HomeMy WebLinkAbout2021-06-02 Utilities Advisory Commission Agenda PacketMATERIALS RELATED TO AN ITEM ON THIS AGENDA SUBMITTED TO THE COMMISSION AFTER DISTRIBUTION OF THE AGENDA PACKET ARE
AVAILABLE FOR PUBLIC INSPECTION ON THE UTILITIES ADVISORY COMMISSION WEBPAGE.
AMERICANS WITH DISABILITY ACT (ADA)
Persons with disabilities who require auxiliary aids or services in using City facilities, services or programs or who would like information on the City’s
compliance with the Americans with Disabilities Act (ADA) of 1990, may contact (650) 329-2550 (Voice) 24 hours in advance.
NOTICE IS POSTED IN ACCORDANCE WITH GOVERNMENT CODE SECTION 54954.2(a) OR 54956
Supporting materials are available online at https://www.cityofpaloalto.org/gov/boards/uac/default.asp on Thursday, 5 days preceding the
meeting.
****BY VIRTUAL TELECONFERENCE ONLY****
Join Zoom Webinar Here Meeting ID: 966 9129 7246 Phone: 1 (669) 900-6833
Pursuant to the provisions of California Governor’s Executive Order N-29-20, issued on March 17, 2020, to prevent
the spread of COVID-19, this meeting will be held by virtual teleconference only, with no physical location. The
meeting will be broadcast on Cable TV Channel 26, live on Midpen Media Center at https://midpenmedia.org.
Members of the public who wish to participate by computer or phone can find the instructions at the end of this
agenda.
I. ROLL CALL
II. AGENDA REVIEW AND REVISIONS
III. ORAL COMMUNICATIONS
Members of the public are invited to address the Commission on any subject not on the agenda. A reasonable time restriction may
be imposed at the discretion of the Chair. State law generally precludes the UAC from discussing or acting upon any topic initially
presented during oral communication.
IV. APPROVAL OF THE MINUTES
May 12, 2021 Draft Minutes will be set for Review on July 07, 2021
V. UNFINISHED BUSINESS - None
VI. UTILITIES DIRECTOR REPORT
VII. NEW BUSINESS
1. Selection of Officers Action
2. Discussion and Update of the Wildfire Mitigation Plan Discussion
3. Discussion and Update on the Utilities MyCPAU Customer Portal Discussion
4. Discussion and Overview of the 2021 City Survey Discussion
VIII. COMMISSIONER COMMENTS and REPORTS from MEETINGS/EVENTS
IX. FUTURE TOPICS FOR UPCOMING MEETINGS: July 7, 2021
UTILITIES ADVISORY COMMISSION – SPECIAL MEETING
WEDNESDAY, June 2, 2021 – 5:00 P.M.
ZOOM Webinar
Chairman: Lisa Forssell Vice Chair: Lauren Segal Commissioners: Michael Danaher, Donald Jackson, A.C. Johnston, Greg Scharff, and Loren Smith Council Liaison: Eric Filseth
MATERIALS RELATED TO AN ITEM ON THIS AGENDA SUBMITTED TO THE COMMISSION AFTER DISTRIBUTION OF THE AGENDA PACKET ARE
AVAILABLE FOR PUBLIC INSPECTION ON THE UTILITIES ADVISORY COMMISSION WEBPAGE.
AMERICANS WITH DISABILITY ACT (ADA)
Persons with disabilities who require auxiliary aids or services in using City facilities, services or programs or who would like information on the City’s
compliance with the Americans with Disabilities Act (ADA) of 1990, may contact (650) 329-2550 (Voice) 24 hours in advance.
SUPPLEMENTAL INFORMATION - The materials below are provided for informational purposes, not for action or
discussion during UAC Meetings (Govt. Code Section 54954.2(a)(3)).
Informational Reports 12-Month Rolling Calendar Public Letter(s) to the UAC
• Informational Update on the Utilities Quarterly Report for Q1&2 of FY 2021
MATERIALS RELATED TO AN ITEM ON THIS AGENDA SUBMITTED TO THE COMMISSION AFTER DISTRIBUTION OF THE AGENDA PACKET ARE
AVAILABLE FOR PUBLIC INSPECTION ON THE UTILITIES ADVISORY COMMISSION WEBPAGE.
AMERICANS WITH DISABILITY ACT (ADA)
Persons with disabilities who require auxiliary aids or services in using City facilities, services or programs or who would like information on the City’s
compliance with the Americans with Disabilities Act (ADA) of 1990, may contact (650) 329-2550 (Voice) 24 hours in advance.
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email,
teleconference, or by phone.
1. Written public comments may be submitted by email to UACPublicMeetings@CityofPaloAlto.org.
2. Spoken public comments using a computer will be accepted through the teleconference meeting.
To address the Commission, click on the link below for the appropriate meeting to access a Zoom-
based meeting. Please read the following instructions carefully.
A. You may download the Zoom client or connect to the meeting in-browser. If using your
browser, make sure you are using a current, up-to-date browser: Chrome 30+, Firefox 27+,
Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers
including Internet Explorer.
B. You will be asked to enter an email address and name. We request that you identify
yourself by name as this will be visible online and will be used to notify you that it is your
turn to speak.
C. When you wish to speak on an agenda item, click on “raise hand.” The Attendant will
activate and unmute speakers in turn. Speakers will be notified shortly before they are
called to speak.
D. When called, please limit your remarks to the time limit allotted.
E. A timer will be shown on the computer to help keep track of your comments.
3. Spoken public comments using a smart phone use the telephone number listed below. When you
wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will
be asked to provide your first and last name before addressing the Council. You will be advised how
long you have to speak. When called please limit your remarks to the agenda item and time limit
allotted.
Join Zoom Webinar Here
Meeting ID: 966-9129-7246
City of Palo Alto (ID # 12190)
Utilities Advisory Commission Staff Report
Report Type: New Business Meeting Date: 6/2/2021
City of Palo Alto Page 1
Summary Title: Wildfire Mitigation Plan Updates
Title: Discussion and Update of the Wildfire Mitigation Plan
From: City Manager
Lead Department: Utilities
Recommendation
This report is presented for the Utilities Advisory Commission (UAC) discussion and no action is
required.
Executive Summary
The purpose of this report is to present to the UAC the annual update to the City of Palo Alto
Utilities (CPAU) Wildfire Mitigation Plan (WMP). Following this public meeting and opportunity
for public comment, CPAU will submit the 2021 WMP Update to the California Wildfire Safety
Advisory Board by July 1, 2021. Attachment B to this report contains the 2021 update to the
WMP. The updates this year are to the WMP’s Appendix F (Status of Proposed Activities). For
the purpose of this UAC report, the WMP appendi x is presented in Attachment C with changes
from the 2020 WMP shown in redline.
Background
In 2019, a new law1 mandated that electric publicly owned utilities prepare a wildfire mitigation
plan. The law required the wildfire mitigation plan to incorporate specified information and
procedures, as deemed necessary by the electric utility. The City’s first WMP was reviewed by
an independent evaluator and was received by Palo Alto City Council on January 21, 2020
(report).
Discussion
The attached mitigation plan is a collaborative effort between Utilities, Fire, Public Works –
Urban Forestry, Open Space, and Office of Emergency Services departments. Each department
performs a critical role in preventing wildfires from occurring and communicating information
to the public and outside agencies. Per the law, the Mitigation Plan concentrates primarily on
wildfires associated with overhead electric utility infrastructure but many of the activities
1 Public Utilities Code 8387, modified by SB 901 (Dodd).
Staff: Jim Pachikara;
Tikan Singh; Debra Lloyd
CITY OF
PALO
ALTO
City of Palo Alto Page 2
overlap with general procedures for each department.
Notable updates this year to the proposed activities include:
• Rebuild of overhead lines in the Foothills – As updated to the UAC in March 2021
(report), Utilities initially solicited bids for a design/build contractor to rebuild, relocate,
or replace the overhead lines in the Foothills. However, after reviewing bids, Staff is
proceeding with an alternative solution to convert the Foothill overhead lines to
underground. Staff will design this in-house and contract as needed for construction,
with an anticipated completion target of summer 2025 . Two short sections of the
Foothills overhead lines were identified to test the practicality and cost of
undergrounding the lines, with the second segment currently in construction. These first
two segments eliminated twelve (12) poles and the associated overhead wire and
hardware that is the main risk to causing wildfires from electrical facilities. A few other
activities listed in Appendix F of the WMP (new construction standards, fiber optic cable
extension, and SCADA Switch installation) are integrated with the rebuild and so their
target dates have been adjusted to coordinate with the rebuild .
Timeline
The WMP will be updated annually, presented in a publicly noticed meeting and submitted to
the California Wildfire Safety Advisory Board by July 1 of each year. At least once every three
years, the City shall complete a comprehensive revision of the WMP along with an independent
evaluator review. A comprehensive revision and third party evaluation of CPAU’s WMP is due
by July 1, 2023.
Resource Impact
The Utilities Wildfire Mitigation Plan does not have any immediate resource impact besides the
staff time to develop the plan and its updates. Ongoing and proposed activities listed in the
plan are and will be approved annually through the Capital and Operating Budget process.
Policy Implications
CPAU verifies that the wildfire mitigation plan complies with all applicable rules, regulations,
and standards, specifically with PUC Section 8387, as appropriate.
Stakeholder Engagement
The annual presentation of updates to the WMP in a publicly noticed meeting provides an
opportunity to hear and accept comments on the plan from the public, other local and state
agencies, and interested parties.
Environmental Review
The UAC’s receipt of this report is not a project requiring California Environmental Quality Act
review, because it is an administrative governmental activity which will not cause a direct or
indirect physical change in the environment.
Attachments:
City of Palo Alto Page 3
• Attachment A: Presentation
• Attachment B: Utilities Wildfire Mitigation Plan Update
• Attachment C: Appendix F
Utilities Wildfire Mitigation Plan Update
June 2, 2021
Attachment A
A c1Tv OF
WPALO ALTO
2
Background information
California legislation (Senate Bill 901) requires electric utilities to prepare a
Wildfire Mitigation Plan and update it annually.
The Utilities’ Wildfire Mitigation Plan will be updated annually, presented
in a publicly noticed meeting and submitted to the California Wildfire
Advisory Board by July 1st of each year.
A c1Tv OF
WPALO ALTO
3
Utilities Wildfire Mitigation Plan
Update
Objective
Review the plan and determine if there
are any changes or updates.
Collaboration
Prepared with assistance and input from
Fire, Urban Forestry, Open Space, Office
of Emergency Services
4-
A c1Tv OF
WPALO ALTO
4
Utilities Wildfire Mitigation Plan Updates
Rebuild of overhead lines in the Foothills
Staff recommended and is proceeding with an alternative solution to design in-
house underground conversion project and contract as needed for construction,
with an anticipated completion target of summer 2025.
A c1Tv OF
WPALO ALTO
5
Discussion
End of Presentation
Questions?
A c1Tv OF
WPALO ALTO
Utilities Wildfire
Mitigation Plan
April 27, 2021
Attachment B
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 1 of 22 April 27, 2021
Table of Contents
Purpose ................................................................................................................................... 3
Wildfire Risk Factors ............................................................................................................... 3
Compliance ............................................................................................................................. 4
Objectives ............................................................................................................................... 5
Minimizing Sources of Ignition ....................................................................................... 5
Resiliency of the Electric Grid ........................................................................................ 5
Minimizing Unnecessary or Ineffective Actions ............................................................. 5
Definitions .............................................................................................................................. 6
Roles and Responsibilities - City of Palo Alto Departments ................................................... 7
Utilities Department....................................................................................................... 7
Urban Forestry Division of the Public Works Department ............................................ 8
Fire Department ............................................................................................................. 8
Open Space and Parks Division of the Community Services Department ..................... 8
Office of Emergency Services ......................................................................................... 9
Completed Tasks .................................................................................................................... 9
City of Palo Alto Foothills Fire Management Plan ......................................................... 9
High Fire Threat Area Identification ............................................................................. 10
Public Utility Code 8387 (SB 1028) ............................................................................... 10
Ongoing Fire Prevention Activities ....................................................................................... 11
Vegetation Management ............................................................................................. 11
Electric System Inspection ........................................................................................... 12
Electric System Maintenance ....................................................................................... 12
Training......................................................................................................................... 13
Electric System Design/Operation ............................................................................... 13
Proposed Activities to Reduce Risk or Improve Response ................................................... 15
CPAU – Electric ............................................................................................................. 15
CPAU – Fiber ................................................................................................................. 16
CPAU – Water ............................................................................................................... 16
URBAN FORESTRY ........................................................................................................ 16
FIRE ............................................................................................................................... 17
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 2 of 22 April 27, 2021
OPEN SPACE ................................................................................................................. 17
OES ............................................................................................................................... 18
Response to Wildfire Incident .............................................................................................. 18
FIRE ............................................................................................................................... 18
OPEN SPACE ................................................................................................................. 19
Communication ............................................................................................................ 19
Emergency Vehicle access ............................................................................................ 19
Resident Evacuation routes ......................................................................................... 19
Mutual Aid .................................................................................................................... 19
CPAU ............................................................................................................................. 19
Community Outreach ........................................................................................................... 20
About Wildfire Mitigation Plan .................................................................................... 20
Prior to proactive deenergization ................................................................................ 20
Prior to restoring power............................................................................................... 20
During a fire .................................................................................................................. 20
Mitigation Plan Review and Assessment Process ................................................................ 21
METRIC 1: Outages on the Overhead Electric System in the High Fire Threat Area .. 21
METRIC 2: Fire Ignitions ............................................................................................... 21
Revision and improvement implementation process .................................................. 21
Auditing ................................................................................................................................ 22
Attachments ......................................................................................................................... 22
APPENDIX A: City of Palo Alto Foothills Fire Management Plan
APPENDIX B: Map of CPUC High Fire Threat areas in California
APPENDIX C: Map of CPUC High Fire Threat area in Palo Alto
APPENDIX D: Utilities Department Wildfire Mitigation Plan Roles and Responsibilities
APPENDIX E: Summary of requirements of SB 901
APPENDIX F: Status of Proposed Activities to Reduce Risk of Wildfire
APPENDIX G: DRAFT PSPS Policy and Process
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 3 of 22 April 27, 2021
PURPOSE
Devastating wildfires throughout the State of California have prompted electric utilities
throughout the state to identify areas within their jurisdiction that are susceptible to power-
line ignited wildfires and to take steps to prevent their occurrence. This plan outlines the
processes and activities undertaken by the City of Palo Alto ’s Utilities Department (CPAU) to
mitigate the threat of wildfires associated with overhead electric lines and associated
equipment owned and operated by CPAU.
WILDFIRE RISK FACTORS
Located 35 miles south of San Francisco and 14 miles north of San Jose, Palo Alto is a
community of approximately 67,082 residents. Part of the San Francisco Metropolitan Bay
Area Palo Alto is located within Santa Clara County and borders San Mateo County. The
City's boundaries extend from San Francisco Bay on the east to the Skyline Ridge of the
coastal Santa Cruz mountains on the west, with Menlo Park to the north and Mountain View
to the south. The City encompasses an area of approximately 26 square miles, of which one-
third is open space (a majority being in the western foothills of the Santa Cruz mountains).
The city is predominantly a flat urban setting with treelined streets transitioning into the
sparsely populated and open space areas of the western foothills.
CPAU manages the 60kV subtransmission, 12kV and 4kV primary, and secondary electric
distribution systems serving customers within the city limits. There are approximately 304
miles of primary distribution line in the city, of which 6% is in the western foothills area. Of
the lines in the foothills, 56% are overhead bare conductors attached to insulators on wood
poles. The remaining 44% is underground.
Palo Alto has long been a leader in addressing issues that are tied to climate change.
Starting with the Sustainability Policy in 2000, to the Climate Protection Plan in 2007, and
most recently adopting the Sustainability/Climate Action Plan in 2016. Palo Alto
understands the wildfires occurring throughout California may well be a new norm and we
must take a proactive approach to prevent this from happening in Palo Alto.
In 2011 CPAU hired a Consultant to perform a Hazard Risk Assessment to assess natural and
man-made intentional hazard risks associated with the City of Palo Alto’s Utilities
Department’s (CPAU’s) electric, gas, water, wastewater and fiber utilities as a combined
entity. The primary purpose of the assessment was to provide information on potential risk
exposure and the financial responsibility for losses that could result from property damage,
bodily injury and/or death, and interruption of business.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 4 of 22 April 27, 2021
The evaluation was based on 14 different hazard types (9 natural, 5 man-made) which
included wildfire in the Foothills area due to the impact of wind on electric facilities. Of all
the hazards evaluated, wildfire due to wind in the foothills posed the highest financial risk.
Staff is in the process of negotiating a contract with a consultant to conduct a review and
update the Risk Assessment specifically for the impact of wildfire in the foothills attributed
to the electric system.
Within CPAU’s service territory and the surrounding areas, the primary risk drivers for
wildfire are the following:
• Vegetation type;
• Vegetation Density;
• Weather;
• High winds;
• Terrain;
• Changing Weather Patterns (Climate Change)
• Extended drought;
• Electric system maintenance and construction practices and methods
• Electric system operating practices
• Vegetation management practices
COMPLIANCE
This plan is prepared in compliance with Senate Bill (SB) 901, which amended Public Utilities
Code Section 8387 by establishing several new policies and programs to help address the
increased risk of wildfires across the state. The bill further directed California’s electric
utilities to develop wildfire mitigation plans regarding power lines and equipment. Public
electric Utilities such as Palo Alto must annually prepare a wildfire mitigation plan; receive
an independent review to assess compliance, and ensure it complies with all applicable
rules, regulations, and standards; and present it to their governing body at a noticed public
meeting for comment.
This plan applies to areas identified as a High Fire Threat in the California Public Utilities
Commission (CPUC) State Firemap. As of 2019, the High Fire Threat Area in Palo Alto is all
areas with the city limits west of Highway 280 (Foothills Area). Adjoining areas in other cities
and jurisdictions are included in PG&E’s Wildfire Mitigation Plan.
This plan also touches on several areas of the CPAU Strategic Plan by “identifying high
priority issues that interfere with emergency services and recovery times and develop s plans
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 5 of 22 April 27, 2021
to improve resiliency, engage stakeholders and strengthen collaboration to achieve a shared
objective, and enhance planned maintenance programs with clearly defined plans.”1
OBJECTIVES
The overarching objective of the work instituted by CPAU in this plan is to eliminate
electrical faults on the overhead electrical system in the High Fire Threat Area in Palo Alto,
thereby eliminating power-line ignited wildfires and the ensuing risk to life and property.
But this is a stretch goal that cannot be 100% guaranteed through changes to the electric
system as outside forces can impact even the most robust construction. Even if all electric
facilities were underground, there still exists the possibility, though at much lower
probability, that a fault on the underground electric system could be a source of ignition of a
wildfire.
Minimizing Sources of Ignition
The primary goal of this Wildfire Mitigation Plan is to minimize the probability that CPAU’s
distribution system may be an original or contributing source for the i gnition of a fire. CPAU
continues to evaluate the prudent and cost-effective improvements to its physical assets,
operations, and training that can help to meet this objective and has implemented, or plans
to implement, those changes consistent with this evaluation. These improvements include:
changes to construction practices; increased inspection and maintenance; new and revised
operating practices during periods of high fire threat; and increase in staff awareness.
Resiliency of the Electric Grid
The secondary goal of this Wildfire Mitigation Plan is to improve the resiliency of the electric
grid. As part of the development of this plan, CPAU assesses new industry practices and
technologies that will reduce the likelihood of a disruption in service, minimize the impact to
customers, and improve the time of service restoration should there be a wildfire that
impacts the electric system.
Minimizing Unnecessary or Ineffective Actions
The final goal for this Wildfire Mitigation Plan is to measure the effectiveness of specific
wildfire mitigation strategies. Where a particular action, program, or protocol is determined
to be unnecessary or ineffective, CPAU will determine which modification or replacement is
required, or what new actions should be implemented to improve the plan. This plan will
also help determine if more cost-effective measures would produce the same or better
results.
1 2018 City of Palo Alto Utilities Strategic Plan – Priority 4, Strategy 5, Action4.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 6 of 22 April 27, 2021
DEFINITIONS
Deenergization – to shut off electrical power. This can be either planned (intentional act by
Utilities staff) or unplanned (a short circuit causes a protective device, e.g. circuit
breaker, to open causing an outage).
Fault – refers to short circuits on an electric system. Examples include a bird or tree making
contact between wires, a piece of equipment failing, or wires coming together because
of severe wind or car pole accident.
Fuses – equipment used to isolate faults on the electric system. This is basically a piece of
wire that melts and breaks an electric circuit if the current exceeds a safe level.
High Fire Threat Area – areas that are at an elevated or extreme risk of power line ignited
wildfire as identified during the CPUC State Firemap development process.
PSPS – Public Safety Power Shutoff
Public Safety Power Shutoff – a proactive deenergization of the electric system by the utility
during periods of high fire threat to prevent power-line ignited wildfires.
Recloser – circuit breakers on the distribution system that will sense the occurrence of a
short circuit and automatically open, shutting off power. They can be programmed to
automatically reclose, to restore power after opening or can be remotely or manually
reclosed.
Reclose – the action of closing a device after it has automatically opened due to a short
circuit on the electrical system. Some devices, such as Reclosers and Substation Circuit
Breakers, can be programmed to automatically reclose.
SCADA – “Supervisory Control and Data Acquisition”, is the system used by CPAU to
remotely monitor the status and operate equipment on the electric system.
Tier level – the CPUC State Firemap assigns Tier levels to all areas of California based on their
risk of wildfires.
Tier 1: Moderate Risk – any area not designated Tier 2 or 3
Tier 2: Elevated risk – A greater likelihood of utility-associated wildfire that would impact
people/property; and where enhanced utility regulations could be expected to
reduce utility-fire risk
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 7 of 22 April 27, 2021
Tier 3: Extreme risk – The highest likelihood of utility-associated wildfire that would
impact people/property; and where the most restrictive utility regulations could
be necessary to reduce utility-fire risk.
Wildfire – a sweeping and destructive conflagration {fire} especially in a wilderness or a rural
area.2
ROLES AND RESPONSIBILITIES - CITY OF PALO ALTO DEPARTMENTS
CPAU will work with other Departments of the city to mitigate the threat of wildfires that
could impact the city and residents. These departments work individually and together to:
• Ensure the electric system operates in a manner that will minimize potential wildfire
risks.
• Take all reasonable and practicable actions to minimize the risk of a catastrophic wildfire
caused by CPAU electric facilities.
• Coordinate with federal, state, and local fire management personnel as necessary or
appropriate to implement CPAU’s Wildfire Mitigation Plan.
• Immediately report fires, pursuant to existing department practices and the
requirements of this Wildfire Mitigation Plan.
• Take corrective action when the staff witnesses or is notified that fire protection
measures have not been properly installed or maintained.
• Comply with relevant federal, state, and industry standard requirements, including the
industry standards established by the CPUC.
• Collect and maintain wildfire data necessary for the implementation of this Wildfire
Mitigation Plan.
• Provide regular training programs for all employees having obligations for
implementation of this Wildfire Mitigation Plan.
Utilities Department
The City of Palo Alto is the only municipality in California that operates a full suite of City -
owned utility services (electric, water, natural gas, wastewater, fiber optic). CPAU manages
these services and has been providing quality service to the citiz ens and businesses of Palo
Alto since 1896.
CPAU is responsible for the design, construction, maintenance, and operation of the utility
electric and water systems in the City of Palo Alto and is the lead on all utility system
mitigation activities. Various personnel within Utilities are involved with creating and
2 Definition cited from Merriam - Webster Dictionary
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 8 of 22 April 27, 2021
implementing the tasks in this plan. Detailed roles and responsibilities for Utilities
Department staff are shown in Appendix D.
The Electric Engineering and Electric Operations Managers are responsible for ensuring that
this mitigation plan is prepared, completed, and updated as planned. Electric Engineering
staff are responsible for activities related to design, policies and procedures, and contractor
selection. Electric Operations staff are responsible for operating, construction, inspection ,
and maintenance activities, and overseeing the completion of field mitigation activities by
other city departments.
Urban Forestry Division of the Public Works Department
The Urban Forestry Division (URBAN FORESTRY) maintains nearly 66,000 trees in Palo Alto’s
urban and rural t areas. The urban forest consists of all trees in the City, public and private
street trees, park trees, forested park-lands and trees on private property.
City Staff, in-house tree crews, and contractors plant, prune, maintain, and remove public
trees; clear vegetation from utility lines; issue tree permits and monitor tree protection for
development and capital improvement projects; field resident questions and requests; and
attend to tree emergencies.
Fire Department
The Palo Alto Fire Department (FIRE) strives to apply the best practices in fire, rescue and
emergency services, and uses innovative approaches to protect the citizens and businesses
in Palo Alto. They are committed to reducing the community's risk from fire and other
emergencies and focus a great deal of resources to identify, mitigate and prevent hazards
that could cause fires or other emergencies.
FIRE is a first responder to any fire incidence and a key resource in helping to assess hazards
for proactive mitigation and prepare reaction plans prior to a fire occurring.
Open Space and Parks Division of the Community Services Department
Open Space and Parks (OPEN SPACE) is responsible for the maintenance of 174 developed
acres of urban park lands and 2000 acres of “rural” open space areas in the western foothills
of Palo Alto.
A portion of the High Fire Threat area in Palo Alto includes two open space preserves.
• Foothills Park is a 1,400-acres preserve with rugged chaparral, woodland, fields,
streams, a lake, and 15 miles of trails. It is bounded by Portola Valley, Los Altos Hills,
Pearson-Arastradero Preserve and Los Trancos Open Space Preserve in Portola
Valley.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 9 of 22 April 27, 2021
• Pearson Arastradero Preserve is 622 acres of grassland, riparian and oak woodland
habitat. It has nine miles of trails and two small lakes. Hikers, equestrians and
cyclists use the preserve. It is bounded by Stanford, Los Altos Hills, Portola Valley, and
Foothills Park.
Rangers and other division staff maintain and operate facilities in Foothills Park and provide
an onsite presence to identify and alert city perso nnel to issues that affect the park or
surrounding areas.
Office of Emergency Services
The Office of Emergency Services’ (OES) mission is to prevent, prepare for, mitigate, respond
to, and recover from all hazards. They develop, maintain, and sustain a citywide,
comprehensive, all-hazard, risk-based emergency management program that engages the
whole community.
OES manages and coordinates the overall emergency response and recovery activities and is
key to ensuring all necessary coordination and communication with the community,
governmental agencies, or emergency responders is accomplished in a systematic and
complete manner.
COMPLETED TASKS
City of Palo Alto Foothills Fire Management Plan
The Foothills Fire Management Plan3 addresses a broad range of integrated activities and
planning documents to address and mitigate the impacts of fire hazards in the Foothills area.
The Fire Management Plan Update addresses the following key items:
• Fire Hazard Assessment
• Regional Evacuation Routes
• Wildland Fire Management Recommendations and Mitigations
• Recommendations for specific high-threat areas
• Management Plan
• Review of Municipal Ordinances
• Staffing of the fire station closest to the Foothills
• Implementation Plan and Identification of Potential Funding
3 Available at https://www.cityofpaloalto.org/civicax/filebank/documents/61522 and last updated in January
2017
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 10 of 22 April 27, 2021
The plan was developed by the City of Palo Alto’s Urban Forestry, Fire, and Open Space staff
in collaboration with, or with input from, various stakeholders including:
Arrillaga Property: 500 Los Trancos Road
CAL FIRE
Friends of Foothills Park
Grassroots Ecology (formerly Acterra)
Los Altos Hills Fire District
Los Altos Hills: ARES/RACES
Los Trancos Water District
Los Trancos Woods Neighborhood
Menlo Park Fire District
Midpeninsula Regional Open Space
District
PA Protect Our Open Space
Palo Alto Hills Neighborhood Association
Pony Tracks Ranch
Portola Pasture Stables
San Mateo County FireSafe Council
San Mateo County Sheriff
Santa Clara County Fire Department
South Skyline Association
Stanford Community Residential
Leaseholders (SCRL)
Stanford University
Town of Los Altos Hills
Vista Verde Community Association
Woodside Fire Protection District
High Fire Threat Area Identification
In 2012, the CPUC ordered the development of a statewide map (Fire-Threat Map) designed
specifically for the purpose of identifying areas where there is an increased risk for utility
associated wildfires (Attachment B). Publicly Owned Utilities, though not under the
jurisdiction of the CPUC, participated in development of the Fire-Threat Map. CPAU took the
responsibility of acting as the “territory lead” and performed the assessment of the
geographical areas under their responsibility. CPAU worked with local fire departments, the
City’s Urban Forestry staff, communications companies, and the adjoining electric utility, and
with the assistance of a fire science consultant determined the areas within the City’s
jurisdiction that are at an elevated or extreme risk of power line ignited wildfire.
The High Fire Threat Area in Palo Alto was identified as all areas within the city limits west of
Highway 280 (see Attachment C) and is rated as Tier 2 – Elevated Risk, no other areas in Palo
Alto were identified for inclusion in the Fire Threat Map. High Fire Threat areas require
more stringent construction, vegetation management, and inspection requirements as listed
in CPUC General Order 95 – Rules for Overhead Line Construction (“GO 95”). Though not
governed by these rules, CPAU follows them as a minimum industry safety standard for
construction of its electric lines.
Public Utility Code 8387 (SB 1028)
SB 1028 mandated that the governing boards of local publicly owned electric utilities
determine wildfires risk in certain geographic areas. Specifically, governing bodies are to
determine whether any portion of an area within its jurisdiction has a “significant risk of
catastrophic wildfire” resulting from the utility’s electrical lines and equipment.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 11 of 22 April 27, 2021
On August 20, 2018, the Palo Alto City Council determined that the area within City limits
west of Highway 280 (Foothills area) is at significant risk of catastrophic wildfire resulting
from electric lines. They also approved mitigation measures that Public Works and Utilities
staff will implement to reduce the risk of wildfire.
ONGOING FIRE PREVENTION ACTIVITIES
Vegetation Management
Responsibility: Electric Operations Manager will coordinate activities with Manager Urban
Forestry
CPAU, through the efforts of Urban Forestry, meets or exceeds the minimum industry
standard vegetation management practices. Specifically, CPAU meets the standards
articulated in: (1) Public Resources Code section 4292; (2) Public Resources Code section
4293; (3) GO 95 Rule 35; and (4) the GO 95 Appendix E Guidelines to Rule 35 (See table
below). These standards require significantly increased clearances in the High Fire Threat
Areas. The rules establish a minimum clearance and a guideline for clearance distance at the
time of trimming requirement between conductors and trees. Clearance distance at the time
of trimming are discretionary guidelines. Urban Forestry will use specific knowledge of
growing conditions and tree species to determine the appropriate clearance distance. Urban
Forestry will also clear ground vegetation around the base of a pole to minimize the chance
of fires.
Within the High Fire Threat Area, Urban Forestry performs an evaluation of every tree that
has the potential to have branches strike, or the entire tree fall into, the overhead facilities.
Urban Forestry performs more frequent and detailed inspections of these trees, and in
severe cases will work with the land owner to remove the tree.
Table 1: Minimum allowable clearances of overhead primary (12,000 Volt) electric lines from vegetation,
stipulated in CPUC General Order 95.
General Order 95: Rule 35 Appendix E
Type of Clearance Minimum
Clearance
Clearance at time of trim
(allows for tree growth between tree trimming)
Radial clearance of bare line conductors from
tree branches or foliage 1.5 feet 4 feet
Radial clearance of bare line conductors from
vegetation in the Fire-Threat District 4 feet 12 feet
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 12 of 22 April 27, 2021
Electric System Inspection
Responsibility: Electric Operations Manager
CPAU meets or exceeds the minimum inspection requirements provided in CPUC GO 165
and CPUC GO 95, Rule 18. Pursuant to these rules, CPAU inspects electric facilities in the
High Fire Threat Area more frequently that the other areas of its service territory.
Additionally, CPAU staff uses their knowledge of the specific environmental and geographical
conditions to determine when areas outside of the High Fire Threat Area require more
frequent inspections. CPAU also uses infrared scanning of our facilities to detect problems
before they reach a point of failure.
If staff discovers a facility in need of repair that is owned by an entity other than CPAU, we
issue a notice to repair to the facility owner and works to ensure that necessary repairs are
completed promptly.
CPAU works to ensure that all inspections within the High Fire Threat Area are completed
before the beginning of the historic fire season, typically June 1st. CPAU monitors drought
conditions and other relevant factors throughout the year to determine if insp ections should
be completed on a shorter timeframe.
Future overhead electric line inspections in the High Fire Threat Area will be coordinated
between CPAU, FIRE, URBAN FORESTRY, OPEN SPACE, and OES staff, as required, to ensure
all needs are met.
Electric System Maintenance
Responsibility: Electric Operations Manager
Maintenance work is identified through several methods including:
• Visual Inspection by CPAU Staff – staff performs an annual visual inspection of all
overhead facilities in the High Fire Threat Area.
• Wood pole inspection and treatment program – staff contracts out to perform
inspection and treatment of all wood poles in the city on a 10-year cycle. Poles
identified for replacement are done so on a priority basis depending on level of
deterioration.
• Notification by other City staff or outside sources – staff will act as necessary on the
identification of issues by CPAU staff, other City staff, outside utility sources (PG&E,
AT&T, etc.) or citizens.
Work is scheduled and accomplished as needed by CPAU or contract staff based on priorities
set by CPAU.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 13 of 22 April 27, 2021
Training
Responsibility: Electric Engineering and Operations Managers
Staff within CPAU’s Engineering and Operations Divisions have received an overview of the
development of measures to reduce the risk of power line-ignited fires. As of this first
iteration of the Wildfire Mitigation plan, CPAU is developing related processes and
procedures as applicable. Training will commence once these are finalized and will include
general readiness requirements and guidance from FIRE.
CPAU is reviewing and updating as needed the procedures to prepare for and respond to
load shedding requirements due to influences outside of the City, i.e. high voltage
transmission line outages. Load shedding may be required if the impact of deenergization of
a transmission line impacts the stability of the transmission network. The determination is
made by the California Independent System Operator (CAISO) who makes the call to reduce
electrical demand on the system. Depending on the amount of decrease required, load
shedding could result in rolling blackouts for Palo Alto customers.
Electric System Design/Operation
Responsibility: Electric Engineering and Operations Managers
• Reclosers – there are two reclosers on the electric distribution line in the Foothills Area.
Both devices will automatically open when they sense the large amount of current th at
flows when a fault (short circuit) occurs on the line. Both can also automatically close
(i.e. reclose) after a preset time delay. To minimize the risk of causing a fire, th is
reclosing capability is permanently disabled on both reclosers and the circuit breaker at
the substation. Before the recloser is manually/remotely closed, CPAU staff will patrol
the lines to identify the cause, repair the line as needed, or ensure that the cause of the
outage is no longer present. Disabling the reclosing capability could result in longer
duration outages due to the time required for line patrolling and manual closing of the
equipment to restore power.
• Fuses – the fuses used in the High Fire Threat Area are “non-expulsion” type, meaning
when they blow due to a fault, any hot metal of the fuse is contained within the fuse
holder and does not fall to the ground where it could ignite dry vegetation.
• Protective device coordination – Staff has performed protective device coordination
studies to ensure that a fault on the line is isolated as quickly as possible and the impact
is limited to the smallest area possible. This also aids during troubleshooting to identify
the location and cause of the outage after it has occurred. The fuses have been changed
on the distribution system based on these studies.
• Staff Notification – staff will be notified when pending high fire threat conditions are
identified. Deenergization protocols, in development, will be implemented.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 14 of 22 April 27, 2021
• Deenergization – Often referred to as a Public Safety Power Shutoff (PSPS) CPAU has the
authority to preemptively shut off power due to high fire-threat conditions; however,
this option will only be used in extraordinary circumstances. CPAU considers a PSPS as a
last resort to eliminate the possibility of a wildfire caused by overhead electric
equipment and is only expected to occur during extreme weather conditions. A PSPS will
impact all electrical customers in the High Fire Threat Area for the duration of the
extreme weather conditions and the time afterward to inspect all facilities and make
repairs as necessary. Because of this CPAU has drafted the PSPS policy and procedures
on identification of the fire threat condition that will dictate deenergization , the
authorization process to implement, a pre/post communication process to notify
customers and outside entities, and post inspection/restoration. PSPS communication is
coordinated with OES staff. The decision to institute a PSPS includes working with CPAU’s
Water utility staff to determine if pumping water up to the reservoirs located in the
Foothills Area in advance of shutting off power should occur to ensure there is sufficient
water and water pressure for firefighting activities, should they be necessary. CPAU, in
conjunction with City Staff, will make a case-by-case decision to shut off power based on
the following considerations:
o Red Flag Warnings issued by the National Weather Service for fire weather zones
that include the Foothills Area;
o City staff assessments of local conditions, including wind speed (sustained and
gust), humidity and temperature, fuel moisture, fuel loading an d data from
weather stations;
o Real-time information from staff located in areas identified as at risk of being
subject to extreme weather conditions;
o Input from City fire experts and vegetation experts;
o Input from local and state fire authorities regarding the potential consequences
of wildfires in select locations;
o Awareness of mandatory or voluntary evacuation orders in place;
o Expected impact of de-energizing circuits on essential services;
o On-going fire activity throughout the City’s territory and California;
o Notifications to local governments and public officials; and
o Safety and potential impacts to communities and customers
The plan to deenergize includes procedures for communications with customers,
residents, and outside agencies, and power restoration after the threat passes. The lines
must be patrolled and inspected to ensure there is no damage before restoring power.
Approval of the CPAU PSPS policy and procedure should be completed by January 2020.
A draft of the PSPS policy is included in Appendix G.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 15 of 22 April 27, 2021
During the October 2019 Red Flag Warnings for the Santa Cruz Mountains, CPAU staff
utilized a PG&E website of weather stations4 to monitor weather conditions in the Palo
Alto High Fire Threat Area. CPAU is installing a weather station at one of our water
reservoirs in the High Fire Threat Area. This should be completed by the end or 2019.
PROPOSED ACTIVITIES TO REDUCE RISK OR IMPROVE RESPONSE
CPAU – Electric
Responsibility: Electric Engineering and Operations Managers
• Electric Service Restoration after an Outage – CPAU is assessing current practices and
procedures for troubleshooting outages to identify the cause and restore power to
identify any process improvements that may be necessary, or equipment that could be
installed, that would decrease the restoration time without sacrificing safety. All
deenergized lines will undergo a full visual inspection prior to reenergization (i.e.
restoring power to customers).
• Refine Construction Practices – CPAU staff is evaluating the current construction
practices for overhead distribution lines in the High Fire Threat Areas and will identify
and implement practices that could reduce the likelihood of utility line caused fires and
outages, and increase the resiliency of the line should one occur. Staff will implement
changes brought about by experience and industry best practices . This could include
alternative pole/crossarm types (steel/composite/fiberglass vs wood) that will withstand
fire and improve resiliency; insulated overhead wire (tree wire); different line
construction techniques (triangular/vertical vs crossarm); raptor (bird) protection at
electric equipment; increased pole loading safety factors; and replacement of protective
devices (line breaker vs fuses) for improved response time. Staff will also review possible
improvements to the fiber optic cables used for the communication needs of utility and
city facilities.
• Rebuild/reroute Overhead Line – based on the findings of new construction practices,
CPAU staff will determine the cost and feasibility of rebuilding the approximately 11
miles of overhead line, as necessary. This could include rerouting to avoid vegetation and
improve access for inspection and maintenance.
• Convert overhead lines to underground – where possible the feasibility of converting the
overhead lines to underground will be assessed. Because of the terrain, there will be
areas where this will not be possible.
• SCADA switch to facilitate line deenergization – to facilitate the ability to quickly shut off
power on the line serving the Palo Alto foothills, CPAU staff will install a remotely
operable switch at a select location. This switch will give Electric Dispat ch Operators at
4 https://www.pge.com/en_US/safety/emergency-preparedness/natural-disaster/wildfires/psps-weather-
map.page , Page Mill Road location
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 16 of 22 April 27, 2021
the Utility Control Center the capability to deenergize the line immediately, when a
decision is made.
• Drone inspection of utility lines and vegetation – because of the inaccessibility of some
portions of the overhead lines, staff may seek the capability to inspect the lines, pole top
equipment, poles, and vegetation clearance using aerial drones. This will give close-up
visual access to many things that can only be viewed from the ground. Past investigation
into this technology several years ago showed that it was not capable of providing the
photo/video resolution necessary to adequately and reliably analyze the condition of
infrastructure. Newer technologies may prove to be more capable for this task. The
decision to move forward with this activity will depend on progress made with
rebuilding/changing the existing overhead lines.
• Additional activities will/could be identified by CPAU staff during completion of the work
identified in this plan or through the annual overhead line inspection process. These will
be added and tracked on the status of proposed activities sheet in Appendix F.
CPAU – Fiber
Responsibility: Electric Engineering and Operations Managers
• Communications System Improvements – there is a need to improve communications for
personnel in the foothills. There are spots where radio communications are spotty or
non-existent. CPAU is working with OES to facilitate improvements by installing
additional fiber optic cables to a proposed location for a new antenna.
CPAU – Water
Responsibility: WGW Engineering and Operations Managers
• Proactive pumping of water up to reservoirs – part of the procedures for identifying fire
threat conditions and the decision to deenergize power lines will include working with
CPAU’s Water utility staff to determine if pumping water up to the reservoirs located in
the Foothills Area in advance of shutting off power should occur to ensure there is
sufficient water and water pressure for firefighting activities, should they be necessary.
• Emergency generators – CPAU will assess the need for emergency diesel backup
generators at key utilities facilities, if needed.
URBAN FORESTRY
Responsibility: Electric Operations Manager will coordinate activities with Urban Forestry
• Urban Forestry performs an evaluation of every tree that has the potential to strike
overhead facilities it if were to fall. Urban Forestry performs more frequent or detailed
inspections of any trees considered high risk or species that exhibit rapid regrowth, and
in severe cases will work with the land owner to remove the tree.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 17 of 22 April 27, 2021
• Additional activities are documented in the City of Palo Alto Foothills Fire Management
Plan – 2016 Update
FIRE
Responsibility: Electric Operations Manager will coordinate activities with FIRE
• Site Visits – FIRE will perform site inspections on private property to assess defensible
space around homes, home construction, and access for emergency responders
necessary to prevent damage due to wildfires.
• Controlled Burns – FIRE will assess the need, seek approval for, and carry out any
controlled burns in the Foothills Area during the cooler months to reduce fuel buildup
and decrease the likelihood of serious wildfires. This will be coordinated with the partner
agencies and groups.
• Fire Threat condition monitoring – FIRE will work with CPAU on development of the
process to monitor current and forecasted weather data from a variety of sources
including:
o United States National Weather Service
o United States Forest Service Wildland Fire Assessment System
o National Fire Danger Rating System
o National Interagency Fire Center – Predictive Services for Northern and Southern
California.
o Fire warnings provided by OES
One of four operating conditions will be determined based on the relevant weather data
and knowledge of local conditions:
1. Normal: During normal conditions, no changes are made to operations or work
policy.
2. Elevated: During elevated fire-risk conditions.
3. Extreme: During extreme fire-risk conditions.
4. Red Flag: If the National Weather Service declares a Red Flag Warning for any
portion of CPAU’s service territory.
The decision to deenergize electric lines in the Foothills Area will be made jointly and
determined during this evaluation.
• Additional activities are documented in the City of Palo Alto Foothills Fire Management
Plan – 2016 Update
OPEN SPACE
Responsibility: Electric Operations Manager will coordinate activities with OPEN SPACE
• Fuel Reduction – Per the Foothills Fire Management Plan, overseeing the removal of built
up and annual fuel from roadsides, structures inside preserves, high-use public areas,
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 18 of 22 April 27, 2021
evacuation routes, and fire breaks using contractors and park staff through mowing,
sawing, and disk lines.
• Patrol – Rangers actively monitor fire danger in type 6 patrol trucks. OPEN SPACE staff
informs the public of high fire danger and enforces fire restrictions inside Foothills Park
and Pearson Arastradero Preserve.
OES
Responsibility: Utilities Communications Manager will coordinate activities with OES
Situational awareness. OES contributes to the daily monitoring of threats and hazards to the
Palo Alto area of interest and shares relevant information within the local and regional
community. This also includes introducing advanced technologies to increase our
perspective of this hazard area.
Community education and training. OES provides online content, hosts community
education sessions, and supports neighborhood preparedness efforts.
Emergency response planning – OES participates in regional planning efforts, continues to
evolve existing plans and develop additional emergency related plans.
Alerts and Warnings - OES has procedures for communication with residents during
emergencies that are documented in the City Emergency Operations plan and are not
included in this document. 5
RESPONSE TO WILDFIRE INCIDENT
Responsibility: Response to a wildfire incident will guided by the City Emergency Operations
plan
FIRE
FIRE takes the lead with suppression of any fires and will coordinate efforts with adjoining
agencies and if necessary, request mutual aid assistance. They will also, based on their
firefighting efforts, determine the evacuation routes for residents and anyone else caught in
the area. Evacuation activities are carried out by the Palo Alto Police Department.
5 The City Emergency Operations Plan is on the City website at the following link:
https://www.cityofpaloalto.org/civicax/filebank/documents/34121 .
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 19 of 22 April 27, 2021
OPEN SPACE
Rangers will provide FIRE with an initial size up of a fire and under direction of FIRE do initial
attack with type 6 patrol trucks until FIRE units arrive. Rangers will also initiate Open Space
preserve evacuations and direct visitors to safety zones.
Communication
OES will assess the situation and take the lead in activating the Emergency Operations
Center (EOC) as necessary, establishing communication with other city and county agencies,
coordinate the communication between the EOC and city staff, and coordinate the process
of timely release of information to the press and general public.
OES has procedures documented in the City Emergency Operations plan and they are not
included in this document.
CPAU will use their own communication channels to coordinate deenergization and
restoration efforts of facilities shared with PG&E and AT&T.
Emergency Vehicle access
Activities to maintain access to the Foothills area are documented in the City of Palo Alto
Foothills Fire Management Plan – 2016 Update
Resident Evacuation routes
Activities to maintain evacuation routes from the Foothills area are documented in the City
of Palo Alto Foothills Fire Management Plan – 2016 Update
Mutual Aid
CPAU – CPAU has mutual aid agreements with “California Utilities Emergency Association”
and the “American Public Power Association”. Should there be a wildfire in the foothills,
CPAU would call on outside assistance to rebuild the line, as necessary. As part of the review
of construction practices and possible line rebuild, keeping the line intact and usable after a
fire is a key criterion of any new construction.
FIRE – FIRE has procedures for requesting mutual aid and these are not documented in this
plan.
OES – OES has procedures for requesting mutual aid and these are not documented in this
plan.
CPAU
During a fire – As a “Disaster Service Worker”, utilities staff will assist other city emergency
responders with any activities required of staff. This could include deenergization of electric
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 20 of 22 April 27, 2021
lines, clearing of debris, assistance with evacuation, ensuring availability of water, and
communication with customers and other utilities (PG&E, AT&T, etc.). Utilities staff will
standby for direction from FIRE, Police, and Office of Emergency Services direction.
Electric Service Restoration after a wildfire or deenergization due to wildfire concerns –
It may become necessary to deenergize all or portions of the utility electric lines in the
foothills. Utilities Operations staff will deenergize electric lines as necessary for safety, fire
prevention, and to facilitate firefighting efforts. Activities to restore power will be
coordinated with FIRE and would not occur until deemed safe by FIRE.
Before restoring power after a wildfire or proactive deenergization, Utilities staff will
perform a full visual inspection of the overhead electric lines. Any damage or hazardous
conditions will be repaired before the lines are reenergized. In general, the repairs will be
identified, necessary repairs triaged; and then repairs made to restore power as soon as
possible. Work will include coordination with PG&E as appropriate and with the Utilities
Communication Manager for community outreach.
COMMUNITY OUTREACH
About Wildfire Mitigation Plan
CPAU will present this Wildfire Mitigation Plan to Council in December 2019.
Prior to proactive deenergization
Notification of deenergization – FIRE, Police, Emergency Services, Water Utility, Telephone,
Emergency Operations Center activation, Health Care facilities, and affected Customers
CPAU communications staff will work with OES to develop communication protocol to
ensure stakeholders, customers/residents, and critical first responders (health care facilities,
communication companies, neighboring agencies, etc.) are notified of any impending Utility
activities that will impact electric service in the foothills.
Prior to restoring power
CPAU communications staff will work with OES to provide timely updates on status and
conditions related to the fire threat, power deenergization, line co nditions, and projections
for power restoration.
During a fire
OES has procedures for communication with residents during emergencies that are
documented in the City Emergency Operations plan and are not included in this document.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 21 of 22 April 27, 2021
MITIGATION PLAN REVIEW AND ASSESSMENT PROCESS
CPAU will use the following metrics to measure the performance of this Wildfire Mitigation
Plan:
METRIC 1: Outages on the Overhead Electric System in the High Fire Threat Area
The implementation of activities identified in the Plan will minimize the probability of
outages on the overhead electric system in the high fire threat area. Full implementation is
necessary to facilitate the objective of zero faults on the overhead system. Utilities will
continue to track outages in the high fire threat area and anticipates there will be a
reduction over time as activities are completed.
All outages in Palo Alto are reviewed. The cause of the outage, steps necessary to
troubleshoot and restore service, and protective device operation are analyzed to determine
if equipment operated as expected, if the cause could be related to a bigger issue, or if
system improvements could be made to prevent or minimize the impact of the fault. System
improvement projects are proposed and implemented based on these findings.
Outages in the High Fire Threat Area will also be evaluated to determine if activities
implemented in the Wildfire Mitigation Plan : 1) should have prevented the outage, 2) were
inadequate to prevent the outage, 3) could be improved, or 4) would not have been able to
prevent the outage. Based on these findings, revisions to the plan will be made as necessary
METRIC 2: Fire Ignitions
For purposes of this metric, a fire ignition is defined as follows:
• A CPAU facility was associated with the fire;
• The fire was self-propagating and of a material other than electrical and/or
communication infrastructure;
• The resulting fire traveled greater than one linear meter from the ignition point; and
• CPAU has knowledge that the fire occurred.
In future Wildfire Mitigation Plans, CPAU will provide the number of fires that occurred that
were less than 10 acres in size. Any fires greater than 10 acres will be individually described.
Revision and improvement implementation process
Annually, CPAU will analyze the metrics and identify any deficiencies in the system
operation/design or in this Mitigation Plan. This analysis along with proposed improvements
will be presented to Council as part of the annual update.
•
CITY OF
PALO ALTO
UTILITIES
WILDFIRE MITIGATION PLAN
P a g e | 22 of 22 April 27, 2021
The Utilities Electric Engineering Manager is responsible for plan’s implementation, status
updates, and that the metrics are tracked to achieve the plan objectives. The manager, or
their designee, will monitor completion of the mitigation plan activities and schedule
meetings twice a year (4 months prior and just after the start of the typical fire season) to
discuss preparation and planning of current and future work. Each Department or Division is
responsible for completing activities within their area of responsibilit y; and identifying and
proposing changes or improvements to the plan. Any new items for completion or
suggestions for improvement to the plan will be discussed and incorporated into the plan as
necessary.
AUDITING
This Wildfire Mitigation Plan is subject to review by Council. Additionally, a qualified
independent evaluator is required to review the initial plan to ensure it complies with the
requirements of SB 901 and the actions contained sufficiently address the risk posed by
utility lines.
ATTACHMENTS
Appendix A: City of Palo Alto Foothills Fire Management Plan
Appendix B: Map of CPUC High Fire Threat areas in California
Appendix C: Map of CPUC High Fire Threat area in Palo Alto
Appendix D: Utilities Wildfire Mitigation Plan Roles and Responsibilities Org Chart
Appendix E: Summary of requirements of SB 901
Appendix F: Status of Proposed Activities to Reduce Risk
Appendix G: DRAFT PSPS Policy and Process
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX A
APPENDIX A: CITY OF PALO ALTO FOOTHILLS FIRE
MANAGEMENT PLAN
2009 – Cover and Executive Summary
2012 Update – Cover and Executive Summary
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
Palo Alto Foothills Fire Management Plan
Update
WILDLAND FIRE RISK ASSESSMENT AND MITIGATION PROGRAM
Submitted to:
City of Palo AJto
Attention : Kelly Moral"iu
250 Hamilton Avenue
Palo Alto, CA 94301
Submitted by:
Wil,lland Resource Management, htc.
Wi ldl and Resource Management
134 Journeys End
A lamo, CA 94507
January 15, 2009
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto
Foothills F ire M anagement Plan Update
TABLE OF CONTENTS
Part A -FIRE HAZARD ASSESSMENT AND FUEL MANAGEMENT PLAN/ PROJECTS
Executive Summary
2 Introduction
2 .I Goals and Obj ectives
2 .2 Planning Hi story
.............................. 8
............................ 12
........................... 13
............................ 14
2 .3 Scop e of the Plan ......................................................................................................................................................... 17
2 .4 Pl anning Process .......................................................................................................................................................... 17
3 Existing Conditions ................................................................................................................................................................ 19
3. I Fire Hazard
3 .1.1 Vegetation and Fire Fuels
3 .1.2 Fire Behavior
3 .1.2 .1 Fire Behavior Modeling
............................ 19
............ 19
........................... 21
............................ 2 1
3.1.2 .2 Spa ti al lnput Files ................................................................................................................................... 21
3.1.2 .3 U ser-Defined Inputs ............................................................................................................................... 22
3.1.2 .4 FlarnMap Results .................................................................................................................................... 23
3 .2 Fire Suppression Ca pabiliti es
3.3 Access
3.4 Sensitive Res ourc es
3 .4 .1 Social and Cultural Features
............................ 27
....... 28
....... 28
............................ 31
3 .4.2 Environmental Features .................................................................................................................................... 31
3 .4 .2 .1 Species and Wildli fe ............................................................................................................................... 32
3.4.2 .2 Soils and Geology .................................................................................................................................. 37
4 Fuel Management in City Parks
4 . I Identi fying Potential Treatment Areas
4 .2 E stablishing Proj ect Obj ectives
4 .3 Current Fuel Management Prog ram
............................ 39
............ 39
....... 39
............................ 4 1
4 .4 Proj ect Descri ption ....................................................................................................................................................... 46
4.4 .1 Scope of Recommended Fuel Management Proj ects ....................................................................................... 46
4.4.2 Proj ect Descri pti on Summary .......................................................................................................................... 46
4.4 .3 Proj ect Obj ectives
4.4.4 Priority
4.4 .5 Proj ect Locations
4.4 .6 Proj ect Dimensions and Post-Treatm ent Standards
............................ 46
............................ 47
....... 47
............ 53
4.4.7 Roadside and Driveway Fuel Modificati on fo r Safe Access and Egress .......................................................... 54
4.4.7.1 Specifi c Goal of Acti on .......................................................................................................................... 54
4 .4 .7.2 Locati on and Description o f Proj ects ..................................................................................................... 54
4.4 .8 Fuel Mo dification for Firefi ghter Safety Proj ects ..
15 Ja nua ry 2009 2
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto
Foothills Fire Management Plan Update
4.4.8.1 Specifi c Goal of Acti on
4.4.8.2 Location and Description of Projects
4.4 .9 Structure and Infrastructure Projects -Defen sibl e Space
4.4.9.1 Specifi c Goal of Acti on
4.4.9.2 Locati on and Description of Projects
4.4 . l O Ignition Prevention Fuel Management Proj ects
4.4.10.l Specific Goal of Acti on
............................ 57
........... 57
............................ 57
............................ 57
....... 58
........................... 59
............................ 59
4.4 .10.2 Location and Description of Projects ..................................................................................................... 59
4.4.11 Fuel Modification for Containment Ease ......................................................................................................... 59
4.4.11 .1 Specific Goal of Action .......................................................................................................................... 59
4.4.11.2 Location and Description of Projects
4.4 .12 Fuel Modification for Ecosystem Heal th
4.4.12.l Spec ific Goal of Action
............................ 60
............ 62
........................... 62
4.4.12.2 Location and Description of Projects ..................................................................................................... 62
4.4. I 3 Cooperative Fuel Management Proj ects for Offsite Fire Containment and Evacuation Ease .......................... 63
4.4 .13 .1 Specific Goal of Action .......................................................................................................................... 63
4.4.13.2 Location and Description of Projects ..................................................................................................... 63
5 Im plementation Plan
5 . I Implementation Strategies
5 .2 Priorities
5 .3 Fu el Management Project Costs
............................ 64
....... 64
....... 65
............................ 66
5.3.1 Proj ect Cost Estimates ...................................................................................................................................... 67
5 .4 Funding Strategies to Support Fue l Management ......................................................................................................... 71
5.5 Grant Opportunities ...................................................................................................................................................... 72
6 Treatment Standards and Methods
6 .1 Treatment Standards for Vegetati on Types
6.1.1 Prescription for Grasslands
6.1.2 Prescription for North Coas tal Scrub and Chaparral
............................ 74
............ 74
....... 74
............................ 74
6.1.3 Prescription for Oak Woodlands ...................................................................................................................... 76
6.1.4 Presc ription for Riparian Forest ....................................................................................................................... 76
6.1.5 Defensible Space Guide lines ............................................................................................................................ 77
6 .2 Description of Treatment Methods
6.2 .1 Summ ary
6.2 .2 Timing of Treatments
6.2 .3 Hand Labor
............................ 78
............................ 78
....... 78
............ 79
6.2.4 Mechanica l Treatments .................................................................................................................................... 79
6.2.5 Grazing with Sheep and Goats ......................................................................................................................... 8 1
6.2.6 Broadcast Pre scribed Bums .............................................................................................................................. 8 1
6.2.7 Euc alyptns Tree Removal
15 January 2009 3
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto
Foothills Fire Management Plan Update
6.2 .8 Herbi cide Appli cation to Control Invasive Plants
6 .3 Best Management Practices
6.3 .1 Hand Labor
6.3 .2 Mechanical Treatments
6.3.3 Grazing with Sh ee p and Goats
6.3 .4 Broadc ast Prescri be d Burns
6.3.5 Herbicide Application
............................ 83
............ 84
............................ 84
............................ 85
....... 86
........................... 86
............................ 87
PART 8 -POLICY REVIEW AND SUPPLEMENTAL RECOMMENDATIONS
Evacuation and Refuge
1.1 Identific ati on and Notific ati on
1.2 Regional Cooperation
1.3 Temporary Refuge
............................ 89
....... 89
............................ 90
............................ 90
2 Codes and Regulations ........................................................................................................................................................... 91
2 .1 Existing Codes and Ordinances .................................................................................................................................... 9 1
2.1.1 FireCode .......................................................................................................................................................... 9 1
2.1.2 Building Code
2.2 Recommendations
2 .3 Exterior Hazard Abatement
2.3 .1 For parcels of land one acr e or less maintain parcel in complete abatement
............................ 93
............ 93
........................... 95
................................ 95
2.3.2 For parcels larg er than one acre in size ............................................................................................................ 96
3 Fire Protecti on -Station 8 ...................................................................................................................................................... 98
3 .1 Description ................................................................................................................................................................... 98
3 .2 Appraisal
3 .3 Recommendation
4 Trail Plan Update
4.1 Pearson-Arastradero Preserve Trails Management Plan (March 2001)
............................ 99
.......................... 100
.......................... 101
.......................... 101
4.1.1 Recommended Revisions ............................................................................................................................... 101
4.1.2 Existing Fire Miti gation and Fuel Management in th e Arastradero Trails Management Plan ........................ 103
4.1.3 Vegetation Manag ement ................................................................................................................................. 107
4.1.3.1 Brushing and Clearing Defined
4 .1 .3.2 Techniques fo r Maintaining a Clear Passageway
4 .2 Fo othills Park Trail s Maintenance Plan (January 29, 2002)
.......................... 107
.......... 10 7
..... 109
4.2 .1 Recomm ended Revisions ............................................................................................................................... 109
4.2.2 Existing Fire Mitigation and Fuel Management in the Foothills Park Trails Maintenance Plan .................... 110
5 References ............................................................................................................................................................................ 1 13
15 January 2009 4
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto
Foothills F ire M anagement Plan Update
LIST OF FIGURES
Figure 1: City of Palo Alto Ov erview ............ 12
Fi gure 2: 1997 Fire Managem ent Zon es ......................................................................................................................................... 16
Figure 3: Wildl and Sur face Fue ls ................................................................................................................................................... 20
Fi gure 4: Spatial Data Require d for Fire Behavior Modeling ........................................................................................................ 22
Fi gure 5: Comparison of T or ching and Acti ve Crown Fire ............................................................................................................ 23
Figure 6: Crown Fire and Torching Potential. ................................................................................................................................ 24
Figure 7: Pr edi cted Fl ame Length .................................................................................................................................................. 25
Fi gure 8: Pr edi cted Rate of Sprea d ................................................................................................................................................. 26
Figure 9: Locati ons of Cul tural and Environmental Sensitive Resources in Pearson-Arastradero Preserve .................................. 29
Figure 10 : Locations of C ul tural and Environmental Sen sitive Resour ces in Foothills Park ........................................................ 30
Fi gure 11 : Sensiti ve Species Known or Potentiall y Occurring in Foothill s Park or Pearson-Arastradero Preserve ....................... 37
Figure 12 : Soil Types in Foothills Park and Pearson -Arastra dero Preserv e ................................................................................... 38
Fi gure 13: Pr oj ect Goals and Actions ............................................................................................................................................ 40
Fi gure 14: Pearson-Arastradero Preserve Current Fu el Management Areas .................................................................................. 42
Figure 15: Foothill s Park Current Fuel Management Areas ........................................................................................................... 43
Figure 16: Recent Treatme nts in Pearson-Arastradero Preserv e .................................................................................................... 44
Fi gure 17: Recent Treatme nts in Foothill s Park ............................................................................................................................ 45
Figure 18: Listing of Proj ect Locati ons .......................................................................................................................................... 50
Fi gure 19: Proposed Treatment Locations in Pearson -Arastr adero Preserv e ................................................................................. 5 1
Fi gure 20: Proposed Treatment Locati ons in Foothill s Park .......................................................................................................... 52
Fi gure 2 1: Treatm ent Methods and Interv al s .................................................................................................................................. 53
Fi gure 22 : Listing of Proj ect Locati ons fo r Evacuation and Access ............................................................................................... 55
Fi gure 23 : Evacuati on Routes External to Foothill s Park and Pearson-Arastradero Pr eserve ........................................................ 56
Figure 24: Listing of Proj ect Locati ons fo r Fire Fighter Safety Fuel Modi fi cati on ....................................................................... 57
Fi gure 25: Li sting of Proj ect Locati ons fo r Defensibl e Space ........................................................................................................ 59
Fi gure 26: Listing of Proj ect Locati ons fo r Ignition Prevention ..................................................................................................... 59
Figure 27: Listing of Proj ect Locati ons fo r Containment Ease ...................................................................................................... 6 1
Fi gure 28 : Listing of Proj ect Locati ons fo r Ecosystem Health ...................................................................................................... 62
15 Ja nua ry 2009 5
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of P alo A lto
F oothills Fire Management Plan Update
Figure 29: Unit Costs fo r Fuel Reducti on Treatment Methods
Figure 30 : Funding Mechani sm s.
Figure 3 1: Initial Priority of Removal for Brush ............................................................................................................................ 76
Figure 32 : Pruning Example .......................................................................................................................................................... 77
Figure 33 : Pruning Example .......................................................................................................................................................... 95
Figure 34 : Shrub Spacing ............................................................................................................................................................... 96
Figure 35: Fire Protecti on Resources ............................................................................................................................................. 98
Figure 36: Em erg ency/Maintenance Access Points ..................................................................................................................... I 02
Figure 37: Vehicle Turn-around Des ign Summary ...................................................................................................................... I 09
15 January 2009 6
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of PaloAlto
Foothills Fire Management Plan Update
PART A -FIRE HAZARD ASSESSMENT AND FUEL
MANAGEMENT PLAN/ PROJECTS
I 5 Janua,y 2009
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto
Foothills Fire Management Plan Update
1 EXECUTIVE SUMMARY
The Fire Management Plan update process addresses a broad range of integrated activities and planning
documents to address and mitigate the impacts of fire hazards in the Palo Alto Foothills Area. The area of
interest includes the areas west of Foothills Expressway to the city limits of Palo Alto. Fire mitigation project
areas include the boundaries of Foothills Park and Pearson-Arastradero Preseive within this area of interest.
The Fire Management Plan Update addresses the following key items:
• Fire Hazard Assessment
• Regional Evacuation Routes
• Review of Municipal Ordinances
• Staffing of Station 8
• Wildland Fire Management Recommendations and Mitigations
• Updates to Pearson-Arastradero Trails Master Plan and Foothills Trail Maintenance Plan
• CEQA Documentation
• Implementation Plan and Potential Funding
Community Participation. Community participation in the development of the plan began with the
refinement of the scope of work and selection of the consultant team. Three community meetings were held
at key points in the planning process to gather continued input from the community. A stakeholder group
made up of adjacent jurisdictions, neighborhood associations, special interest groups , volunteers etc. also
participated in the planning process . An environmental review in accordance with the California
E nvironmental Quality Act (CEQA) was undertaken by City Staff in conjunction with the plan development.
Fire Hazard Assessment. There are many ways to assess fire hazard. Most utili ze the three main factors of
fuels , weather, and topography , with possible inclusion of elevation or fire history. Fire behavior was chosen
as the means to assess fire hazard since it can identify locations where containment may be easiest, and where
access may be precluded during the time of a fire. In addition, fire behavior outputs can identify locations
where structures or natural resources may be unduly harmed by a wildfire , as well as locations where fire
effects may be inconsequential to natural resources.
Not every area identified as a potential fire hazard can be modified to produce low-intensity fires. Not only
would this be too costly , but environmental impacts would also be unacceptable.
Results of Fire Behavior Analvsis. Fire behavior was analyzed for the entirety of the Foothills Area,
including adjacent neighborhoods , property owned by Midpeninsula Regional Open Space District
(MROSD), and Stanford University. Flame length, rate of fire spread and potential for crown fire were three
characteristics considered in the analysis. The following are generalities obsetved:
Flame lengths follow fuel types, with long flame l engths in chaparral and untreated grass, and short flame
lengths in woodlands and mowed grass. The largest areas oflong flames are located in Foothill Park and
Monte Bello Open Space Preseive. Low fire spread rates were predicted in woodlands and forests, and fast
15 January 2009 8
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of P alo A lto
F oothills Fire Management Plan Update
spread rates in untreated grass and chaparral. There is very little active crown fire predicted within the
Foothills area, however, the potential for trees to torch is high throughout the treed portion of the Foothills
area. Torching is caused by low-hanging limbs , or ladder fuels.
Wildland Fire Management Recommendations and Best Management Practices
Treatments were strategically placed to achieve the following goals:
• Life Safety
• Structure and Infrastructure Protection
• Ignition Prevention
• Fire Containment
• Resource Enhancement
Treatments were identified for 51 project areas. The most visible recommended set of projects will be to
conduct roadside treatments along Page Mill Road, Arastradero Road , Los Trancos Road , and Skyline
Boulevard. Other projects entail the continuation of mowing along trails and some boundaries , grazing along
the selected segments of the perimeter of both Parks/Preserves, treatments to install and maintain defensible
space around structures, treatments around barbeques to minimize the chance ofignitions, and treatments to
bolster the success of fires containment efforts within the parks. Fuel management treatments can also
enhance natural resources , through targeting non-native invasive plants as part of biomass removal -
potentially with grazing animals , mechanical mowing and hand labor -and conducting prescribed fires in
selected areas under conditions consistent with fire control.
Best management practices are included for each treatment type , based on the sensitivity of the resource.
These include practices that consider the timing intensity of the treatment, or selection of the type of treatment
methods ( e.g., whether the project would entail mowing or grazing, hand labor or mechanical equipment), the
strata of treatment (e .g ., whether the project would remove lower tree limbs, or instead involve gras s
mowing), and the scale of the treatment ( e.g ., to treat small or large patches).
Review Recommendations Regarding Pearson-Arastradero Trails Master Plan and Foothills Trail
Management Plan
• Addition of fuel management and fuel reduction zones
• Location of prescribed burns
• Modify fuel break width for performance standards
• Modify roadside treatment standards
• Include fire hazard in regulatory , warning and education signs ( especially prescribed fires)
Regional Evacuation Routes
The Palo Alto Police Department has responsibility within City limits for evacuation operations under state
law . However, multiple jurisdictions will likely be involved in an event in the Foothills. Evacuation routes
15 J a nua ry 2009 9
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto
Foothills Fire Management Plan Update
should not be blocked anywhere, regardless of jurisdiction or ownership ; this is especially important because
most of the regional evacuation routes span multiple cities, ownership categories and protectionjurisdictions.
The following recommendations will help reach a reasonably safe condition along the regional evacuation
routes.
• Formalize agreements with adjacent landowners for ingress and egress routes (from parks) and offsite
refuge areas
• Develop partnerships to address regional evacuation routes from residential and public areas
(Regional Evacuation Plan, Co mmunity Notification (multi-jurisdictional) and Unified Command)
Analysis and Recommendations Regarding Staffing of Station 8
An analysis of the staffing level of Station 8 was conducted that considered the distribution and concentration
of fire personnel and equipment in relation to the incidents. The recommendation was to maintain current
staffing levels. Response times for incidents are significantly longer from other stations, even when
considering mutual aid offered by other jurisdictions. The fire behavior analysis indicates the potential for
fast-moving fires of high intensity , further justifying the current staffing level s .
Review of Municipal Ordinances
The existing code is comprehensive; only minor changes are recommended. These include :
• Expand Wildland Urban Interface Fire Area (between Foothill Blvd & Highway 280)
• Fire Protection Planning: Begin early in permitting process
• Expand Defensible Space Requirements: Maintain roof free of materials
• Expand Access Requirements: bridge load limits , parking restrictions
• Additional guidance for Maintenance of Defensible Space
• Ignition Source Control
• Fencing
• Signage
• Mechanical E quipment Ignition Prevention
• Restriction on Smoking at Pearson-Arastradero Preserve
Implementation Plan and Potential Funding for Fire Management Recommendations
Implementation of this plan will be managed by th e City of Palo Alto staff, including th e Fire Department, the
Police Department (evacuation, notification, neighborhood preparedness coordinators), and Open Space
(rangers). Volunteer groups , such as Acterra, Friends of Foothills, and other groups should continue to be
involved and encouraged to help with the implementation. Further, the City should work with mutual aid
government agencies and other stakeholders on an ongoing basis .
15 January 2009 JO
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto
Foothills Fire Management Plan Update
Prioritization of Treatments
The following is the priority of treatment types:
1. Life Safety
2. Structure and Infrastructure Protection
3. Ignition Prevention
4. Fire Containment
5. Resource Enhancement
Cost Estimates
The total five-year cost to implement the recommended proj ec ts is estimated at slightly less than $700,000.
The largest cost, at slightly more than $400,000, is to manage 19 containment areas. The initial treatment for
segments of major evacuation routes is estimated to cost almost $178,000 . The use of California Youth
Authority Crews may offer a means to reduce costs for the hand labor-based treatments. Without volunteers
pre-treatment surveys and follow-up may cost $100 ,000 over the next five years.
15 January 2009 11
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
1/23/2017
FOOTHILLS FIRE
MANAGEMENT PLAN
2016 UPDATE
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
Acknowledgements
This document was prepared by Wild land Reso urce Management under contract to the City of Palo Alto.
Contributions
Daren Anderson ................................. Co mmunity Serv ices Department
Curt Dunn ............................................ Community Services Departme nt
Walter Pa ssmore ................................ Public Works Department
Dinaa Alco cer ...................................... Publi c Works Department
James Henrickso n-----------------------Fire Departm e nt
Nathan Rainey .................................... Office of Emergency Services
Mark Nadim ....................................... Midpenninsu la Fire Safe Co u nci l
Image 1: Palo Alto Fire Department Brush Rig Patrolling Trapper's Trail
Pa ge 2 of 35
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
Table of Contents
Exec utive Summary ................................................................................................ , ..................................... 4
Foothills Fire Management Plan Update Process ......................................................................................... 4
Accomplishments .......................................................................................................................................... 5
Post-Treatment Fire Behavior ....................................................................................................................... 6
New Recommendations ............................. , .............. , ................................................................................... 7
Program Costs ............................. , ................................................................................................................. 7
APPENDICES .................................................................................................................................................. 8
APPENDIX A. Treated Areas .......................................................................................................................... 9
APPENDIX B. New Treatments Areas and Activities ..................................................................................... 0
APPENDIX C -Treatment Areas to be Abandoned or Revised ....................................................................... 3
APPENDIX D -Program Costs ........................................................................................................................ 0
Image 2:Treated area in Foothills Park
Page 3 of 35
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
Executive Summary
The 2009 Foothills Fire Management Plan (FFMP) addressed a broad range of integrated activities and
produced planning documents to address and mitigate the impacts of fire hazards in the Palo Alto
Foothills Area. The area of interest includes the areas west of Foothills Expressway to the city limits of
Palo Alto.
The FFMP addressed fire hazard assessment and regional evacuation routes, wildland fire management
recommendations and mitigations. The FFMP also reviewed non-project related topics such as
Municipal ordinances related to wildland fire and recommended staffing levels for Station 8 in Foothills
Park . It proposed an implementation plan and identified potential funding, and included CEQA
documentation for the proposed projects. Last, it recommended updates to the Pearson-Arastradero
Trails Master Plan and Foothills Trail Maintenance Plan.
This 2016 FFMP update focuses on topics directly related to fire hazard mitigation, emphasizing project-
related improvements. This program is also documented in the City of Palo Alto Local Hazard Mitigation
and Adaptation Plan (LHMAP) and demonstrates how the City mitigates wildfire risk through the
implementation of projects in the FCWPP.
This update provides a description of significant accomplishments achieved since 2009 in the areas of
treatment of evacuation routes, prescribed fire and associated containment lines, and residential boundary
treatments (mowing, disking). Program costs are also provided showing how allocated funds were used.
City funding since 2009 has totaled $452,332.
A post treatment fire behavior assessment is also included in this update to describe the threat but also
to identify areas of future treatments. The most important benefit has been an increased ease of
evacuation and emergency access through the ex pansion of managed roadside vegetation. The
roadsides along Arastradero Rd , Los Trancos Rd and Page Mill Rd are all safer for access and egress
through increased line of sight, reduced fuel volumes and reduction of ladder fuels. The probability of
ignitions has been reduced through a reduction of fuels near barbeques and structures, and along
roadsides . The potential for containment of a wildfire (both within the parks, and between City property
and neighbors) has been enhanced through the creation, maintenance, and enhancement of reduced
fuel zones. These treatment areas are strategically placed along property perimeters and ridgelines.
The update also incorporates the participation in the county-wide Community Wildfire Protection Program
(CWPP), which includes a Palo Alto/Stanford annex.1 The county CWPP project began after the initiation of
this planning update, but future updates will be transitioned to the Palo Alto/Stanford Community Wildfire
Protection Plan on a five year update cycle .
Foothills Fire Management Plan Update Process
The 2009 Foothills Fire Management Plan (FFMP) addressed a broad range of integrated activities and
produced planning documents to address and mitigate the impacts of fire hazards in the Palo Alto
Foothills Area. The area of interest includes the areas west of Foothills Expressway to the city limits of
1 The Santa Cla ra Co unty Co mmunity Wildfire Prote ction Pr o gram (CWPP) is a collaborative appro ach for reducing
wild land fire risks to communities and the environment. The plan includes an analysis of conditio ns such as fire
apparatus access , community evacuation , fuels , topography, and weather. The plan also includes proposed projects
developed th rough the wor ks hops . http://www.sccfd.org/santa-cla ra-county-community-wildfire-protection-p la n
Page 4 of 35
APPENDIX A
•
CITY OF
PALO ALTO
UTILITIES
Palo Alto.
The 2009 Plan addressed fire hazard assessment and regional evacuation routes, wildland fire
management recommendations and mitigations. The FFMP also reviewed non-project related topics
such as Municipal ordinances related to wildland fire and recommended staffing levels for Station 8 in
Foothills Park. It proposed an implementation plan and identified potential funding, and included CEQA
documentation for the proposed projects. Last, it recommended updates to the Pearson-Arastradero
Trails Master Plan and Foothills Trail Maintenance Plan .
This 2016 update focuses on topics directly related to fire hazard mitigation, emphasizing project-
related improvements. This program is also documented in the City of Palo Alto Local Hazard Mitigation
and Adaptation Plan (LHMAP) and demonstrates how the City mitigates wildfire risk through the
implementation of projects in the FCWPP. The City of Palo Alto contracted with Wild land Resource
Management Group, who also completed the 2009 FFMP effort, to assist in this update. Staff members
from Community Services, Fire, Public Works Departments and the Office of Emergency Services formed
the planning team to work with Wildland Resource Management Group. Additionally, members of the
Midpennisula Fire Safe Council also provided input to this update.
Accomplishments
Since the Foothills Fire Management Plan was adopted in Jan 2009 significant progress has been made.
Perhaps two of the most significant accomplishments have been advances in organization and
relationships .
The City will be taking an additional step to adopt the FFMP as a Community Wildfire Protection Plan.
With a Community Wildfire Protection Plan (CWPP), the City is in a better position to receive grants from
Federal or State funding sources. Because the FFMP satisfied the requirements of a CWPP , the City was
able to simply obtain an approval signature from the local CAL FIRE representative and send it to the
California Fire Alliance where it became official.
Another significant advance was the development of an ongoing relationship with the Santa Clara County
Fire Safe Council (SCFSC). The City developed a 5-year Stewardship Agreement with the SCFSC to help
implement the FFMP/CWPP. An annual work plan is mutually agreed-upon, based on availability of
funding and capacity of the SCFSC. The SCFSC typically supervises and pays for CAL FIRE hand crews to
reduce fuels along roads and in say Foothills Park and Pearson-Arastradero Preserve , and provides
community outreach and education programs in the City regarding wildland fire.
A novel organizational strategy was adopted which recognizes that the FFMP involves and requires
support from many City Departments. While the program originated in the Fire Department, the Public
Works Department, Office of Emergency Services and Community Services Department are all key to the
success and beneficiaries of the projects. As such, representatives of each of these four departments
meet regularly (generally quarterly, but sometimes more often) to strategize effective actions. The
Chair of this inter-departmental group rotates between the departments. Funding is pooled from all
four departments based on the anticipated costs of performing fire hazard reduction work under their
responsibility. For example, roadside treatments on public right-of-ways are funded by Public Works
whereas evacuation treatments along roads inside parks are funded by the Community Services
Department.
Through efforts and funding of the City and with support of the SCFSC, many on-the-ground projects
Page 5 of 35
APPENDIX B
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX B
APPENDIX B: MAP OF CPUC HIGH FIRE THREAT AREAS IN
CALIFORNIA
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX B
•
O 15 30 --
CITY OF
PALO ALTO
UTILITIES
,._.....,.....__,, .............. ~ ..... -............ -...... ,___i. .... ,..,,.... ... ....,..~
-p-bmr:!.IJl'f>-~
CPUC Fire-Threat Map
Adopted by CPUC January 19, 2018
PUC:F Tl
Fire-Thr eat Areas
G
1er -leva e<I
1er 3 -
ountie$
reme
--
APPENDIX C
APPENDIX C: MAP OF CPUC HIGH FIRE THREAT AREA IN
PALO ALTO
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX C
•
+
CITY OF
PALO ALTO
UTILITIES
PUC F re -h ea, 1\-bp -
-ier.a
Tre -i Palo Al:c
is .all areas ·i • n t-e c ty im ts wes of
High\/ y 290, and it i s an -e 2 .
•lounta 111
I
APPENDIX D
APPENDIX D: UTILITIES DEPARTMENT WILDFIRE
MITIGATION PLAN ROLES AND RESPONSIBILITIES
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX D
CI
T
Y
M
A
N
A
G
E
R
D
I
R
E
C
T
O
R
-
U
T
I
L
I
T
I
E
S
Assi
s
t
a
n
t
D
i
r
e
c
t
o
r
-
Op
e
r
a
t
i
o
n
s
As
s
i
s
t
a
n
t
D
i
r
e
c
t
o
r
-
En
g
i
n
e
e
r
i
n
g
Ma
n
a
g
e
r
-
El
e
c
t
r
i
c
O
p
e
r
a
t
i
o
n
s
Man
a
g
e
r
-
WG
W
O
p
e
r
a
t
i
o
n
s
Op
e
r
a
t
i
o
n
s
S
u
p
e
r
v
i
s
o
r
-
El
e
c
t
r
i
c
S
y
s
t
e
m
O
p
e
r
a
t
i
o
n
s
Uti
l
i
t
y
S
y
s
t
e
m
O
p
e
r
a
t
o
r
Op
e
r
a
t
i
o
n
s
S
u
p
e
r
v
i
s
o
r
-
WG
W
O
p
e
r
a
t
i
o
n
s
Man
a
g
e
r
-
WG
W
E
n
g
i
n
e
e
r
i
n
g
Man
a
g
e
r
-
El
e
c
t
r
i
c
E
n
g
i
n
e
e
r
i
n
g
Ut
i
l
i
t
i
e
s
D
e
p
a
r
t
m
e
n
t
W
i
l
d
f
i
r
e
M
i
t
i
g
a
t
i
o
n
P
l
a
n
Ro
l
e
s
a
n
d
R
e
s
p
o
n
s
i
b
i
l
i
t
i
e
s
x
May
a
c
t
a
s
I
n
c
i
d
e
n
t
C
o
o
r
d
i
n
a
t
o
r
dur
i
n
g
P
S
P
S
x
Pr
o
v
i
d
e
s
u
p
d
a
t
e
s
t
o
D
i
r
e
c
t
o
r
–
Uti
l
i
t
i
e
s
x
Co
o
r
d
i
n
a
t
e
s
w
i
t
h
o
t
h
e
r
c
i
t
y
dep
a
r
t
m
e
n
t
s
x
Mo
n
i
t
o
r
s
N
a
t
i
o
n
a
l
W
e
a
t
h
e
r
S
e
r
v
i
c
e
and
e
l
e
c
t
r
i
c
s
y
s
t
e
m
c
o
n
d
i
t
i
o
n
s
x
Ini
t
i
a
t
e
s
P
S
P
S
a
p
p
r
o
v
a
l
p
r
o
c
e
s
s
x
When
a
p
p
r
o
v
e
d
,
w
i
l
l
m
a
k
e
d
e
c
i
s
i
o
n
to
i
m
p
l
e
m
e
n
t
P
S
P
S
x
Up
d
a
t
e
s
p
h
o
n
e
s
y
s
t
e
m
m
e
s
s
a
g
i
n
g
x
Pr
o
v
i
d
e
s
u
p
d
a
t
e
s
t
o
I
n
c
i
d
e
n
t
Co
o
r
d
i
n
a
t
o
r
d
u
r
i
n
g
P
S
P
S
x
Pr
o
v
i
d
e
s
u
p
d
a
t
e
s
t
o
I
n
c
i
d
e
n
t
Co
o
r
d
i
n
a
t
o
r
d
u
r
i
n
g
P
S
P
S
x
Pr
e
p
a
r
e
s
W
a
t
e
r
s
y
s
t
e
m
f
o
r
P
S
P
S
event
Uti
l
i
t
i
e
s
E
n
g
i
n
e
e
r
i
n
g
S
t
a
f
f
:
x
Engi
n
e
e
r
i
n
g
M
a
n
a
g
e
r
-
x
over
a
l
l
r
e
s
p
o
n
s
i
b
i
l
i
t
y
f
o
r
ensu
r
i
n
g
t
h
e
i
m
p
l
e
m
e
n
t
a
t
i
o
n
of
t
h
e
M
i
t
i
g
a
t
i
o
n
P
l
a
n
x
Co
o
r
d
i
n
a
t
e
m
e
e
t
i
n
g
s
a
n
d
up
d
a
t
e
s
t
o
p
l
a
n
a
s
n
e
c
e
s
s
a
r
y
x
Pr
o
v
i
d
e
s
s
u
p
p
o
r
t
t
o
I
n
c
i
d
e
n
t
Co
o
r
d
i
n
a
t
o
r
x
Pr
o
v
i
d
e
s
s
u
p
p
o
r
t
t
o
E
l
e
c
t
r
i
c
a
n
d
WGW
O
p
e
r
a
t
i
o
n
s
x
Pr
o
v
i
d
e
s
i
n
s
p
e
c
t
i
o
n
a
n
d
c
o
n
s
t
r
u
c
t
i
o
n
engi
n
e
e
r
i
n
g
d
e
s
i
g
n
a
n
d
p
r
o
c
u
r
e
m
e
n
t
sup
p
o
r
t
a
f
t
e
r
a
n
e
v
e
n
t
x
Co
m
p
l
e
t
i
o
n
o
f
d
e
s
i
g
n
,
p
o
l
i
c
y
a
n
d
pr
o
c
e
d
u
r
e
,
a
n
d
c
o
n
t
r
a
c
t
o
r
s
e
l
e
c
t
i
o
n
requi
r
e
m
e
n
t
s
Man
a
g
e
r
– U
t
i
l
i
t
i
e
s
Co
m
m
u
n
i
c
a
t
i
o
n
s
x
Co
m
p
l
e
t
i
o
n
o
f
o
p
e
r
a
t
i
n
g
,
co
n
s
t
r
u
c
t
i
o
n
,
i
n
s
p
e
c
t
i
o
n
,
a
n
d
mai
n
t
e
n
a
n
c
e
r
e
q
u
i
r
e
m
e
n
t
s
o
f
Mi
t
i
g
a
t
i
o
n
P
l
a
n
x
May
a
c
t
a
s
I
n
c
i
d
e
n
t
C
o
o
r
d
i
n
a
t
o
r
dur
i
n
g
P
S
P
S
x
Pr
o
v
i
d
e
s
u
p
d
a
t
e
s
t
o
D
i
r
e
c
t
o
r
–
Uti
l
i
t
i
e
s
x
Co
o
r
d
i
n
a
t
e
s
w
i
t
h
o
t
h
e
r
c
i
t
y
dep
a
r
t
m
e
n
t
s
x
May
a
c
t
a
s
I
n
c
i
d
e
n
t
C
o
o
r
d
i
n
a
t
o
r
dur
i
n
g
P
S
P
S
x
Pr
o
v
i
d
e
s
u
p
d
a
t
e
s
t
o
D
i
r
e
c
t
o
r
–
Uti
l
i
t
i
e
s
x
Co
o
r
d
i
n
a
t
e
s
w
i
t
h
o
t
h
e
r
c
i
t
y
dep
a
r
t
m
e
n
t
s
x
Co
o
r
d
i
n
a
t
e
s
r
e
s
t
o
r
a
t
i
o
n
pr
o
c
e
s
s
x
Co
o
r
d
i
n
a
t
e
s
c
o
m
m
u
n
i
c
a
t
i
o
n
t
o
resi
d
e
n
t
s
,
c
u
s
t
o
m
e
r
,
e
t
c
.
x
Pr
e
p
a
r
e
p
r
e
s
s
r
e
l
e
a
s
e
s
x
Li
a
i
s
o
n
w
i
t
h
c
i
t
y
C
h
i
e
f
Co
m
m
u
n
i
c
a
t
i
o
n
s
O
f
f
i
c
e
r
x
Ap
p
r
o
v
e
s
P
S
P
S
,
w
h
e
n
w
a
r
r
a
n
t
e
d
x
Li
a
i
s
o
n
w
i
t
h
C
i
t
y
M
a
n
a
g
e
r
a
n
d
o
t
h
e
r
ci
t
y
d
e
p
a
r
t
m
e
n
t
s
Fi
r
e
D
e
p
a
r
t
m
e
n
t
Of
f
i
c
e
o
f
E
m
e
r
g
e
n
c
y
Ser
v
i
c
e
s
P
u
b
l
i
c
W
o
r
k
s
Dep
a
r
t
m
e
n
t
– Ur
b
a
n
Fo
r
e
s
t
r
y
Co
m
m
u
n
i
t
y
S
e
r
v
i
c
e
s
Dep
a
r
t
m
e
n
t
– Op
e
n
Sp
a
c
e
a
n
d
P
a
r
k
s
PS
P
S
–
Pu
b
l
i
c
S
a
f
e
t
y
P
o
w
e
r
S
h
u
t
o
f
f
WG
W
–
Wat
e
r
,
G
a
s
,
a
n
d
W
a
s
t
e
w
a
t
e
r
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX E
APPENDIX E: SUMMARY OF REQUIREMENTS OF SB 901
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX E
SB 901 REQUIREMENTS
Requirement Statutory Language Cross Reference
Persons
Responsible
An accounting of the responsibilities of persons
responsible for executing the plan.
Page 7 - Roles
and
Responsibilities
Appendix D
Objectives of
the Plan
The objectives of the wildfire mitigation plan. Page 5 -
Objectives
Preventive
Strategies
A description of the preventive strategies and
programs to be adopted by the local publicly owned
electric utility or electrical cooperative to minimize
the risk of its electrical lines and equipment causing
catastrophic wildfires, including consideration of
dynamic climate change risks.
Page 9, 11, 15 -
Completed Tasks,
Ongoing
Activities,
Proposed
Activities
Evaluation
Metrics
A description of the metrics the local publicly owned
electric utility or electrical cooperative plans to use
to evaluate the wildfire mitigation plan’s
performance and the assumptions that underlie the
use of those metrics.
Page 21 –
Mitigation Plan
Review and
Assessment
Impact of
Metrics
A discussion of how the application of previously
identified metrics to previous wildfire mitigation
plan performances has informed the wildfire
mitigation plan.
Page 21 –
Mitigation Plan
Review and
Assessment
Deenergization
Protocols
Protocols for disabling reclosers and deenergizing
portions of the electrical distribution system that
consider the associated impacts on public safety, as
well as protocols related to mitigating the public
safety impacts of those protocols, including impacts
on critical first responders and on health and
communication infrastructure.
Page 13 – Electric
System Design /
Operation -
Reclosers
Customer
Notification
Procedures
Appropriate and feasible procedures for notifying a
customer who may be impacted by the deenergizing
of electrical lines. The procedures shall consider the
need to notify, as a priority, critical first responders,
health care facilities, and operators of
telecommunications infrastructure.
Page 13 –
Ongoing Fire
Prevention
Activities –
Electric System
Design/Operation
- Deenergization
Vegetation
Management
Plans for vegetation management. Page 11, 16 –
Vegetation
Management,
Urban Forestry
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX E
Inspections
Plans for inspections of the local publicly owned
electric utility’s or electrical cooperative’s electrical
infrastructure.
Page 12, 15 –
Electric System
Inspection; Drone
Inspection
Prioritization
of Wildfire
Risks
A list that identifies, describes, and prioritizes all
wildfire risks, and drivers for those risks, throughout
the local publicly owned electric utility’s or electrical
cooperative’s service territory. The list shall include,
but not be limited to, both of the following:
(i) Risks and risk drivers associated with design,
construction, operation, and maintenance of the
local publicly owned electric utility’s or electrical
cooperative’s equipment and facilities.
(ii) Particular risks and risk drivers associated with
topographic and climatological risk factors
throughout the different parts of the local publicly
owned electric utility’s or electrical cooperative’s
service territory.
Page 3 – Wildfire
Risk Factors
CPUC Fire
Threat Map
Adjustments
Identification of any geographic area in the local
publicly owned electric utility’s or electrical
cooperative’s service territory that is a higher
wildfire threat than is identified in a commission fire
threat map, and identification of where the
commission should expand a high fire threat district
based on new information or changes to the
environment.
Page 10 – High
Fire Threat Area
Identification
Enterprise
wide Risks
A methodology for identifying and presenting
enterprise wide safety risk and wildfire-related risk.
Page 3 – Wildfire
Risk Factors
Restoration of
Service
A statement of how the local publicly owned electric
utility or electrical cooperative will restore service
after a wildfire.
Page 19 –
Response to
Wildfire Incident
– CPAU
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX E
Monitor and
Audit
A description of the processes and procedures the
local publicly owned electric utility or electrical
cooperative shall use to do all of the following:
(i) Monitor and audit the implementation of the
wildfire mitigation plan.
(ii) Identify any deficiencies in the wildfire mitigation
plan or its implementation, and correct those
deficiencies.
(iii) Monitor and audit the effectiveness of electrical
line and equipment inspections, including
inspections performed by contractors, which are
carried out under the plan, other applicable
statutes, or commission rules.
Page 21,
Appendix E –
Mitigation Plan
Review and
Assessment;
Qualified
Independent
Evaluator
The local publicly owned electric utility or electrical
cooperative shall contract with a qualified
independent evaluator with experience in assessing
the safe operation of electrical infrastructure to
review and assess the comprehensiveness of its
wildfire mitigation plan. The independent evaluator
shall issue a report that shall be made available on
the Internet Web site of the local publicly owned
electric utility or electrical cooperative, and shall
present the report at a public meeting of the local
publicly owned electric utility’s or electrical
cooperative’s governing board.
Page 22 –
Auditing
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX F
APPENDIX F: STATUS OF PROPOSED ACTIVITIES TO REDUCE RISK OF WILDFIRE
Activity
City Staff
Member
Responsible
Description/Status
Projected
Completion
Date
Status
Date
1 Overhead line rebuild Engineering
Manager –
Electric
Staff is working on drafting the Scope of Work and Request
for Proposal for consultants/contractors to bid on the design
and construction of a new/replacement utility line in the
High Fire Threat Area (Foothills).
Proposals and bids received were either incomplete or at
very high cost. Utilities staff is proceeding with plans to do
design in-house staff. Utilities engineering staff is designing
the first overhead segment to be converted to underground
with construction that began February 2021
Summer 2025
4/26/2021
2 Document
construction
standards for high
fire threat areas
Engineering
Manager –
Electric
New construction standards for use in the high fire threat
areas will be developed as Phase I of the Overhead line
rebuild/relocation/replacement project listed item 3. Staff
will work with the consultant selected for the overhead line
rebuild project to develop the standards based on staff input,
industry best practices, and existing material stock items.
This will be phase I of the project before any design work is
started.
The need for new construction standards are still being
assessed. New construction standards were part of the
Foothills overhead line rebuild contract which staff decided
June 2022
4/26/2021
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX F
to design in-house. If 100% of the overhead line is built
underground then new standards may not be required.
3 Deenergization
(PSPS) policy and
procedures
Assistant
Directors –
Engineering and
Operations
Documents for a PSPS Policy and a PSPS Procedures have
been developed and are being reviewed for approval. Some
procedures have already been implemented to meet the
concerns brought on by Red Flag warnings in October 2019.
Documents for a PSPS Policy and Procedures are being
reviewed.
Summer 2021
4/26/2021
4 Fiber optic cable
extension
Engineering
Manager –
Electric
Staff is working on development of the design to install new
fiber optic cable to enhance the communications capability in
the Foothills for City staff. Depending on the staff availability
this may be done as its own project or as part of the
overhead line rebuild.
The construction of the fiber optic cable will be done
concurrently with either the overhead line rebuild or
underground design. Segments of underground
communication conduit are being installed with the electric
substructure work.
Summer 2025
4/26/2021
5 Emergency generator
assessment
Engineering &
Operations
Managers –
WGW
Water, Gas, and Wastewater Engineering and Operations
staff are discussing the need for emergency backup
generators at the water pumping stations and wastewater
lift station in the Foothills.
The generator assessment is complete and staff is now
working on the generator requirements for each site.
Summer 2022
4/26/2021
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX F
6 SCADA switch
installation
Engineering &
Operations
Managers –
Electric
The switch has been identified but requires replacement with
a SCADA controlled switch and underground substructure
installation for fiber optic communication cables. Depending
on the staff availability this may be done as its own project or
as part of the overhead line rebuild.
The installation of a new SCADA controlled switch will be
completed as part of the overhead or underground line
rebuild.
Summer 2025
4/26/2021
7 Drone inspection of
utility lines in
foothills
TBD No progress on this item at this time. The quality of this type
of service when investigated 3 years ago did not meet
Utilities or Urban Forestry needs. Staff is hoping that newer
technologies will be more useful.
No change
TBD
4/26/2021
8 Controlled burn
policy and plans
Operations
Manager -
Electric / CPA
Fire
To be in conjunction with the City of Palo Alto Fire
Department
No change
TBD
4/26/2021
9 New Weather Station Engineering &
Operations
Managers –
Electric
Electric Operations staff is working to install a new weather
station at Montebello Reservoir.
The construction of a new utility pole is completed.
Installation of a new weather station to follow.
December 2021
4/26/2021
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX F
10 Risk Assessment of
wildfire in the
foothills
Utilities
Strategic
Business
Manager
Staff is in negotiation with a consultant to complete a Risk
Assessment of wildfire in the foothills due to utilities electric
facilities.
An assessment of the City’s liability risk to a wildfire was
completed by ABSG Consulting Inc.. This was an actuarial
study for insurance purposes. It has not resulted in any
planned operational changes.
April 2021
4/26/2021
11 Proactive Pumping of
water up to
reservoirs
Engineering &
Operations
Managers –
WGW
Water, Gas, and Wastewater Engineering and Operations
staff are discussing the need to proactively pump water up to
the reservoirs before electric lines are deenergized.
This activity was provided in the mitigation plan report but
not listed in Appendix F. It will be part of staff notification
process in the PSPS Policy and Procedures.
Summer 2021
3/25/2021
12 NEW ITEMS WILL BE
ADDED AS
IDENTIFIED/NEEDED
TBD – To be Determined
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX G
APPENDIX G: DRAFT PSPS POLICY AND PROCESS
•
CITY OF
PALO ALTO
UTILITIES
'-..,.I I 'f ~·t-
PALO
ALTO
Ufl llflCS
PU RPOSE
Po li cy and Process for Pub li c Safety Power Shutoff
Devastati ng wi'ldfires lihroughout the State of Ca[ifornia have p rompted e learic ulli1ities throughout lihe
state to, identify a:rea,s w :ith:in the;ir jurisdiction ·tliJ.a t are stm:ejptible to power-line igJirit.ed wildfir es and
to take steps to prevent thei r ocrurr e nce_ One of t ihese steps is a proactille deenergjzation of e l ectric
lines., ,often ca 'l le d Ptl'b[ic Safety Powe;r Shutdown ,(PSPSI, by tihe State and other Ca l ifu:rnia utiliti es _
The City of Pa 'lo Alto's Utifiliies Departm e nt (CPA.U) has tihe a uthorrty to 1preem;ptively slhu t ,off 1power
due to fi re-;tlueat conditions; however, lihis optii o:n wiU only be used as a ast reso:rt in eirora o:rd i nary
dircumstan.ces_ This d ocu ment outli nes tlhe 1policy alilid process to identify the lire threat conditions tih a,t
wil l d ictate PSPS of CPA.U fadfl ties by CPAU _ CPA.U, in conjunction with Oity Staff, 'wi tl m ake a ca~-
case dedsiion to slhu t -off power based on cmi te;ria tisted in tfnis document. The ellectr,ic lines most like ly
to b e co.n:si dered for PSPS are fin.es in Pa. o A!lto west of H igtnwa,y 280 whim are in a Tie r 2 (el evated ris!k
far witdfire) area o:n the CPUC Fiire Threat Map_ Palo Alm cou d a lso be impacted lby PSPS a.ctillities
in:itiiated by PG&f o n the t r ansmissi o n system_
CPA.U typically deals with two types o f outages, 1) ~lanned outages for co:nstructiom maintenance, ,or 2)
Un p!a nned ou,tages due to, circumstances beyond our mmrnl, e.g. car po'le ac<Jidents, lbirds/tree
contact w .ith ove rhead lines,. equi pment fai ure, etc~ (commonly referred to as a fautt o:r s!hon-cirrnit)_
The PSPS iis a p reempliive sh'utdown of power to prevent lihe occu r;rence ,of lihe faults that cause lihe
unplanned outages. from occurr ing when high fire threat conditions exist, as S'parts from a f a lilt or
energized wi res o:n lihe ground could result in wildfires_
POLICY
CPA.U considers the s:afety of lihe community our top ,prioriity and wil I ta'ke the rnecessary steps. to
mitigate tine threat o f wildfires .associated w ,ith overhead el ectric [in.es and aiSsooiated e q u ipment
owned a:nd ope;ra ted 'by CPAU _ In extreme cond itions, this will req,,i ire CPAU 'to deenergize power tin.es
far lihe safety of llife and p r ope;rty_
PROCESS
Be low -s a summary of mks ·for p roactille deenergjzatiio:n and ,restoration of tihe ellectri c d'istributio:n
system as pan ,of lihe City'.s wildfire mitigation plan_ Detai Is of tlhe steps to i mplernent a PSPS are i n
aUtilitie:s Wiirlfire .Mitigation Procedure for Pul'Jfic .Safety Power Shutoff'_
Task# DeS<Jr iptio n Page
l_ rDetemmation of possi ble need for PSPS bas-ed on weilllterforecast and field amcitiORS -----------·-------------2
2_ Preappmva .and Authorization t o n otify c □:stooner:s ,of possible PSPS bilSE!d <Jill we.niter roreG1sls .. _, ______________ 2
3_ Notification of affected rustomers of possible PSP5 ------------------------------------------------------------------------2
4 _ Monitoring of real time weather and field conditia~ ----·-·-·----------·-·-·-·--·-----·-·---·-·-·-·-·-----·-·-·--·-·-·-·-·--3
5 _ Notification of customers of impemlini: outage _______________________________________________________________________________ 3
Page lof 3
APPENDIX G
•
CITY OF
PALO ALTO
UTILITIES
0 Po li cy and Process for Publi c Safety Powe r Shutoff 'v i IV :.n-
PALO
ALTO
UT ILIT ICS
6"_ IDeenergjznion, of power line ----·-·--·-·-·-·-·------·---·-·-·-·-·------·--·--·-·-·-·------·--·--·-·-·-·--------·--·-·-·-·--3
7 _ llnspec:tion a □d patrol of line ________________________________________________________________________________________________________ 3
8_ Notification of customers o f impending restorallian --·-·-·-·-·-----·-···--·-·-·-·-·------·-·--·-·-·-·-·------·-·····-·-·-·-·--3
g _ IReenetrgize power line -·-·-·-·-----·--·-·-·-·-·-·-·------·-·--·-·-·-·-·------·-·--·-·-·-·-·------·-·-·-·-·-·-·-·------·-·-·-·-·-·-·-·--3
Determi rnat ion of po:ss i bre need fo r PS.PS bacSed o weather forecast arid fiel d conditions
CPAU, iim conj 11naion witl'l otiherCity Staff~ will make a ,case-by-case decision to shut off power based
on tile fol lowimg ,o:onsiderations:
• Red f l!ag Warlil'in:gs iissued by tihe National Weather Service (NWS) for tihe fire ·weatliter zam,e that
iindudes tihe foolihills Area (San.ta Cruz Mountains);
• City staff assessments of toca cand'itians, including wind speed 1(sust.ainecl arnd gust), lhumiclity
am:I tempe;rallure, fu:el l moist!ure, fu:ell loading and data fmm weather stallions;
• Rea htime inf ormation fr,am S'ulff tocated i n areas 1identif1ied as at risk of being subject ta,
mreme weatiher ,c:cand itiio:ns;
• I nput from dty Fire and Urban Forestry sta:fif;
• Input ·from loca'I and state fire autllo:rities 1regardim:g the potentia'I ,ccamequerices of w i ldfires in
se l ect l.ocations;
• Awareness of mandataryorvo'luntary evacuation o:r ders ii n 1pllace;
• IEJ!!,pe-cted impact of de-eriergilii m:g d rirnits on essentiial servJce.s~
• Notmcations to locajl governments a111d public offidiials; and
• Satiety and potential -mpacts to commu nitiies and rnst,omer:s
The decision process wil I ,occur as soon as the inf ormation i s awilab'le to, fadil il:ate ari im;ormed decision
and timely 111otiificallio:n of c,ustome;rs_ There may be instances where weather c,and i:tJio:ns rap'idly
dhange and advance notice to, wsto:mers ii.s 1not possible. It is antiidpated that this will be· i nf requelilt, if
at allL
Preapproval arnd Au orization to no -fy customers of possibl e PSP.S. based on weather forecasts
Once iit is determin.ed tihat a PSPS may be required, staff wil I pre.se m,t a111 a&sessme111t to tile Uti lities
Director o:r llis./her de.signee will revJew, asse.ss, an d approve tile request..
Notificatiorn of affected rustomers of possib le PSPS
If ai PSPS iis, a pp roved, staff wil l notify tihe City Manager's Office (CIO}, OE'S, Po rice , Fiire, 911. Oispallclil,
WGW Ope;ratiions, Uti[ities Oust,omer Senliice arid Uti l'ities Commu:nicaliio:ns"_ Tiley iri tum will
communicate w itih tihe community~ c,ustomer.s impacted, and tile media_
Page 2of3
APPENDIX G
•
CITY OF
PALO ALTO
UTILITIES
0
'v i IV :.n-Po li cy and Process fo r Publi c Safet y Pow e r Shutoff
PALO
ALTO
UT ILIT ICS
M cmitoling of r ea I t i m e w eath er and fie ld condit ions
Staff wm monitor rea'l time a11d u;pdated forecast informatio11 to determine if forecasts, are accurate
and tile PSPS. .shou'ld ornur as pla11ned; if d1a11ges liteed to lbe m ade to tile PSPS sclledu[ing; or if lhe
PSPS ,can lbe cancelled.
Notifi catiol'l of cust omers of i mp ern:l i ng outage
If a PSPS ii,s, to• ,occur, staff will notify tile· City Mla niager's O ffice (00), OB, Po tice,. f i re, 911 Dispatch,
WGW Operatiio:ns, lhiti:ties Oust,omer Serviice a11dl lhil ities Commu:nica1ions . Tiley ill tum wi[I
communicate w:ilih 1!h e community, rnstomer.s impa:cted, and tile media.
Dee n ergi zation of power li ri e
At tlite determined time, Uiti tiliies Elleomic OperatioliliS staff wil l deene;rgize all lli11es ii n areas iide;ntified for
l?SPS
Insp ection an d p atrol of line
After the wealiheir lhiliS passed and it i s safe to d'.o so, El ectric Qperatio11s staff will 1perform a filll v,i,su.i l
ili11'ipection of lihe distJr1ibU1io11 system to ensure tlhat tlite;re iis no, d.imiage before ree11ergil!ing tile ti ne.
Any d'ama:ge wi ll be assessed and repairs wil I need to be m ade before 1power ,can lbe restored to those
secitions o r anytlli11g downstreaml
Notifi catiol'l of customers of i m ending restoration
Staff W:i ll notify lihe City Ma11ager'.s Office (CI O).. OES, Police,. Fi re,. 911 Dispatch, WGW Oper atioliliS,
Uiti l iliies, Customer Service and Uliil ities Commu11iratiol'liS.. They i n t,um will communicate with tlhe
community~ ,cust,omers iimpacted, a.nd tile media.
Ree n ergize power l i n e
The lli11es wi l be system.itically r eenergiz:ed as lihe lli11es a re patrolled and iin.spected, and any damage ii&
r epair ed .
Page 3of3
APPENDIX F
APPENDIX F: STATUS OF PROPOSED ACTIVITIES TO REDUCE RISK OF WILDFIRE OR IMPROVE
RESPONSE
Activity
City Staff
Member
Responsible
Description/Status
Projected
Completion
Date
Status
Date
1 Overhead line rebuild Engineering
Manager –
Electric
Staff is working on drafting the Scope of Work and Request
for Proposal for consultants/contractors to bid on the design
and construction of a new/replacement utility line in the
High Fire Threat Area (Foothills).
Proposals and bids received were either incomplete or at
very high cost. Utilities staff is proceeding with plans to do
design in-house staff. Utilities engineering staff is designing
the first overhead segment to be converted to underground
with construction that began February 2021
Summer 2025 4/26/2021
2 Document
construction
standards for high
fire threat areas
Engineering
Manager –
Electric
New construction standards for use in the high fire threat
areas will be developed as Phase I of the Overhead line
rebuild/relocation/replacement project listed item 3. Staff
will work with the consultant selected for the overhead line
rebuild project to develop the standards based on staff input,
industry best practices, and existing material stock items.
This will be phase I of the project before any design work is
started.
The need for new construction standards are still being
assessed. New construction standards were part of the
Foothills overhead line rebuild contract which staff decided
to design in-house. If 100% of the overhead line is built
underground then new standards may not be required.
June 2022 4/26/2021
Attachment C
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX F
3 Deenergization
(PSPS) policy and
procedures
Assistant
Directors –
Engineering and
Operations
Documents for a PSPS Policy and a PSPS Procedures have
been developed and are being reviewed for approval. Some
procedures have already been implemented to meet the
concerns brought on by Red Flag warnings in October 2019.
Documents for a PSPS Policy and Procedures are being
reviewed.
Summer 2021
4/26/2021
4 Fiber optic cable
extension
Engineering
Manager –
Electric
Staff is working on development of the design to install new
fiber optic cable to enhance the communications capability in
the Foothills for City staff. Depending on the staff availability
this may be done as its own project or as part of the
overhead line rebuild.
The construction of the fiber optic cable will be done
concurrently with either the overhead line rebuild or
underground design. Segments of underground
communication conduit are being installed with the electric
substructure work.
Summer 2025
4/26/2021
5 Emergency generator
assessment
Engineering &
Operations
Managers –
WGW
Water, Gas, and Wastewater Engineering and Operations
staff are discussing the need for emergency backup
generators at the water pumping stations and wastewater
lift station in the Foothills.
The generator assessment is complete and staff is now
working on the generator requirements for each site.
Summer 2022
4/26/2021
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX F
6 SCADA switch
installation
Engineering &
Operations
Managers –
Electric
The switch has been identified but requires replacement with
a SCADA controlled switch and underground substructure
installation for fiber optic communication cables. Depending
on the staff availability this may be done as its own project or
as part of the overhead line rebuild.
The installation of a new SCADA controlled switch will be
completed as part of the overhead or underground line
rebuild.
Summer 2025
4/26/2021
7 Drone inspection of
utility lines in
foothills
TBD No progress on this item at this time. The quality of this type
of service when investigated 3 years ago did not meet
Utilities or Urban Forestry needs. Staff is hoping that newer
technologies will be more useful.
No change
TBD
4/26/2021
8 Controlled burn
policy and plans
Operations
Manager -
Electric / CPA
Fire
To be in conjunction with the City of Palo Alto Fire
Department
No change
TBD
4/26/2021
9 New Weather Station Engineering &
Operations
Managers –
Electric
Electric Operations staff is working to install a new weather
station at Montebello Reservoir.
The construction of a new utility pole is completed.
Installation of a new weather station to follow.
December 2021
4/26/2021
•
CITY OF
PALO ALTO
UTILITIES
APPENDIX F
10 Risk Assessment of
wildfire in the
foothills
Utilities
Strategic
Business
Manager
Staff is in negotiation with a consultant to complete a Risk
Assessment of wildfire in the foothills due to utilities electric
facilities.
An assessment of the City’s liability risk to a wildfire was
completed by ABSG Consulting Inc.. This was an actuarial
study for insurance purposes. It has not resulted in any
planned operational changes.
April 2021
4/26/2021
11 Proactive Pumping of
water up to
reservoirs
Engineering &
Operations
Managers –
WGW
Water, Gas, and Wastewater Engineering and Operations
staff are discussing the need to proactively pump water up to
the reservoirs before electric lines are deenergized.
This activity was provided in the mitigation plan report but
not listed in Appendix F. It will be part of staff notification
process in the PSPS Policy and Procedures.
Summer 2021
3/25/2021
12 NEW ITEMS WILL BE
ADDED AS
IDENTIFIED/NEEDED
TBD – To be Determined
•
CITY OF
PALO ALTO
UTILITIES
City of Palo Alto (ID # 12179)
Utilities Advisory Commission Staff Report
Report Type: New Business Meeting Date: 6/2/2021
City of Palo Alto Page 1
Summary Title: MyCPAU Metric
Title: Discussion and Update on the Utilities MyCPAU Customer Portal
From: City Manager
Lead Department: Utilities
RECOMMENDATION
This report is presented for the Utilities Advisory Commission (UAC) discussion and no action i s
required.
EXECUTIVE SUMMARY
The new self-service customer portal, MyCPAU, fully launched in April 2020 and is available to
all residential and commercial Utilities customers. MyCPAU is a convenient and secure way for
customers to view and pay their utility bill, display monthly consumption and charges, browse
energy efficiency tips, and much more. The new portal is a significant step in improving
customer experience while also fulfilling many of staff’s objectives that includes providing a
mobile optimized portal. Overall, MyCPAU has been well received with a 73% adoption rate.
The new customer portal includes features that make navigating the site and completing
transactions online much more intuitive. This report describes the new features of the portal,
shares customer feedback, presents the business metrics comparing the legacy customer
portal, MUA (My Utilities Account), to MyCPAU, and, lastly, previews the short and long -term
enhancement roadmap for the platform.
BACKGROUND
MUA was the City’s first on-line payment offering, introduced in 2009 until it was
decommissioned in 2020. MUA was well received by residents and offered utilities customers
their first opportunity to pay their invoice online with a credit card or bank account. However ,
as customer expectations and City staff requirements grew over time, a new vendor and
software was required in order to meet objectives. The project team’s objectives for the next
generation online portal, MyCPAU, were to increase customer adoption and engagement,
increase customer productivity and satisfaction, and automate internal processes while
improving the efficiency of business workflow. In addition, staff also sought improvements in
Staff: Kevin Enderby
City of Palo Alto Page 2
security to offer customers the ability to store a credit card or enroll in recurring credit card
payments.
Strategic goals for the portal included an increase in registered users by 10% for the first year as
well as an increase of 5% in the daily utilization of the portal.
DISCUSSION
MyCPAU’s new features, customer feedback, business metrics and short and long-term
roadmap are discussed below.
I. NEW FEATURES AND IMPROVEMENTS
To develop the business requirements for the next generation customer portal, Utilities
participated in several industry specific website assessments, obtained input from customers
via a special survey, collaborated with other municipalities and utilities, and received feedback
from critical front-office staff. Key features that customers have requested in the past are now
available including setting up recurring credit card payments and updating mailing addresses.
Customer are now able to track their usage and monthly utility expenditures through the
interactive usage and graph modules. In addition, customers can download their energy and
consumption data into a worksheet that they can access to do further analysis.
Table 1 below summarize the features and improvements introduced with the implementation
of MyCPAU.
Although this is not an exhaustive list, MyCPAU offers these popular features and
improvements:
City of Palo Alto Page 3
• Fits any size to any device or screen and includes a modern look and feel
The portal is designed to offer convenience and control to access utility information on any
device (phone, tablet, computer) all while keeping things simple and user-friendly. Although a
separate mobile app is not currently offered, accessing MyCPAU using a mobile phone or tablet
is much easier than previously with MUA.
• Enhanced Usage/Cost Graphs and Residential Tiered Usage
The portal provides a dynamic view of graphs and charts that illustrate consumption and costs.
Customers can hover (cursor) over a specific month on the graph to view the billing period, rate
plan, and specific tiered consumption amount. This information is downloadable to a
spreadsheet for up to thirty-six months. Residential tiered usage information (e.g. E-1, electric
residential rate) is now available to show residents their monthly consumption. Displays of net
generation and consumption data for solar electric Net Energy Metering (NEM) customers are
also available.
• Credit Card Payment Enhancements
Based on customer requests, MyCPAU offers several new credit card payment features
including:
o Ability to enroll in recurring or automatic payment using a credit card
• Flexibility to select the number of days to automatically pay in advance of the
due date
o Option to store one or multiple credit cards for future use
o The ability to pay the utility bill using an American Express or Discover card
o An option to “Pay without login”
• Update Profile Information and Guest User Access
MyCPAU offers the ability to maintain account information in real-time with direct updates to
the Utilities Billing System, including:
o Add and update primary and secondary email addresses
o Add and update primary and alternate phone numbers
o Add and update a billing address
o “Paperless Bill” enrollment
o Add and update home/business details
o Select the email notification preference
o Guest User Access
▪ A CPAU customer may invite a property management firm or an individual (e.g.
spouse or family member) to oversee the daily operations of their utilities account.
• Enhanced Security Features and Website Analytics
MyCPAU improved security features include two-factor authentication via email at registration,
enhanced username and password requirements, as well as, additional security measures
provided by the vendor and payment processor for credit card payments. In addition, the
portal provides City staff with reporting and analytics related dashboards of customer
City of Palo Alto Page 4
interactions including the count of total logins, new registrations, paperless billing enrollments,
“Contacts Us” requests, email notifications, and service requests (i.e. move-outs or stop
service). Staff is also able to view detailed reports corresponding to the type of devi ces and
browsers used, number of clicks by module and clicks by banner.
II. MODULES
The new portal is divided by menu options or modules. Table 2 below summarize the modules
available to all customers after log-in.
City of Palo Alto Page 5
Table 2
Module Name Description
Home The Home (or Dashboard) page provides a quick glance of the customer’s
utilities account using separate tiles for each module. These tiles are
configurable and can be easily adjusted by the customer in any sequence.
My Account Allows customers to view and update customer profile, home and payment
information, manage multiple accounts, and set notification preferences.
Billing Displays current and historical bills, pay bills online, and contact CPAU for
billing inquiries.
Usage Displays graphs and charges illustrating monthly consumption, costs, and
rate schedule.
City of Palo Alto Page 6
III. CUSTOMER FEEDBACK - STRENGTHS AND CHALLENGES
For the past year, Utilities Customer Service staff have collected and compiled customer
feedback, is summarized below by module:
A. STRENGTHS
• Home
o Customers now have a dashboard with a quick view of their balance, usage graphs,
and outstanding notifications.
▪ MUA defaulted to the payment screen and basic menu and did not provide
an overview of the account.
o Customers with multiple services addresses (or accounts) can be toggled from a
drop-down menu at the top.
▪ In MUA, all accounts were displayed together, and the customer had to
know each by the account number, as the service address was not displayed.
• My Account
o Customers can update their mailing address
o Ability to select an address to be their default billing address
o Guest User Access
▪ Property Management level
▪ Guest Level Limited accessibility
• Billing
City of Palo Alto Page 7
o Automatic credit card payments
o Installment plans are now visible and payable
o Budget Billing is displayed on the site is applicable
o Notifications - Customer is able to enroll for email confirmation of their payment
o Payment History (up to 36 months)
o Shows amount paid and indicates type of payment (i.e. checking, credit card)
o History can be exported to a spreadsheet
• Usage
o Graphs includes both consumption and costs for all three commodities – electricity,
gas, and water. MUA had only basic charts of consumption with no dollar amounts.
o Graphs are interactive – customers can hover over bars to see specific dates of bill
periods as well as tiered usage information.
o Graphs display 12 months of data, providing customers with a quick view of cost or
consumption over time.
o Customers can see monthly average and highest consumption and cost val ues.
o Data for CPAU’s two types of solar customers (NEM 1 and NEM 2) are displayed
clearly: NEM 1 solar customers can view net generation as well as net consumption
data, and NEM 2 solar customers can view electricity import and export data.
o 36 months of cost and consumption data can be exported to a spreadsheet.
o Customers can navigate to rate information.
• Outages
o Proves link to outage maps, social media links and outage contact information
• Notifications
o Bill due, bill reminders, past due reminders, which were not available in MUA
o Customers can opt-in or opt-out of receiving notifications
• Efficiency
o Customer can now view savings tips and rebates in one location.
• CSR Admin Portal (Customer Service Representative Administrative Portal)
o City staff can now reply to customer inquiries from the admin portal without having
to log into the Utilities Billing System to respond. All information is in one spot.
o Reporting and Analytics are now available.
B. CHALLENGES
The following is a list of constructive and helpful feedback from customers and staff:
o Billing - Does not state in detail why a credit card payment is not accepted, can
sometimes be difficult for a CSR to investigate.
City of Palo Alto Page 8
o Billing - Customers can get confused if they are enrolled in auto pay as soon as they
enroll and must refresh to view if they are actually enrolled.
o Mobile and Tablet - Users have stated it is not as friendly as using the desktop
version.
o Billing - Customers can no longer make a single payment for multiple accounts;
instead they must make them individually.
Staff plans to send out a survey in FY 2022 to obtain additional feedback from customers. In
addition, staff will review customer challenges and will work with the vendor to determine
improvements that can be made to incorporate feedback.
IV. METRICS
Program objectives and goals for MyCPAU are monitored and evaluated using business metrics
and KPIs (Key Performance Indicators). Table 3 below summarize the metrics tracked
comparing MUA (January/February 2020) to MyCPAU (January/February 2021):
Table 3
Customer Portal – Metrics MUA (legacy) MyCPAU Diff.
1. Registered Users
Utilities Accounts Registered 19,000 22,218 3,218
-Residential n/a 86% -
-Commercial and other classes n/a 14% -
- % of Total Utilities Accounts 62% 73% -
2. Payments (per month)
One-Time – ACH 1,266 1,214 -52
One-Time - Credit Card 5,197 3,648 -1,549
Recurring - ACH 7,354 6,673 -681
Recurring - Credit Card n/a 2,973 2,973
Total Online Payments 13,817 14,508 691
3. Notifications - emails (per month)
Monthly Invoice -"Your Bill is Ready to View" 6,749 22,346 15,597
Payment Reminders and Past Due n/a 7,002 7,002
Payments Received/Declined n/a 8,473 8,473
4. Enrollments (per month)
Paperless Billing n/a 171 171
Total Accounts on Paperless Billing (email only) 4,489 6,251 39%
5. Customer Service Correspondence (emails per month)
Customer Inquiries Received/Sent n/a 350
6. Services (per month)
City of Palo Alto Page 9
Move-Outs / Turn-off Service 74 102 28
7. Traffic (per day)
Number of Unique Customer Logins n/a 510 -
8. Customer Engagement
a. Clicks by Module (per month)
Billing n/a 6,065 -
MyAccount n/a 1,483 -
Usage n/a 706 -
Connect-Me n/a 203 -
Service n/a 191 -
Notifications n/a 97 -
Efficiency n/a 71 -
Total Customer Clicks n/a 8,816 -
b. Clicks by Banner (per month)
Usage ("Obtain Your Rate Details") n/a 175 -
Dashboard ("Paperless Bill") n/a 65 -
My Account ("Paperless Bill") n/a 35 -
Billing ("Payment Methods") n/a 24 -
Total Customer Clicks n/a 299 -
City staff interpret these metrics below:
1) Registered Users
MyCPAU has been well received with 73% of all accounts currently enrolled. This is an
increase in adoption of 17% year-over-year when comparing MyCPAU (22,218) to MUA
(19,000). This has exceeded staff’s strategic goal to increase customer adoption (or
portal registrations) by 10% per year. In addition, a majority of users are residential
customers at 86% of the registered accounts, versus commercial customers at 14%.
2) Payments
There was a slight increase in customers making their payment via the customer portal
with the total number of monthly online payments increasing by 691 payments , or 5%.
In addition, with the introduction of the recurring credit card option (or automatic
payments), a shift in customer preference occurred from making one-time credit card
and recurring ACH payments in MUA, to recurring credit card payments in MyCPAU. As
a result, CPAU credit card payment fees (or City expenses) have increased by 35%. Staff
will continue to monitor and evaluate options to reduce the fees incurred, for example,
by lowering the maximum credit card payment amount per month.
3) Notifications - emails alerts
The MyCPAU portal emails approximately 22,000 bills, payment received, and reminder
emails per month including “Your bill is ready to view,” “Your bill is due in X days,” and
City of Palo Alto Page 10
“Your payment has posted.” The enhanced notifications options have improved the
look and feel of the notices, introduced new notification types, and allow staff to edit
content on demand. Example, special COVID-19 messages were added to notifications
last year.
4) Enrollments
From January 2020 to January 2021, there was an increase of 1,762 accounts or a 39%
increase in Paperless Billing enrollments. This has greatly exceeded staff’s strategic goal
of 10% per year. Staff will continue to promote paperless billing since it will reduce
printing and mailing costs.
5) Customer Service Correspondence
MyCPAU provides a customer notification inbox to easily submit and track
correspondence with City staff for online assistance with billing, usage, and customer
inquiries (i.e. high bill). This new feature has been popular with customers and provides
a convenient method at any hour to communicate with staff. Utilities Customer Service
staff receive and process approximately 350 inquires a month.
6) Services
Customers increased their adoption of the move-out (stop service) option in MyCPAU by
38% per month or 28 additional move-outs per month. This exceeds staff’s strategic
goal of increasing the use of the move-out feature by 5% per year. In addition, the
move-outs submitted via the portal automatically initiates the final meter read wor k
order request in the billing system as well as adds the new forwarding address. This
saves staff the manual efforts to enter this information into the system.
7) Traffic
As discussed earlier in this update report, MyCPAU introduced new website analytics
that allows staff to track the daily usage of the portal. According to these analytics,
there are an average of 510 unique users that visit the site on average per day. Now
that this metric is available, Staff will be able to benchmark and gauge daily usage of the
site and determine methods to improve online adoption.
8) Customer Engagement
a. Number of “Clicks by Module” – The most popular modules in the portal
are the Billing, My Account, and Usage modules. This appears to be in line with
staff assumptions as customers visit the site to conduct such business as
view/pay bills, view/change their phone number, email, billing address, or enroll
in paperless billing and view their consumption.
b. Number of “Clicks by Banner”- The most popular banners are on the
Usage, Home (Dashboard), and My Account modules relating to finding usage
details and enrolling in paperless billing.
City of Palo Alto Page 11
V. NEXT STEPS: SUMMARY OF THE ROAD MAP AHEAD – SHORT AND LONG TERM
The City of Palo Alto Utilities (CPAU) is dedicated to improving the f unctionality of the MyCPAU
online portal as part of its goal to make utility information readily available to customers so that
they can make informed decisions on their own utility costs, energy savings and climate
reduction efforts.
CPAU is committed to engaging with its residents, businesses, and technology experts to
enhance the online portal to deliver more value for all customers. Numerous enhancements are
being developed into both short- and long-term schedules in order to achieve maximum
benefits.
A number of these enhancements are underway and include the following:
A. SHORT-TERM (1 year to 18 months)
• WaterSmart - Provides customers with additional water analytics and comparison
reports.
• Clean Power Research - Provides customers interested in learning more about solar and
electric vehicles with solar and EV calculator tools.
• Based on feedback, staff plans to address the challenges customers are currently
experiencing since the portal’s launch (e.g. add communication or make more intuitive
where needed)
• Add a notification banner across the top of the log -in and post-login pages. This is to be
used to alert customers of important information such as emergency situations (e.g.
wildfires or Covid-19), outage information, fraud alerts, portal instructions, or one-time
messages to reduce customer calls into the call center (e.g. call center/phones are down
or invoices will be delayed one day)
• Evaluate options to reduce credit card fees, for example, by instituting a maximum
monthly credit card amount.
B. LONG-TERM (2 to 3 years)
• An option for text alerts for high bill notification (tentative)
• Coordination with the Outage Management System (OMS) to improve delivery of email
notifications (tentative)
• Integration with the future AMI (Advanced Metering Infr astructure) system to provide
customers with hourly interval usage data and water leak alerts
• Upgrade to the latest version of the vendor’s portal software and explore the need for a
separate mobile application
• Electronic bill presentment in financial inst itutions
City of Palo Alto Page 12
Resource Impact
For short-term enhancements, staff estimates the cost to implement will range between
$85,000 and $100,000. Staff does not currently have an estimate for long-term enhancements
and will have to develop statement of works and contact multiple vendors for future
integration and service offerings. Please note should staff elect to institute a maximum
monthly credit card amount in MyCPAU, a net savings of $250,000 annually is estimated from
$600,000 per year to $350,000 in annual credit card fees.
Stakeholder Engagement
The online MyCPAU customer account management system was presented to the UAC on
March 6, 2019 (https://cityofpaloalto.org/civicax/filebank/documents/69599). CPAU received
input from Utility industry consultants, E Source; survey results from 1,200 CPAU customers;
and system requirements from multiple divisions in Utilities including Customer Support, Billing
and Utilities Program Services.
Environmental Review
The UAC’s review of this update is not a Project requiring California Environmental Quality Act
review, as an administrative governmental activity which will not cause a direct or indirect
physical change in the environment, under 14 CCR Section 15378(b)(5).
Attachments:
• Attachment A - Presentation
MyCPAU Customer Portal
June 2, 2021
1
Attachment A
A c1Tv OF
WPALO ALTO
•MyCPAU Objectives
•New Features and Improvements
•Customer Dashboard and Modules
•Key Performance Metrics
•Roadmap
Outline
2
A c1Tv OF
WPALO ALTO
•Increase customer engagement
–New functionality and features, new modern screens
•Increase customer satisfaction, productivity, and convenience
–Mobile experience, single sign-on, fewer clicks…
•Reduce incoming phone calls by offering new services and information
online
•Improved security features
•Encourage energy efficiency and conservation by adding new online tools
MyCPAU Objectives
3
A c1Tv OF
WPALO ALTO
Customer Portal -Improvements
4
✓Fits and sizes to any device
✓Modern Look and Feel
✓ Alert Email Notifications
✓website Analytics
✓Enhanced security features
✓scalable (add future
functionality)
✓Residential Tiered Usage Data
✓Enhanced Usage and Cost Charts
✓Recurring credit card option
✓usage export to Excel (36 months)
✓ Guest User Access
✓Energy Efficiency Tips
A c1Tv OF
WPALO ALTO
✓improved e-billing
✓ AMEX and Discover
✓update Profile real-time
(e.g. email, phone, address)
✓store a credit card
✓social Media Links
✓pay without login
(Desktop view)
New nline Customer Portal -ImprovementsCustomer Dashboard and Modules
5
•
C!T V OF
PALO ALTO
UTILITIES
Good Alte,noon
HOME MY ACCOUNT BI LLING USAGE OUTAGES NOTIFICATIONS CONTACT US MOVE OUT EFFICIENCY
@ Billing
Q
t!'
t!'
rj)
$91 .68
Total Payment Due
04/07/2021
Due O..te
Notifications
BIK1r>g Qucn.,,,,
Servic~
Coo1actUs
View
View
View
J1 MyAccounl G Usage
Monthly
900
AlrHE·M-600
<!) Outages
300
0 I I ■
-300
t~ Efficiency
@M:M
I I I
) FAQs ) Contact U, ) Terms & Conditions ) Privacy Policy
® Sign Out
Elo,ctn< V
Wh
I
6
REGISTERED
ACCOUNTS:
22,218 OR 73%
ONLINE PAYMENTS:
14,508 OR 51%
BILL NOTIFICATIONS:
22,346 MONTHLY
PAPERLESS BILLING:
6,251 MONTHLY
(39% INCREASE)
SELF MOVE-OUTS:
102 MONTHLY OR 32%
Key Performance Metrics
7
Road Map
•Water analytics and comparison report
•Solar and EV calculator
•Maximum monthly credit card payment
Short-Term (12 –18 months)
•AMI hourly interval data and water leak notifications
•Notifications via text
•Outage notifications
•Electronic bill presentment (i.e. Bill Pay/ebill) in financial
institutions
Long-Term (24 –36 months)
A c1Tv OF
WPALO ALTO
•Questions
•Suggestions
•Thoughts and Ideas
Discussion
8
A c1Tv OF
WPALO ALTO
City of Palo Alto (ID # 12306)
Utilities Advisory Commission Staff Report
Report Type: New Business Meeting Date: 6/2/2021
City of Palo Alto Page 1
Summary Title: Survey Overview
Title: Discussion and Overview of the 2021 City Survey
From: City Manager
Lead Department: Utilities
Background
Palo Alto has been surveying residents since the first survey in 2003. The survey report shares
the survey results with some historical comparison. As described in the City Council report of
May 17, 2021, the survey was conducted starting on December 21, 2020 and responses were
collected over seven weeks.
Selecting Survey Recipients “Sampling” refers to the method by which households were chosen
to receive the survey. All households within the City of Palo Alto were eligible to participate in
the survey. A list of all households within the zip codes serving Palo Alto was purchased from
Go-Dog Direct based on updated listings from the United States Postal Service. Since some of
the zip codes that serve Palo Alto households may also serve addresses that lie outside of the
community, the exact geographic location of each housing unit was compared to community
boundaries using the most current municipal boundary file (updated on a quarterly basis) and
addresses located outside of Palo Alto boundaries were removed from consideration. Each
address identified as being within City boundaries was further identified as being l ocated in
North or South Palo Alto, and within one of six areas. To choose the 3,600 survey recipients, a
systematic sampling method was applied to the list of households previously screened for
geographic location. Systematic sampling is a procedure whereby a complete list of all possible
households is culled, selecting every Nth one, giving each eligible household a known
probability of selection, until the appropriate number of households is selected. Multi -family
housing units were selected at a higher rate as residents of this type of housing typically
respond at lower rates to surveys than do those in single-family housing units.
Executive Summary
Ratings for some utility-related aspects have improved since 2018. Out of the 3,600 citizens the
survey was sent to, 768 responded and about 9 in 10 of those residents gave positive marks to
Staff: Dean Batchelor;
Dave Yuan
City of Palo Alto Page 2
the reliability of utility services in Palo Alto and 8 in 10 or more awarded favorable scores to:
the community value received from the City owning and operating its o wn municipal utility
services, utilities online customer self-service features, providing opportunities for energy and
water efficiency at home or business, value of Palo Alto Utilities’ customer communications,
ease of contacting Utilities department staff, and speed of response after contacting Utilities
department staff. Five of the 11 individual aspects of utility services included in this question
saw improved ratings from 2018 to 2021; the remaining 6 aspects were similar to the previous
survey results. Further, more than 8 in 10 residents gave positive marks to utility payment
options, drinking water, and storm water management (the latter rating also increased from
2018 to 2021).
Attachments:
• Attachment A: Presentation
2021 Community SurveyAttachment A
Survey Background & Methods
•Mailed to 3,600 households
•768 completed (22%)
•530 completed online
•±4% margin of error
•Weighted to reflect
community
•Results compared by
geography, by gender, and by
race/ethnicity
2Prepared by Polco/NRC
What one change would make you
happier?
3
82%
80%
19% made a comment related to
housing (amount, type,
affordability/cost of living)
#1
most frequently-mentioned
topic area
Ratings for some utility-
related aspects have
improved since 2018.
I lt•I r •• ,.. .. , • . . . ,,. ..
'
Alternative Transportation
5
34%
of respondents used
public transportation
in past 12 months
= higher than benchmark
Residents in 2021 were more likely than in
2018 to:
•describe walking and biking as
convenient modes of transportation
•Plan to purchase an electric car in the
next two years
Utility Ratings
6
82%
80%
Reliability of utility services
Utilities online customer self-service features
Value received from City owning/operating own utility services
Ease of contacting Utilities department staff
Speed of response after contacting Utilities dept. staff
Value of Palo Alto Utilities’ customer communications
Providing opportunities for energy/water efficiency at home/business
93%
86%
84%
84%
83%
80%
80%
lJ
lJ
lJ
Benchmark Utility Ratings
7
82%
80%
Drinking
water
Sewer
services
Utility
payment
options
Gas
utility
Electric
utility
88%87%86%
78%77%
= higher than benchmark*
How are survey results used?
8
Monitor trends in resident opinion
Measure government performance
Inform budget, land use, strategic planning decisions
Benchmark service ratings
Prepared by National Research Center, Inc.
City of Palo Alto (ID # 12099)
Utilities Advisory Commission Staff Report
Report Type: New Business Meeting Date: 6/2/2021
City of Palo Alto Page 1
Summary Title: Utilities Quarterly Report for Q1&2 FY21 (Info)
Title: Informational Update on the Utilities Quarterly Report for Q1&2 of FY
2021
From: City Manager
Lead Department: Utilities
Recommendation
This report is for information only. No action is required.
Executive Summary
This is an update on water, gas, electric, wastewater collection and fiber utilities, efficiency
programs, legislative/regulatory issues, utility-related capital improvement programs,
operations reliability impact measures and a utility financial summary, and is for the City
Council’s information. This update Attachment A (Linked Report) has been prepared to keep
the Council and Utilities Advisory Commission apprised of the major issues that are facing the
water, gas, electric, wastewater collection and fiber utilities.
Items of special interest for Q1 and Q2 FY 2021 include:
•COVID-19 Impacts: The COVID-19 shelter in place order affected utility loads in Q1 and Q2
of FY 2020:
o Electric utility loads for CY 2020 were 7% to 10% below the average of CY 2018 and CY
2019 loads. Lower electric loads were accounted for in FY 2021 and FY 2022 financial
forecasts. (page 6)
o Gas utility loads for CY 2020 were as much as 18% below the average of CY 2018 and CY
2019 sales in April of 2020 and continued to be low through the summer. But by
December 2020 loads had returned to normal levels. (page 9)
o Water loads (demands) for CY 2020 roughly matched the average of CY 2018 and CY
2019 sales. (page 14)
o Q1 and Q2 Wastewater sales revenues were nearly 5% lower than projected in the FY
2021 Financial Plan. This reflects lower sales revenue from the commercial sector.
These sales declines have been accounted for in the FY 2022 Financial Plan forecast.
(page 28)
Staff: Eric Wong
CITY OF
PALO
ALTO
City of Palo Alto Page 2
• Electric Utility: As of the end of Q2 FY 2021 the electric utility reserves are forecasted to
decline by $6.3 million by end of FY 2021. This is compared to the reserve forecast decline
of $4.0 million projected in the FY 2021 Financial Plan. While retail sales are higher than
forecasted, and wholesale sales revenue is also higher than forecasted due to the REC
exchange program, this is offset by increased expenses from low hydroelectric supply,
increased administrative expenses, and increased spending on electric vehicle programs.
Precipitation has been roughly 50% of average for the year in the watersheds associated
with the City’s hydroelectric projects, so hydroelectric generation in calendar year 2021 will
be lower than average. However, these effects will be felt more in FY 202 2 than in FY 2021,
and are taken into account in the forecast. (See pages 3, 25-26, 28)
• Gas Utility: Gas supply prices were higher than forecasted in November and December of
2021, and are expected to be above forecasts through the end of the fiscal year . These cost
increases are passed through to customers through a variable gas commodity rate that
adjusts monthly, but are offset in part by a discounted gas agreement that has reduced
customer gas supply costs by about $354,000 through Q2 FY 2021. Aside from these
commodity cost increases, gas utility costs are roughly in line with the FY 2021 Financial
Forecast (See pages 9-11, 26, 28)
• Water Utility: Precipitation has been low in California in the 2020-2021 water year. Total
storage in the Hetch Hetchy system was 83% full as of March 29, 2021. Precipitation is
roughly 50% of average, though snowpack was more favorable. Water consumption and
costs for FY 2021 are forecasted to be roughly 5% higher than forecasted in the FY 2021
Financial Plan because forecasted sales decreases from the pandemic shelter in place orders
have not materialized. The small commercial sector saw some declines, but water use did
not decline for residential use and commercial irrigation. However, the cost and revenue
impacts from higher sales have been offset by declines in other revenues, including interest
income, and cost savings due to delays in a project to install additional backup generators at
water pumping stations. As a result, costs and revenues roughly align with the FY 2021
Financial Forecast. (See pages 11-14, 26-27, 28)
• Wastewater Utility: The Wastewater Collection Utility is projected to realize a $2.9 million
surplus rather than $200,000 loss, as projected in the FY 2021 Financial Plan. Sales are lower
due to lower non-residential sewer charges (these are based on non-residential water use,
so decreases in water consumption can lead to decreases in sewer revenues). However,
costs were significantly lower due to one-time treatment cost reductions and collection
system CIP deferrals. These surplus funds are expected to be expended on deferred CIP.
(See pages 27, 28)
• Fiber Utility: Magellan Advisors has been hired to perform a four -phase Fiber Network
Expansion assessment. In Q4 2020, work commenced on phase one of a high -level design to
support internal City services including Advanced Metering Infrastructure (AMI),
Supervisory Control and Data Acquisition (SCADA) Systems, and wireless communication.
Phase three of the project to develop a fiber-to-the-home (FTTH) business case and high-
level design was accelerated and is being worked on in parallel with phase one tasks.
Preliminary findings and recommendations of the fiber network expansion and FTTH
business case were made available to the Utilities Advisory Commission on April 21, 2021.
City of Palo Alto Page 3
Fiber utility revenue for FY 2021 is projected to be $430,000 (7%) lower than forecasted in
the FY 2021 Financial Plan due to the impact of business closures related to the economic
impacts of the pandemic. Fiber capital expenses are projected to be $900,000 lower than
expected, primarily due to delays in the Fiber Optic System Rebuild, which is on hold
pending the results of the Fiber to the Home study. As a result, the Fiber Optic Utility’s net
position is expected to increase, with a total of $34.7 million in reserves expected at year-
end. (See pages 27, 28)
• Customer Programs: The report contains descriptions of efficiency programs (pages 16 -17),
innovation programs (page 19), and sustainability programs (pages 20 -25). Many energy
efficiency programs were suspended due to shelter in place orders. Programs that can be
executed outdoors or on commercial properties in compliance with County health orders
have been restarted, but programs that require entering residences remain suspended. In
the meantime CPAU is providing tips and tricks electronically to residents and business es on
reducing energy and water use while sheltering in place or during a suspension of business.
CPAU has also launched a virtual program delivery option for its Home Efficiency Genie
service, and recently expanded it to low-income customers. The City also continues to
promote its multi-family and workplace EV charger programs, which are summarized on
pages 22-24.
• Communications: A digest of major outreach efforts is provided on pages 17-18, including
outreach related to building and vehicle electrification and water conservation.
• Legislative and Regulatory: Major legislative and regulatory items are summarized on pages
25-26, with a more detailed list of potential bills in Attachment B (Linked Document).
Attachments:
• Attachment A: Quarterly Report for Q1 and Q2
• Attachment B: Bill Sample
Utilities
Quarterly
Update
First & Second Quarters of
Fiscal Year 2021
June 2021
Attachment A
Quarterly Update for First & Second Quarters of FY 2021
June 2021
i
Utilities Quarterly Update
Table of Contents
i. Electricity ................................................................................................................... 3
Electric Supplies ............................................................................................................................................ 3
Electric Budget and Portfolio Performance .................................................................................................. 7
ii. Natural Gas................................................................................................................. 9
Gas Supply ..................................................................................................................................................... 9
Gas Budget and Portfolio Performance ...................................................................................................... 10
iii. Water ....................................................................................................................... 11
Water Availability ........................................................................................................................................ 11
Water Use ................................................................................................................................................... 13
Water Budget and Portfolio Performance .................................................................................................. 14
iv. Fiber Optics .............................................................................................................. 15
Commercial Dark Fiber Service: .................................................................................................................. 15
Phased Fiber Optics Expansion: .................................................................................................................. 15
v. Efficiency Programs .................................................................................................. 16
Events and Workshops ................................................................................................................................ 17
vi. Communications Highlights ....................................................................................... 17
vii. Innovation and Pilot Programs .................................................................................. 19
Program for Emerging Technologies ........................................................................................................... 19
viii. Sustainability ............................................................................................................ 20
Electrification .............................................................................................................................................. 20
Electric Vehicles .......................................................................................................................................... 21
ix. Legislative and Regulatory Issues .............................................................................. 24
State legislation ........................................................................................................................................... 24
State regulatory proceedings ...................................................................................................................... 26
x. Utility Financial Summary ......................................................................................... 26
Electric Utility Overview .............................................................................................................................. 27
Gas Utility Overview.................................................................................................................................... 27
Wastewater Collection Utility Overview ..................................................................................................... 28
Fiber Optic Utility Overview ........................................................................................................................ 28
Residential Bill Comparisons ....................................................................................................................... 31
Quarterly Update for First & Second Quarters of FY 2021
June 2021
ii
List of Figures
Figure 1: Electric Supply Resource Actual and Projection, 2020 to 2022 ..................................................... 4
Figure 2: CY 2021 Monthly Electric Supply Resource Projection .................................................................. 5
Figure 3: Northern California Peak Electric Prices ........................................................................................ 6
Figure 4: CY 2020 Electric Load, compared with CY 2018-19 Average ......................................................... 6
Figure 5: FY 2021 Electric Load and Resource Balance ................................................................................. 7
Figure 6: FY 2021 Electric Market Prices ....................................................................................................... 8
Figure 7: CY 2020 Gas Usage, compared with CY 2018-19 Average ............................................................. 9
Figure 8: CPAU’s Gas Commodity Rates ...................................................................................................... 9
Figure 9: FY 2020 Natural Gas Volumes and Costs .................................................................................... 10
Figure 10: FY 2020 Natural Gas Prices ........................................................................................................ 11
Figure 11: California Drought Monitor ....................................................................................................... 11
Figure 12: Hetch Hetchy Snowpack ............................................................................................................ 12
Figure 13: SFPUC Water Deliveries ............................................................................................................. 13
Figure 14: Potable Water Use ..................................................................................................................... 13
Figure 15: CY 2020 Water Usage, compared with CY 2018-19 Average ..................................................... 14
Figure 16: FY 2020 Water Volumes and Costs ............................................................................................ 14
Figure 17: History of LCFS Credits Earned Per Quarter ............................................................................... 21
List of Tables
Table 1: FY 2021 Electric Load and Generation Compared to Budget Projections ....................................... 7
Table 2: FY 2021 Electric Utility Supply Cost Summary ................................................................................ 8
Table 3: Status to date of all applications to the Program for Emerging Technologies ............................. 19
Table 4: Notable EV Charger Projects Completed ...................................................................................... 22
Table 5: Utilities Financials, FY 2021 Projections ........................................................................................ 30
Table 6: Operations Reserves, FY 2021 Q2 ................................................................................................. 30
Table 7: Residential Electric Bill Comparison .............................................................................................. 31
Table 8: Residential Natural Gas Bill Comparison ....................................................................................... 31
Table 9: Residential Water Bill Comparison ................................................................................................ 31
Table 10: Residential Wastewater Collection (Sewer) Bill Comparison ..................................................... 31
Table 11: Median Residential Overall Bill Comparison ............................................................................... 32
Table 12: FY 2021 Q1&2 Reserve Report from the City’s Financial System ............................................... 33
Quarterly Update for First & Second Quarters of FY 2021
June 2021
3
i. Electricity
Electric Supplies
Western Area Power Administration (Western) Issues
Water year 2021 1 is shaping up to be the state’s second consecutive dry year, with significantly below-average
precipitation levels (with cumulative precipitation at 50% of average for April 29).
For Q1 of FY 2021, Western delivered 121 GWh to the City (82% of long-term average levels, which is about 88%
of the amount that was delivered in Q1 of FY 2020).
For Q2 of FY 2021, Western delivered 33 GWh to the City (75% of long-term average levels, which is about 48%
the amount that was delivered in Q2 of FY 2020). Based on the April 2021 WAPA forecast, Western is projected
to generate a total of 285 GWh (71% of long-term average supply levels, and 72% of FY 2020 levels) in FY 2021.
Calaveras Hydroelectric Project Issues
New Spicer Meadow Reservoir (NSMR) storage as of February 28, 2021 was 64,116 ac-ft. The historical average
storage level for NSMR for the end of February is 75,340 ac-ft. Water year 2021 has been dry so far, with
cumulative precipitation currently at about 51% of average for this date, tracking just above the levels of 2015
(a serious drought year).
For Q1 FY 2021, the Calaveras project generated 17 GWh (44% of long-term average levels, which is about 48%
of the amount that was delivered in Q1 of FY 2020).
For Q2 FY 2021, the Calaveras project generated 9 GWh (55% of long-term average levels, which is about 47%
of the amount that was delivered in Q2 of FY 2020). Based on the March 2021 forecast, for FY 2021 as a whole,
Calaveras is projected to generate 62 GWh (53% of long-term average levels, and 60% of FY 2020 supply levels).
Electric Load and Resource Balance
Palo Alto’s electric supply portfolio for CY 2020 saw significant surplus energy positions in some periods, largely
owing to the previous year being an above-average hydro year. However, there were other periods that saw
deficit positions as well. The City sold, on a forward basis, nearly 58 GWh of surplus energy during Q1 of FY 2021
(Jul 2020 – Sep 2020) to manage the surplus position, while it purchased about 60 GWh in Q2 of FY 2021 (Oct
2020 – Dec 2020) to manage the deficit position. The City also purchased, on a forward basis, about 35 GWh of
surplus energy during Q3 of FY 2021 (Jan 2021 – Mar 2021) to manage the deficit position.
In addition, due to the availability of surplus carbon neutral supplies, as well as the updated Carbon Neutral Plan
that was approved by Palo Alto City Council in August 2020, the City is authorized to sell all Bucket 1 RECs
exceeding the amount required to comply with the City's RPS requirements, and to replace them with
Bucket 3 REC purchases. Accordingly, the City sold Bucket 1 RPS resources and purchased Bucket 3 RECs in Q1-
Q2 of FY 2021. While this plan causes the City’s RPS levels to decrease, the City still remains in compliance with
1 A “water year” is defined as the 12-month period from October 1 through September 30. “Water year 2021” refers to the period
from October 1, 2020 through September 30, 2021.
Quarterly Update for First & Second Quarters of FY 2021
June 2021
4
its RPS requirements. RPS compliance is based on aggregate RPS procurement over the entire compliance
period (2017-2020), which ensures that the City is still in compliance with the state RPS requirements. Also,
since these transactions were index-based (plus a REC premium), they did not impact the City’s energy price
exposure (and are therefore not reflected in the load-resource balance charts shown in Figure 1 and Figure 2
below).
CY 2021 has been a second consecutive dry year after CY 2020. The overall electric supply resources are 15%
deficit to load in CY 2021 including forward market transactions (and 2% deficit to load excluding forward market
transactions). The overall electric supply resources are projected to be equal to load for CY 2022. Figure 2 below
shows the monthly load and resource balance for CY 2021.
As mentioned earlier, some of the monthly surplus/deficit positions were sold/purchased as generic energy
ahead of time, while the rest were settled in the spot market through the California Independent System
Operator.
Figure 1: Electric Supply Resource Actual and Projection, 2020 to 2022 (as of April 14, 2021)
19' S\lrph,1,s 15% Di!!ftat o,ti:Jl t1rn lus IZl Net Pl:a,nned
1,200 Mar~et
Transaction,
1.000 □ Net Committed
Marltiet
Tran5 att1Qll'l s
800
So >ar
600
j ■Wind
"' ~00
,111
~
i;:
II;
II Landfill G a:s: "' 200
0 □cal avera~
•100
■West,ern
-400
i020 2021 2i022
cal~ncl!ar 'fear
Quarterly Update for First & Second Quarters of FY 2021
June 2021
5
Figure 2: CY 2021 Monthly Electric Supply Resource Projection (as of April 14, 2021)
Electric Market Price History and Projections
As of March 31, 2021, the price for on-peak energy for April 2021 in Northern California was $32.33 per
megawatt-hour (MWh)2, while the prices for May and June 2021 were $31.44/MWh and $44.70/MWh,
respectively. These values are between 12% - 24% higher than they were at the time of the last quarterly report3
and between 18% - 31% higher than they were at the time of budget. On-peak prices for calendar year strips
are about $56.25/MWh for 2021, reducing to about $36/MWh for 2027 and onward. The on-peak strip price for
2021 is approximately $13.85/MWh (33%) higher than it was at the time of the last quarterly report, and
$15.73/MWh (39%) higher than it was at the time of budget. Also, the on-peak strip prices are 10% higher on
average for the 2022-2027 time period than they were at the time of the last quarterly report, and 15% higher
on average for the same time period, compared to what they were at the time of budget. Figure 3 below
illustrates historical monthly on-peak prices and projected monthly forward prices for Northern California from
2006 through 2026.
2 Note that $32.33 per megawatt-hour is equal to 3.233 cents per kilowatt-hour.
3 Market prices for the previous quarterly report were from November 24, 2020.
~
i
.140 ---------------------------------------.......
no +--------------------------------
100 +-----------~
80
60
~
20
0
-20
-«I
E.l Net Pia ,rmed
Market
Transact ion$
□ Net Comm itted
Market
ransact ions
Snlar
-'60 ....._ ______________________________________ ____.
Quarterly Update for First & Second Quarters of FY 2021
June 2021
6
Figure 3: Northern California Peak Electric Prices (as of March 31, 2021)
Covid-19 Impact on Electric Load
Figure 4 below shows the difference between electric load in CY 2020, compared with CY 2018-19 average.
During the start of the Covid-19 in April 2020, electric load was about 10% below CY 2018-19 average, but the
difference had slightly shrunk to about 7% in Q3 and Q4 of CY 2020.
Figure 4: CY 2020 Electric Load, compared with CY 2018-19 Average
$160 ...... ------------------------.....----------
$140
$120
HI isto.ri ca I +---+-+ Projected
$0 --..-----------------....... -----------.~·-----..---....--# #,, ~ ~ # ~ ~ # ~ ~ ~ ~ # ~ # ~ ~, ~ 'V '\: -i.:·-v '\: ·1,; 'VT'\: 'V ~ 'V· ri; '\: 'V '):',:'VT 'V 'V
80K
60K
MWh 40K
20K
OK
::,.,. ...
Ill
:::J
C
Ill -,
::,.,. ..c ... u
Ill ...
:::J Ill ... ~ .n
ii}
LL
Mont h
::,.,. 41 ::,.,.
i: 113 C (l_ ~ :::J :::J
-=.r -. -.
■ Ele ctric , 202 0
Ele ctric , 20 8-1 9 Av e rage
.µ ... ... ... ...
u, 41 41 41 41
:::J ..[l ..[l ..[l .Ll
Ol E 0 E E :::J tl -=i 41 41 ii}
.µ 0 ;;,, u
0. D ii}
41
LEI z 0
Quarterly Update for First & Second Quarters of FY 2021
June 2021
7
Electric Budget and Portfolio Performance
Electric Load, Generation, and Supply Cost Summary Compared to Budget Estimates
Table 1 and Figure 5 below summarize the City’s electric supply sources through Q2 FY 2021. Load was about
7.2% above forecast. Hydro generation from Calaveras and Western combined were 19.3% above forecast,
wind generation was 2.8% above forecast and solar generation was 1% below forecast. Net market purchases
through Q2 FY 2021 were roughly 1 GWh above forecasts.
Table 1: FY 2021 Electric Load and Generation Compared to Budget Projections, MWh (up to Q2)
Figure 5: FY 2021 Electric Load and Resource Balance, MWh (up to Q2)
Bu d get Actua l Vo l Va riance
Spot Ma r ket 7,748 8,797 1,050
forward Market 1,725 1,725 0
Solar 144,662 143,180 -1,483
Wind 54,139 55,681 1,541
Calaveras 27,335 25,654 -1 ,681
West ern 123,464 154,188 30,724
landfil l 52,182 51,596 -586
Total 411,255 440,820 29,565
-='(2021
_QOK
SOK
OK
-50K
Ju l Aug Se Oct
Vol Var iance%
13.5% 400K
0.0%
-1 .0 % 300K
2.8%
200K
-6 .2 %
24.9% '.!.00K
-1.1%
OK
7.2%
Nov ec
FY 202'.!. Reso urces
■ Spo Mark et
■ Fo rw a r d Ma r et
Sola r
Win.
■ Ca la ve ras
■ Western
■ La ndfi ll
Budget Actual
Reso u r ces
■ Spo-M arket
■ Fo rwa r d M a r et
So lla r
■Win
■ Ca l av e r as
■ Wester
■ Land il l
■ Pa lo Alt o oa d
Quarterly Update for First & Second Quarters of FY 2021
June 2021
8
Table 2 below shows CPAU’s supply cost by cost category through Q2 FY 2021. Supply costs were 7% below
budget, primarily due to lower market purchase costs of energy and capacity and higher market sales of energy.
Western costs were also lower due to reduction in Restoration Fund costs.
Table 2: FY 2021 Electric Utility Supply Cost Summary (up to Q2)
Electric Market Prices
Figure 6 shows monthly market prices. Electric market prices have been slightly higher than budgeted through
Q2 FY 2021.
Figure 6: FY 2021 Electric Market Prices (up to Q2)
~"'''' Actu al Var ia n ce Varia n ce
so.I
Description % -y 2021
Western 5,259 4,817 -442 -8%
Re e w a b le
Re n e w able 18,034 17,936 -97 -1% ■ EMA Pu r ch as.e s
EMA Sales -2,263 -2,263 0 0% 40K ■ NC PA Servi ces
EMA Pu r chases 4,038 2,416 -1,622 -40%
■ NC PA Pooling
■ Contr a Surplus Ene r g y Co st
Su rp lus Energy Re venue -1,281 -3,121 -1,840 144% 30K ■ TANC & Ca lav e r a s O&M
Loca l Capacity Sa les -3,339 -3,243 96 -3%
Tr a n s mis.s ion a n.d Ot h er Ene r g y
■ Lo cal Capacity Pu r e ases 20K
l ocal Capacity Purch ases 1,989 750 -1,239 -62% ■ De bt S ervic e
NCPA Servic es 1,171 1,220 so 4% ■ Surplu s En ergy Re ve nu e
10K EMA Sal es
NCPA Po o ling 972 1,621 648 67% Local Capa cit y Sa les
TA NC & Cala ve r as O&M 2,51.9 2,015 -503 -20% OK
■ Surplus En er g y Cost
■ RECSa les
Trans m is s ion a nd Othe r Energy 10,292 1.2,034 1,741 17%
Debt Servic e 3,981 3,981 0 0% -lOK
REC Sa les -1,588 -1,016 572 -36%
I Budge Tot al 39,784 37,147 -2,637 -7% A ctu a l
2021
so
-.E:
I
~ 3-0
..!.!
L
a_ ..,
.Y. 20 11:.
~
10
■ Bu get
al (CAISO L -d A gg r egatio Point}
0
j I Aug Sep Oct o v Dec
Quarterly Update for First & Second Quarters of FY 2021
June 2021
9
ii. Natural Gas
Gas Supply
Covid-19 Impact on Gas Usage
Figure 7 below shows the difference between gas usage in CY 2020, compared with CY 2018-19 average.
During the start of the Covid-19 in April 2020, gas usage was about 18% below CY 2018-19 average, but the
difference had reduced in Q3 CY 2020 and recovered to normal levels during the winter season of Q4 CY 2020.
Figure 7: CY 2020 Gas Usage, compared with CY 2018-19 Average
Gas Supply Retail Rates
The commodity portion of CPAU’s retail gas rates for all customers varies every month depending on the market
price of natural gas. Figure 8 below shows the actual commodity rates charged from FY 2013 through Q3 FY
2021. Gas commodity prices in FY 2021 have slightly increased compared with FY 2020.
Figure 8: CPAU’s Gas Commodity Rates—FY 2014 through Q3 FY 2021
These rates can also be found on the web at: http://www.cityofpaloalto.org/civicax/filebank/documents/30399.
Month
Gas ,2020
Gas , 2018-19' Ave r age
3M
The r s 2M
M
0~
'.>, '.>, ..c '.>, a, :,., .µ ... ... ... ... ... ... u .:: 113 C u, a, a, a, a,
113 113 ... u. 2c :::J 3 :::J _o _o _o .0
:::J :::J 113 -=.I -. ....... a, E 0 E E C ... 2: :::J ~ 113 .0 •::;[ a, a, a,
a, .µ 0 :;. u .....,
C. 0 a, LL a, z 0 Lfl
$0.80
$0.60
§
{ $0.40 -
$0.20
$0.00
FY 20::..4 FY 20 5 FY 2016 FY 2017 FY 2018 FY 20::..9 FY 2020 FY 202_
Quarterly Update for First & Second Quarters of FY 2021
June 2021
10
Muni Gas Prepay
On September 15, 2014, Council adopted Resolution #9451 authorizing the City’s participation in a natural gas
purchase from Municipal Gas Acquisition and Supply Corporation (MuniGas) for the City’s entire retail gas load
for a period of at least 10 years. The MuniGas transaction includes a mechanism for municipal utilities to
utilize their tax-exempt status to achieve a discount on the market price of gas. The program has cumulatively
reduced about $354K in commodity costs for customers through Q2 of FY 2021.
Value of CPAU’s Share of Redwood Pipeline Capacity
The Redwood pipeline allows the City to buy gas at the receipt point of Malin, Oregon and transport the gas to
“PG&E Citygate”, which is normally a higher priced receipt point. The City’s share of the Redwood pipeline was
a net benefit to the Gas Utility of $276K through Q2 FY 2021. This is the difference between the cumulative
value of Redwood capacity of $933K (the difference of the monthly index prices at the ends of the Redwood
pipeline in Malin, Oregon and PG&E Citygate) and the cumulative transportation cost of using the Redwood
pipeline of $657K.
Gas Budget and Portfolio Performance
Supply Volumes and Costs: Budget vs. Actual
Figure 9 compares actual natural gas supply volumes and costs with the FY 2021 budget. Natural gas
consumption through Q2 FY 2021 was 11.8% lower than the budget forecast, due to reduced consumption
from COVID-19 shelter in place orders. Costs were 10.1% lower than budget due to reduced demand.
Figure 9: FY 2020 Natural Gas Volumes and Costs – Budget vs. Actual (up to Q2)
Figure 10 below shows actual gas commodity prices at Malin, PG&E Citygate and Palo Alto Net Purchase Cost.
Natural Gas prices experienced slightly higher volatility during the winter months, due to high nation-wide
natural gas demand. Prices are anticipated to be higher than budget for the rest of the fiscal year.
30M
25M
,;-20M E
"'
1 1sM
E
:,
0
:, lOM 1
SM
OM
Cumulative Volumes (Therms)
=y 2021
■ Budget
■ Actual
Jul Aug Sep Oct Nov Dec an Fet. Mar Apr May Jun
12M
10M
SM
,.._
-e
t: GM
0 u
4M
2M
OM
Cumulative Costs ($)
:y 2021
■ Budget
Co mm odity
■ Local Tra ns
■ Bae t>one
Quarterly Update for First & Second Quarters of FY 2021
June 2021
11
Figure 10: FY 2020 Natural Gas Prices ($/MMBtu) -
Malin, Citygate and Palo Alto Net Purchase Costs (up to Q2)
iii. Water
Water Availability
Although there have been numerous stories in the media about severe drought in California particularly
regarding the State Water Project and Central Valley Project, conditions are not as severe in Tuolumne county,
Alameda county, San Mateo and Santa Clara counties where drought is considered moderate. Valley Water,
the groundwater manager in Santa Clara county is continuing to ask for 20% voluntary water use reductions
which has been in place since the last drought. The figure below shows a rough map of drought conditions across
the state.
Figure 11: California Drought Monitor
cy 2021
3
2
Ju l Aug Se p Oa: Nov Dec a
■ Pa lo Alto Net Pu rchase rice
■ Mal i n Actua l ■ Citygate Actual
Mal i n o recast
Mar
Intensity:
D None
D DOAl>normallyDry
D D1 Moderate Drougtt
D2 severe Drought
-D3 Extreme Drought
-D4 Exceptiona l Drought
Apr
The Drought Monitor fowses on broad-scale
cond1hons. Local condltJons may vary For more
nformat,on on 6te Drooght Mo nitor, go lo
httpdldroughtmon itor.unl.edu/About.a::px
Auth or:
Brad Pug h
CPC/NOAA
USDA -droughtmonitor.unl .edu
Citygate Fo r ecast
Ma y Ju
Quarterly Update for First & Second Quarters of FY 2021
June 2021
12
As of March 29, 2021, the Regional Water System total storage operated by the San Francisco Public Utilities
Commission (SFPUC) was 83% full. Normally Hetch Hetchy is 59% full by this date; it is slightly below average at
51%. Water Bank, a critical asset used to manage variable water availability, is normally nearly full this time of
year; it is also slightly below at 94%. The figures below show the snowpack at Hetch Hetchy and water usage
on the Peninsula which is higher than last year and the 5-year average. SFPUC will notify Palo Alto and other
customers by April 15th voluntary reductions in water usage will be implemented. It is possible but very unlikely
that the state will mandate water use reductions this year as occurred in the last drought.
Figure 12: Hetch Hetchy Snowpack
300
_250
C:
ctJ :a
Cl)
:!: 200
""" '-c. < 0 150
~ -.:.::
(.)
ct1 100
C.
~
0
C:
VJ 50
-2021 Snow Pillows Index
-Long Term Median * 2021 Snow Course Index
····•• 1983
••••• 2015
····••2020
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Quarterly Update for First & Second Quarters of FY 2021
June 2021
13
Figure 13: SFPUC Water Deliveries
Water Supply
Water supply through Q2 FY 2021 was slightly lower compared to FY 2020, due to meter read issues at two of
the SFPUC meter turnouts. The figure below shows the monthly water supply purchases in FY 2021 through
Q2, compared with FY 2018, FY 2019 and FY 2020.
Figure 14: Potable Water Use
s ,:,
~ ..
I
75
70
65
60
55
50
45
40
35
30
25
20
15
-Awg . of CY 20 16-202 0 Oel ive ri es
-+-20 13 M e tH De liverie-s
~2020 M ei:e,r De li>J erie s
...,_202 1 M ete,r De live rie s
Monthly Volumes (CCF)
J u l Aug Sep
6OO K
SOO K
~ 4OOK
u
~ .,
E 3OO K
Cl
0 ::,
ZOO K
10O K
OK
SF PUC Reg ·onal Water System -Meter Deliveri es
Peninsula Customers
Source : SFPUC Reg ional Water System Co unty Me ters
Oct N ov Dec Jan ... Feb M ar
San Fra n cisco
Water Power Sewer
Apr M ay Jun
Yea r
FY 2018
■ FY 2019
■ FY 2020
■ FY 2021
Quarterly Update for First & Second Quarters of FY 2021
June 2021
14
Covid-19 Impact on Water Usage
Figure 15 below shows the difference between water usage in CY 2020, compared with CY 2018-19 average.
Covid-19 had no impact on CPAU’s system-wide water usage; although there was reduced commercial use, it
was offset by increased residential use.
Figure 15: CY 2020 Water Usage, compared with CY 2018-19 Average
Water Budget and Portfolio Performance
Supply Volumes and Costs: Budget vs. Actual
The figure below compares actual water supply volumes and costs to the FY 2021 budget projections. Actual
water supply volumes were 4.5% below forecast and water supply costs were 4.1% lower than budget. Lower
supply volumes and costs were likely due to meter read mentioned above.
Figure 16: FY 2021 Water Volumes and Costs – Budget vs. Actual (Up to Q2)
Mont h
600K
400K
CCF
ZOOK
OK
;;.. ;;.. .r: >, ill >, .µ ..... ..... u ·;:: Ill C "' Ill Ill ..... CL ~ :::J :::J :::J
::J :::J Ill -:1 2. -, ...... !JI
C ..... ~ :::J
Ill .n <:l: -, ill
LL
Cumulative Volumes {CCF)
FY 202:'..
4M
iL' 3M u
~ ■ Actual
" E
::; ■ Budget
0 2M
>
1M
OM
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
..... .....
ill ill
.n .0
E D
-H ill .µ 0 CL
ill
LFl
.....
ill
.0
E
ill
~~
D z
.....
ill
.0
E
ill u
Ill a
■ W ater, 202 0
■W ate r, 2018-_9Av e rsg e
Cumu lative Costs($)
~ e
t:
20M
15M
8 lOM
SM
OM
FY 202:'..
Actual
■ Budget
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Quarterly Update for First & Second Quarters of FY 2021
June 2021
15
iv. Fiber Optics
Commercial Dark Fiber Service:
The total number of commercial dark fiber customers at the end of FY 2021 Q2 was 93 accounts (92 commercial
accounts and 1 City account). The total number of active dark fiber service connections serving commercial and
City customers is 191 (some customers have multiple connections). Commercial customers generate
approximately 44.87% of the dark fiber license revenues. The remaining 55.13% of licensing revenues is from
City departments.
Phased Fiber Optics Expansion:
On September 10, 2019 the City issued an RFP to solicit one or more qualified consultant(s) to begin a multi-
phase fiber network expansion to support a communications platform for Advanced Metering Infrastructure
(AMI), Supervisory Control and Data Acquisition (SCADA) system, and wireless communication for City
Operations. This proposed approach would also become a springboard for Fiber to the Home (FTTH) because
the City will be adding new telecommunications infrastructure which may reduce the incremental cost to extend
fiber to the home. On June 1, 2020 a contract was awarded to Magellan Advisors as project consultants (Staff
Report #11368);
The Magellan contract was amended on October 5, 2020 to accelerate some tasks in phase 3 to develop the
fiber-to-the-premises (FTTP) business case (Staff Report #11580). The current recommendation is to combine
Phase 2 and Phase 4 of the Magellan contract to provide detailed engineering design of the City’s fiber backbone
and fiber-to-the-home (FTTH).
The Fiber Expansion initiative is divided into four phases in the RFP scope of work. As phases are completed,
staff will be seeking Council’s approval of the completed tasks and funding authorization for subsequent phases
(2 and 4).
Phase 1 High-Level Design and Cost Estimate for AMI, SCADA, and Wireless Communications for City Field Staff
and Other City Services. The backbone design, and its subsequent implementation is the critical element of the
Fiber network since all technologies and services are enabled by, and depend upon, the backbone. City
departments, services and community needs are considered in the high-level design;
Phase 3a FTTH Business Case and high-level design for a citywide network. This expands on the fiber network
for AMI, SCADA and wireless communication backbone and includes an assessment of possible alternatives for
FTTH. The City seeks to be all-inclusive in its study of various broadband solutions. Wireless, Fiber, microwave
and other technologies are under review;
Phase 3b Development of a community engagement platform including a broadband survey for residents and
businesses, exploration of public-private partnership opportunities and models for FTTH, and the evaluation of
federal and state grant funding options for broadband infrastructure;
Phase 2 seeks a detailed engineering design and cost estimate for fiber expansion to support AMI, SCADA, and
wireless communication for City field staff and other City services;
Quarterly Update for First & Second Quarters of FY 2021
June 2021
16
Phase 4 seeks a detailed engineering design, cost estimate and a phased deployment approach for FTTH.
Staff presented the FTTH business case to the UAC on April 21, 2021. Magellan has completed the high-level
design of the FTTH network and a broadband market assessment by small neighborhoods. Magellan has also
developed cost and revenue models and different deployment scenarios ranging in costs from $22 - $28 million
for the fiber backbone expansion and an additional $86 - $98 million for FTTH, depending on whether there is a
public-private partnership and on the number of premises passed during the initial deployment.
v. Efficiency Programs
Saving Energy and Water While Sheltering in Place – Staff is committed to finding additional ways to innovate
and expand energy and water related programs in the shelter in place environment. Recognizing that
unprecedented numbers of people are working and studying from home and will likely experience increased
costs on their utility bills, the City have been sending e-mails and running a social media campaign to share tips
and tricks for saving energy and water and making the home environment more comfortable. View these tips
online at https://www.cityofpaloalto.org/Departments/Utilities/Residential/Home-Efficiency-Genie/Efficiency-
Tips and follow the City in social media with the hashtags #WePowerOn #PaloAltoProud and #PublicPower.
Energy & Water Efficiency Workshops
Many public events and workshops were canceled this spring in response to the COVID-19 pandemic. The City’s
partners at the Bay Area Water Supply and Conservation Agency (BAWSCA) are offering virtual landscape
workshops so residents can learn how to save water and improve the sustainability of your landscape from the
comfort of home. Palo Alto residents and businesses can take advantage of landscaping programs through the
City’s cost-sharing partnership with Valley Water at https://www.valleywater.org/saving-water/rebates-surveys
The Home Efficiency Genie program will be continuing with a webinar series, started in the summer of 2020,
with an informative evening on May 4 2021 covering the many aspects of preparing a home for spring and
summer conditions by focusing on efficiency, comfort and health. Highlights include maintaining a comfortable
and healthy home by improving the building envelope with insulation and air sealing. With impending fire
seasons, the webinar will emphasize best practices for air sealing and adequate filtration to reduce the health
risks associated with smoky outdoor conditions. With warmer temperatures approaching and more residents
interested in adding air conditioning, an emphasis will be on the benefit of converting a gas fueled furnace to
an efficient all electric heat pump that will add cooling to their home. With a year of lower annual rainfall, the
City will provide guidance on water saving measures, especially with promoting the lawn replacement rebates
offered through its partner Valley Water.
Modifications to Utilities Programs
In accordance with the County order lifting restrictions on construction activities, some energy efficiency
projects are resuming. Examples of allowed activities include commercial energy efficiency projects, solar
installations, EV charger installations, and other work that does not require staff or consultant visits inside
occupied residential dwellings. The County’s construction protocols must be followed.
• Large projects in spaces over 20,000 feet of floor space require one set of protocols be followed:
https://www.sccgov.org/sites/covid19/Documents/appendix-b-2-lg-project-04-29-2020.pdf
Quarterly Update for First & Second Quarters of FY 2021
June 2021
17
• Small project in spaces less than 20,000 square feet require a different set of
protocols: https://www.sccgov.org/sites/covid19/Documents/appendix-b-1-sm-project-04-29-
2020.pdf
Although all visits inside occupied residential dwellings are temporarily on hold, many Utilities programs have
been modified to continue to provide value to the community. The Residential Energy Assistance Program
(REAP) program has been unable to provide the usual in-home visits to offer direct install efficiency measures
to REAP program participants since March of 2020 due to health and safety concerns associated with COVID-19.
In order to provide no contact service to REAP customers, the City has arranged with its Home Efficiency Genie
program provider CLEAResult to offer free over the phone efficiency advice, free self-install measures and free
Genie virtual in-home visits. The Genie virtual assessment offers participants an innovative, smart-phone-based
engagement platform with the Genie technician to virtually walk participants through their home offering live,
interactive efficiency advice. Following the assessment, they are offered free efficiency measures like LED light
bulbs, smart power strips and water saving devices delivered to their home. These virtual Genie services are
initially being offered to approximately 100 REAP participants who have been unable to take advantage of the
REAP in-home services since March 2020.
Events and Workshops
For updates on future events and workshops, please visit cityofpaloalto.org/workshops.
vi. Communications Highlights
This section summarizes communications highlights, updates on major campaigns and noteworthy events.
Copies of ads and bill inserts are available online at cityofpaloalto.org/UTLbillinsert
Current Communication and Outreach Activities
Communicating Through Crises
During COVID-19, heatwaves and wildfires, CPAU and other publicly owned electric utilities bolstered public
outreach to assist customers during difficult times. California Municipal Utilities Association (CMUA) Water &
Power Magazine published an article in the Winter 2021 Edition highlighting this enhanced communication
effort. In a survey conducted last summer in the midst of multiple once-in-a generation crises, customers of
California’s publicly owned electric utilities gave them high marks for the quality and relevance of their
communications. Respondents also said those communications conveyed sincere empathy for those struggling
because of the pandemic.
In many dimensions, communications from California’s publicly owned electric utilities got higher marks from
customers than those served by the state’s investor-owned utilities. POUs solidified their position among
customers by communicating important material, by serving customers despite many staffing and other
challenges, and by showing empathy. This was not an accident. Many publicly owned electric utilities quickly
adapted their communications strategies to deal with the confluence of the pandemic, record-setting heat, the
looming threat of brownouts and the constant risk of devastating wildfires. Read more here:
https://www.cityofpaloalto.org/News-Articles/Utilities/Communicating-Through-Crises
Quarterly Update for First & Second Quarters of FY 2021
June 2021
18
The Switch is On
CPAU is a member of the Building Decarbonization Coalition and helping fund a new
Bay Area wide campaign about home electrification. The Switch Is On campaign offers information and
resources to help residents who want to convert appliances and home energy use from natural gas to electricity.
Palo Alto residents can take advantage of rebates from CPAU for upgrading appliances, such as heat pump water
heaters. Visit cityofpaloalto.org/electrification for an overview about
electrification and switchison.org to check out the resources available to residents in all communities.
Water Conservation Showcase
CPAU is a proud outreach partner of the 18th annual Water Conservation Showcase—a free virtual conference
hosted each Tuesday in April, 2021. The showcase features dozens of sessions and speakers discussing major
water issues of the day. Attendees will learn about scalable strategies and solutions to conserve one of Earth's
most precious resources.
Drive-Clean-a-Thon
Join us for an electric vehicle and electric bike Drive-Clean-a-Thon on Saturday, April 24 from 4-5pm. This event
is organized by Drive Clean Bay Area with support from several climate-focused organizations, including CPAU.
EV and e-bike experts will share unbiased expertise about how driving and biking electric can help save time,
money, and the planet. This webinar is free. Sign up at cityofpaloalto.org/workshops
Valley Water Advanced Purification Treatment Plant Scoping Meeting
On March 29, Valley Water hosted a public scoping meeting to discuss potential siting options for a new
advanced purified water treatment plant. One location option is the former Los Altos Treatment plant site,
located on San Antonio Road in Palo Alto. At this meeting, community members were presented with the
opportunity to learn about the project, the planning process, and provide feedback related to environmental
impacts that will be analyzed as part of the California Environmental Quality Act (CEQA). We will continue to
share information with the UAC about the “Purified Water Project” as plans evolve.
Landscape Design 101 Workshop
On March 23, CPAU hosted a free virtual workshop about how to design and create a sustainable, low-water
use landscape. This event was coordinated in partnership with the Bay Area Water Supply and Conservation
Agency (BAWSCA) and Valley Water. Attendees learned about the variety of free efficiency services and rebates
available from CPAU and our partners in water conservation. More than 120 people attended the workshop,
which is one of the best turnouts we have seen for an event of this type.
Upcoming events
On May 4 and May 6 CPAU offers landscape sustainability and Home Efficiency Genie workshops. Details and
registration are available at cityofpaloalto.org/workshops
Quarterly Update for First & Second Quarters of FY 2021
June 2021
19
vii. Innovation and Pilot Programs
Program for Emerging Technologies
CPAU’s Program for Emerging Technologies, or PET, (www.cityofpaloalto.org/UTLInnovation) provides the
opportunity for local businesses and organizations to submit proposals for innovative and impactful products to
CPAU for review as a prospective partner. The goal is to find and nurture creative products and services that will
improve customer value, save natural resources, or reduce carbon emissions. From the program’s inception in
June 2012 through the third quarter of FY 2021, the program has received a total of 94 applications. Table 3
below summarizes the status of all applications through the third quarter of FY 2021.
So far this year, none of the applicants have reached the threshold of value, quality, and relevance to be
considered good fits for a pilot project. CPAU is currently in discussions with some applicants about revising
their projects and is also evaluating potential regional collaborations with promising early stage companies. In
order to provide more clarity for applicants and better focus the applications on CPAU’s priorities, staff is also
revising the program’s guidelines to highlight what makes a compelling project pitch for CPAU. These updated
program priorities and guidelines were released this year and presented to the UAC. Pending other priorities
and sufficient resources, staff will work with local universities and accelerators to solicit high-quality applications
closely aligned with CPAU’s highest priorities in calendar year 2021.
Academic Collaborations
This past six months, staff completed two academic collaborations which were started in FY 2020. One
collaboration was with a Stanford researcher modeling hourly all-electric load shapes for single family homes
and the implications for the distribution systems, transmission system and electricity generation in California.
The other collaboration was with a San Jose State researcher modeling the impacts of utility scale battery
systems on the emissions of the California electricity wholesale market.
Completed Projects
In FY 2020 we submitted three letters of support for exceptionally promising very early-stage technologies for
research grants and accelerators, and completed the previously mentioned academic collaborations.
Table 3: Status to date of all applications to the Program for Emerging Technologies
Deadline Total Received Under Review Declined/Closed Active Completed
FY 2013 13 0 11 0 2
FY 2014 15 0 11 0 4
FY 2015 15 0 11 0 3
FY 2016 14 0 9 0 5
FY 2017 10 0 7 0 3
FY 2018 10 0 9 0 1
FY 2019 9 0 5 0 4
FY 2020 8 0 3 0 5
FY 2021 0 0 0 0 0
TOTAL 94 0 66 0 27
Quarterly Update for First & Second Quarters of FY 2021
June 2021
20
viii. Sustainability
Electrification
Heat Pump Water Heater Program
The heat pump water heater program (HPWH) has experienced an increase in completed projects in 2020
compared to 2019. There were 7 completed HPWH projects in 2019 and in contrast, there were 24 projects
completed in 2020. The increase may be due to several factors, one being that COVID-19 shelter in place orders
have kept residents at home more and this may have increased awareness of their home’s water heater
condition. There has also been an increased number of utility bill inserts and print advertising promoting the
HPWH rebate, highlighting the need to be proactive in replacing a water heater before it fails. The HPWH
continues to be promoted in our electrification and Home Efficiency Genie webinars. We expect this upward
trend to continue into 2021 with 9 HPWH applicants as of March 31, 2021. Staff expects to explore how to revise
this program to accelerate participation as part of the S/CAP update process.
Multifamily Gas Furnace to Heat Pump Retrofit Pilot
In 2018, CPAU was awarded a $300,000 grant by the Bay Area Air Quality Management District to implement a
pilot to help retrofit existing in-unit gas wall furnaces with high efficiency heat pump systems at up to 3
affordable multifamily properties. The goal of the pilot is to identify the retrofit barriers, the energy savings and
GHG reductions from such retrofits. As of September 2020, MidPen Housing has committed to retrofitting a
minimum of 20 units at Page Mill Court. MidPen has selected a contractor and signed a contract with ASG
Builders for the furnace replacement work through a competitive bid process. Due to COVID-19 shelter in place
orders, the installation work had been deferred. MidPen has selected a contractor through a competitive
solicitation process; construction is tentatively scheduled to begin in May 2021.
The Switch is On Campaign
CPAU has been collaborating with the Building Decarbonization Coalition and other utilities/CCAs on a consumer
outreach campaign to support home electrification. The campaign is aptly named “The Switch is On.” CPAU
officially launched a local campaign in mid-November. This will include digital ads on popular online platforms
such as Google and Facebook and will leverage the city’s social media channels and e-newsletters. The digital
ads will direct traffic to the website “switchison.org,” which provides comprehensive information on how to
make the switch from natural gas to electric appliances for water heating, space heating/cooling, cooking, as
well as barbeques, fireplaces and pool heating. The campaign will be actively promoted by Community Choice
Aggregators (CCAs) in Northern California and will expand to the Southern California in spring 2021.
Electrification Education and Outreach
In the effort to expand building electrification education, CPAU collaborated with NCPA (Northern California
Power Agency) and 15 other member agencies to issue an RFP for electrification education including workshops,
online classes, electrification expo’s, virtual electrification audits and youth education. Proposals were
submitted on September 10, 2020 and interviews and evaluations were conducted in October. Ten proposals
were submitted, and 4 vendors have been selected. Contracting is expected to be completed by the end of
CY2020.
Quarterly Update for First & Second Quarters of FY 2021
June 2021
21
Cool Blocks Electrification Initiative
CPAU engaged the Empowerment Institute to conduct 3 focus groups comprised of existing Cool Block leaders
and members to understand the perceived barriers to electrification and to gauge levels of interest in different
program areas for homeowners and renters. The focus groups were conducted in September 2020, Based on
the focus group findings, the Empowerment Institute recommended that CPAU align the all-electric home
message with the City’s S/CAP goals, focus on the health and safety benefits of an all-electric home, provide
tools and resources to residents to begin the home electrification journey, increase communications about the
available services, and leverage resident support and expertise. The Empowerment Institute has also updated
the Cool Block program curriculum to include home electrification actions.
Electric Vehicles
LCFS Low Carbon Fuel Standard Program
LCFS base credits are allocated by CARB to CPAU, based on the number EVs registered in Palo Alto, the
estimated miles travelled and the difference in carbon intensity of transportation fuels and electricity.
Additional credits were also allocated for fork-lifts but have now been discontinued. Credits are also allocated
based on CNG dispensed and electricity dispensed at city owned EV chargers. Due to the pandemic, the credits
earned declined in CY Q2 2020 and are slowly recovering.
Figure 17: History of LCFS Credits Earned Per Quarter (Up to Q4 CY2020)
LCFS Credits Earned Per Quarter By Sector
3,500
-Credits Based on Est i mated EVsRegistered i n Pa bAlto
3,000
-e r edits Based on Electr icity Dipen9:CI f rom City ow ned EVSEs
2,5 00
-Credits Based on Electr icity Di pen9:CI f rom City Electr ic For kl" s
-c redits Based on CNG Dispensed at MSC
2,000 -Total Crecf sGai ned
1,5 00
1,000
Quarterly Update for First & Second Quarters of FY 2021
June 2021
22
Table 4: Notable EV Charger Projects Completed in CY2020
EV Charger Rebate Program
CPAU rebates up to $8,000 per EV charging port for a maximum of 10 ports, for multifamily and non-profit
customers. CPAU also offers Residential Transformer Upgrade (Utility Service Capacity Fee) rebates of up to
$10,000 as well as Commercial Transformer Upgrade rebates up to $100,000 when a minimum of 10
connectors or fully wired EVSE-ready outlets are installed. All incentives are funded through LCFS credits.
These incentives continue to help drive interest to the EV Technical Assistance Program (EVTAP). Staff is also
learning that to accommodate new EV chargers, about half of the transformers serving the non-profits and
multifamily properties participating in TAP may require a new transformer. Program statistics as of the end of
Q2 FY2021:
• Number of applications: 42
• Approved number of rebates: 13
• Total amount of rebates approved: $346,000
• Number of new ports installed: 75
EV Solutions and Technical Assistance Program
The EV Technical Assistance Program (EVTAP) was launched in October 2019 with the goal of assisting
customers such as multifamily properties and non-profits in taking advantage of State and Local incentives to
install EV charging infrastructure and to help navigate the complex technical process of installing charging
infrastructure. Program interest and new enrollments slowed down significantly due to COVID but interest is
gradually picking. In Q1, the EVTAP program was also expanded to Small to Medium Sized Businesses (SMB). In
coordination with the City Manager’s Office, a call campaign was conducted from November through December
to SMB customers. Only 10 of the 132 call recipients were interested in EV chargers, but almost all were
extremely appreciative of information about the City and COVID response efforts for small medium businesses.
Program statistics as of the end of Q2 FY2021:
• TAP Interested Sites: 88
Site I Level 1 level2 t.. I Tota[ Number of DC Fast Cuarger New Ports
El I e n Fletcher
0 1 8 1 1 9
M i dd le Sc hoo l
Gunn Hig h Sch ool 0 14-1 1 5
Gree n e M i d d le
Scho o l
0 14-1 1 5
SAP 0 120 4 1 2 4
Bryan t Street 0 6 0 6
Ga rage
Co w per /Web st ,er
0 14-0 14
Ga rage
-------
186 , I 193
Quarterly Update for First & Second Quarters of FY 2021
June 2021
23
• Number of Technical Site Visits Complete: 24
• Number of Final Reports Presented: 28
• Proposed total number of new EV Charging Ports: 226 @ 16 Multifamily Properties, 9 Places of
Worship and 1 Non-Profit
• Number of Permit Applications Submitted: 2 @ 2 Multifamily sites for 6 new EV Charging Ports
• Number of new ports installed: 0
CALeVIP
The California Energy Commission partnered with five local energy agencies to launch the Peninsula-Silicon
Valley Project, an initiative of the California Electric Vehicle Infrastructure Project (CALeVIP), which aims to
develop and implement regional incentives to support statewide adoption of EVs. CPAU has committed $1M of
Low Carbon Fuel Standard (LCFS) funds, to receive $1M in grant funding. These funds became available to all
Palo Alto commercial customers to install Level 2 or Level 3 fast chargers over the next 2 years. The program
was successfully launched on December 16, 2020. The City of Palo Alto also applied for CALeVIP funds to install
DC Fast Chargers at 2 downtown public parking garages. The hope is that increased EV charging infrastructure
in the downtown area will help not only visitors and commuters, but also the 727 low-income households (10
low-income multifamily properties) living within walking distance to University Ave. Over the coming months,
applicants will be notified whether they successfully reserved funds.
Program statistics as of the end of Q2 FY2021:
Clean Fuel Rewards Program
■•;ufl(,t,j ■
__ J ilJ0,000 _
1,.
$1
Quarterly Update for First & Second Quarters of FY 2021
June 2021
24
The Clean Fuel Rewards point-of-sale $1,500 rebate launched on November 17, 2020 at participating
dealerships. All Palo Alto residents purchasing electric vehicles are eligible for this discount. The City of Palo
Alto Utilities has contributed Low Carbon Fuel Standard (LCFS) funds towards this new statewide initiative,
which was approved by City Council in May 2020. CPAU expects to contribute $300-$400K annually for the
next 10 years.
Curbside Charging Pilot Program
The goal of this pilot program is to install publicly available curbside chargers at 10 pilot sites with electricity
supplied by resident homes. In Q2 2020, the City Manager approved EV charger rebates to be extended to
curbside charger locations. Public Works and Planning are working with residents interested to do such
curbside projects in front of their homes by issuing encroachment permits and Utilities’ role is to provide the
rebates to cover associated customer costs. The non-profit Adopt-A-Charger is facilitating these projects.
Program statistics as of the end of Q2 FY2021:
• One permit application has been submitted for a 2-port curbside charger
Electric Vehicle Education and Outreach
In Fall 2020, CPAU collaborated with NCPA (Northern California Power Agency) and 15 other member agencies
to issue an RFP for EV and Electrification education including workshops, online classes, virtual and in-person
ride and drives, expos and youth education. Eight vendors have been selected with five offering EV programs
Contracting is expected to be completed by the end of Q3 FY2021.
Vendors selected for EV education:
• Charge Across Town
• D+R International
• Electric Car Insider
• Plug-In America
• Acterra
ix. Legislative and Regulatory Issues
State legislation
CPAU is currently tracking over 45 bills. Some of the bills are tracked because they would add reporting
requirements or modify our operations; some because they could change the state’s energy policy or are of
interest given the City’s priorities. Key bills to note are:
AB 100 (Holden) Drinking water: pipes and fittings: lead content. This bill limits the amount of lead leaching
from faucets and fixtures to no more than 1 microgram, which is five times lower than the current industry
standard.
AB 339 (Lee) Local government: open and public meetings. Requires all “Brown Act” meetings (such as the UAC
meeting) to include an opportunity for members of the public to attend via a call-in or video conference. All
meetings must also include an in-person comment opportunity, unless the meeting takes place during a
declared emergency. Also requires interpretation services as requested, with a system to process requests for
Quarterly Update for First & Second Quarters of FY 2021
June 2021
25
interpretation services and the availability of instructions on joining the meeting to all non-English-speaking
persons upon request. Instructions must be published in the 2 most spoken languages, other than English, within
the local agency’s jurisdiction.
AB 525 (Chiu) Energy: offshore wind generation. Requires the CEC, on or before March 1, 2022, to evaluate and
quantify the maximum feasible capacity of offshore wind to achieve reliability, ratepayer, employment, and
decarbonization benefits and to establish offshore wind planning goals for 2030 and 2045.
AB 641 (Holden) Transportation electrification: local publicly owned electric utilities. Requires electric POUs to
develop and adopt a transportation electrification plan, individually or in collaboration with other POUs, with
certain elements to support the level of EV adoption required for the state to meet certain goals.
AB 970 (McCarty) Planning and zoning: electric vehicle charging stations: permit application: approval. Provides
that a residential charging station permit is approved within 15 days of submittal if certain criteria are met,
including that the applicant has already obtained all required approvals from a POU.
AB 1434 (Friedman) Urban water use objectives: indoor residential water use. Starting in 2023, this bill would
incrementally lower the standard for indoor residential water use to 40 gallons per capita daily by January 1,
2030. The current standard has us at 50 gallons by 2030, or whatever number DWR studies recommend. Also
mandates conduct necessary studies and investigations and may recommend a standard for indoor residential
water use that more appropriately reflects best practices than the standard described in the bill.
AB 1500 (Garcia, Eduardo) Safe Drinking Water, Wildfire Prevention, Drought Preparation, Flood Protection,
Extreme Heat Mitigation, and Workforce Development Bond Act of 2022. If approved by voters, would provide
bond funding to finance projects for safe drinking water, wildfire prevention, drought preparation, flood
protection, extreme heat mitigation, and workforce development programs.
SB 45 (Portantino) Wildfire Prevention, Safe Drinking Water, Drought Preparation, and Flood Protection Bond
Act of 2022. Enacts the Wildfire Prevention, Safe Drinking Water, Drought Preparation, and Flood Protection
Bond Act of 2022, which, if approved by the voters, would authorize bonds for $5.6 billion to finance projects
for a wildfire prevention, safe drinking water, drought preparation, and flood protection program.
SB 223 (Dodd) Discontinuation of residential water service. This bill seeks to expand provisions regarding
prohibiting discontinuation of residential water service due to nonpayment. These provisions include expanding
the conditions that must be met to discontinue water service (such as expanding the duration of delinquency)
and requiring the consideration of arrearage management plans.
SB 323 (Caballero) Local government: water or sewer service: legal actions. Creates a 120 day statute of
limitations for legal challenges to water and sewer service charges that are adopted after January 1, 2022.
SB 351 (Caballero) Water Innovation Act of 2021. Sponsored by CMUA, this bill would create the Office of Water
Innovation for the furtherance of new technologies and innovative approaches in the water sector. By December
31, 2023,the Office shall take specified measures to advance innovation in the water sector. The bill would
further create the Water Innovation Fund for the furtherance of water innovation.
Quarterly Update for First & Second Quarters of FY 2021
June 2021
26
SB 378 (Gonzalez) Local government: broadband infrastructure development project permit processing:
microtrenching permit processing ordinance. Authorizes a fiber provider to determine the method of installing
fiber in a city, including microtrenching.
SB 427 (Eggman) Water theft: enhanced penalties. Authorizes a local government to make any violation of a
local ordinance regarding water theft subject to an administrative fine in excess of current legal limits.
SB 617 (Wiener D) Residential solar energy systems: permitting. Requires every city and county to implement
an online, automated permitting platform that verifies code compliance and instantaneously issues permits for
solar energy systems no larger than 38.4 kW and an energy storage system paired with a solar energy system
that is no larger than 38.4 kW. Also requires a city or county to amend a certain ordinance to authorize a
residential solar energy system and an energy storage system to use the online, automated permitting platform.
CPAU staff continues to work closely with CMUA and NCPA on legislative issues. This work includes participating
on legislative committees, standing work groups, and ad hoc work groups.
State regulatory proceedings
Below, we note the issues CPAU have tracked or engaged in with various agencies during the last quarter,
primarily through our work with CMUA and NCPA.
Energy Commission
Load management standards and the SB 100 joint agencies report: Achieving 100 Percent Clean Electricity in
California: An Initial Assessment
Public Utilities Commission
Proceedings related to PSPS and physical security
Wildfire Safety Advisory Board – currently under the CPUC’s jurisdiction
Template for future Wildfire Mitigation Plans and Mitigation plans generally
State Water Resources Control Board
Indoor and outdoor water use; drought and water shortage; water loss control standards. CPAU also
participated in a survey regarding utility debt due to the pandemic.
x. Utility Financial Summary
This section describes the unaudited actual financial results for FY 2021 for all Utilities funds. The Council-
adopted long-term Financial Plans for the Electric, Gas, and Water Funds was updated for FY 2021 during the
budget review process. The Wastewater Collection Fund Financial Forecast was updated for FY 2021 and
presented to the Finance Committee.
Quarterly Update for First & Second Quarters of FY 2021
June 2021
27
Electric Utility Overview
Sales for the Electric Utility in FY 2021 are projected to be 3.9% higher than forecasted in the FY 2021 Financial
Plan. Revenues are also projected to increase by $7.4 million or 4.5% higher than forecasted; this is due to higher
sales as well as increasing EMA/Market sales (sales of surplus energy) as well as REC sales revenue. Staff projects
expenses to be $9.8 million higher than forecasted in the FY 2021 Financial Plan. This is due in part to higher
administration cost projections based on higher FY 2020 actuals (about $1 million), and new budget funding for
the City’s Low Carbon Fuel Standard (LCFS) budget which did not show in the FY 2021 adopted budget. However,
LCFS spending is funded by LCFS revenues rather than ratepayer funding or other funding sources. The impact
to reserves in FY 2021 is due to the segregation of these funds into a separate LCFS reserve. In addition, electric
supply purchase costs are projected to increase by about $5.4 million, mainly due to poor projected hydro
conditions.
The Electric Supply and Distribution Reserves were within guideline ranges at the beginning of FY 2021 and are
projected to be within guideline ranges at year end FY 2021. In addition, due to surplus energy revenues seen
in FY 2019 and FY 2020, staff continued repayment of a short term $10 million loan from the Electric Special
Projects (ESP) reserve done in FY 2018, and provided additional funds to the Hydro Stabilization Reserve for
future dry-year conditions and the Capital Reserve for future capital improvement needs.
The Electric Utility CIP Reappropriation and Commitment Reserves totaled a projected $28.6 million at the end
of Q2 FY 2021.
Gas Utility Overview
Sales for the Gas Utility in FY 2021 are projected to be 7.1% lower than forecasted in the FY 2021 Financial Plan.
However, staff projects a decrease of only 2.2% in revenues, mainly due to increased projected market costs for
natural gas itself, but also increased cost projections for transmission and Cap and trade related costs. These
charges are pass-through in nature, so variations from budget will not have dramatic reserve effects. On the
expense side, while commodity costs are increasing, operational cost estimates have been revised downward
from the original FY 2021 forecast, effectively netting out much of the cost increase impact.
The Gas Operations Reserve was within the reserve guideline levels at the beginning of FY 2021 and is projected
to be within the guideline levels at year end FY 2021. The Gas Utility CIP Re-appropriation and Commitment
Reserves totaled $9.4 million at the end of Q2 FY 2021.
Water Utility Overview
Staff projects sales for the Water Utility in FY 2021 to be 4.8% higher than forecasted in the FY 2021 Financial
Plan. Similarly, sales revenue is expected to be 4.2% higher than forecasted in the FY 2021 Financial Plan. This is
in part because the sales decreases forecasted in the FY 2021 Financial Plan, which were made in light of the
COVID-19 pandemic and related economic impacts have not materialized and additionally because of continued
dry weather conditions. Staff projects overall FY 2021 sales revenue to be only 0.9% higher than in the FY 2021
Financial Plan due to other revenue, including interest income, being lower. Expenses were 0.3% lower than
anticipated in the Financial Plan; this does not reflect changes in the timing of CIP expenditures. In FY 2020 there
was a deferral of water utility capital spending due to pursuing lower pricing for the Corte Madera tank
replacement as well as removing a portion of Water Main Replacement 27 from the original scope. Changes in
Quarterly Update for First & Second Quarters of FY 2021
June 2021
28
deferred CIP spending for FY 2021 will be reflected in the CIP Reserve at year end. This is because the Water
Utility funds CIP through an annual transfer from the Operations Reserve to the CIP Reserve.
The Water Operations Reserve was above the reserve guideline levels at the beginning of FY 2021 and Table 5
below illustrates the reserve remaining above the maximum at year end FY 2021. However, Council approved
up to an $8 million transfer from the Operations Reserve to the CIP Reserve FY 2021 to fund ongoing CIP work
and staff is requesting authorization for up to an additional $13.24 million in transfers from the Operations
Reserve to the CIP Reserve in FY 2022 to fund ongoing main replacements (WMR 28 is planned in FY 2022) as
well as one-time seismic reservoir upgrades (one upgrade is ongoing and a second is planned for FY 2023). These
transfers together with expected revenues and expenses are projected to bring the Operations Reserve to
approximately target levels by the end of FY 2023. The need for the transfers will be re-evaluated at the end of
FY 2021 when the reserve balances are known.
Approximately $11 million in projects budgeted in FY 2020 or earlier will be re-appropriated to FY 2021. The
largest being seismic water system upgrades, estimated at $5 million. The Water Utility CIP Reappropriation and
Commitment Reserves are projected to total $10.2 million at the end of Q2 FY 2021.
Wastewater Collection Utility Overview
Staff projects Wastewater revenues for FY 2021 to be 4.7% lower than forecasted in the FY 2021 Financial
Forecast. This is in part due to expected reductions in non-residential sewer usage due to the impacts of the
COVID-19 pandemic and also because of updated reduced projections for other revenue from connection and
capacity fees and interest. Staff projects expenses to be 17.6% lower than projected in the FY 2021 Financial
Forecast. This is in part due to treatment cost projection reductions of $1.2 million as well as deferrals of CIP
spending. However, Sewer System Replacement 30 is planned for FY 2022 with an estimated cost of $4.1 million.
Any surplus from FY 2021 and prior years will be used to fund the deficit for sewer replacement in FY 2022.
Additionally, as part of the FY 2022 Financial Plan, staff is requesting to implement an annual capital program
contribution from the Operations Reserve to the CIP Reserve beginning in FY 2022 as well as a one-time transfer
of $2.2 million in FY 2021. Staff expects these changes to minimize Operations Reserve fluctuations due to the
timing of Wastewater Collection CIP.
The Wastewater Collection Utility CIP Reappropriation and Commitment Reserves totaled $4.8 million at the
end of FY 2020. In addition to these previously budgeted funds, the FY 2021 Financial Plan estimated the
additional CIP funding needed for FY 2021 to be $4.6 million while the current projection is for only $1.2 million.
The Wastewater Collection Operations Reserve was within the guideline range at the beginning of FY 2021 and
staff projects it will remain within the guideline range through year end FY 2021.
Fiber Optic Utility Overview
Fiber revenue is projected to be 7.7% or $428,000 lower than forecasted in the FY 2021 Financial Plan. Due to
impacts of the pandemic, several businesses have either closed or relocated their offices. In addition, one of
the City’s few remaining EDF-1 promotional rate customers have converted to the EDF-3 rate which results in a
decrease of $280,000 of annual fiber leasing revenue. Fiber expenses are projected to be 20.7% or $900,000
lower than forecast. The Fiber Network Rebuild CIP project is temporarily on hold pending Council’s direction
for the City fiber network expansion plan and fiber-to-the-home (FTTH). The new proposed fiber backbone will
provide high capacity fiber to City departments (Utilities, Public Works, Office of Emergency Services,
Quarterly Update for First & Second Quarters of FY 2021
June 2021
29
Transportation, Information Technology, and Community Services). The backbone will be routed through
neighborhoods and business districts and serve as a springboard to FTTH. The projected ending FY 2021 Fiber
Optic Utility Rate Stabilization Reserve is $34.7 million.
Quarterly Update for First & Second Quarters of FY 2021
June 2021
30
Table 5: Utilities Financials, FY 2021 Projections
Sales Volumes
Revenue
$,000
Expense
$,000
Net Reserve Change
$,000
Electric Utility
FY 2021 Financial Plan 766,625 MWh 163,139 (167,097) (3,958)
FY 2021 Projections 796,450 MWh 170,494 (176,854) (6,360)
Change from Financial
Plan
29,825 MWh
3.9%
7,355
4.5%
(9,756)
5.8%
(2,402)
Gas Utility
FY 2021 Financial Plan 27,411,000 therms 40,408 (45,176) (4,768)
FY 2021 Projections 25,451,000 therms 39,527 (45,053) (5,526)
Change from Financial
Plan
(1,960,000) therms (881) 123 (758)
(7.1%) (2.2%) (0.3%)
Water Utility
FY 2021 Financial Plan 4,355,000 CCF 48,832 (48,270) 562
FY 2021 Projections 4,567,464 CCF 49,264 (48,420) 843
Change from Financial
Plan
212,464 CCF 432 (150) 282
4.8% 0.9% 0.3%
Wastewater Collection Utility
FY 2021 Financial Plan 22,462 (22,660) (198)
FY 2021 Projections 21,404 (18,677) 2,727
Change from Financial
Forecast
(1,058) 3,983 2,925
(4.7%) (17.6%)
Fiber Optic Utility
FY 2021 Financial Plan 5,563 (4,345) 1,218
FY 2021 Projections 5,135 (3,445) 1,690
Changes from Financial Plan (428)
(7.7%)
(900)
(20.7%)
472
Table 6: Operations Reserves, FY 2021 ($,000)
Electric
Supply
Electric
Distribution
Gas Water
Wastewater
Collection
Fiber
Optic *
FY 2021 Beginning 29,429 9,109 13,450 19,841 5,661 33,065
Change (4,216) 1,699 (2,668) 843 527 (19)
FY 2021 Ending
(Projected)
25,213 10,808 10,782 20,684 6,188 33,046
Reserve Minimum 16,543 8,682 8,000 9,400 3,900 700
Reserve Maximum 33,086 13,822 16,000 18,900 9,800 1,400
* For Fiber Optics, the Reserve is the Rate Stabilization (not the Operations) Reserve
Quarterly Update for First & Second Quarters of FY 2021
June 2021
31
Residential Bill Comparisons
Table 7: Residential Electric Bill Comparison ($/month)
As of January 2021
Season Usage (KWh/mo) Palo Alto PG&E Santa Clara Roseville
Winter
(Nov-May)
300 $41.27 $74.96 $36.96 $56.58
453 (Median) 69.22 113.19 56.50 72.18
650 107.37 174.55 81.66 99.82
1200 213.89 347.48 151.91 183.61
Table 8: Residential Natural Gas Bill Comparison ($/month)
As of January 2021
Season
Usage (therms
per month) Palo Alto
Menlo Park, Redwood City,
Mountain View, Los Altos, and
Santa Clara (PG&E Zone X)
Roseville
(PG&E Zone S)
Winter
(November -
May)
30 $40.97 $49.66 $49.66
54(Median) 65.45 92.48 95.21
80 106.09 149.00 151.74
150 232.40 301.19 303.92
Table 9: Residential Water Bill Comparison ($/month)
As of January 2021
Usage CCF/month Palo Alto
Menlo
Park
Redwood
City
Mountain
View Santa Clara Hayward
4 $46.89 $52.42 $54.04 $38.34 $25.72 $39.20
(Winter median) 7 70.28 77.50 76.09 59.37 45.01 60.62
(Annual median) 9 90.42 94.23 90.79 73.39 57.87 74.90
(Summer median) 14 140.77 136.31 138.94 108.44 90.02 112.51
25 251.54 229.06 267.39 227.65 160.75 205.02
Based on the FY 2013 BAWSCA survey, the fraction of SFPUC as the source of potable water supply was
100% for Palo Alto, 95% for Menlo Park, 100% for Redwood City, 87% for Mountain View, 10% for Santa
Clara and 100% for Hayward.
Table 10: Residential Wastewater Collection (Sewer) Bill Comparison ($/month)
As of January 2021
Palo Alto Menlo Park Redwood City Mountain View Los Altos Santa Clara Hayward
$41.37 $102.00 $85.44 $42.90 $39.63 $44.53 $35.81
Quarterly Update for First & Second Quarters of FY 2021
June 2021
32
Table 11: Median Residential Overall Bill Comparison ($/month)
As of January 2021
Utility and Usage Palo Alto
Menlo
Park
Redwood
City
Mountain
View Santa Clara Hayward
Electricity (453 kWh/mo) $69.22 $113.19 $113.19 $113.19 $56.50 $113.19
Gas (54 th/mo) 65.45 92.48 92.48 92.48 92.48 92.48
Water (9 CCF/mo) 90.42 94.23 90.79 73.39 57.87 74.90
Wastewater 41.37 102.00 85.44 42.90 44.53 35.81
TOTAL 266.46 401.90 381.90 321.96 251.38 316.38
Quarterly Update for First & Second Quarters of FY 2021
June 2021
33
Table 12: FY 2021 Q1&2 Reserve Report from the City’s Financial System (‘000)
Elec tricity
S upply/Dist Operations
C IP Reappro/Co mmit
Hydro Stabilization
C IP Reserv e
Ra te Stab ilization
P ublic Benefit
ESP
GAS S 68 Pe nsioo Rs rv
GAS S 75 O PE S Rsrv
A ll Others
Net Capita l Investme nt
Tota l
Gas
Operati ons Reserve
C IP Reserve
Ra te Stab ilization
C IP Reappro/Co mmil.
GAS S 68 Pe nsi oo Rs rv
GAS S 75 O PE S Rsrv
A ll Others
Net Capita l Investme nt
Tota l
Water
Operati ons Reserve
CI P Rese rve
Ra te Stab ilization
C IP Reappro/Co mmil.
GAS S 68 Pe nsi oo Rs rv
GAS S 75 O PEB Rsrv
A ll Others
Net Capita l Investme nt
Tota l
Fiber Optic
Ra te Stab ilization
C IP Reappro/Co mmil.
GAS S 68 Pe nsi oo Rs rv
A ll Others
Net Capita l Invest me nt
Tota l
Wastewater Coll ection
Operati ons Reserve
C IP Reserv e
Ra te Stab ilization
C IP Reappro/Co mmil.
GAS S 68 Pe nsi oo Rs rv
GAS S 75 O PE S Rs rv
A ll Others
Net Capita l Invest me nt
Tota l
C ity Of Palo Alto
Uti l ity Fund Reserve
02 Reserve Report -Deta il
as of Dec. 31 , 2020 -UNAUDITE D
Beg in11i11g Changes to Cu r re nt Projected
Reserve Ba lance Rese rves Reserve Ba lruice
as of 7/0 1/20 Su mm ary as o f 12/3 1/2020
FY 202 1 ASD FY 202 1
$ 38,536 s (8,914 ) s 29 ,624
9,52 1 19,054 28 ,575
15,400 15,400
5 ,880 5 ,880
--
1,905 1,905
46 ,665 46 ,665
(33,747) (33,747)
(13,7 4 1) (13,74 1)
13,16 1 388 13,549
205,6 13 (138 ) 205,475
$ 289,195 $ 10 ,390 $ 299 ,585
$ 13,450 s (8,177) s 5 ,273
3 ,820 3 ,820
8,420 (2 ,376) 6 ,044
1,6 14 7 ,769 9 ,383
(14 ,85 1) (14 ,85 1)
(6 ,058 ) (6 ,058 )
2 ,9 18 4 ,37 1 7 ,289
106 ,659 (925) 105,734
$ 115 ,972 $ 662 $ 116 ,634
$ 19 ,841 $ 7 ,165 s 27 ,006
5 ,726 5 ,726
9 ,069 9 ,069
11 ,036 (783) 10,253
(14 ,114 ) (14 ,11 4 )
(4 ,2 15 ) (4 ,2 15 )
4 ,122 2 ,375 6,497
103,463 (580) 102,883
$ 134 ,928 $ 8,177 $ 143,105
$ 33,065 $ (19) s 33,046
1,0 11 55 1 1,562
(2 ,154 ) (2 ,154 )
1,057 170 1,227
9 ,333 (120) 9 ,2 13
$ 42,3 12 $ 582 s 42,89 4
$ 5,66 1 s (250) s 5,4 11
978 978
342 342
4 ,775 (9) 4,766
(8 ,3 19 ) (8,3 19 )
(2 ,3 16 ) (2 ,3 16 )
132 259 39 1
9 1,4 10 4 11 9 1,82 1
$ 92,663 $ 4 11 s 93,074
Add i C urren t
Chruiges to Projected
Reserve Reserves to Ba lance for 12/31/2020
Uti l 12/3 1/2020
FY 202 1 (Util)
Status Report
Tuesday, April 13, 2021
ENERGY
AB 64 (Quirk D) Electricity: long-term backup electricity supply strategy.
Current Text: Amended: 3/23/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires the CPUC, CEC, and CARB, in consultation with all balancing authorities, to develop a strategy,
by January 1, 2024, to achieve (1) 5 GWh of operational long-term backup electricity by December 31,
2030, and (2) at least an additional 5 GWh of operational long-term backup electricity in each
subsequent year through 2045.
Memo
CMUA and NCPA are working to shift the focus towards studying the issue rather than setting firm targets and aligning
the evaluation with existing reporting mechanisms.
AB 111 (Boerner Horvath D) Transportation: zero-emission vehicles.
Current Text: Amended: 3/22/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Directs the CEC to develop model rate structures that POUs can utilize to promote customers’ adoption
of zero-emission vehicles, freight equipment, and for the production of hydrogen by electrolysis using
electricity from renewable sources.
Memo
This is a two year bill; will not move forward in 2020.
AB 448 (Mayes I) Fire safety: electrical transmission or distribution lines: clearances.
Current Text: Amended: 3/25/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Allows those who maintain electrical transmission or distribution lines to go onto private property to
remove hazardous, dead, rotten, leaning, or otherwise structurally defective trees, which must be done
using a tree evaluation tool or method developed by a certified arborist. The bill further provides that
any cut trees would remain the property of the landowner unless the landowner requests the trees to
be removed.
Memo
CPAU communicated with Public Works, Vegetation Management Division.
AB 525 (Chiu D) Energy: offshore wind generation.
Current Text: Introduced: 2/10/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
A bill to build offshore wind facilitates. Requires the CEC to develop a strategic plan to achieve a goal of
at least 10,000 MW of offshore wind energy from off the California coast by 2040, with an interim
target of 3,000 MW installed by 2030. The plan must be submitted to the Natural Resources Agency
and the Legislature on or before June 1, 2022. The bill also requires the CEC to assess and develop a
plan to improve existing waterfront facilities that could support a range of floating offshore wind energy
development activities, and would require the CPUC to include offshore wind energy as a resource for
full consideration in the CPUC’s IRP process.
Memo
May not move in 2021.
Page 1/10
AB 641 (Holden D) Transportation electrification: local publicly owned electric utilities.
Current Text: Amended: 3/25/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires electric POUs to develop and adopt a transportation electrification plan, individually or in
collaboration with other POUs, with certain elements to support the level of EV adoption required for
the state to meet certain goals.
Memo
Such a plan is already a component of IRPs; NCPA and CMUA are working to ensure the bill isn't
overly burdensome.
AB 847 (Quirk D) Electrically conductive balloons.
Current Text: Amended: 3/25/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Directs the State to develop regulations governing the sale of Mylar balloons to ensure those sold after
September 1, 2025, use non-conductive material.
Memo
Will become a two year bill after the first committee hearing.
AB 1139 (Gonzalez, Lorena D) Energy: California Alternate Rates for Energy program: net energy metering:
electrical corporation distributed eligible renewable energy resource allocations: interconnections.
Current Text: Amended: 4/8/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
The Solar Equity and Ratepayer Relief Act, this bill repeals NEM programs for IOUs and POUs and
replaces it, for IOUs only, with a renewed focus on the existing California Alternate Rates for Energy
(CARE) program. No replacement or focus is mentioned for POUs.
AB 1161 (Garcia, Eduardo D) Electricity: eligible renewable energy and zero-carbon resources: state agencies:
procurement.
Current Text: Amended: 3/22/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Enacts the Clean Economy and Clean Jobs Stimulus Act of 2021, requiring the Department of Water
Resources to procure newly developed eligible renewable energy resources or zero-carbon resources
and energy storage associated with those resources to serve all state agencies by December 31,
2030. DWR would invite POUs to voluntarily subscribe procurement, at the State's expense.
Memo
The bill raises questions as to how a procurement for state agencies located in POU
communities would occur. NCPA is inquiring.
AB 1239 (Ting D) Electricity: demand response resources and programs.
Current Text: Amended: 3/29/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires the CPUC, by January 31, 2022, to open an investigation into the root causes of demand
response market failures, why demand response has not reached its potential, and make
recommendations for policy changes. Requires the CPUC, the CEC, and ISO to develop initiatives to
achieve all cost-effective demand response by 2030, with expanded demand response programs that
improve grid reliability, avoid increasing GHG emissions, and include optional participation by residential
customers. Also requires the CPUC, CEC, and ISO to identify barriers that limit ISO's ability to plan for
Page 2/10
and utilize demand response.
AB 1325 (Burke D) Microgrids: Clean Community Microgrid Incentive Program.
Current Text: Introduced: 2/19/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Allows a microgrid to be used to reduce RA obligations for load-serving entities and POUs, even though
the Program the bill creates only applies to large electrical corporations. The bill also mandates LSEs
and POUs consider microgrids for ensuring electrical grid reliability in their IRPs.
SB 67 (Becker D) Clean energy: California 24/7 Clean Energy Standard Program.
Current Text: Amended: 3/3/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Revises the State's 100% clean energy by 2045 goal and establishes the California 24/7 Clean Energy
Standard Program. The Program requires 90% of retail sales annually by December 31, 2035 be
supplied by eligible clean energy resources, with other target dates along the way. For POUs, requires
the CEC to develop clean energy procurement requirements for each POU for various compliance
periods and subperiods. *Reaching the bill's goal means significantly increasing storage, a sharp
increase in our supply costs, a restructure of our supply portfolio, and a change in how hydro is
dispatched. CPAU, CMUA, SCPPA, and NCPA have all been in direct contact with the author's office.
SCPPA and CMUA are opposing*
Memo
CPAU contacted Mr. Becker's office very quickly after the bill was introduced as a spot bill to provide information on our electric utility.
Later, we were on the phone with the lead staffer within days of release of the amendments to express how the bill would negatively
impact CPAU. We also reached out to NCPA and CMUA, who are both actively opposing this bill that, for CPAU, would significantly
increase supply costs, completely change the way we dispatch our hydro facilities, cause us to fundamentally restructure our supply
portfolio, and disregards the regional nature of the grid.
SB 99 (Dodd D) Community Energy Resilience Act of 2021.
Current Text: Amended: 4/12/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Not specific to POUs, this bill requires the CEC to develop and implement a grant program for local
governments to develop community energy resilience plans.
SB 345 (Becker D) Energy programs and projects: nonenergy benefits.
Current Text: Amended: 3/23/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
An Environmental Justice bill, SB 345 seeks to have the CPUC consider nonenergy benefits in a more
consistent manner across more of its programs. As such, the bill requires the CPUC to determine
common definitions for non-energy benefits, and to determine the values of distributed energy
technologies. Nonenergy benefits of distributed energy could include lower energy costs, increased
property values, and improved public health.
SB 423 (Stern D) Energy: renewable and zero-carbon resources.
Current Text: Introduced: 2/12/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires CARB and the CEC to timely incorporate emerging renewable energy and firm zero-carbon
resources, (ie: geothermal, offshore wind, green electrolytic hydrogen, long-duration energy storage,
Page 3/10
and multi-day energy storage) into its energy and resource planning processes. By December 31, 2022,
the CPUC and CEC must to each adopt measures to bolster the near-, mid-, and long-term reliability
and resiliency of the rid consistent with State goals to reduce localized air pollutants and GHG
emissions.
Memo
SB 437 (Wieckowski D) Local publicly owned electric utilities: integrated resource planning: transportation
electrification.
Current Text: Amended: 4/8/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires POU IRPs to include details of rate designs that support transportation electrification across
all sectors and to provide customers with a cost calculator to accurately predict the cost of paying
electricity of vehicle engines.
Memo
sssss
SB 533 (Stern D) Electrical corporations: wildfire mitigation plans: deenergization events: microgrids.
Current Text: Amended: 3/5/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
For POUs, allows us to use capacity from a microgrid for RA requirements and directs the CPUC and ISO
to develop a methodology to account for the RA value of distributed storage.
Memo
sssss
SB 617 (Wiener D) Residential solar energy systems: permitting.
Current Text: Amended: 4/12/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires every city and county to implement an online, automated permitting platform that verifies
code compliance and instantaneously issues permits for residential PV systems and energy storage
system paired with a residential PV, as long as they are each no larger than 38.4 kWh. Prescribes a
compliance schedule for satisfying these requirements; for a city the size of Palo Alto, compliance is due
by September 30, 2022. Does not affect a POUs' interconnection requirements or approval process.
Memo
sssss
ENERGY - WILDFIRE-RELATED
AB 280 (Rivas, Robert D) Electrical corporations: wildfire mitigation plans.
Current Text: Introduced: 1/21/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires electric IOUs to submit their wildfire mitigation plans to the Legislature. (Already submitted to
the Wildfire Safety Advisory Board). Tracking in case the bill is amended to include POUs.
AB 529 (Bauer-Kahan D) Electrical utilities: fire safety, prevention, or mitigation services: notice.
Current Text: Introduced: 2/10/2021 html pdf
Page 4/10
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires IOUs and POUs engaging in fire safety, prevention, or mitigation services in a high fire-threat
district or very high fire hazard severity zone to notify the fire protection district responsible for that
area at least 48 hours before work is commenced, except in an emergency. The bill also requires
electric utilities to provide the fire protection district with a copy of any form used to document any daily
safety briefing at those worksites no later than 72 hours after the completion of that workday.
Memo
The foothills area is considered a "high fire-risk area" under the definitions in this bill; PAFD is our "fire protection district."
We hear the bill will be amended to limit the scope to prescribed burn activity and not broader utility mitigation work.
SB 312 (Nielsen R) California Renewables Portfolio Standard Program.
Current Text: Amended: 3/9/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Spot bill promoting biomass facilities and biomass funding.
OTHER
AB 59 (Gabriel D) Mitigation Fee Act: fees: notice and timelines.
Current Text: Introduced: 12/7/2020 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Repeals the code section pertaining to the 120 day statute of limitations for challenging new
connection fees and impact fees and allows those fees to be paid under protest if a developer believes
the fees to be unreasonably high.
Memo
May impact CPAU's ability to charge cost-based connection fees. The bill hasn't been acted upon since
January and may not move forward.
AB 332 (Committee on Environmental Safety and Toxic Materials) Hazardous waste: treated wood waste:
management standards.
Current Text: Amended: 3/26/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Reinstates the ability to dispose of treated wood waste (such as utility poles) at a landfill.
AB 339 (Lee D) State and local government: open meetings.
Current Text: Introduced: 1/28/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Would require all public meetings to include an opportunity for all persons to attend via a call-in option
or an internet-based option that provides closed captioning services. Further requires: (1) that any
teleconferenced meeting, even those held during a public health emergency, include an in-person public
comment opportunity, where the public can report to a designated site to give public comment in
person, and (2) agendas and instructions for accessing a meeting, whether teleconferenced or in
person, shall be translated into all languages for which 5 percent of the population is a speaker, and
(3) translators at public meetings.
Memo
Could mean significant costs to CPAU and the City for UAC and Council/other city meetings. CPAU
Page 5/10
communicated our concerns to CMUA, who worked with the author's office. This bill hasn't moved since
January and may not move forward.
AB 602 (Grayson D) Development fees: impact fee nexus study.
Current Text: Amended: 4/6/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Among other things, would require utility fees to be calculated on a development-by-development basis
and would subject them to a square footage requirement.
Memo
Should be amended soon to exempt connection fees.
AB 703 (Rubio, Blanca D) Open meetings: local agencies: teleconferences.
Current Text: Introduced: 2/16/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Allows for additional flexibility for local city councils, boards, commissions, and other public agencies to
hold public meetings remotely via video and teleconference.
AB 758 (Nazarian D) Marks-Roos Local Bond Pooling Act of 1985: electric utilities: rate reduction bonds.
Current Text: Amended: 3/11/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
A CMUA-sponsored bill that authorizes POUs to issue rate reduction bonds for utility projects.
Memo
CPAU submitted a letter of support.
AB 853 (Stone D) Mountainous, forest-, brush-, and grass-covered lands: timber operations: clearings: notice:
enforcement: limitations periods.
Current Text: Amended: 3/25/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires "utility companies" (undefined) to provide 21 days notice to landowners before conducting
vegetation management activities. The bill would provide a window for landowners to object to a
"utility company" performing the work.
Memo
As currently written, it's not clear if the bill applies to POUs. We expect the bill to be narrowed
significantly soon to focus on timber harvesting, probably for IOUs only.
AB 1557 (Santiago D) Communications: utility pole attachments.
Current Text: Amended: 3/18/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Directs "public utilities" to respond to a pole attachment request from a cable TV provider within 10
days if more information is needed and to let the provider know within 45 days if the request is
accepted or denied. "Public Utilities" is undefined, probably refers to IOUs.
SB 297 (Durazo D) Subsurface installations: penalties.
Current Text: Amended: 3/25/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Page 6/10
Imposes a new $100,000 civil penalty on an operator or excavator who knowingly and willfully violates
the Call Before You Dig Law and damages a gas or hazardous gas pipeline.
SB 378 (Gonzalez D) Local government: broadband infrastructure development project permit processing:
microtrenching permit processing ordinance.
Current Text: Amended: 4/12/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Authorizes a fiber provider to determine the method of installing fiber in a city, including microtrenching.
Memo
NCPA, CMUA, and SCPPA have raised concerns with the author about potential impacts on safety and
reliability of utility infrastructure if cities are not allowed to reasonably limit installation methods. CPAU
has communicated to NCPA and CMUA our concerns about allowing microtrenching, a key aspect of the
bill.
SB 556 (Dodd D) Street light poles, traffic signal poles: small wireless facilities attachments.
Current Text: Amended: 4/12/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires cities and electric POUs to make space and capacity on utility poles, street light poles, traffic
signal poles, and supporting structures for telecom providers. Also adds language that attachment fees
and cost estimates must be “nondiscriminatory” and “reasonable.”
Memo
Amendments coming later in April will remove all references to utility poles.
SUSTAINABILITY
AB 33 (Ting D) Energy Conservation Assistance Act of 1979: energy storage systems and transportation
electrification infrastructure.
Current Text: Amended: 3/16/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Through an existing account, this bill requires the CEC to provide grants and loans to local
governments and public institutions to maximize energy use savings, expand installation of energy
storage systems, and expand the availability of transportation electrification infrastructure.
AB 970 (McCarty D) Planning and zoning: electric vehicle charging stations: permit application: approval.
Current Text: Introduced: 2/18/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Provides that a residential charging station permit is approved within 15 days of submittal if certain
criteria are met, including that the applicant has already obtained all required approvals from a POU.
AB 1395 (Muratsuchi D) Greenhouse gases: carbon neutrality.
Current Text: Introduced: 2/19/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Would declare the policy of the state to achieve carbon neutrality as soon as possible, but no later
than 2045, and to achieve and maintain net negative greenhouse gas emissions thereafter.
Page 7/10
Memo
sssss
AB 1500 (Garcia, Eduardo D) Safe Drinking Water, Wildfire Prevention, Drought Preparation, Flood Protection,
Extreme Heat Mitigation, and Workforce Development Bond Act of 2022.
Current Text: Introduced: 2/19/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
If approved by voters, would provide bond funding to finance projects for safe drinking water, wildfire
prevention, drought preparation, flood protection, extreme heat mitigation, and workforce development
programs.
SB 31 (Cortese D) Building decarbonization.
Current Text: Amended: 3/5/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires the CEC to identify and implement programs to promote existing and new building
decarbonization. For POUS, the bill allows us to use funds set aside for low-income/demand-side
management programs on building decarb IF the entity implementing the decarbonization project
(whether CPAU or a contractor) and its subcontractors at every tier pay prevailing wages.
SB 45 (Portantino D) Wildfire Prevention, Safe Drinking Water, Drought Preparation, and Flood Protection Bond
Act of 2022.
Current Text: Amended: 4/8/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Enacts the Wildfire Prevention, Safe Drinking Water, Drought Preparation, and Flood Protection Bond
Act of 2022, which, if approved by the voters, would authorize bonds for $5.6 billion to finance projects
for a wildfire prevention, safe drinking water, drought preparation, and flood protection program.
SB 68 (Becker D) Building decarbonization.
Current Text: Amended: 4/8/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Requires the CEC to gather or develop, and publish on its website, guidance and best practices to help
building owners, the construction industry, and local governments overcome barriers to electrification of
buildings and installation of EV charging equipment.
WATER
AB 100 (Holden D) Drinking water: pipes and fittings: lead content.
Current Text: Amended: 4/5/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
This bill limits the amount of lead leaching from faucets and fixtures to no more than 1 microgram, which
is five times lower than the current industry standard.
AB 460 (Mayes I) Fire protection: residential fire sprinklers: fees.
Current Text: Amended: 3/25/2021 html pdf
Page 8/10
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
This bill would, among other things, prohibit water-related fees imposed on the owner of residential
property from being affected by the installation of a residential fire sprinkler system including those
residential fire sprinkler systems mandated by a local jurisdiction or a fire protection district.
Memo
Two year bill.
AB 588 (Garcia, Eduardo D) California Safe Drinking Water Act: compliance.
Current Text: Amended: 3/30/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Consistent with federal law, requires the Water Board to establish a compliance period between 30
days and three years for meeting specified drinking water regulations.
AB 1434 (Friedman D) Urban water use objectives: indoor residential water use.
Current Text: Introduced: 2/19/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Starting in 2023, this bill would incrementally lower the standard for indoor residential water use until
we reach 40 gallons per capita daily by January 1, 2030. The current standard has us at 50 gallons by
2030, or whatever number DWR studies recommend. This bill also eliminates the need for DWR to
conduct any studies.
Memo
CMUA opposes. 2018's urban water use objectives haven’t gone into effect yet, so these proposed
changes are troublesome and inappropriate.
SB 222 (Dodd D) Water Rate Assistance Program.
Current Text: Amended: 4/5/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Establishes the Water Rate Assistance Fund to help provide water affordability assistance, for both
drinking water and wastewater services, to low-income ratepayers and ratepayers experiencing
economic hardship. Long term funding mechanism is unclear.
SB 223 (Dodd D) Discontinuation of residential water service.
Current Text: Amended: 4/5/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Would prohibit water systems from discontinuing residential service for nonpayment during a state or
local emergency. The bill would prohibit these systems from discontinuing residential water service for
nonpayment until a payment by a customer has been delinquent for at least 120, rather than 60, days
and the total amount of the delinquency, exclusive of late charges and interest, is at least $400. The
bill would also prohibit these systems from discontinuing residential water service for nonpayment to a
master-metered multifamily residence with at least 4 units or to a master-metered mobilehome park.
The bill also requires water systems to waive fees for disconnection and reconnection of service to
households with income below 200% of the federal poverty line.
SB 323 (Caballero D) Local government: water or sewer service: legal actions.
Current Text: Amended: 3/17/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Page 9/10
Summary:
This bill creates a statute of limitations for legal challenges to water and sewer service charges that
are adopted after January 1, 2022.
SB 351 (Caballero D) Water Innovation Act of 2021.
Current Text: Introduced: 2/9/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Sponsored by CMUA, this bill would create the Office of Water Innovation for the furtherance of new
technologies and other innovative approaches in the water sector. By December 31, 2023,the Office
shall take specified measures to advance innovation in the water sector. The bill would further create
the Water Innovation Fund for the furtherance of water innovation.
SB 427 (Eggman D) Water theft: enhanced penalties.
Current Text: Amended: 4/12/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
Authorizes a local government to make any violation of a local ordinance regarding water theft subject
to an administrative fine in excess of current legal limits.
SB 526 (Min D) Community water systems: lead user service lines.
Current Text: Introduced: 2/17/2021 html pdf
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.
Conc.Enrolled Vetoed Chaptered1st House 2nd House
Summary:
This bill would, until January 1, 2025, require a community water system to remove or replace the full
lead user service line, if the water system disturbs, removes, or replaces a portion of the line. There is
no definition of “full lead service line” in the bill but that typically includes the lateral from the meter to
the home.
Memo
Bill should be amended later in April to include a definition, which may focus on goosenecks and similar
parts rather than lines.
Total Measures: 48
Total Tracking Forms: 48
Page 10/10