in
Year 3 for construction to upgrade substation transformers in Years 5 and 6. Purchase equipment in Year
5 for construction to upgrade all underground areas in Years 6 and 7. As pilots are completed, staff will
bring forth information to the UAC for review, comments and recommendations.
The Fiber Fund FY 2025 initiatives included expanding the fiber backbone network into the foothills,
conducting cost and benefit analysis study, as well as launching Palo Alto Fiber Internet in the pilot area.
Mr. Yuan remarked that the fiber pilot would launch in CY 2025 Q1 or Q2. After CEQA approval in June,
construction and material purchasing can begin.
Gas initiatives for FY 2025 included Gas Main Replacement 24B, Cross-bore Phase IV, as well as
conducting a study and identifying proof of concept area for downsizing the gas system.
Ms. Vuong explained the Customer Connection Project. Customers fully pay for gas connections but the
City pays for the portions of work needed to meet the customer’s needs in the public right of way or
that benefit the City’s gas distribution system.
Wastewater Fund FY 2025 initiatives included completing the Sewer Master Plan Study. Vice Chair
Mauter was curious about the Sewer Master Plan Study objectives around changes in the magnitude of
precipitation and if it’s tied into resiliency work the City might be doing on flooding. Ms. Vuong was not
familiar with the goals or scope other than flow analysis of the system and recalibrating the sewer
system hydraulic model. Mr. Batchelor remarked Utilities was working with Public Works to evaluate
what needed to be done in the flooding areas. A full hydraulic model of the sewer system is updated
periodically.
Water Fund FY 2025 initiatives included Water Main Replacement Project 29, Water Seismic Project for
Park and Dahl Reservoirs, as well as completion of alternative water resource approaches for the One
Water Plan.
Discussion ensued regarding backflow devices. Mr. Batchelor stated that about 80% of customers have
their backflow device inspected; however, 20% were repeatedly not in compliance. Staff addressed this
problem with Legal. CPAU was advised they did not have the right to shut off water. Those 20% are
causing us to be out of compliance with the State for the last four or five years. Staff discussed charging
$50 to $60 for the City to certify backflow devices and have parts for making repairs if needed. CPAU will
shut off service if the backflow is nonfunctional. There are 7800 backflow devices in Palo Alto.
Item #1
Packet Pg. 11
Utilities Advisory Commission Minutes Approved on: Page 8 of 9
ACTION: Commissioner Phillips moved to approve Staff recommendation the Utilities Advisory
Commission recommend the City Council adopt the Proposed Operating and Capital Budgets for the
Utilities Department for Fiscal Year 2025.
Chair Scharff seconded the motion.
The motion carried 6-0 with Chair Scharff, Vice Chair Mauter, Commissioners Croft, Forssell, Metz and
Phillips voting yes.
Commissioner Segal absent.
COMMISSIONER COMMENTS and REPORTS from MEETINGS/EVENTS
Council Liaison Vice Mayor Lauing reported the Finance Committee approved Utility’s rate proposals
with one minor change. Last night, Council interviewed candidates for the UAC. One candidate was out
of town, so Council will finalize their decision after meeting with the final candidate on Monday night.
FUTURE TOPICS FOR UPCOMING MEETINGS
Vice Chair Mauter asked what was the appropriate way of addressing separate meters for ADUs and/or
bringing the topic onto the agenda for a future meeting. Utilities Director Dean Batchelor replied it was
complicated because our Utilities rules and regulations do not allow two meters on one property. Staff
had some discussions on engineering and Development Center permitting. Mr. Batchelor offered to
provide an answer by the next UAC meeting or he could write up a short report and include the rules
and regulations. Chair Scharff stated the UAC could recommend to Council that they change the rules
and staff could provide their input.
Commissioner Phillips noted the UAC spent very little time on electric power service to business but
spent a lot of time on residential, which was approximately 20% of the load. He would appreciate more
than just the segmentation of the businesses and he urged staff to schedule an informational item.
In view of the court cases, Commissioner Metz wondered what were staff’s views on the electrification
strategy and its impact on the Gas Utility. Mr. Batchelor responded that Utilities would devise a strategy.
The Development Center may change the Reach Code. Five cities use the Source Energy Margin model,
including San Jose, San Luis Obispo and Santa Cruz. Those Cities have high goals for appliance efficiency
that gas appliances are unable to meet. The courts or residents have not challenged the model. In
response to Council’s request for staff to come back to Council, staff is moving forward with a similar
recommendation. If Council provides approval in June, staff will return to the UAC in July for a
discussion.
NEXT SCHEDULED MEETING: June 3, 2024
ADJOURNMENT
Chair Scharff moved to adjourn.
Vice Chair Mauter seconded the motion.
The motion carried 6-0 with Chair Scharff, Vice Chair Mauter, Commissioners Croft, Forssell, Metz, and
Phillips voting yes.
Item #1
Packet Pg. 12
Utilities Advisory Commission Minutes Approved on: Page 9 of 9
Commissioner Segal absent.
Meeting adjourned at 10:13 p.m.
Item #1
Packet Pg. 13
Item No. 2. Page 1 of 3
Utilities Advisory Commission
Staff Report
From: Dean Batchelor, Director Utilities
Lead Department: Utilities
Meeting Date: June 3, 2024
Staff Report: 2404-2905
TITLE
City of Palo Alto Utilities Wildfire Mitigation Plan (WMP) Annual Update.
RECOMMENDATION
Staff recommends the Utilities Advisory Commission accept and approve the updated 2024
Wildfire Mitigation Plan (WMP or Plan).
EXECUTIVE SUMMARY
The purpose of this report is to present to the UAC the updated annual Plan. Each year, electric
utilities are required to update their Wildfire Mitigation Plans, present the Plan in a noticed
public meeting, then submit the Plan annually by July 1 of to the California Wildfire Safety
Advisory Board (WSAB).1
BACKGROUND
California law requires all electric Utilities (Investor and Publicly-Owned Utilities) to annually
update and submit a WMP to the WSAB, and to perform a comprehensive revision of the Plan
at least once every three years.2 The Plan outlines specific ways in which the utility will prepare
for and mitigate against possible wildfire ignition from electric equipment. The WMPs are
limited in geographic scope to the areas previously identified as a high fire threat area by the
California Public Utilities Commission’s State Fire map. For Palo Alto, this is the Foothills area.
The City of Palo Alto Utilities Department (CPAU) submitted its initial Plan on January 21, 2020
(Staff Report ID 106703). As required by law, staff has updated the Plan in subsequent years
1 California Wildfire Safety Advisory Board https://energysafety.ca.gov/wp-content/uploads/2023/12//wsab-2024-
wmp-pou-advisory-opinion.pdf
2 Public Utility Code 8387
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?sectionNum=8387.&lawCode=PUC
3 Staff Report ID 10670 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/reports/city-
manager-reports-cmrs/year-archive/2020/id-10670-mini-packet-01212020.pdf?t=53268.17
Item #2
Packet Pg. 14
Item No. 2. Page 2 of 3
2021 (Staff Report ID 121904), 2022 (Staff Report ID # 141755), and performed a
”comprehensive revision of the Plan” last year in 2023 (Staff Report ID #2301-0900).6
Palo Alto Utilities’ primary mitigation activity is undergrounding eleven miles of overhead
electric lines in the Foothills area. This project involves installing substructure work, including
boxes for electric and fiber lines; removing electric lines and fiber lines from overhead poles;
and installing pad-mounted equipment where possible. This project consists of multiple phases
and is expected to be complete in 2025. We have completed the substructure portions for
Phase 1, Phase 2, and currently wrapping up Phase 3. We will then be moving onto Phase 4,
which is the last phase of the project. Please see Appendix A within the 2024 Plan for a listing of
mitigation activities and status.
FISCAL/RESOURCE IMPACT
Neither the UAC presentation nor the Wildfire Mitigation Plan itself have any immediate
resource impacts besides the staff time to monitor, review, and update the Plan and the
corresponding presentation. Ongoing and proposed activities listed in the Plan are and will be
approved annually through the Capital and Operating Budget processes.
STAKEHOLDER ENGAGEMENT
The annual presentation of the Plan in a publicly noticed meeting provides an opportunity to
hear and accept comments from the public, other local and state agencies, and interested
parties. Additionally, all versions of the plan are posted on the Utilities Department website for
public review.
ENVIRONMENTAL REVIEW
The UAC’s receipt of this WMP is not a project requiring California Environmental Quality Act
review, because it is an administrative governmental activity which will not cause a direct or
indirect physical change in the environment. To the extent proposed activities in the WMP
require CEQA review, environmental review will be addressed when the City reviews the
proposed project.
ATTACHMENTS
Attachment A: Updated 2024 Wildfire Mitigation Plan
4 Staff Report ID 12190 https://www.cityofpaloalto.org/files/assets/public/utilities/id-12190-item-2.pdf
5 Staff Report ID 14175 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas-
minutes/utilities-advisory-commission/archived-agenda-and-minutes/agendas-and-minutes-2022/06-08-2022/06-
08-2022-id-14175-item-3-wildfire.pdf
6 Update” and “comprehensive revision” are undefined in the statute. Palo Alto staff and other POUs interpret
“update” to mean bringing the original plan up to date with limited to no significant changes, and “comprehensive
revision” to mean an in-depth review of each plan element, with significant changes made as needed to the
original plan. Staff report ID 2301-0900
https://cityofpaloalto.primegov.com/meetings/ItemWithTemplateType?id=1404&meetingTemplateType=2
Item #2
Packet Pg. 15
Item No. 2. Page 3 of 3
APPROVED By:
Dean Batchelor, Director of Utilities
Staff: Tomm Marshall, Assistant Director, Electric & Fiber Utilities
Item #2
Packet Pg. 16
WILDFIRE MITIGATION PLAN
JUNE 2024
Item #2
Packet Pg. 17
TABLE OF CONTENTS
I. Utility overview and context……………………………………………………………………………………………….. 1
A. Context table……………………………………………………………………………………………………………… 1
B. Statutory cross-reference table………………………………………………………………………………….. 1
C. Process for WMP adoption…………………………………………………………………………………………. 2
D. Plan location on the website………………………………………………………………………………………. 2
II. Plan purpose and objectives……………………………………………………………………………………………….. 2
A. Purpose……………………………………………………………………………………………………………………… 2
B. Scope…………………………………………………………………………………………………………………………… 2
C. Plan objectives…………………………………………………………………………………………………………… 3
III. Roles and responsibilities…………………………………………………………………………………………………….. 5
A. City of Palo Alto Utilities Department…………………………………………………………………………. 5
B. Coordination with other departments……………………………………………………………………….. 6
C. Deenergization-related communication……………………………………………………………………… 6
IV. Electric-line ignited wildfire risk drivers with prevention and mitigation efforts………………… 7
A. Primary risk drivers and specific mitigation efforts……………………………………………………. 7
B. Primary risk driver and specific mitigation efforts: Vegetation type, density, and
management practices………………………………………………………………………………………………
7
C. Other electric equipment-specific mitigation strategies……………………………………………… 8
D. Enterprise-wide Safety Risks………………………………………………………………………………………. 9
E. Current and prior activities………………………………………………………………………………………… 10
V. Monitoring the plan…………………………………………………………………………………………………………...... 10
A. Measuring Plan and inspection performance……………………………………………………………… 10
B. Performance and outcome metrics……………………………………………………………………………. 11
C. Applying previous Plan metrics to this Plan………………………………………………………………… 11
Appendix A: Wildfire Mitigation Activities………………………………………………………………………………….. 13
Item #2
Packet Pg. 18
1
I. UTILITY OVERVIEW AND CONTEXT
A. Context table
B. Statutory cross-reference table
1 CPUC ArcGIS map @ https://www.arcgis.com/home/webmap/viewer.html.
2 CAL Fire’s Santa Clara Unit 2023 Strategic Fire Plan @
https://cdnverify.osfm.fire.ca.gov/media/aw4hpsgj/2023-santa-clara-unit-fire-plan.pdf.
City of Palo Alto
Size in Square Miles 26 square miles
Assets Distribution
Number of Customers Served 29,849 residential and business customer accounts
Customer Classes Residential and Small/Medium Business
Location/Topography Urban
Percent Territory in
CPUC High Fire Threat Districts
Tier 3 - 0%
Tier 2 - 40%
CAL FIRE FRAP Map Fire Threat Zones 40% High Approx. based on visual interpretation of CPUC
ArcGIS map.1
Existing Grid Hardening Measures Undergrounding
Impacted by another utility’s PSPS? Yes, as a transmission dependent utility, Palo Alto could be
impacted by a PG&E PSPS.
Mitigates impact of another utility’s PSPS? Yes
Expects to initiate its own PSPS?
Factors used to identify possible need for PSPS are based on
weather forecast and field conditions. Refer to the PSPS Policy
and Process.
Prevailing wind directions & speeds by
Please refer to Cal Fire’s Santa Clara Unit 2023 Strategic Fire
Plan for information about wind regional wind conditions. 2
Code section Requirement Page
8387(b)(2)(A) Accounting of responsibilities 5
8387(b)(2)(B) Plan objectives 3
8387(b)(2)(C) Preventive strategies and programs to minimize risk 7
8387(b)(2)(D) Metrics used to evaluate Plan’s performance 11
8387(b)(2)(E) Current Plan informed by previous Plan’s metrics 11
8387(b)(2)(F) Protocols related to deenergizing and public safety impacts 8
8387(b)(2)(G) Customer notification around deenergizing 6
8387(b)(2)(H) Vegetation management 7
8387(b)(2)(I) Electrical infrastructure inspection plans 10
8387(b)(2)(J) A list of wildfire risks and drivers 7
8387(b)(2)(K) Area that is a particularly high wildfire threat 4
8387(b)(2)(L) Wildfire and safety risk methodology 7
8387(b)(2)(M) Restoring service after a wildfire 9
8387(b)(2)(N) Process to monitor Plan, identify any execution deficiencies, and audit
inspection effectiveness
10
Item #2
Packet Pg. 19
2
C. Process for WMP adoption
Palo Alto is unique among POUs because it has a Utilities Advisory Commission (UAC), an
advisory Commission to the City Council. This commission is comprised of Council-appointed
residents who meet monthly to provide advice to City Council and staff on utilities-related
matters, including the City’s Wildfire Mitigation Plan (Plan). A Brown Act body, the UAC
publishes agendas in advance of each public meeting and provides opportunities for public
comment at each meeting. Each year, Palo Alto staff presents the Plan at a UAC meeting
where staff accept any public comments and receive feedback from Commissioners.3
Minutes and videos of past meetings are available on the City’s website.
D. Plan location on the website
Palo Alto’s Plan is the first substantive item found on the Utilities Department safety
webpage. Navigating to this page from the Department’s main page takes only two clicks
and is intuitive. Users click on “Utilities Services and Safety,” then “Wildfire Mitigation.” 4
Because the City also has a Fire Department and an Office of Emergency Services that
respond to fires and other emergencies, this report briefly notes how this wildfire Plan
differs from other City emergency response plans.
II. PLAN PURPOSE AND OBJECTIVES
A. Purpose
This Plan is written in compliance with Public Utilities Code section 8387 and describes how
the City of Palo Alto’s Utilities Department (CPAU) maintains and operates its electrical lines
and equipment in a manner that minimizes the risk of wildfire posed by those lines and
equipment.
B. Scope
The scope of this Plan is limited to providing information about mitigating the risk of
wildfires from electric lines and equipment. It distinguishes between mitigating risks of
possible electric line-ignited wildfires versus wildfires or wildfire suppression generally. The
latter topics are in the scope and under the purview of trained fire experts, such as the city’s
Fire Department, and not within the expertise of utility engineers and technicians. The
former is within the scope of CPAU responsibilities and is the subject of the state code
section mandating this Plan; therefore, it is the sole focus of this Plan.
3 PUC 8783(b)(3) requires a POU to “present its wildfire mitigation plan in an appropriately noticed public
meeting…[and] accept comments on its wildfire mitigation plan from the public….” While not the
governing board of the utility, the UAC review satisfies the legal requirement of presenting the Plan at a
noticed public meeting where comments from the public are accepted.
4 Utilities Department safety webpage @ https://www.cityofpaloalto.org/Departments/Utilities/Utilities-
Services-Safety/Safety/Utilities-Wildfire-Safety.
8387(b)(3) Present Plan in an appropriately noticed public meeting 2
Item #2
Packet Pg. 20
3
Additionally, this Plan applies to the only area in the City of Palo Alto identified as a high fire
threat area in the California Public Utilities Commission (CPUC) State Fire Map. As of 2023,
the high fire threat area in Palo Alto includes all areas with the City limits west of Highway
280, referred to as the Foothills Area. (See below, Figure 1). This area is about eight square
miles, is sparsely populated, and consists primarily of open space.
Lastly and per the Board’s request of all POUs, this updated Plan deliberately omits general
information the Board already understands in favor of specific information about the City’s
territory, infrastructure, and mitigation projects. For example, the Board already knows that
CPAU, and other POUs, meet all applicable GO 95 standards so it is not reiterated here. To
avoid redundancy, the Plan omits appendices submitted in prior years, although there may
be references to information from prior Plans. This is intended to acknowledge that both
CPAU and the Board have limited resources to write and review Plans, the Board has
already reviewed the appendices and offered guidance, and recycling past information is
not as helpful as providing new information.
C. Plan objectives
The Plan’s primary objective is to guide CPAU staff in minimizing the probability that the
City’s distribution system may be an original or contributing source for wildfire ignition. The
City strives to ensure that its infrastructure is safe and resilient by taking proactive actions
to maintain its equipment, refine the existing Public Safety Power Shutoff (PSPS) protocols
as needed, and underground the electric lines in the only high fire threat area.
A secondary objective is to improve the resiliency of the City’s distribution system and to
measure the efficacy of the mitigation strategies.
Item #2
Packet Pg. 21
4
Fig. 1: CPAU electric service area, showing high fire threat “Foothills
Area”.
Item #2
Packet Pg. 22
5
III. ROLES AND RESPONSIBILITIES
A. City of Palo Alto Utilities Department
In Palo Alto, the City Council is the governing body of all City functions including the City’s
utilities. As noted above, the UAC is a Brown Act body that provides advice on utilities-
related matters. CPAU operates and maintains all the utilities in the City, including electric,
water, gas, fiber, and wastewater. CPAU also employs communications staff to engage with
the community and a Compliance Manager who, among other duties, ensures reports such
as this Plan are completed timely and appropriately.
CPAU’s electric and fiber staff noted above all play a role in mitigating wildfire risk from
electric lines and equipment. Specifically, CPAU engineers produce safe and resilient
designs, and oversee wildfire mitigation projects such as undergrounding electric lines.
Item #2
Packet Pg. 23
6
Electric Operations staff inspect, repair, and maintain equipment while flagging any
potential causes for concern. The CPAU Communications team produces safety
communication material to the community, and the Compliance Manager ensures CPAU
meets or exceeds laws and regulations.5
B. Coordination with other departments
As one division of the City’s utilities department, CPAU’s Electric Utility staff works closely
with other utilities divisions and other City departments. These include the Public Works
Department and its Urban Forestry and Environmental Services Divisions, the Fire
Department, the Office of Emergency Services, and the water utility Engineering and
Operations team. Together, these departments and divisions proactively prepare for
wildfires, act to mitigate climate and fire-related risks, maintain electric and water
infrastructure, develop plans for deenergization events, ensure appropriate vegetation
management, and lead Palo Alto’s robust climate action efforts. As these divisions,
departments, and teams are under the umbrella of one City, there is a strong history of
working together closely.
C. Deenergization-related communication
CPAU’s Communications staff is responsible for engaging the community about
deenergization events. In doing so, and in deciding whether to deenergize lines, CPAU
utilizes the “Utilities Wildfire Mitigation Response and Communications Procedure for
Public Safety Power Shutoff.”6 This procedure includes proactively sending a specific
recorded message to customers living in the Foothills area, and a more general but still
targeted message to all electric customers. These messages are sent prior to deenergizing
lines, to allow residents time to act, if necessary.
Palo Alto also sends emails to Foothills residents, with specific information about conditions
that may prompt deenergization, the anticipated dates and times of a shutoff, how to
prepare, and where to find more information. During a deenergization event, CPAU
continues to email and call customers.
The calls and emails prior to and during any shutoffs are supplemented with frequent
information posted on CPAU’s website and social media accounts.
5 To keep the public informed of CPAU’s capital improvement projects (CIPs), CPAU places CIP-related
information @ https://www.cityofpaloalto.org/Departments/Utilities/Utilities-Services-Safety/Utilities-
Projects/Foothill-Fire-Mitigation-Project. This information includes primary staff contact information for
the projects.
6 This document was previously provided to the Board as Attachment G in Palo Alto’s 2022 Plan. As a
newer procedure that remains accurate, it has not been updated since that submittal.
Item #2
Packet Pg. 24
7
IV. ELECTRIC-LINE IGNITED WILDFIRE RISK DRIVERS
WITH PREVENTION AND MITIGATION EFFORTS
A. Primary risk drivers and specific mitigation efforts
Palo Alto recognizes that the Board is most interested in specific risks unique
to each POU and its service territory, rather than general risks carried by all
electric utilities. As such, and because Palo Alto is in the process of
undergrounding the lines in its single high fire threat area, this Plan notes only
the risk associated with electric equipment in the Foothills area. The more
general risks Palo Alto regularly mitigates, but does not specifically address in
this Plan, include:
• Electric system operating, management, and construction practices outside the
Foothills area
• Weather including high winds outside the Foothills area
• Extended drought
With regard to weather monitoring, Palo Alto installed a weather station in the Foothills
area, allowing staff direct, localized weather data. CPAU staff also monitor regional
conditions, receive red flag warnings, and communicate with first-responder departments
on any actions needed due to weather conditions.
B. Primary risk drivers and specific mitigation efforts: Vegetation type, density, and
management practices.
Wildfire risks from electric lines and equipment include vegetation intruding into power
lines, falling onto lines, or roots damaging undergrounded equipment. Mitigation efforts
include ongoing physical inspections, ensuring the proper type of vegetation is placed at
the correct distance from equipment, and adherence to the City’s Line Clearing Program
and Tree Technical Manual for proper care of trees. Palo Alto is fortunate to have a
dedicated Urban Forestry Division within the Public Works Department, staffed by trained
and experienced urban foresters. Twice a year, these individuals evaluate every line-
adjacent tree in the high fire threat area with a potential for contact with CPAU electric
lines.
Palo Alto utilizes a variety of vegetation treatment methods to reduce the risk of wildfire,
including tree or branch removal, trimming, mowing, brush cutting, discing, and herbicide
use. The Urban Forestry Department is planning a program to help remove potential fall-
ins from trees outside of Palo Alto’s maintenance envelope of line-adjacent trees. In the
future, to help staff track and manage flammable new growth, Palo Alto may utilize GIS
and growth modeling. Currently, this work is performed manually with physical
inspections.
Item #2
Packet Pg. 25
8
In addition, for the Foothills area, Urban Forestry uses an enhanced vegetation
management buffer as shown in the diagram below:
This practice exceeds GO 95 minimum clearance standards for the line voltage.
Specifically, a 4-foot radial clearance is the minimum required in high fire danger areas for
lines between 750 volts and 300kv; Palo Alto maintains a minimum of 10 feet and a target
of 12 feet radial clearance for all circuits in the Foothills area.
C. Other electric equipment-specific mitigation strategies
• Disabling certain reclosures. In the Foothills area, CPAU has two reclosers on the
distribution line that automatically open when they sense a large amount of current
flowing due to a fault. After a preset delay, they both can automatically reclose;
however, as a method to minimize fire risk, the reclosing function is permanently
disabled on both reclosures and at the circuit breaker of the substation serving this
area. Restoring service requires manual reclosing, which occurs only after staff have
physically inspected the lines, performed any needed repairs, and ensured that the
outage cause is removed. While this practice means potentially longer outage times,
it is an important risk mitigation activity.
• Utilizing specific fuses. CPAU utilizes non-expulsion fuses in the high fire threat area.
Specifically, CPAU utilizes Eaton’s Cooper PowerE series ELFE fuse, a full range,
current-limiting dropout fuse with a self-contained design that eliminates noise and
expulsive showers. If these fuses explode, any hot metal is contained within the fuse
holder, preventing contact with vegetation.
• Deenergizing, then reenergizing when prudent. CPAU considers deenergizing electric
lines as a last resort, realizing that while the lack of power could be an
Item #2
Packet Pg. 26
9
inconvenience for some customers, it could cause significant health and safety
concerns for others. However, CPAU will utilize this option when necessary to
minimize the risk of an electric-line ignited wildfire in the high fire threat area.
Factors CPAU considers when determining whether to deenergize include:
o The possible safety impacts to City customers
o Any fire activity in the vicinity
o Any evacuation orders and other information from emergency personnel
o Information from local fire agencies, vegetation staff, and CPAU electric
operators
o Local and regional weather conditions including wind, humidity, precipitation
and any red flag warnings
o The state of vegetation in the area (i.e. very dry)
• Restoring power after a wildfire or deenergization event. Lines will only be
reenergized when (1) the risk has passed, (2) the lines are inspected, and (3) any
needed repairs are complete. CPAU utilizes a Public Safety Power Shutoff (PSPS)
policy and procedure when determining whether to deenergize lines because of a
wildfire risk. The written protocol also includes customer notification procedures
and reenergization information.7 In addition to customer notification from the
Utilities Department, PSPS communication is also coordinated with Palo Alto’s Office
of Emergency Services. The decision to institute a PSPS also includes working with
CPAU’s water utility staff to determine if the City should pump water up to the
reservoirs located in the Foothills area in advance of shutting off power, to ensure
there is sufficient water and water pressure for any firefighting activities.
• Coordination with PG&E. As a transmission-dependent utility, CPAU communicates
with PG&E regarding their potential deenergization events that may impact the
City’s service territory.
• Studying device coordination strategies. Staff has engaged in protective device
coordination studies to ensure that any fault is isolated quickly and any impact
limited. Based on these studies, CPAU changed the fuse type and size, as noted
above, on Foothills area distribution lines and changed relay settings for reclosers
and a station circuit breaker.
D. Enterprise-wide Safety Risks
Palo Alto’s protocol for identifying and addressing enterprise-wide safety risks is a
collaborative effort with various City departments. Together the goal is to prevent,
protect from, mitigate, respond to, and recover from a broad range of potential hazards
and threats. The City’s Office of Emergency Services (OES) leads that coordination with
the goal of developing, maintaining, and sustaining a citywide, comprehensive, all
hazard, risk-based emergency management program that engages the whole
7 The PSPS Policy and Process was included as Appendix F in the City’s 2022 update and has not been
updated since then. Information on PSPS events can also be found on the website @
https://www.cityofpaloalto.org/Departments/Utilities/Utilities-Services-Safety/Outages/Public-Safety-
Power-Shutoffs.
Item #2
Packet Pg. 27
10
community. The City maintains and updates the following reports and plans that provide
information regarding the risks in Palo Alto and the necessary actions to take.
- Threat and Hazard Identification and Risk Assessment Report8 - The result of the
THIRA process is an organized evaluation of vulnerability and implementation
measures based on the necessary capabilities to deal with the natural and non-
natural hazards and threats of most concern.
- Local Hazard Mitigation Plan9 - Identifies and prioritizes potential and existing
hazards across jurisdictional borders, including hazards that may be further
amplified by climate change, and provides mitigation objectives with prioritized
actions.
- Foothills Fire Management Plan10 - Addresses a broad range of integrated
activities and produced planning documents to address and mitigate the impacts
of fire hazards in the Palo Alto Foothills Area.
E. Current and prior activities
CPAU’s earlier Plans note mitigation tasks the City has already completed, such as
preparing a Foothills Fire Mitigation Plan and acting as “territory lead” for the CPUC’s
fire threat map. Additionally, prior Plans note ongoing efforts, which continue. These
include regular vegetation management, inspection and maintenance of the electric
system, and electric infrastructure designs that consider fire safety. Attachment A shows
the status of CPAU’s mitigation-related activities.
V. MONITORING THE PLAN
A. Measuring Plan and inspection performance
In preparing annual Plans, CPAU takes the opportunity to evaluate the current Plan for
any deficiencies, or if any best practices have changed. In doing so, CPAU considers what,
if anything, related to wildfires occurred in the high fire threat area. Any events related
to wildfires or City electric infrastructure in the Foothills area could inform future Plans
and help understand the effectiveness of the current Plan. Since CPAU began submitting
these annual reports, there have been no wildfires in the high fire threat area.
With regard to inspections, CPAU examines its electric equipment in the high fire threat
area more frequently than in other areas of the service territory. Staff strive to ensure
that all inspections are completed by June, before the historic start of fire season, or
earlier, depending on drought conditions. Inspections are completed manually. Staff
analyzes the results of the inspections for trends of any failures or maintenance needs,
8 The Threat and Hazard Identification and Risk Assessment Report can be found @
https://www.cityofpaloalto.org/files/assets/public/oes/plans/unrestricted_palo_alto_thira_report_final_a
pril-2017.pdf.
9 The Local Hazard Mitigation Plan can be found @
https://www.cityofpaloalto.org/files/assets/public/oes/lhmap/paloalto_separateannex_march2017.pdf.
10 The Foothills Fire Management Plan can be found @
https://www.cityofpaloalto.org/files/assets/public/oes/plans/foothills-fire-management-plan-update-
2016-final.pdf .
Item #2
Packet Pg. 28
11
which can inform future design changes. Staff also monitors the performance of
equipment during windy and raining weather as described in the metrics below.
B. Performance and outcome metrics
CPAU audits the effectiveness of the Plan’s mitigation and prevention efforts by using
two broad metrics: performance and outcomes. Information specific to each are below:
i. Performance metrics
a. Vegetation management. This metric includes the amount of
vegetation cleared or number of trees trimmed in the high fire
threat area.
b. Infrastructure maintenance in high fire threat area. This metric
includes the amount of equipment and number of lines inspected
and repaired (if needed) in the high fire threat area.
c. Project status. This metric involves monitoring the progress of any
projects related to mitigating wildfires from electric equipment or
lines in the high fire threat area and ensuring that projects
progress on the proper timeline.
ii. Outcome metrics
a. Electric-line ignited wildfire. This metric includes any fire started by
CPAU’s electric equipment in the high fire threat area that traveled
greater than one linear meter from the ignition point. In at least
the past 20 years, there have been zero such fires.
b. Downed lines in the high fire threat area. For purposes of this Plan,
a wires-down event includes any instance where an electric line in
the high fire threat area of the service territory falls to the ground
or onto a foreign object. CPAU will not normalize this metric by
excluding unusual events, such as severe storms. Instead, staff will
supplement this metric with a qualitative description of any such
unusual events.
C. Applying previous Plan metrics to this Plan
CPAU’s initial Plan specified two metrics for evaluating performance, each
discussed below, and noting how they have informed this revised Plan:
i. Outages to the overhead lines in the high fire threat area
Item #2
Packet Pg. 29
12
In the 2020 Plan, staff described how CPAU would evaluate any outages in the
high fire threat area. (Page 21). It also noted a related project in Appendix F,
rebuilding the overhead lines, the status of which is presented below in Appendix
A. CPAU’s evaluation of any outages in the high fire threat area described in 2020
remains: Determine if CPAU’s activities (a) should have prevented any outages,
(b) were adequate to prevent an outage, (c) could be improved, and (d) could not
have prevented an outage. Both the evaluation and metric remain for this Plan
because they properly inform CPAU efforts in preventing outages.
Since January 1, 2020, CPAU has had 10 outages in the Foothills area. None were
a result of a PSPS event or weather-related. Most were caused by animal activity
in this heavily wooded area or a car hitting a pole.
ii. Fire ignitions
An important metric, CPAU stated in the 2020 Plan that staff would provide the
number of fires occurring in the high fire threat area that were less than 10 acres
in size, specifically describing any fires larger than 10 acres. Since January 1,
2020, CPAU has had zero wildfires in the high fire threat area over 10 acres with
no calls to 911 to report of a fire of any size.
If CPAU experiences any wildfires in this area, whether ignited by electric
infrastructure or not, CPAU will work with the Fire Department, Office of
Emergency Services, and any related local government agency to review the
cause, how or if CPAU equipment related to the cause or was impacted and
collaborate on any after-action activities.
iii. Wires down
This metric includes instances of any electric lines or conductors that fall to the
ground or come into contact with a foreign object in the high fire threat area. For
each wires-down event, CPAU will utilize an evaluation system similar to CPAU’s
outage evaluation: reviewing the cause, what actions may have prevented the
event, and if there are areas for improvement.
Item #2
Packet Pg. 30
13
APPENDIX A: WILDFIRE MITIGATION ACTIVITIES
The City’s key mitigation activity is undergrounding eleven miles of overhead electric lines in
the Foothills area. This project involves installing substructure work, including boxes for electric
and fiber lines; removing electric lines and fiber lines from overhead poles; and installing pad-
mount equipment where possible.
This iterative project consists of multiple phases (Phases 1-4) and is expected to be complete in
2025. CPAU already installed three of four required substructures.
This image is a high-level visual
representation of the project area,
timeline, and how many feet below
the surface equipment will be placed.
Item #2
Packet Pg. 31
14
WILDFIRE MITIGATION ACTIVITIES
Activity Description Status Projected
completion date
Undergrounding
Phase 1 and Phase 2
Substructure work, installing boxes and
padmount equipment, pulling cable,
energizing electric lines, and removing
electric facilities off of overhead poles.
Substructure work for Phases 1 and 2
in Foothills Park is done. Electric lines
are now underground, and facilities
are energized.
Completed 2024
Utilizing Fiberglass Some poles will remain in the high fire threat
area once lines are underground. CPAU will
use new fiberglass crossarms when
replacement is needed to enhance resiliency.
Staff completed the fiberglass
crossarms design, ordered materials,
but faced shipping delays. Materials
arrived in Spring 2023.
Completed 2023
Outage Management
System (OMS)
Updating the Outage Management System to
provide enhanced customer communication
during outages and improve customer service.
Implementation upgrades now offer
enhanced functionalities, enabling
customer notifications and resource
mobilization for outages and
emergencies, with updates via email,
text, and social media.
Completed 2023
Overhead Pole
Removal and Fiber
Transfer
Full removal of aerial facilities in Phases 1 and
2 by the end of the Summer.
Fiber cable is still aerial due to long lead
times for material, however that material
has been received and staff anticipate the
full removal of aerial facilities in Phases 1
and 2 by then end of the Summer 2024.
Fall 2024
Item #2
Packet Pg. 32
15
Activity Description Status
Projected
completion date
Undergrounding
Phase 3
Substructure work, installing boxes and
padmount equipment, pulling cable,
energizing electric lines, and removing electric
facilities off of overhead poles.
Substructure for Phase 3 has been
completed on Pony Tracks Fire Road and
Page Mill Road.
Fall 2024
SCADA switch to
facilitate
deenergization
To facilitate the ability to quickly shut off
power on the line serving the high fire threat
area, CPAU staff will install a remotely
operable switch, providing Electric Dispatch
Operators at the Utility Control Center the
capability to deenergize the line immediately.
CPAU selected the location of the remote
switch and will install it while completing
the above- mentioned undergrounding
project
Spring 2025
Fiber Optic Extension CPAU will design and install new fiber optic
cable to enhance the communications
capability in the high fire threat area.
Segments of underground
communication conduit are being
installed along with the electric
substructure work, phase by phase.
Summer 2025
Undergrounding
Phase 4
Substructure work, installing boxes and
padmount equipment, pulling cable,
energizing electric lines, and removing electric
facilities off of overhead poles.
Phase 4 substructure is under
construction along Page Mill Road and
Montebello Road. It is expected to reach
Montebello Reservoir by year-end. Staff is
discussing relocating the Public Utility
easement with Mid-Peninsula Open
Space to extend installation along
Montebello Road beyond Montebello
Reservoir.
Spring 2025
Item #2
Packet Pg. 33
Item No. 3. Page 1 of 3
Utilities Advisory Commission
Staff Report
From: Dean Batchelor, Director Utilities
Lead Department: Utilities
Meeting Date: June 3, 2024
Staff Report: 2402-2691
TITLE
Staff Recommends that the Utilities Advisory Commission Recommend the City Council Adopt
the 2024 Annual Water Shortage Assessment Report
RECOMMENDATION
Staff requests the Utilities Advisory Commission (UAC) recommend the City Council adopt the
2024 Annual Water Shortage Assessment Report.
EXECUTIVE SUMMARY
Beginning in 2022, every urban water supplier in California must conduct an Annual Water Supply
and Demand Assessment as required by California Water Code Section 10632 (a). Each urban
water supplier must also submit an Annual Water Shortage Assessment Report to the
Department of Water Resources (DWR) on or before July 1, as required by California Water Code
Section 10632.1. The City’s Annual Water Shortage Assessment Report (Attachment A, Tables 1-
5) shows that there is no water shortage anticipated for Fiscal Year 2025. On April 15, 2024, the
San Francisco Public Utilities Commission (SFPUC), Palo Alto’s water supplier, provided Palo Alto
with the Water Supply Availability Update indicating for the current water year, Hetch Hetchy
watershed has experienced nearly average conditions for precipitation and snowpack. The City
of Palo Alto encourages continued water conservation efforts and the City’s website contains
more information about available water conservation programs.1
DISCUSSION
To prepare the 2024 Annual Water Shortage Assessment Report, staff followed the procedures
outlined in its Water Shortage Contingency Plan, contained in Section 7 of the City’s 2020 Urban
Water Management Plan (UWMP).2 Palo Alto’s 2024 Annual Water Shortage Assessment Report
uses the DWR-developed Optional Annual Assessment Tool format. This format includes the 5
tables shown in Attachment A. Staff will submit the standard tables to DWR by July 1, 2024.
1 Water Conservation Programs https://www.cityofpaloalto.org/Departments/Utilities/Sustainability/Ways-to-
Save
2 UWMP https://www.cityofpaloalto.org/files/assets/public/v/1/utilities/uwmp/2020-uwmp_final-submission-to-
dwr.pdf
Item #3
Packet Pg. 34
Item No. 3. Page 2 of 3
“Table 1. Annual Assessment Information” (Table 1) provides required overview information. The
remaining tables project water supply and demand for FY 2025 under dry conditions, as required,
and finds that there is no projected water shortage.
After Palo Alto and other urban water suppliers report to DWR on the 2024 Annual Water
Shortage Assessment Reports, DWR will prepare a summary report on its review of the Annual
Water Supply and Demand Assessment results and provide it to the State Water Resources
Control Board (State Board) by September 30. The DWR report will include water shortage
information at the supplier level, as well as regional and statewide analysis of water conditions
as required by California Water Code Section 10644 (c)(1)(B).
Potable Water
Palo Alto receives 100% of its potable water supply from the SFPUC Regional Water System and
staff used the SFPUC's April 15, 2024 Water Supply Availability Update to determine water
supply.
• “Table 2: Water Demands” (Table 2) provides a demand projection for each month of FY
2025;
• “Table 3: Water Supplies” (Table 3) notes that there is sufficient supply to meet Palo Alto’s
demand and projects supply equal to the demand projection since there is no projected water
shortage in FY 2025;
• “Table 4(P): Potable Water Shortage Assessment” (Table 4(P)) compares projected FY
2025 demand with supply and illustrates that there is no shortage projected for FY 2025;
• “Table 5: Planned Water Shortage Response Actions” (Table 5) shows no triggered water
shortage actions.
Palo Alto’s eight permanent water use regulations remain in effect (see Palo Alto Municipal Code
Section 12.32.010).
Non-Potable Water
For non-potable recycled water, Table 2 provides the demand projection and Table 3 notes that
there is sufficient supply to meet Palo Alto’s non-potable recycled water demand in FY 2025. For
that reason, the supply is set to equal demand and there is no shortage of non-potable water
projected in Table 4(NP), “Non-Potable Water Shortage Assessment”.
ANALYSIS
Upon review, discussion, and action by the UAC, staff will bring the Annual Water Shortage
Assessment Report to the City Council to consider its adoption on June 19, 2024. California Water
Code Section 10632.1 requires the Annual Water Shortage Assessment Report to be submitted
to DWR by July 1 each year.
FISCAL/RESOURCE IMPACT
There is no fiscal impact from Council approving the 2024 Annual Water Shortage Assessment
Report.
STAKEHOLDER ENGAGEMENT
Item #3
Packet Pg. 35
Item No. 3. Page 3 of 3
Staff encourages interested parties to comment or provide feedback on the draft Annual Water
Shortage Assessment Report at the UAC or Council meeting where the report will be considered
for approval, or to submit written comments prior to those meetings.
ENVIRONMENTAL REVIEW
Adoption of the 2024 Annual Water Shortage Assessment Report is exempt from California
Environmental Quality Act’s (CEQA) review pursuant to Water Code Section 10652.
ATTACHMENTS
Attachment A: 2024 Annual Water Shortage Assessment Report Tables
Attachment B: Presentation
AUTHOR/TITLE:
Dean Batchelor, Director of Utilities
Staff: Lisa Bilir, Senior Resource Planner
Item #3
Packet Pg. 36
Attachment A: 2024 Annual Water Shortage Assessment Report Tables
Item #3
Packet Pg. 37
Item #3
Packet Pg. 38
Item #3
Packet Pg. 39
Item #3
Packet Pg. 40
Item #3
Packet Pg. 41
Item #3
Packet Pg. 42
June 5, 2024 www.cityofpaloalto.org
2024 Annual Water Shortage Assessment Report
Utilities Advisory Commission
Item #3
Packet Pg. 43
TITLE 40 FONT BOLD
Subtitle 32 font
2 www.cityofpaloalto.org
§Beginning in 2022, every urban water supplier must:
§1) Conduct an Annual Water Supply and Demand Assessment; and
§2) Submit an Annual Water Shortage Assessment Report to the Department of Water Resources
§Required by the California Water Code Sections 10632(a) and 10632.1
§There is no water shortage and no triggered water shortage actions
§SFPUC’s April 15, 2024 Water Supply Availability Update indicates precipitation and snowpack close to
long-term median levels; SFPUC does not anticipate any water shortage
§Palo Alto’s temporary drought emergency water use restrictions expired June 10, 2023
§Permanent Water Use Restrictions (Palo Alto Municipal Code Section 12.32.010)
Annual Water Shortage Assessment Report
Item #3
Packet Pg. 44
TITLE 40 FONT BOLD
Subtitle 32 font
3 www.cityofpaloalto.org
The Utilities Advisory Commission recommends Council
adopt the 2024 Annual Water Shortage Assessment
Report.
RECOMMENDED MOTION
Item #3
Packet Pg. 45
Questions
www.cityofpaloalto.org
Item #3
Packet Pg. 46
Item No. 4. Page 1 of 1
Utilities Advisory Commission
Staff Report
From: Dean Batchelor, Director Utilities
Lead Department: Utilities
Meeting Date: June 3, 2024
Staff Report: 2404-2968
TITLE
City of Palo Alto One Water Plan: Presentation of Initial Results
RECOMMENDATION
This item is for discussion and no action is requested. Staff seeks input from the Utilities Advisory
Commission (UAC) on its initial results from the City of Palo Alto One Water Plan.
The attached presentation describes the One Water Plan background, goals, approach, overview
and initial results. Staff also plans to return to the UAC with a complete One Water Plan in Fall
2024 before finalizing the One Water Plan for Council acceptance by the end of 2024. A
conceptual list of water supply options (projects) was provided to the UAC in February 2023 and
is available as an attachment to Staff Report 14974.1 Attachment A provides a table of initial draft
planning-level unit cost estimates for water supply projects; note that before Council approves
any water supply project, additional studies would be necessary to explore information such as
feasibility, engineering design and cost.
ATTACHMENTS
Attachment A: Unit Costs for Water Supply Options (Projects)
Attachment B: Presentation
AUTHOR/TITLE:
Dean Batchelor, Director of Utilities
Staff: Lisa Bilir, Senior Resource Planner
1 Staff Report 14974 https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes-reports/agendas-
minutes/utilities-advisory-commission/archived-agenda-and-minutes/agendas-and-minutes-2023/02-feb-2023/02-
01-2023-id-14974-item-2.pdf
Item #4
Packet Pg. 47
Attachment A – Initial Draft Planning Level Unit Cost Estimates of Water Supply Projects
1 | P a g e
Note: Projects identified with “*” in the tables were included as water supply and conservation options and proceeded through the project screening
Current Cost Basis 2023
Imported Desalination Units
SFPUC*
Enhanced
Conservation,
Phase 1*
Enhanced
Conservation,
Phase 2*
Irrigation Wells
Emergency Well
Conversion Full
Treatment*
Emergency Well
Conversion (El
Camino Only),
Full Treatment
Emergency Well
Conversion
Blending
Emergency Well
Conversion (El
Camino Only)
Blending
DPR, Palo Alto
Facility*
DPR, Regional
Facility*
DPR, Palo Alto
Facility with
SSRF*
IPR,
Groundwater
Injection*
Non Potable
Reuse
Bay Water
Desalination*
Multi Source
Storage
Green
Infrastructure Graywater Rain Barrels
Total Capital Cost
Capital Cost $0 $0 $0 $1,000,000 $49,760,760 $25,472,442 $1,532,363 $0 $105,257,000 $16,410,000 $48,900,000 $188,900,000 $148,510,000 $251,832,599 $22,630,000 $4,080,000 $0 $0 $
Land Acquisition Cost $0 $0 $0 $0 $0 $0 $0 $0 $11,463,000 $0 $7,400,000 $7,400,000 $0 $43,560,000 $0 $0 $0 $0 $
Amortized Capital and Land Cost $0 $0 $0 $65,051 $3,408,068 $1,788,376 $92,395 $0 $7,592,804 $1,067,494 $3,662,396 $12,769,597 $9,660,789 $19,215,712 $1,472,114 $265,410 $0 $0 $
Total Annual O&M Cost
Groundwater Production Charge N/A N/A N/A $93,096 $5,172,000 $4,137,600 $5,172,000 $4,137,600 $0 $0 $0 $5,671,960 $0 $0 $0 $0 $0 $0 $ per Year
O&M Cost $24,267,125 $188,176 $639,142 $6,822 $1,811,749 $1,362,069 $212,010 $169,608 $9,305,267 $6,049,640 $1,897,644 $6,213,260 $992,271 $9,827,073 $60,000 $240,000 $46,650 $43,251 $ per Year
Energy Cost $0 N/A N/A $3,276 $99,964 $74,426 $99,964 $74,426 $74,733 $270,999 $45,045 $1,054,780 $82,592 $1,281,486 $0 $0 $0 $0 $ per Year
Total Unit Cost
Total Annual Cost $24,267,125 $188,176 $639,142 $168,246 $10,491,781 $7,362,471 $5,576,369 $4,381,634 $16,972,804 $7,117,134 $5,605,085 $25,709,597 $10,653,060 $30,324,272 $1,532,114 $505,410 $46,650 $43,251 $ per Yr
Project Yield 10,982 606 330 54 2,250 1,800 3,000 2,400 4,723 1,769 630 5,150 1,100 4,480 39 30 6 0.7
Acre Feet
per Year
Capital Cost Unit Cost $0 $0 $0 $1,205 $1,515 $994 $31 $0 $1,608 $603 $5,813 $2,480 $8,783 $4,289 $38,125 $8,847 $0 $0 $ per AF
GPC Unit Cost $0 $0 $0 $1,724 $2,299 $2,299 $1,724 $1,724 $0 $0 $0 $1,101 $0 $0 $0 $0 $0 $0 $ per AF
O&M Unit Cost $2,210 $310 $1,939 $126 $805 $757 $71 $71 $1,970 $3,420 $3,012 $1,206 $902 $2,193 $1,554 $8,000 $8,215 $58,321 $ per AF
Energy Unit Cost $0 $0 $0 $61 $44 $41 $33 $31 $16 $153 $71 $205 $75 $286 $0 $0 $0 $0 $ per AF
Total Unit Cost $2,210 $310 $1,939 $3,116 $4,663 $4,090 $1,859 $1,826 $3,594 $4,024 $8,897 $4,992 $9,685 $6,768 $39,679 $16,847 $8,215 $58,321 $ per AF
Future Cost Basis 2045
Imported Desalination Units
SFPUC*
Enhanced
Conservation,
Phase 1*
Enhanced
Conservation,
Phase 2*
Irrigation Wells
Emergency Well
Conversion Full
Treatment*
Emergency Well
Conversion (El
Camino Only),
Full Treatment
Emergency Well
Conversion
Blending
Emergency Well
Conversion (El
Camino Only)
Blending
DPR, Palo Alto
Facility*
DPR, Regional
Facility*
DPR, Palo Alto
Facility with
SSRF*
IPR,
Groundwater
Injection*
Non Potable
Reuse
Bay Water
Desalination*
Multi Source
Storage
Green
Infrastructure Graywater Rain Barrels
Total Capital Cost
Capital Cost $0 $0 $0 $1,071,225 $53,304,971 $27,286,717 $1,641,505 $0 $159,050,554 $29,450,626 $73,891,257 $240,333,553 $188,946,193 $380,536,347 $25,968,446 $4,681,894 $0 $0 $
Land Acquisition Cost $0 $0 $0 $0 $0 $0 $0 $0 $17,321,380 $0 $11,181,908 $9,414,867 $0 $65,822,151 $0 $0 $0 $0 $
Amortized Capital and Land Cost $0 $0 $0 $69,685 $3,650,808 $1,915,753 $98,976 $0 $11,473,247 $1,915,805 $5,534,131 $16,246,493 $12,291,221 $29,036,261 $1,689,285 $1,689,285 $0 $0 $
Total O&M Cost
Groundwater Production Charge $0 $0 $0 $346,726 $19,262,570 $19,262,570 $19,262,570 $15,410,056 $0 $0 $0 $21,124,618 $0 $0 $0 $0 $0 $0 $ per Year
O&M Cost $49,517,551 $418,502 $1,421,444 $15,173 $4,029,311 $3,029,227 $471,508 $377,206 $20,694,811 $13,454,332 $4,220,340 $13,818,221 $2,206,800 $21,855,303 $133,439 $533,757 $103,749 $96,190 $ per Year
Energy Cost $0 $0 $0 $4,826 $159,607 $118,832 $159,607 $118,832 $119,323 $432,691 $71,921 $1,684,115 $131,871 $2,046,084 $0 $0 $0 $0 $ per Year
Total Unit Cost
Total Annual Cost $0 $418,502 $1,421,444 $436,410 $27,102,295 $24,326,381 $19,992,661 $15,906,094 $32,287,381 $15,370,137 $9,826,392 $52,873,447 $14,629,892 $52,937,648 $1,822,724 $2,223,042 $103,749 $96,190 $ per Yr
Project Yield 12,113 606 330 54 2,250 1,800 3,000 2,400 4,723 1,769 630 5,150 1,100 4,480 39 30 6 1
Acre Feet
per Year
Capital Cost Unit Cost $0 $0 $0 $1,290 $1,623 $1,064 $33 $0 $2,429 $1,083 $8,784 $3,155 $11,174 $6,481 $43,749 $56,309 $0 $0 $ per AF
GPC Unit Cost $0 $0 $0 $6,421 $8,561 $10,701 $6,421 $6,421 $0 $0 $0 $4,102 $0 $0 $0 $0 $0 $0 $ per AF
O&M Unit Cost $4,088 $690 $4,313 $281 $1,791 $1,683 $157 $157 $4,382 $7,606 $6,699 $2,683 $2,006 $4,878 $3,456 $17,792 $18,271 $129,705 $ per AF
Energy Unit Cost $0 $0 $0 $89 $71 $66 $53 $50 $25 $245 $114 $327 $120 $457 $0 $0 $0 $0 $ per AF
Unit Cost $4,088 $690 $4,313 $8,082 $12,045 $13,515 $6,664 $6,628 $6,836 $8,689 $15,597 $10,267 $13,300 $11,815 $47,205 $74,101 $18,271 $129,705 $ per AF
Other
Conservation
Conservation
Water Reuse Other
Water ReuseGroundwater
Groundwater
Item #4
Packet Pg. 48
June 3, 2024 www.cityofpaloalto.org
One Water Plan:
Initial Results
Utilities Advisory Commission
Item #4
Packet Pg. 49
2 www.cityofpaloalto.org
One Water Initial Results Outline
1.Goal, Overview & Approach
2.Supply and Conservation Projects
3.Water Supply & Conservation Portfolios
4. Initial Conclusions
5. Next Steps
Item #4
Packet Pg. 50
3 www.cityofpaloalto.org
Previous UAC Meetings on One Water Plan
•July 7, 2021 – One Water Plan Draft Scope
•February 1, 2023 – One Water Plan Update;
provided update on screening process,
stakeholder engagement and portfolio
approach
Item #4
Packet Pg. 51
4 www.cityofpaloalto.org
One Water Plan: Goal
Council adoption of a One
Water supply plan that is a
20-year adaptable roadmap
for implementing prioritized
portfolio alternatives for
water supply and
conservation
Item #4
Packet Pg. 52
5 www.cityofpaloalto.org
One Water Plan: Approach
•Key Action in City’s Sustainability and Climate Action Plan (SCAP)
•Long-term 20-year (through 2045) Water Supply Plan
•Addresses future uncertainties
•Includes robust and meaningful stakeholder engagement
•In collaboration with Carollo Engineers, a national One Water thought leader
•Builds on existing plans/work
One Water Plan does not directly address:
•Near-term drought
•Short-term emergencies such as earthquakes and wildfires – addressed under separate
emergency plans
•Building codes
Item #4
Packet Pg. 53
6 www.cityofpaloalto.org
Key Uncertainties
•Valley Water Transfer
•About half of effluent from Regional Water Quality Control Plant
•Option expires in 2033
•Transfer incompatible with some Palo Alto water supply options
•Future Water Supply Availability (varies by water supply project)
•Droughts
•Climate Change
•State regulations
•SFPUC’s alternative water supply implementation
•Cost
Item #4
Packet Pg. 54
TITLE 40 FONT BOLD
Subtitle 32 font
7 www.cityofpaloalto.org
One Water Plan: Overview
(Summer 2024)
(End of 2024)
Item #4
Packet Pg. 55
8 www.cityofpaloalto.org
Water Supply and Conservation Project
Screening
§Environmental
Benefits
§Ease of
Implementation
§Cost
§Reliability
Item #4
Packet Pg. 56
9 www.cityofpaloalto.org
Screening Results:
Top Water Supply Projects
Baseline - SFPUC (Regional Water System; Current Potable Water Supply)
Conservation Phase 1
Conservation Phase 2
Groundwater Full Treatment (Iron, Manganese, Total Dissolved Solids)
Groundwater Blending
Direct Potable Reuse - Palo Alto Facility
Direct Potable Reuse - Regional Facility
Direct Potable Reuse - Palo Alto Facility with Small Salt Removal Facility
Indirect Potable Reuse
Bay Water Desalination
Note: full list of water supply and conservation options attached to this presentation, and schematics
on upcoming slides
Item #4
Packet Pg. 57
10 www.cityofpaloalto.org
Enhanced Conservation Phase 1 & 2
Possible Measures
Conservation Phase 1 Conservation Phase 2
Outdoor irrigation assistance for commercial customers High Efficiency Toilet direct install for commercial
customers
Non- functional turf ban for commercial customers Turf conversion support for residential customers
Front lawn limitation for residential new developments
and major retrofits
Front lawn limitation for residential properties upon resale
Permanent 3-day watering week restriction
Low-income residential High Efficiency Toilet direct install
Item #4
Packet Pg. 58
11 www.cityofpaloalto.org
Groundwater Options
Groundwater Blending Only (no treatment) –
not carried forward in One Water Plan, need to understand public acceptance
Groundwater with blending plus Iron (Fe), Manganese (Mn) and Total Dissolved Solids (TDS) treatment
SFPUC Water
Item #4
Packet Pg. 59
12 www.cityofpaloalto.org
Direct Potable Reuse (DPR)
DPR Treatment Facility with three possible
configurations:
1) Palo Alto DPR Facility
Or
2) Regional DPR Facility owned by Valley
Water, if effluent transfer occurs
Or
3) Palo Alto DPR Facility that utilizes the
Small Salt Removal Facility currently being
built at the Regional Water Quality Control
Plant
Item #4
Packet Pg. 60
13 www.cityofpaloalto.org
Indirect Potable Reuse (IPR)
Item #4
Packet Pg. 61
14 www.cityofpaloalto.org
Baywater Desalination
Item #4
Packet Pg. 62
15 www.cityofpaloalto.org
Project Normal Year Yield Comparison
(Acre Feet per Year)
Item #4
Packet Pg. 63
16 www.cityofpaloalto.org
Project Unit Cost Per Acre Foot Comparison
Item #4
Packet Pg. 64
17 www.cityofpaloalto.org
Project Compatibility With Valley Water
Effluent Transfer
No Valley Water
Transfer
With Valley Water
Transfer
Baseline - SFPUC (Regional Water System; Current Potable Water Supply)
Conservation Phase 1
Conservation Phase 2
Groundwater Full Treatment (Fe, Mn, TDS)
Groundwater Blending
Direct Potable Reuse - Palo Alto Facility No
Direct Potable Reuse - Regional Facility No
Direct Potable Reuse - Palo Alto Facility with SSRF
Indirect Potable Reuse – Palo Alto Facility No
Bay Water Desalination
Note: list of water supply and conservation options attached to this presentation
Item #4
Packet Pg. 65
Water Supply and Conservation Tool & Portfolios
Item #4
Packet Pg. 66
19 www.cityofpaloalto.org
Tool for Water Supply Portfolio Analysis
Future Scenario Assumptions
Project Variables
Portfolio Development
Project Costs Estimates
Portfolio Evaluation
Portfolio Supply
Summary
Portfolio Costs
Estimates
Portfolio Evaluation
Graphical Outputs
Water Demand Forecast
Project Yields
Project Cost Estimates
Project Evaluation
Data Inputs User Selections Outputs
Item #4
Packet Pg. 67
20 www.cityofpaloalto.org
Water Supply Portfolio Evaluation Criteria &
Suggested Weights
Suggested weights from
stakeholder engagement
meeting with community
and interdepartmental
staff as well as online
survey
Item #4
Packet Pg. 68
21 www.cityofpaloalto.org
Initial Water Portfolio Evaluation Results
Weighted Criteria Ranking by Portfolio - No Valley Water Transfer - 2045
Evaluation Criteria
Note:
1)Each portfolio includes
Conservation Phase 1 and
Phase 2, except Baseline SFPUC
2)Each portfolio includes SFPUC
supply
Item #4
Packet Pg. 69
22 www.cityofpaloalto.org
Initial Water Portfolio Evaluation Results
Weighted Criteria Ranking by Portfolio - With Valley Water Transfer - 2045
Evaluation Criteria
Note:
1)Each portfolio includes
Conservation Phase 1 and
Phase 2, except Baseline
SFPUC
2)Each portfolio includes
SFPUC supply
Item #4
Packet Pg. 70
23 www.cityofpaloalto.org
Initial Observations
•Conservation Phase 1 and Phase 2 score higher than “do nothing” and do not
require large investment to proceed (included in every portfolio other than the
SFPUC or “do nothing”)
•Highest Scoring Portfolios:
DPR - Palo Alto Only No Valley Water Transfer
DPR - Regional Facility with Valley Water Transfer
•Both DPR portfolios contingent on Valley Water Effluent Transfer; resolved in nine
years
•Baywater Desal is highest scoring portfolio not dependent on the Valley Water
Effluent Transfer
•Other high scoring portfolio is emergency supply well conversion with blending only
(no treatment); lower water quality so not included
Item #4
Packet Pg. 71
24 www.cityofpaloalto.org
Sensitivity of Initial Results
Weighted Criteria Ranking by Portfolio - No Valley Water Transfer - 2045
Evaluation Criteria
Note:
1)Each portfolio includes
Conservation Phase 1 and
Phase 2, except Baseline SFPUC
2)Each portfolio includes SFPUC
supply
Item #4
Packet Pg. 72
25 www.cityofpaloalto.org
Sensitivity of Initial Results
Weighted Criteria Ranking by Portfolio - With Valley Water Transfer - 2045 Evaluation Criteria
Note:
1)Each portfolio includes
Conservation Phase 1 and
Phase 2, except Baseline
SFPUC
2)Each portfolio includes
SFPUC supply
Item #4
Packet Pg. 73
26 www.cityofpaloalto.org
Initial Results Sensitivity to Cost Weighting
•Top portfolios unchanged
DPR - Palo Alto Only No Valley Water Transfer
DPR - Regional Facility with Valley Water
Transfer
•Conservation scores higher
•Only the top scoring portfolio and Conservation
score higher than Baseline – SFPUC
•Groundwater blending only (no treatment) is
second-highest scoring infrastructure project and
scores higher than Baseline – SFPUC
Item #4
Packet Pg. 74
27 www.cityofpaloalto.org
Next Steps
UAC Final One Water Plan (Fall 2024)
•Recommended supply strategy
•Trigger-based implementation plan
City Council Final One Water Plan (End of 2024)
Future Activities
•Funding Strategy
•Implementation
•Updating One Water Tool as conditions change
Item #4
Packet Pg. 75